HomeMy WebLinkAbout08-06-2020 PZ Agendarnva
HOME OF PELICAN ISLAND
1225 MAIN STREET ® SEBASTIAN, FLORIDA 32958
TELEPHONE (772) 589-5518 ■ FAX (772) 388-8248
AGENDA
PLANNING AND ZONING COMMISSION/LOCAL PLANNING AGENCY
THURSDAY, AUGUST 6, 2020 - 6:00 P.M.
CITY COUNCIL CHAMBERS
1225 MAIN STREET, SEBASTIAN, FLORIDA
ALL AGENDA ITEMS MAYBE INSPECTED IN THE OFFICE OF COMMUNITY DEVELOPMENT
1225 MAIN STREET, SEBASTIAN, FLORIDA OR ON THE CiTY WEBSITE
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
4. ANNOUNCEMENTS AND/OR AGENDA MODIFICATIONS
Modifications and additions require unanimous vote of members. Deletions do not apply.
5. APPROVAL OF MINUTES: None
6. QUASI-JUDICIAL and PUBLIC HEARINGS None
• Chairman opens hearing, attorney reads ordinance or resolution or title
• Commissioners disclose ex parte communication
• Chairman or attorney swears in all who intend to provide testimony
• Applicant or applicant's agent makes presentation
• Staff presents findings and analysis
• Commissioners asks questions of the applicant and staff
• Chairman opens the floor for anyone in favor and anyone opposing the request (anyone presenting factual
information shall be sworn but anyone merely advocating approval or denial need not be sworn in)
• Applicant provided opportunity to respond to issues raised by staff or public
• Staff provided opportunity to summarize request
• Commission deliberation and questions
• Chairman calls for a motion
• Commission Action
7. UNFINISHED BUSINESS (Tabled Comprehensive Plan Element, if applicable)
8. PUBLIC INPUT
Public Input on items other than on the printed agenda, is five minutes, however, it can be extended
or terminated by a majority vote of members present
9. NEW BUSINESS
A. Recommendation to City Council - Review of Capital Improvement Program (CIP)
and Capital Outlay Items Greater than $50,000 - 6 Year Schedule FY 2020/2021
through 2025/2026
B. Accessory Structure Review - LDC Section 54-2-7.5 - 402 Quarry Lane - 999 SF
Detached Garage (27' X 37') - Thomas Klooz
10. COMMISSIONERS MATTERS
11. CITY ATTORNEY MATTERS
12. STAFF MATTERS
13. ADJOURN
DUE TO HEALTH CONCERNS REGARDING CORONAVIRUS, ALTERNATIVE METHODS WILL BE IN
PLACE FOR THE PUBLIC TO PROVIDE INPUT REGARDING THIS MEETING. INTERESTED PARTIES
MAY CONTACT THE CITY AT 772-388-8226 OR E-MAIL QUESTIONS AT
COSTV@COSTV.CITYOFSEBASTIAN.ORG OR MAY VISIT THE CITY'S WEBSITE AT
http:llwww.citvofsebastian.oriz/t)ublic-input-methods.
However, the public is advised to check the City website for up-to-date information on any
changes to the manner in which the meeting will be held and the location.
HEARING ASSISTANCE HEADPHONES ARE AVAILABLE IN THE COUNCIL CHAMBERS FOR ALL GOVERNMENT MEETINGS
ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH RESPECT TO ANY MATTER CONSIDERED AT THIS
MEETING WILL NEED A RECORD OF THE PROCEEDINGS AND MAY NEED TO ENSURE THAT A VERBATIM RECORD OF
THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENCE UPON WHICH THE APPEAL
IS TO BE HEARD. (F.S.286.0105)
IN COMPLIANCE WITH THE AMERICAN WITH DISABILITIES ACT (ADA), ANYONE WHO NEEDS A SPECIAL
ACCOMMODATION FOR THIS MEETING SHOULD CONTACT THE CITYS ADA COORDINATOR AT 589-5330 AT LEAST 48
HOURS IN ADVANCE OF THIS MEETING.
All government meetings in City Council Chambers will be broadcast live on COS -TV Comcast Channel 25 and ATT UVerse Channel 99
and streamed via the city website — www.cirrofsebastian.oni unless otherwise noticed and rebroadcast at a later date — see COS -TV
Channel 25 for broadcast schedule
2
CRYOF
`ice -
HOME OF PELICAN ISLAND
To: Planning and Zoning Commission
From: Ken Killgore, Administrative Services Director/CFO
Copies: Paul Carlisle, City Manager
Date: July 27, 2020
Subject: Draft Capital Improvement Program
Enclosed is the Draft Capital Improvement Program (CIP) for the period from FY 2021 through
FY 2026. 1 will have a brief power -point presentation at your meeting scheduled for Thursday,
August 6, 2020 to highlight the key elements of this important document. The Planning and
Zoning Commission should review the scheduled capital improvements and offer comments that
you collectively feel should consider when this year's CIP is considered for adoption by the City
Council.
Following my presentation and any questions or discussions, it would be appropriate for a
motion to be adopted. If you are in agreement with the proposed CIP, the motion could be. -
"I move that the proposed Capital Improvement Program be recommended to the
City Council with no changes"
If you wish for the City Council to consider changes, the motion could be expanded to say:
`I move that the proposed Capital Improvement Program be recommended to the
City Council with increases or decreases to
I look forward to the meeting. Should you have any questions, please do not hesitate to give me
a call or send an email.
Ken Killgore
Administrative Services Director/CFO
City of Sebastian
(772) 388-8205
kkillgoreC&_cityofsebastian.or4.
SE
HOME OF PELICAN ISLAND
CITY OF SEBASTIAN, FLORIDA
AN N UAL R U DG ET
FISCAL YEAR 2021-2026
CAPITAL IMPROVEMENT
PROGRAM
Craft as 0f June 24,, 2020
CITY OF. SEBASTIAN, FLORIDA
FISCAL YEAR 2021-2026
SUMMARY OF CAPITAL PURCHASES AND IMPROVEMENTS
List of Pr ects
FY 2020.21
FY 2021-22
FY 2022-23
FY 2023-24
FY 2024.25
FY 2025-26
Totals
General Government
Blueprint - Survey Storage
2,310
-
-
-
-
-
2,310
Server/Host Update
43,195
43,195
43,195
43,195
-
-
172,780
City Wide Computers
35,000
45,000
35,000
45,000
35,000
45,000
240,000
Audio Visual Equipment
75,000
-
-
-
-
-
75,000
COSty Equipment
10,000
10,000
10,000
10,000
10,000
10,000
60,000
Phone System
100,000
-
-
-
-
-
100,000
Network Infrastructure
39,000
30,000
30,000
30,000
30,000
30,000
189,000
Over -the -Air Connections
-
10,000
20,000
-
-
-
30,000
Core and Remote Switches
-
-
-
25,000
20,000
45,000
Police Department
COPE Vehicles Graphic Wrap
5,000
-
-
-
-
-
5,000
Police Vehicles
373,500
300,000
305,000
310,000
315,000
320,000
1,923,500
Police Road Patrol Equipment
25,000
56,000
32,500
20,600
36,000
39,500
209,000
Police Investigations Equipment
10,600
-
-
-
-
-
10,600
Community Development
Harrison Street Park Plaza
270,000
250,000
-
-
520,000
N. Central Avenue Event Plaza
40,000
250,000
250,000
-
540,000
Working Waterfront Landscaping
45,000
-
-
-
45,000
Tree Protection Plan
135,000
135,000
-
270,000
Sustainable Sebastian
16,500
-
-
-
16,500
Septic to Sewer
-
200,000
200,000
200,000
600,000
Roads Department
School Zone Lights
46,510
-
-
-
-
46,510
Update City Street Signs
81,000
-
-
-
81,000
Street Repaving
400,000
600,000
600,000
600,000
600,000
600,000
3,400,000
Street Reconstruction
500,000
-
-
-
-
-
500,000
Sidewalk Replacement
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Roads Division Equipment
48.400
-
-
-
-
-
48,400
Roads Division Heavy Equipment
130,000
165,000
85,000
-
-
380,000
Public Facilities Department
Public Facilities Compound
-
1,250,000
1,250,000
1,000,000
3,500,000
Fleet Division Equipment
2,800
9,880
4,800
-
-
17,480
Cemetery Equipment
19,500
-
-
14,000
33,600
Cemetery Grounds Improvements
20,000
20,000
40,000
-
80,000
Cemetery Driveway Resurfacing
15,000
-
-
15,000
Cemetery Columbarium Niches
45,000
45,000
90,000
Bench Seats and Monuments
20,000
-
-
-
20,000
Facility Maintenance Equipment
13,500
40,000
-
-
53,600
Facility Maintenance Vehicles
65,000
-
-
65,000
Facility Maintenance Repairs
6,800
-
-
6,800
Leisure Services Department
Facility Repairs
-
18,300
-
-
18,300
Maintenance Equipment
29,000
13,000
-
14,000
-
-
56,000
Park Identification Signage
30,000
30,000
-
-
-
-
60,000
Barber Street Baseball Dugouts
40,000
-
40,000
Barber Street Fencing
75,000
-
-
-
-
75,000
Parks Division Vehicles
34,000
-
34,000
34,000
34,000
-
136.000
Playground Improvements
40,000
40,000
40,000
110,000
40,000
80,000
350,000
Park Improvements
20,000
20,000
20,000
20,000
20,000
20,000
120,000
Barber St. Lightning System
24,000
-
-
-
-
-
24,000
Stormwater Department
Stormwater Master Plan
200,000
-
-
-
200,000
Stormwater Equipment
77,050
3,100
55,000
58,000
-
193,150
Stormwater Heavy Equipment
165,000
-
-
225,000
-
-
390,000
Slip Lining
100,000
100,000
100,000
100.000
100,000
100,000
600,000
Swale/Driveway/Culvert Repairs
100,000
100,000
100,000
100,000
160,000
100,000
600,000
Canal Restoration
500,000
500,000
500,000
500,000
500,000
500,000
3,000,000
Concha Dam Repairs
-
800,000
-
-
-
-
800,000
Tulip Drive Crossing
-
-
250,000
-
-
250,000
Bayfront Road Crossing
-
-
250,000
-
-
250,000
Ocean Cove Drainage
-
-
-
350,000
-
350,000
Golf Course Fund
Driving Range Equipment
-
5,290
-
-
5,290
Irrigation Software Upgrade
14,000
-
-
14,000
Airport Fund
Construct Taxi Lane
569,264
-
-
569,264
Construction of Square Hangars
-
885,282
-
-
885,282
Establish Sewer Service
1,000,000
-
-
-
1,000,000
Economic Development Hangar
-
1,000,000
-
-
1,000,000
Rehab Taxiway Alpha Apron
290,000
-
-
-
290,000
Rehab Runway 05/23
-
-
2,200,000
-
-
-
2,200,000
Apron Reconstruction
-
-
150,000
-
-
150,000
Building Fund
Front Counter Renovations
24,000
-
-
-
24,000
Totals
$ 5.779,929 $
7.364,047 $
6,104,495 $ 3.944,195 $ 2,304,000 $ 2,144,500
$ 27.641,166
Grouped by Department
General Government
Police Department
Roads Department
Public Facilities Department
Leisure Services
Community Development
Stormwater
Golf Course
Airport
Building
Total by Departments
Grouped by Function
General Government
Public Safety
Transportation
Parks & Recreation
Physical Environment
Total by Functions
Grouped by Funding Source
General Fund
DST
LOGT
Recreation Impact Fees
Riverfront CRA
Stormwater Fund
Golf Course
Building Fund
Cemetery Trust
Grants/Loans
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2021-2026
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 Total
$ 304,505
$ 138,195
$ 138.195
$ 153,195
$ 95,000 $
85,000 $
914,09C
414,100
356,000
337,500
330,000
351,000
359,500
2,148,10C
1,305,910
865,000
785,000
700,000
700,000
700,000
5,055,910
207,600
1,364,880
1,294,800
1,000,000
14,000
-
3,881,280
292,000
121,300
94,000
178,000
94,000
100,000
879,300
506,500
835,000
250,000
200,000
-
200,000
1,991,500
1,142,050
1,503,100
1,005,000
1,233,000
1,050,000
700,000
6,633,150
14,000
5,290
-
-
-
-
19,290
1,569,264
2,175,282
2,200,000
150,000
-
6,094,546
24,000
-
-
-
-
24,000
$ 5,779,929 $ 7,364,047 $ 6,104,495 $ 3,944,195 $ 2,304,000 $ 2,144,500 $ 27.641,166
$ 811,005
$ 973,195
$ 388,195
$ 353,195
$ 95,000 $
285,000
$ 2,905,590
438,100
356,000
337,500
330,000
351,000
359,500
2,172,100
3,082,774
4,405,162
4,279,800
1,850,000
714,000
700,000
15,031,736
306,000
126,590
94,000
178,000
94,000
100,000
868,590
1,142,050
1,503,100
1,005,000
1,233,000
1,050,000
700,000
6,633,150
$ 5,779,929 $ 7,364,047 $ 6,104,495 $ 3,944,195 $ 2.304,000 $ 2,144,500 $ 27,641,166
$ 213,910
$ 137,180
$ 71,300
$ 68,000
$ 70,000
$ 39,500
$ 599,890
2,534,658
3,657,874
2,653,195
2,093,195
1,010,000
1,005,000
12,953,922
757,510
865,000
785,000
700,000
700,000
700,000
4,507,510
205,000
90,000
60,000
130,000
60,000
100,000
645,000
45,000
100,000
-
100,000
-
100,000
345,000
542,050
903,100
405,000
633,000
450,000
100,000
3,033,150
14,000
5,290
-
-
-
-
19,290
24,000
-
-
-
24,000
99,500
65,000
40,000
-
14,000
-
218,500
1,344,301
1,540,603
2,090,000
220,000
-
100,000
5,294,904
Total Funding Sources $ 5,779,929 $ 7,364,047 $ 6,104,495 $ 3,944,195 $ 2,304,000 $ 2,144,500 $ 27,641,166
Project Pricing:
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2021-2026
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
GENERAL. GOVERNMENT - CITY CLERK
Project Name: Blueprint - Survey Storage Project Description:
Funding Source: General Fund Purchase Shelving for storage of blueprints and survey documents.
Justification: Currently the documents are being stored in bankers boxes at a slant and pushing out the bankers boxes on
the opposite side. The shelving will allow us to categorize certain facilities and land development projects.
Long term storage can be electronic after constant review is no longer needed.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$2,310 $0 $0 $0 $0 $0 $2,310
Operating Impact:
$0 ($416) ($92) $231 $508 $693 $924
Project Pricing: The Purchasing Agent advises that we should request $1,030.00 for each. $250 is also expected for freight
costs because they will be bulky and heavy.
GENERAL GOVERNMENT - MIS DIVISION
Project Name: Server/Host Update Project Description: i
Funding Source: Discretionary Sales Tax I Capital Lease Payments on VxRail Infrastructure. Ji
Justification: This product is used to effectively manage all the Police Department programs and applications that are+
hosted in the cloud. It was initially acquired in FY 19-20 via a five year capital lease arrangement.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$43,195 $43,195 $43,195 $43,195 $0 $0 $172,780
Operating Impact:
$0 ($7,775) ($9,503) ($5,183) $4,320 $22,722 $4,580
Project Pricing: I Lease was provided through Dell, which was the only provider of this technology.
Project Name: City Wide Computers Project Description:
Funding Source: Discretionary Sales Tax Upgrades of 7-10 Workstations a Year for All Departments. Most of the
Police Department Units will be included with Vehicle Purchases.
Justification: Computers in All Departments need to be updated on a five year schedule to keep up with technology.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$35,000 $45,000 $35,000 $45,000 $35,000 $45,000 $240,000
Operating Impact:
$0 ($6,300) ($9,500) ($4,600) ($14,600) ($15,150) ($50,150)
Project Pricing: Laptops are approximately $3,000 each, including 5 yr warranties, docking stations and monitors. Desktops
are approximately $1,500 each.
Project Name: I Audio Visual Equipment Project Description: j
Funding Source: IDiscretionary Sales Tax I Acquire Closed Captioning Hardware to Comply with ADA. Jj
Justification: Audio Visual equipment needs to be upgraded to be sure broadcasting can be done when requested. Closed
captioning hardware must be installed to comply with Americans with Disabilities Act streaming service
requirements for COSty.
Project Costs:
FY 20-21
$75,000
Operating Impact:
$0 ($13,500) ($3,000) $7,500 $16,500 $22,500 $30,000
A quote for the purchase was received from Encore Broadcast Solutions. An option to subscribe to service
based on $130 per hour was also received from Automatic Sync Technologies.
Project
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $0 $0 $0 $0 $75,000
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2021-2026
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
GENERAL GOVERNMENT - MIS DIVISION (CONTINUED)
Project Name: 1COSty Equipment Project Description:
Funding Source: IDiscretionary Sales Tax Update Equipment needed to continue broadcasting.
Justification: Continual updates are required in order to continue providing the public with broadcasting of meetings and
other public service events.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$10,000 $10,000 $10,000 $10,000 $10,000 $10,000 $60,000
Operating Impact:
$0 $10,000 $20,000 $0 $0 $0 $30,000
Project Pricing: I Estimate based on the historical spending pattern.
Project Name: Phone System Project Description:
Funding Source: Discretionary Sales Tax Upgrade of the City Phone System to be more robust to support multiple
locations and to have better support for newer technology.
Justification: The City Phone System is over 8 years old and will need upgrading in order to get support and make sure)
that we can continue to receive phone calls.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$100,000 $0 $0 $0 $0 $0 $100,000
Operating Impact:
$0 ($38,000) ($35,000) ($32,000) ($29,000) ($26,000) ($160,000)
Project Pricing: IRough estimate. Dependent on the specifications to be developed and results of an RFP process.
Project Name: Network Infrastructure Project Description:
Funding Source: (Discretionary Sales Tax (Network Infrastructure Upgrades.
Justification: I General upgrading of network infrastucture in order to continue to provide services. This includes switches,
servers and other needed infrastructure.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$39,000 $30,000 $30,000 $30,000 $30,000 $30,000 $189,000
Operating Impact:
$0 ($7,020) ($6,960) ($2,700) $4,980 $10,050 ($1,650)
Project Pricing: ]Dependent on unforseeable needs. I
Project Name: (Over -the -Air Connections Project Description:
Funding Source: Discretionary Sales Tax I Over -the -Air Redundant Network Connections.
Justification: Over -The -Air (wireless) backup network connections for both the Golf Course and the Emergency)
Operations Center need to be added. II
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $10,000 $20,000 $0 $0 $0 $30,000
Operating Impact:
$0 $0 ($1,300) ($2,400) $2,100 $6,400 $4,800
Project Pricing: I Dependent on technology that is selected.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
GENERAL GOVERNMENT - MIS DIVISION (CONTINUED)
Project Name:
Core and Remote Switches
Project Description:
Funding Source:
Discretionary Sales Tax
Upgrade of Core and Remote Switches to maintain security and provide
connection to services
Justification:
Replacment of the Core Switches in
both City Hall and the Police Department will be needed.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23
FY 23-24 FY 24-25 FY 25-26
Total
$0
$0 $0
$25,000 $20,000 $0
$45,000
Operating Impact:
$0
$0 $0
$0 ($4,500) ($4,600)
($9,100)
Project Pricing: I Based on prior replacement costs and dependent on specifications yet to be developed
POLICE DEPARTMENT - ROAD PATROL DIVISION
Project Name: COPE Vehicles Graphic Wrap Project Description:
Funding Source: General Fund Providing Graphic Wrap for Small Trailer and COPE Vehicles.
Justification: f Having graphic wrap on these COPE vehicles is believed to be in line with the Police Department's outreach
philosophy.
Project Costs:
FY 20-21 FY 21-22 FY 22-23
$5,000 $0 $0
Operating Impact:
$0 ($1,100) ($600)
Project Pricing: J Written quotes obtained.
Project Name: Police Vehicles
Funding Source: Discretionary Sales Tax
FY 23-24 FY 24-25
$0 $0
($100) $400
Project
FY 25-26 Total
$0 $5,000
Project Description:
20/21- 6 Vehicles w/equipment (373.5K).
21/22- 5 Vehicles w/equipment (300K).
22/23- 5 Vehicles w/equipment (305K).
23/24- 5 Vehicles w/equipment (31OK).
24/25- 5 Vehicles w/ equipment (315K).
25/26- 5 Vehicles w/equipment (320K)
$600 ($800)
1.
Justification: I This allocation is for the replacement of older and higher mileage vehicles and associated vehicle equipment,
j including body cameras, computers and communications equipment.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
Total
$373,500
$300,000 $305,000 $310,000 $315,000 $320,000
$1.923.500
Operating Impact:
$0
($82,170) ($110,820) ($110,570) ($80,920) ($43,780)
($428,260)
Project Pricing:
�No written quote available due to impending price increase. Verbal quote provided based on the expected
price increase.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
POLICE DEPARTMENT - ROAD PATROL DIVISION (CONTINUED)
Project Name: Police Road Patrol Equipment Project Description:
Funding Source: General Fund 20/21 8 SRT Balistic Helmets (8K); 5 Tasers (7.5K); 5 Ballistic Shields (3K);
5 Ballistic Helmets (1.5K); 5 Rifles (5K).
21/22 10 Mobile Radios (30.5K); 5 Tasers (7.5K); 5 Rifles (5K); 9 Ballistic
Vest/Rifle Plates (13K).
22/23 5 Tasers (7.5K); 5 Rifles (5K); 14 Ballistic Vest/Rifle Plates (20K).
23/24 5 Tasers (7.5K); 5 Ballistic Vest/Rifle Plates (8K); 5 Ballistic Shields
(3K); 5 Ballistic Helmets (1.5K).
24/25 5 Tasers (7.5K); 5 Ballistic Shields (3K); 5 Ballistic Helmets (1.5K); 5
Ballistic Vest/Rifle Plates (8K); 8 SRT Tactical Vest/Rifle Plates (16K).
25/26 5 Tasers (7.5K); 5 Ballistic Shields (3K); 5 Ballistic Shields (3K); 5
Ballistic Helmets (1.5K); 10 Ballistic Vest/Rifle Plates (I 1.5K); 5 Rifles (5K);
8 SRT Ballistic Helmets (8K).
Justification: This allocation is for the replacement of non -compliant mobile radios for vehicles previously purchased and
other necessary personal equipment that must be regularly replaced for the Police Officers.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$25,000 $56,000 $32,500 $20,000 $36,000 $39,500 $209,000
Operating Impact:
$0 ($5,500) ($15,320) ($14,370) ($7,420) ($3,490) ($46,100)
Project Pricing: Received written quotes from CII on the radios. We also have written quotes for all the other equipment. k
POLICE DEPARTMENT - INVESTIGATIONS DIVISION
Project Name: Police Investigations Equipment Project Description:
Funding Source: General Fund I PENLINK Server (3K); Surveillance Equipment (7.6K).
Justification:
Project Costs:
FY 20-21
$10,600
Operating Impact:
$0
Project Pricing:
IThe surveilance equipment will provide equipment necessary for surveillance operations.
FY 21-22 FY 22-23
$0 $0
($1,378) $212
Written quotes obtained.
FY 23-24
$0
$1,802
FY 24-25 FY 25-26
$0 $0
$3,180 $4,134
COMMUNITY DEVELOPMENT DEPARTMENT
I
Project
Total
$10,600
$7,950
I
Project Name: Harrison Street Park Plaza Project Description:
Funding Source: Discretionary Sales Tax Provide additional parking, event space and connections to the
downtown area. Complete the project the following year.
Justification: The CRA Master Plan indicates this will have an immediate positive impact to the business district.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FYI Total
$270,000 $250,000 $0 $0 $0 $0 $520,000
Operating Impact:
$0 ($40,000) ($100,000) ($156,000) ($210,000) ($260,000) ($766,000)
This was projected in the conceptual master plan to approach $700,00 but phasing of site improvements and
deletion of some proposed items should keep the expected costs to $270,000 for the first phase and $250,000
for the second. Including zero curbs, pervious pavers and tree/landscape wells may qualify this forTMDL
Project Pricing: grants.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
COMMUNITY DEVELOPMENT DEPARTMENT (CONTINUED)
Project Name: IN. Central Avenue Event Plaza Project Description:
Funding Source: Discretionary Sales Tax Provide additional parking, event space and connections to the Main
Street Activity Area. Complete the project the following year.
Justification: The CRA Master Plan indicates this will be part of the future Main Street Activity Center.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$40,000 $250,000 $250,000 $0 $0 $0 $540,000
Operating Impact:.
(6,800) (47,700) (78,600) (57,000) (35,400) ($225,500)
Conceptual design costs are in line with costs previously proposed for the Harrison Street Park Plaza. The
construction costs will depend on what is included in the final design, as this may be simple or more
Project Pricing: aggressive.
Project Name: Working Waterfront Landscaping Project Description:
Funding Source: Community Redevelopment Landscaping of shoreline and parking lot improvements at the Working
Agency Waterfront in order to complete this project.
Justification: Remaining 2019 funds for the Shoreline and Parking Lot Improvements are not sufficient to landscape this
public space.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$45,000 $0 $0 $0 $0 $0 $45,000
Operating Impact:
(37,800) (72,900) (67,500) (62,100) (56,700) ($297,000)
Project Pricing: I Staff will limit landscaping to this amount.
Project Name: Tree Protection Plan Project Description:
Funding Source: Discretionary Sales Tax Continuation of Riverview Park Master Plan for protection of the tree
canopy, with design and placement of strategic landscaped areas to
protect the trees from pedestrian traffic and maintenance activities.
Justification: Funding is required to implement this Plan by adding landscaping and irrigation. A reduction in landscape
maintenance costs should be realized with the introduction of low maintenance landscape areas around trees
and reduction in applications of herbicides/pesticides in accordance with the Integrated Pest Management
Plan.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$135,000 $135,000 $0 $0 $0 $0 $270,000
Operating Impact:
$0 ($336) ($1,326) ($1,014) $210 $1,377 ($1,089)
Project Pricing: Total probable costs for landscaping and irrigation is $190,640 but adding the survey ($30,000), design
($30,000) and a 10% contingency brings the total to $269,704. Project is proposed to start with areas
adjacent to new sidewalk areas.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
COMMUNITY DEVELOPMENT DEPARTMENT (CONTINUED)
Project Name: Sustainable Sebastian Project Description:
Funding Source: General Fund Install 10 water bottle filling stations and water fountains (at Parks and
City Hall) and 3 bike racks at Riverfront Park.
Justification: Implementation of Sustainable Sebastian objectives include the installation of public use facilities to reduce
the carbon footprint, such as water bottle filling stations, water fountains and bike racks.
Project Costs:
FY 20-21
$16,500
Operating Impact:
$0
FY 21-22
$0
($1,500)
FY 22-23 FY 23-24
$0
($1,350)
FY 24-25 FY 25-26
Project
Total
$0 $16,500
($1,200) ($6,900)
Project Pricing: Procurement information shows water bottle filling stations and water fountains at $750 each with
installation. Specialty bike racks range from $1,500-2,500 including installation.
Project Name: Septic to Sewer Project Description:
Funding Source: Indian River Lagoon Council 50% Awards grant funds for conversions that result in removal of septic tank
and Community Redevelopment systems within the Riverfront Community Redevelopment boundaries.
Agency 50%
Justification: This continues the State's water quality improvement priority for the Indian River Lagoon. Providing the
Indian River Lagoon Council continues their progam of requiring 50% matching funds, it is recommended
that the City also allocate these funds.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $200,000 $0 $200,000 $0 $200,000 $600,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Pricing: The total $200,000 grant funding level has generally covered two fiscal years, although grant applications
may also be limited without more sewer availability.
ROADS DEPARTMENT
Project Name: School Zone Lights Project Description:
Funding Source: (Local Option Gas Tax Purchase 6 Cloud based remote control School Zone Lights w/ radar
display. City curently has 2 in operation.
Justification: The sign shop personal are required to maintain the 8 School Zone Warning lights. 35 times throughout the
school year we must manually shut off and turn on school zone lights at 6 locations. This causes loss of
manpower hours and production loss for the Sign Shop. An example is on early release days which occur at
least once a month. We must manually turn 6 lights on at 1pm and then return to the same 6 locations at 2pm
and turn them off. The two cloud based lights we have can be programed to go on and off by simply
applying the setting from a cell phone or laptop. One person can access both lights quickly and efficiently.
After initial purchase of lights, an annual fee of $400 per light is required to maintain the cloud based
access. Cloud based lights can also produce "real-time" traffic speeds along with reports to include volume
and speed peak times for more efficient traffic enforcement.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$46,510 $0 $0 $0 $0 $0 $46,510
Operating Impact:
$0 ($7,907) ($6,046) ($4,186) ($2,326) ($465) $0
Project Pricing: IQuotes by Traffic Logix is $14,990.00, Radar Signs Inc. is $31,520.00. i
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
ROADS DEPARTMENT (CONTINUED)
Project Name: Update City Street Signs Project Description:
Funding Source: Local Option Gas Tax Purchase materials needed for the replacement of deficient regulatory
and street signs to meet MUTCD standards in Zones 3, 4 and 5.
Justification: The Sign Shop has divided the City Of Sebastian into 5 zones. Two of the zones, 1 and 2 have been
completed with the installation of Street and Stop signs to meet MUTCD standards. Of the remaining
regulatory signs i.e.: Speed and Warning signs 60% do not meet MUTCD reflectivity standards. The
remaining zones 3, 4 and 5 have approximately 755 Street and Stop signs. 90% of the stop signs in zones 3, 4
and 5 do not meet MUTCD standards for reflectivity. 95% of the remaining regulatory and warning signs in
zones 3, 4 and 5 do not meet MUTCD reflectivity standards. This deficiency leaves the City Of Sebastian
open to unnecessarily high Tort Liability. Approximant installation time upon receipt of all materials needed
to complete project would be 6 to 8 months.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$81,000 $0 $0 $0 $0 $0 $81,000
Operating Impact:
$0 ($21,870) ($17,010) ($12,150) ($7,290) ($2,430) ($60.750)
Project Pricing: I National Traffic sign $81,320: Osbum Asscoiates Inc $87,397: Universal Signs & Accessories $ 87,639.
Project Name: Street Repaving Project Description:
Funding Source: Local Option Gas Tax Crack Sealing, Double Microsurfacing, Cape Sealing and 2" Overlay for
City Streets programmed by City's Pavement Management Consultant.
Justification:
The street pavment maintenance program has been prescribed and scheduled by the City's pavement
management consultant for FY 2019 to FY 2024. Funding from Local Option Gas Tax and another $250K
from Discretionary Sales Tax for FY 20-21 should be sufficient to catch up on several roads not completed
last year. $600K each following year only from Local Option Gas Tax is expected to be sufficient to adhere
to the consultant's schedule.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$400,000
$600,000 $600,000 $600,000 $600,000 $600,000 $3,400,000
Operating Impact:
$0
($192;000) ($476,000) ($746,000) ($1,006,000) ($1,252,000) ($3,672,000)
Project Pricing:
The cost per square foot for the recommended pavement management solution for each of these City streets
has already been bid, awarded and contracted.
Project Name: I Street Reconstruction Project Description:
Funding Source: Discretionary Sales Tax Reconstruction Roadwork based on recommendation from the City's
Pavement Management Consultant.
Justification: Needed to address streets in bad condition that are beyond normal repaving work and require full depth
reconstruction. These funds should sufficiently supplement funds from the Local Option Gas Tax to get back
on schedule with the Consultant's recommended paving program.
Project Costs:
FY 20-21
$500,000
Operating Impact:
$0
FY 21-22 FY 22-23
$0
$3,900
$0
$12,750
FY 23-24 FY 24-25
$0
$24,150
FY 25-26
$0 $0
$35,550 $46,950
Project
Total
$500,000
$123,300
Project Pricing: The cost per square foot for the recommended pavement management solution for each of these City streets
has already been bid, awarded and contracted.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
ROADS DEPARTMENT (CONTINUED)
Project Name: Sidewalk Replacement Project Description:
Funding Source: Local Option Gas Tax Replace 5,000 linear feet of 5 ft wide of badly deteriorated PCC
sidewalk along high pedestrian/bicycle usage City streets each FY.
Justification:
The City PW & Engineering Department and the Citizens Request Line receive a large number of citizen
request to repair City sidewalks that are in a highly deteriorated condition. These present serious trip and
fall hazards and expose the City to significant tort liability. The City has had no formal sidewalk
repair/replacement program for many years and only make spot repairs following significant trip and fall
incidents.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$100,000
$100,000 $100,000 $100,000 $100,000 $100,000 $600,000
Operating Impact:
$0
($22,000) ($34,000) ($36,000) ($28,000) ($16,000) ($136,000)
Project Pricing:
In late February 2020, City Purchasing staff secured quotes from interested contractors. For Precision Cut
Concrete (PCC) and its placement for quantities greater than $61 square yards at 4" thickness, the low quoted
price is $36 per square yard of PCC placed. At 5 foot sidewlk width, approximately 5,000 linear feet of PCC
sidewalk can be placed per year at an estimated cost of $100,000.
Project Name: Roads Division Equipment Project Description:
Funding Source: I General Fund One ton Pickup (34K), Sign Sheeting Roller (2.9K), Tuffrruk/Sidewalk
1 Form Set (I 1.5K).
Justification: Pickup is for Public Works Director, whose truck will go to Fleet Maintenance Superintendent, with his 4x4
pickup going to Sign/Paint Crew for pulling traffic paint equipment and allow both employees of Traffic
Division to work separately when this is the most efficient method. Two person Traffic Signage and
Pavement Marking Crew can barely complete pavement markings one time each year. As a result, a number
of high volume City roads are without required pavement markings for a signficant period each year. For
many locations in the City paint pavement markings do not last the year between painting cycles. Sign
Sheeting Roller is needed for 48" signs. Tuffrruk and Sidewalk Form Set will help in maintaining sidewalks.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$48,400 $0 $0 $0 $0 $0 $48,400
Operating Impact:
$0 ($10,648) ($5,808) ($968) $3,872 $5,808 ($7,744)
Project Pricing: This pricing was provided by the Fleet Sunerintendant based on Quotes he received.
Project Name: Roads Division Heavy Equipment Project Description:
Funding Source: Local Option Gas Tax 20/21 926M Wheel Loader (13OK).
21122 Tandem Axle Dump Truck (115K); Brush Truck (50K).
22/23 Pavement Marking Unit (85K).
Justification: Current Wheel Loader is at end of its useful life based on hours and condition. Tandem Axle Dump Truck is
needed in FY 21-22 to replace oldest Tandem Axle Dump Truck that will be at end of its useful life. Brush
Truck needed in FY 21-22 to replace current Brush Truck that will be at end of its useful life.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$130,000 $165,000 $85,000 $0 $0 $0 $380,000
Operating Impact:
$0 ($35,100) ($71,850) ($77,100) ($54,300) ($31,500) ($269,850)
Project Pricing: I This pricing was provided by the Fleet Superintendant based on quotes he received.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC FACILITIES DEPARTMENT
Project Name: Public Facilities Compound Project Description:
Funding Source: j Discretionary Sales Tax Complete design and construct new City Garage and Public Facilities
Compound to be located at the Sebastian Municipal Aimort.
Justification: The Garage Compound has reached its capacity. Relocating will permit growth and allow the existing
property to be sold. Airport benefits by rent on the land and General Fund benefits four the sale of the
current location. $5,088,899 was budgeted in FY 2018-2020. Additional funds are requested to complete
construction. FY22-23 funds will cover office furnishings, office equipment, computer and security systems.
With these additions, funding for the complete project will equal $8,588,899.
Project Costs:
FY 20-21
$0
Operating Impact:
$0
Project Pricing:
FY 21-22 FY 22-23 FY 23-24
$1,250,000 $1,250,000 $1,000,000
FY 24-25 FY 25-26
$0
$0 ($475,000) ($912,500) ($1,217,500)
Based on estimates from Wright Construction.
PUBLIC FACILITIES - FLEET DIVISION
$0
($1,112,500)
Project
Total
$3,500,000
($3,717,500)
1
Project Name: Fleet Division Equipment Project Description:
Funding Source: General Fund 20/21 Shop MIG Welder (2.8K).
21/22 Portable Stick Welder/Generator (3.5K); Tire Balancer (2.4K);
Tire Changer (4K).
22/23 Shop Chain Hoist (3K): Exhaust Extraction Unit (1.8K).
Justification: Truck Mounted Compressor replaces a 20-yr old unit that no longer functions. The Shop MIG Welder
replaces a unit at the end of its service life. The Portable Stick Welder/Generator replaces a unit having
major repair issues Tire Balancer replaces a worn out unit that no longer performs to specifications. Tire
Changer replaces a worn out unit. Shop Chain Hoist is new to provide added capability and safety to shop
operations. Exhaust Extraction Unit is new and will provide improved air quality in the shop.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$2,800 $9,880 $4,800 $0 $0 $0 $17,480
Operating Impact:
$0 ($336) ($1,326) ($1,014) $210 $1,377 ($1,089)
Project Pricing: This pricing was provided by the Fleet Superintendant based on quotes he received.
PUBLIC FACILITIES - CEMETERY DIVISION
Project Name: Cemetery Equipment Project Description:
Funding Source: Cemetery Trust Fund 20-21 Replace the 52" Cemetery Mower (13.5K); Flag Poles (4.4K);
Desk and Chairs (1.6K).
25-26 Replace the 52" Cemetery Mower (14K).
Justification: Cemetery Mower is heavily used and parts are difficult to find. Replacing it with a Mower that uses common
parts stocked for other City Mowers. Flag Poles will have solar lighting and be added to the new Cemetery
area to compliment veteran burial ceremonies. Office Desk and Chairs replace privately owned equipment by
the Cemetery Sexton who will reclaim them upon retirement. We expect the Cemetery Mower to require
replacement again by FY 24-25.
Project Costs:
FY 20-21
$19,500
Operating Impact:
$0
FY 21-22 FY 22-23
$0
($2,535)
FY 23-24
$0 $0
$390 $3,315
Project Pricing: (Researched from internet pricing, catalogs.
Project
FY 24-25 FY 25-26 Total
$14,000 $0 $33,500
$5,850 $5,785 $12,805
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC FACILITIES - CEMETERY DIVISION (CONTINUED)
Project Name: I Cemetery Grounds Improvements Project Description:
Funding Source:
Cemetery Trust Fund Project consists of grounds leveling, headstone straightening and
placing new sod.
Justification:
These measures are desired to improve the overall appearance and to make it safer for the public.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
Total
$20,000
$20,000 $40,000 $0 $0 $0
$80,000
Operating Impact:
$0
($2,400) ($3,400) ($5,400) $200 $5,400
($5,600)
Project Pricing:
JBased on proposals received.
Project Name:
Cemetery Driveway Resurfacing
Project Description:
I
Funding Source:
Cemetery Trust Fund
Project will rehabilitate the Cemetery's asphalt driveways.
Justification:
The Cemetery driveways are eroding and require resurfacing.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
Total
$15,000
$0 $0 $0 $0 $0
$15,000
Operating Impact:
$0
($5,700) ($5,550) ($5,250) ($5,100) ($4,800)
($26,400)-
Project Pricing:
(Quotation by vendor.
Project Name:
Cemetery- Columbarium Niches
Project Description:
Funding Source:
Cemetery Trust Fund
Adding Columbarium Niches in the New Section of the Cemetery. The
foundations for two Columbariums would be done in FY 20-21.
Justification:
Columbarium Niches are recommended for the new section.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
Total
$45,000
$45,000 $0 $0 $0 $0
$90,000
Operating Impact:
$0
($17,100) ($32,850) ($30,150) ($27,450) ($24,750)
($132,300)
Project Pricing:
(Based on experince with installing previous columbariums.
Project Name:
lBench Seats and Monuments
Description:
Funding Source:
General Fund
(Project
Add Bench Seats and Columbarium Monuments.
Justification:
Newly expanded area of the Cemetery is intended to be set up in a park -like landscape setting with Bench
Seats and new cremation niche Columbaia Monuments.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
Total
$20,000
$0 $0 $0 $0 $0
$20,000
Operating Impact:
$0
($3,600) ($800) $2,000 $4,400 $6,000
$8,000
Project Pricing:
I Rough estimate but dependent on final decisions at the time.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC FACILITIES - FACILITIES MAINTENANCE DIVISION
Project Name: lFacility Maintenance Equipment Project Description:
Funding Source: General Fund 20/21 Scissor Lift (13.5K).
21/22 City Hall East End Air Conditioner (40K).
Justification: Replace Scissor Lift with narrower unit to fit inside Council Chambers. Old lift has mechanical and corrosion
issues that will require expensive repairs. Replace large City Hall RTU #2 that serves the east end of City
Hall.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$13,500 $40,000 $0 $0 $0 $0 $53,500
Operating Impact:
$0 ($4,500) ($4,650) ($4,800) ($4,950) ($5,100) ($24,000)
Project Pricing: I Based on current prices obtained by Fleet Supervisor.
Project Name: Facility Maintenance Vehicles Project Description:
Funding Source: Discretionary Sales Tax 120/21 Truck with 9' Bed and Crane (65K).
Justification: I
Replace Construction Specialist truck with larger bed/cabinets suitable for necessary tools. Smaller truck to
�
be used by City Garage.
Project Costs:
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
$65,000 $0 $0 $0 $0 $0
Operating Impact:
(1,156) (680) (204) 272 748
Project Pricing: lBased on current prices obtained by Fleet Supervisor.
Project Name: Facility Maintenance Repairs Project Description:
Funding Source: General Fund 20/21 Replace Public Facilities Storage Shed roof (6.8K).
Justification: I The Public Facilities Storage Shed has coroded and failing metal roofing panels.
Project Costs:
FY 20-21
$6,800
Operating Impact:
$0
Project Pricing:
Project
Total
$65,000
Project
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $0 $0 $0 $0 $6,800
($1,156) ($680) ($204) $272 $748 ($1,020)
Based on price estimates made by Staff.
LEISURE SERVICES DEPARTMENT
Project Name: Facility Repairs Project Description:
Funding Source: General Fund 21/22 Install new flooring, improve bathrooms and paint Yacht Club
(I OK); Refurbish Friendship Park Attendants Office (1.8K); Refurbish
Friendship Park Restroom Floors with Epoxy (6.5K).
Justification: Yacht Club interior is dated and needs new flooring, painting and bathroom improvements. Friendship Park
Attendants Office to be refurbished with paint, carpet and repair of two structural columns. Friendship Park
restroom floors to be done with Epoxy to improve appearance and allow easier cleaning.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 3-24 FY 24-25 FY 25-26 Total
$0 $18,300 $0 $0 $0 $0 $18,300
Operating Impact:
$0 $1,700 $3,400 $6,800 $11,900 $18,700 $42,500
Project Pricing: I Based on price estimates made by Staff. j
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
LEISURE SERVICES DEPARTMENT (CONTINUED)
Project Name: Maintenance Equipment Project Description:
Funding Source: General Fund FY 20-21 Replace Mower (13K); Purchase Utility Vehicle (16K).
FY 21-22 Replace Mower (13K).
FY 23-24 Replace Mower (14K).
Justification: Currently one mower is out of service and being used for parts for other mowers to keep them running. The
utility vehicle is necessary to improve productivity for staff throughout our parks and eliminate the need to
wait until another one is available in another department to do projects. The other two mowers are scheduled
replacements of our mowing crew mowers that maintain all of the common grounds within our parks, US1,
Schumann Drive, and Sebastian Blvd.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$29,000 $13,000 $0 $14,000 $0 $0 $56,000
Operating Impact:
$0
($6,380) ($6,340) ($2,140) ($1,020) $2,840 ($13,040)
Project Pricing:
I This pricing was provided by the Fleet Superintendant based on quotes he received.
Project Name:
Park Identification Signage
Project Description:
Funding Source:
Recreation Impact Fees
Update Identifying Signage at City Parks that need to be replaced and
install signs at those currently without City identifying signs.
Justification:
Continues the updating of Park Identifying Signs in a uniformed and consistently-themed manner needed to
address one of the goals of the updated Parks and Recreation Element of the Comprehensive Plan. This
addresses all signs needing to be replaced and the installation of signs at parks not currently having City
identifying signs.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$30,000
$30,000 $0 $0 $0 $0 $60,000
Operating Impact:
$0
($3,600) ($5,100) ($900) $3,300 $6,900 $600
Project Pricing:
Based on the Parks Signage agreement with the sign manufacturer, Year 2 and 3 of the sign replacement plan
will total around $80,000 to complete all signage. It is anticipated that we will have money leftover from FY
19-20 due to the sign replacement cycle, which will offset some of this costs the next two years.
Project Name:
Barber Street Baseball Dugouts Project Description:
I
Funding Source:
Recreation Impact Fund Replace the remaining Barber Street Baseball/Softball Dugouts.
Justification:
The Barber Street Baseball and Softball Dugouts are undersized, need new roofmg and fencing. The
structures are old and present safety concerns for the participants. The budgeted funds in FY 19-20 will
allow us to complete renovations on 4 of the dugouts. This will fund the remaining 4 dugouts.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$40,000
$0 $0 $0 $0 $0 $40,000
Operating Impact:
$0
($6,800) ($5,200) ($3,600) ($2,000) ($400) ($18,000)
Project Pricing:
The budgeting amount is based on the quoted pricing to complete the 4 dugout renovations requested in the
FYI 9-20 budget year.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
LEISURE SERVICES DEPARTMENT (CONTINUED)
Project Name: Barber Street Fencing j � Project Description:
Funding Source: Recreation Impact Fund Replace the Barber Street Baseball/Softball Field Fencing
Justification: The fencing around the baseball and softball fields is in need of replacement. The budgeted amount in FY 19
20 only allowed us to replace the fencing on 1 field. Much of the top rail of the existing fencing is rusted and
is not providing the necessary support. Likewise much of the bottom of the fencing is bent with holes that
create a safety concern for the participants once they approach the fencing. This would be the second year of
this project to complete the final 3 fields.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$75,000 $0 $0 $0 $0 $0 $75,000
Operating Impact:
$0 ($9,000) ($3,750) $1,500 $6,750 $10,500 $6,000
Project Pricing: This pricing is based on the quotes received from multiple fence companies to complete the fence
replacement on Baseball Field #1.
Project Name:
Parks Division Vehicles Project Description:
Funding Source:
General Fund FY 20-21 1/2 Ton Extended Cab Pickup (34K).
FY 22-23 1/2 Ton Extended Cab Pickup (34K).
FY 23-24 1/2 Ton Extended Cab Pickup (34K).
FY 24-25 1/2 Ton Extended Cab Pickup (34K).
Justification:
These are all recommended replacements from the Garage based on the age and maintenance expenditures
Ion
these vehicles.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$34,000
$0 $34,000 $34,000 $34,000 $0 $136,000
Operating Impact:
$0
($4,080) ($1,700) ($3,400) ($2,720) ($340) ($12,240)
Project Pricing:
This pricing and replacement schedule was provided by the Fleet Superintendent based on his quotes.
Project Name:
Playground Improvements Project Description:
Funding Source:
Recreation Impact Fund Replace and improve current playgrounds throughout the City to
become more accessible:
20-21 Filbert St. Playground.
21-22 Easy Street Park
22-23 Blossom Playground
23-24 Creative Playground
24-25 Bryant Court Park
25-26 Hardee Park and Schumann Park
Justification:
Many of the playgrounds throughout the City are in need of replacement within the next few years. As a part
of this replacement we are implementing all-inclusive portions to each playground so that we have more
accessible options throughout the City to better serve our residents.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$40,000
$40,000 $40,000 $110,000 $40,000 $80,000 $350,000
Operating Impact:
$0
($7,200) ($8,800) ($4,800) ($8,600) $13,200 ($16,200)
Project Pricing: IPricing is based on the Co -Op pricing quotes received to replace the George Street Park this fiscal year
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
LEISURE SERVICES DEPARTMENT (CONTINUED)
Project Name: Park Improvements Project Description:
Funding Source: I Recreation Impact Fund Provide funds to be able to immediately address park improvements.
Justification: These allocations will provide funds on an annual basis toward addressing park improvements that were not
budgeted but are brought to light by the public or the Parks and Recreation Advisory Committee. These
funds will be allocated so that concerns can be addressed without delay.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$20,000 $20,000 $20,000 $20,000 $20,000 $20,000 $120,000
Operating Impact:
$0 ($5,600) ($10,800) ($15,600) ($20,000) ($24,000) ($76,000)
Project Pricing: I Will be established at time improvements are better defined.
Project Name: 113arber St. Lightning System Project Description:
Funding Source: Discretionary Sales Tax This is for the installation of a ThorGuard Integrated Lightning
Prediction and Warning System for Barber Street.
Justification: The City currently does not have a Lightning Warning System at our athletic fields at Barber Street. The
Parks & Recreation Committee requested that the City look into this and provide a budgetary request to have
a system installed at the Barber Street Sports Complex. This system is a Lightning Prediction system that
would cover the entire complex.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$24,000 $0 $0 $0 $0 $0 $24,000
Operating Impact:
$0 ($2,880) ($1,200) $480 $2,160 $3,360 $1,920
Project Pricing: This is based on pricing from ThorGuard for this system. It also includes an option for the Thor PCX
software in which the community can see the current status of the lightning detector on their phones,
computers, etc... before they show up at the fields.
STORMWATER FUND
Project Name: Stormwater Master Plan Project Description:
Funding Source: Stormwater Utility Fund The Stormwater Master Plan will guide the Stormwater Utility in
making capital improvements to the system that: 1) improves water
quality of Collier Creek/Elkcam Canal, the Sebastian River and Indian
River Lagoon; 2) reduces the Stormwater Utility's annual maintenance
requirements and 3) serves as the spingboard for the City's aggressive
search for state and federal grants. '
Justification: A comprehensive Stormwater Master Plan is the essential planning document necessary to seek state and
federal grant funding needed to achieve the goals listed above. The cost to repair/replace the the Collier
Creek/Elkcam Creek seawalls alone is in excess of $20M. It is recommended that this be initiated in FY
2019-2020; so the pursuit of federal funding can start in FY 2020-021.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$200,000 $0 SO $0 $0 $0 $200,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Pricing: IBased on discussions with firms that provide these services. I
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
STORMWATER FUND (CONTINUED)
Project Name: Stormwater Equipment Project Description:
Funding Source: Stormwater Utility Fund FY 20-21 Two Zippy Head Mower Attachments (48K); Small
Equipment Trailer (25K); Lazer Survey Level (2K); Pin Locator (1K);
Concrete Saw (1.2K).
FY 21-22 Lazer Survey Level (1.9K); Concrete Saw (1.2K).
FY 22-23 Mini Excavator (55K).
FY 23-24 Small Excavator (58K).
Justification: Equipment needed to more effectively and efficiently maintain the Stormwater System and/or to replace
equipment that will be at the end of its useful life.
Project Costs:
FY 20-21 FY 21-22 FY 22-23
$77,050 $3,100 $55,000
Operating Impact:
Project
FY 23-24 FY 24-25 FY 25-26 Total
$58,000 $0 $0 $193,150
$0 ($16,951) ($9,928) ($14,013) ($13,258) $1,434
Project Pricing: This pricing; was provided by the Fleet Superintendant.
Project Name: Stormwater Heavy Equipment Project Description:
Funding Source: Stormwater Utility Fund FY 20-21 Lowboy Tractor & Trailer (165K).
IFY 23-24 311 Excavator (225K).
Justification: I Heavy equipment replacements for Stormwater maintenance program.
Project Costs:
FY 20-21 FY 21-22 FY 22-23 FY 23-24
$165,000 $0 $0 $225,000
Operating Impact:
($52,716)
i
Project
FY 24-25 FY 25-26 Total
$0 $0 $390,000
$0 ($44,550) ($34,650) ($24,750) ($75,600) ($52,200) ($231,750)
Project Pricing: I This pricing was provided by the Fleet Superintendant.
Project Name: Slip Lining Project Description:
Funding Source: Discretionary Sales Tax Slipline stormwater pipes at and near the intersection of Schumann
Drive with Kildare Drive.
Justification: Used for failing stormwater pipes. This method avoids open cutting and replacement of the pipes. 1
Project Costs: Project 1
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $600,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Pricing: I Staff recently completed a similar project and has a good idea of the total cost for this project. 1
Project Name: Swale/Driveway/Culvert Repairs Project Description:
Funding Source: Stormwater Utility Fund Repair front swales and driveway culverts in conjunction with street
reconstruction projects.
Justification: If these repairs are not done, the sizeable investment in street reconstruction will be wasted as saturated road
bases and their overlying asphalt surfaces will quickly degrade well before their useful life of 20 plus years.
As a result we would never catch up with improving the condition of our streets.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $600,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Pricing: [Staff has excellent experience with the cost of this program, with the work done in this past year. I.
Project Pricing:
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
STORMWATER FUND (CONTINUED)
Project Name: Canal Restoration Project Description:
Funding Source: Discretionary Sales Tax Fund Restore canal sides/bottom of Collier Creek/Elkcam Canal to their
original contour.
Justification: Significant accumulation of dead vegetation and growth of rooted invasive aquatic species has occurred over
the years in the City's 8.15 mile Collier Creek/Elkcam Canal. Effective maintenance management and
vegetation management requires that these issues be addressed.
Project Costs:
FY 20-21
$500,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
An annual allocation of $500,000 was made starting in FY 2019-2020 but action has been delayed to allow
for the adoption of an Integrated Pest Management Program for the Collier Creek/Elkcam Canal. The actual
cost will be dependent on the Program eventually adopted.
Project
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$500,000 $500,000 $500,000 $500,000 $500,000 $3,000,000
Project Name:
Concha Dam Repairs Project Description:
Funding Source:
Stormwater Utility Fund Repair/Replace sheet piling on walls and redo cap of Concha Dam.
Justification:
There have been signs of corrosion at the cap and seams of the walls and this has been accelerating in the
past two years. Dam will be approximately 25 years old in FY 2021-2022.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0
$800,000 $0 $0 $0 $0 $800,000
Operating Impact:
$0
$0 ($304,000) ($280,000) ($256,000) ($232,000) ($1,072,000)
Project Pricing:
I Pricing has been increased to reflect the currently estimated extent of work needing to be done.
Project Name:
Tulip Drive Crossing Project Description: j
Funding Source:
I Stormwater Utility Fund IReplace road crossing pipes with a con/span open flow design. li
Justification:
This is a pinch point on a main ditch, where pipes are undersized due to mimimal road coverage over the
pipes. It is recommended they be replaced with a con/span type open flow design to enhance conveyance.
Roadway improvements will also be needed.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0
$0 $250,000 $0 $0 $0 $250,000
Operating Impact:
$0
$0 $0 ($95,000) ($87,500) ($80,000) ($262,500)
Project Pricing:
Pricing was escalated from previous year submittal to allow for construction cost increases.
Project Name:
Bayfront Road Crossing Project Description:
Funding Source:
I Stormwater Utility Fund I Change Bayfront Road Crossing pipe to con/span open flow design.
Justification:
This is a main ditch pinch point causing the existing ditch to overflow into residential properties. A con/spanj
open flow design will prevent the existing pipe being plugged with debris.
Project Costs:
Project
FY 20-21
FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0
$0 $0 $250,000 $0 $0 $250,000
Operating Impact:
$0
$0 $0 $0 ($120,000) ($117,500) ($237,500)
Project Pricing: IRough estimate that will be defined before proceeding with this project.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
STORMWATER FUND (CONTINUED)
Project Name: I Ocean Cove Drainage Project Description:
Funding Source: Stormwater Utility Fund Eroding slopes on ditch bank are encroaching on private property.
Design is to stabilize the slopes.
Justification: I
At times when there are high water levels, the slopes are eroding and encroaching on private property.
Design is to stabilize the slopes and keep the open conveyance of the ditch.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $0 $0 $0 $350,000 $0 $350,000
Operating Impact:
$0 $0 $0 $0 $0 ($168,000) ($168,000)
Project Pricing: JPrice estimate increased to reflect current costs. f
GOLF COURSE
Project Name: Driving Range Equipment Project Description:
Funding Source: Golf Course I21/22 Replace3-gangrangepicker(2.7K);ReplaceBall Washer(2.6K).
Justification: These items are geared toward the driving range and are used multiple times each and every day. It is not
unusual for over 5,000 range balls to be hit out into the driving range. The range picker is used to retrieve the
golf balls and the ball washer cleans the golf balls. Through wear and tear and very heavy use, these items
need to be replaced.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $5,290 $0 $0 $0 $0 $5,290
Operating Impact:
$0 $0 ($635) ($265) $106 $476 ($317)
Project Pricing: Prices were taken out of Easy -Picker Golf Products, Inc.
Project Name: Irrigation Software Upgrade Project Description:
Funding Source: Golf Course I Upgrade the Irrigation Computer Software (14K).
Justification: Currently, the irrigation computer is operating on a software system that is over 19 years old and is
completely obsolete. The computer and software have crashed twice now and each time, Hector Turf techs
were able to save the system, however, with each crash, techs have assured us that eventually the system will
not be able to be saved. The software and irrigation computer are critical to controlling and programming
the 930 irrigation rotors that are on the golf course. The quote includes: software upgrade, hardware
upgrade, radio -interface upgrade and tech support and installation.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$14,000 $0 $0 $0 $0 $0 $14,000
Operating Impact:
$0 ($2,520) ($560) $1,400 $3,080 $4,200 $5,600
Project Pricing: I Price is from Hector Turf which is the sole -source vendor for this software.
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
AIRPORT FUND
Project Name: Construct Taxi Lane Project Description:
Funding Source: 90% FAA Grant $519,338. Construction of Taxi Lane leading from future site for square hangars to
5% FDOT Grant $24,963. Taxiway Alpha.
5% Matching Requirements from
Discretionary Sales Tax $24,963.
Justification: ] This is in conjunction with the eventual development of a site for square hangars.
Project Costs:
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
$569,264 $0 $0 $0 $0 $0
Operating Impact:
$0 ($68,312) ($28,463) $11,385 $51,234 $79,697
Project Pricing: IEstimated by enaineerim consultant.
Project Name: Construction of Square Hangars Project Description:
Funding Source: 80% FDOT Grant $708,603. Develop the Site and Construct Square Hangars.
20% Matching Requirements from
Discretionary Sales Tax $176.679.
Justification: This is an opportunity to increase rental revenues.
Project Costs:
FY 20-21 FY 21-22 FY 22-23
$0 $885,282 $0
Operating Impact:
.$0 $0 ($6,147)
Project Pricing: IEstimated by engineering consultant.
Project
Total
$569,264
$45,541
1
Project
FY 23-24 FY 24-25 FY 25-26 Total
$0 $0 $0 $885,282
$2,706 $11,558 $20,411 $28,528
Project Name: JEstablish Sewer Service Project Description:
Funding Source: 80% FDOT Grant $800,000. Connect to anticipated County extention of sewer main to provide sewer
20% Matching Requirements from service on west side of Airport.
Discretionary Sales Tax $200,000.
Justification: I This will enable sewer service to the planned Public Facilities Compound.
Project Costs:
FY 20-21 FY 21-22 FY 22-23
$1,000,000 $0 $0
Operating Impact:
$0 ($390,000) ($390,000)
Project Pricing: (Estimated based on experience.
Project
FY 23-24 FY 24-25 FY 25-26 Total
$0 $0 $0 $1,000,000
($380,000) ($380,000) ($370,000) ($1,910,000)
I
Project Name: Economic Development Hangar Project Description:
Funding Source: 50% FDOT Grant $500,000. Construct a hangar for economic development.
50% Matching Requirements from
Discretionary Sales Tax $500,000.
Justification: I This can be anticipated to enhance the City's economic development potential.
Project Costs:
FY 20-21 FY 21-22 FY 22-23
$0 $1,000,000 $0
Operating Impact:
$0 ($25,000) ($15,000)
Project Pricing: I Estimated by engineering consultant.
Project
FY 23-24 FY 24-25 FY 25-26 Total
$0 $0 $0 $1,000,000
($5,000) $5,000 $15,000 ($25,000)
1
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2020-2025
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
AIRPORT FUND (CONTINUED)
Project Name: JRehab Taxiway Alpha Apron Project Description:
Funding Source: 80% FDOT Grant $232,000. Rehabilitation of Taxiway Alpha Apron.
20% Matching Requirements from
Discretionary Sales Tax $58,000.
Justification: This taxiway apron will require rehabilitation in this time frame. f
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$0 $290,000 $0 $0 $0 $0 $290,000
Operating Impact:
$0 $0 ($34,800) ($14,500) $5,800 $26,100 ($17,400)
Project Pricing: Estimated by engineering consultant. f
Project Name: Rehab Runway 05/23 Project Description:
Funding Source: 90% FAA Grant $1,980,000. Rehabilitation of asphault and striping on Runway 05/23.
5% F90T Grant $110,00G.
5% Matching Requirements from
Discretionary Sales Tax $110,000.
Justification: This runway will require rehabilitation in this time frame.
Project Costs:
FY 20-21 FY 21-22
$0 $0
Operating Impact:
FY 22-23 FY 23-24
$2,200,000 $0
$0 $0 $0 ($264,000)
Project Pricing: IEstimated by engineering consultant.
FY 24-25 FY 25-26
$0 $0
($110,000) $44,000
Project Name: Apron Reconstruction Project Description:
Funding Source: 80% FDOT Grant $120,000. Engineering and design for the reconstruction of the apron.
20% Matching Requirements from
Discretionary Sales Tax $30,000.
Justification: This apron will require rehabilitation in this time frame.
Project Costs:
FY 20-21 FY 21-22 FY 22-23 FY 23-24
$0 $0 $0 $150,000
Operating Impact:
Project
Total
$2,200,000
($330,000)
Project
FY 24-25 FY 25-26 Total
$0 $0 $150,000
$0 $0 $0 $0 ($18,000) ($7,500) ($25,500)
Project Pricing: Estimated by engineering consultant.
BUILDING FUND
Project Name: Front Counter Renovations Project Description:
Funding Source: Building Fund Renovate front counter area. Lower and increase size of counter area by
moving counter and wall back, add/relocate doors and cabinets, relocate
light fixtures and replace flooring as needed.
Justification: This counter is out of ADA compliance. Lowering counter and moving it back will provide room for
improved customer waiting area seating and add file space for public information. It will also allow the office
space behind the front counter area to be re -configured.
Project Costs: Project
FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26 Total
$24,000 $0 $0 $0 $0 $0 $24,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Pricing: Written quotes for budgeting purposes received from two contractors. Tredsetters Construction Inc, $18,600.1
Treasure Coast Construction Management, $24,850.
GENERALFUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18.19 FY 19-20 FY 20-21
Property Taxes (See Calculations Below),5% Growth
$
3,941,541
$ 4,001,929
$ 4,262,807
Franchise Fees (Flat 19-20, 4.5%20-21, 3.5%Growth)
1,343,744
1,399.140
1,462,101
Utility Service Tax (Flat 19-20, 4.5% 20-21, 3.5% Growth)
2,882,460
2.988,314
3.122,777
Intergovernmental (-21.2%6 Mo.19-20, 4.5%20-21, 3.5 Growth)
3,081,248
2,608,646
2,341,085
Investment Income(Same 19-20, 1%Growth)
155,213
61,500
61,500
Other Revenue (2% Growth)
957,375
1,096,646
1,126,233
Charges to Cemetery
55,000
80,000
85,000
Transfers from Golf Course
-
26,901
35,000
Transfers from Airport
23,928
25,000
150,000
FEMA and State Reimbursements
532,620
14,706
193,666
GENERAL FUND REVENUE
$
12,973,129
$ 12,302,782
$12,840,169
Personnel (Insurance (3%) Then 5%, Pay Zero. Then 2.5%)
$
9,228,444
$ 9,728,850
$ 9,906,781
Operating Expenditures
2,573.88
2,833,102
2.719,478
Total Operation and Maintenance
$
11,802,326
$ 12,561,952
$12,626,259
Transfers to Other Funds
23,244
4,691
City Clerk Equipment
13,983
2,310
MIS Equipment
24,320
912
Police Personnel Equipment
59,224
74,853
35,600
Police Early Warning System
14,650
COPE Vehicles Graphic Wrap
51000
Public Works Roads Equipment
55,743
48,400
Public Works Roads Vehicle
39,190
Public Facilities Fleet Equipment
9,595
2,800
Cemetery Bench Seats and Monuments
20.000
Public Facilities Maintenance Equipment
18,374
13,500
Public Facilities Repairs
42.525
6,800
Leisure Services Facility Repairs
Leisure Services Parks Equipment
67,159
27,588
29,000
Leisure Services Vehicles
73,481
67.580
34,000
Leisure Services Parks Securitiy Cameras
10,000
Leisure Services Friendship Park Tennis Courts
30,000
Leisure Services Barber Street Shed
10,000
Community Development Sustainable Sebastian
16.500
Community Development Plotter/Scanner
14,650
TOTAL EXPENDITURES FY 19
$
12,147,449
TOTAL EXPENDITURES FY 20
TOTAL EXPENDITURES FY 21
TOTAL EXPENDITURES FY 22
TOTAL EXPENDITURES FY 23
TOTAL EXPENDITURES FY 24
TOTAL EXPENDITURES FY 25
TOTAL EXPENDITURES FY 26
$ 12,898,591
$12.840,169
BEGINNING UNRESTRICTED RESERVE BALANCE
$ 5,373,381
$ 6,199,061
TOTAL REVENUES
12,973,129
12,302,782
TOTAL EXPENDITURES
12,147,449
12,898.591
UNRESTRICTED RESERVE BALANCE PER CAFR
$ 6,199,061
$ 5,603,252
Assigned Funds (Inventory, Prepaids & Receivables)
460.621
808.720
Available for Emergencies
$ 5,338,440
$ 4,794,532
Revenue vs Expenditures
Increase Cemetery Transfer $5K 20-21 Then to $90K Total
Zero Raises, (3%) Insurance in 20-21. Then 2.5% Raises 5% Insurance
FY 21-22
FY 22-23
FY 23.24
FY 24-25
FY 25-26
$ 4,475,947
$ 4,699,745
$ 4,934,732
$ 5,181,469 $
5,440,542
1,513,275
1,566,239
1,621,058
1,677, 795
1,736, 517
3,232,074
3,345,197
3,462,279
3,583,458
3,708,879
2,423,023
2,507,829
2,595,603
2,686,449
2,780,475
62,115
62,736
63,364
63,997
64,637
1,148,758
1,171, 733
1,195,167
1,219,071
1,243,452
90,000
90,000
90,000
90,000
90,000
35,000
35,000
35,000
35,000
35,000
$ 12,980,192
$ 13,478,478
$ 13,997,202
$ 14,537,238 $
15,099,503
$ 10,188,975
$ 10,478,224
$ 10,774,704
$ 11,078,597 $
11,390,086
2.719,478
2,719,478
2,719.478
2.7194_ 88 _
2.719.478
$ 12,908,453
$ 13,197,702
$ 13,494,182
$ 13,798,075 $
14,109,564
56,000 32,500 20,000 38,000 39,500
9.880 4,800
40,000
18,300
13,000 14,000
34,000 34,000 34,000
$ 13,045,633
$ 13,269,002
$ 13,662,182
$ 13,868,075
$ 14,149,064
_
$ 5,603,252
$ 5,603,252
$ 5,537.811
$ 5,747,287
$ 6,182,306
$ 6,851,470
12,840,169
12,980,192
13,478,478
13,997,202
14,537,238
15,099,503
12,840.169
13.045,633
13,269.002
13,562,182
13 868.075
14,149,064
$ 5,603,252
$ 5,537,811
$ 5,747,287
$ 6,182,306
$ 6,851,470
$ 7,801,909
623,720
588.720
553.720
518,720
483,720
448, 220
$ 4,979,532
$ 4,949,091
$ 6,193,567
$ 5,663,586
$ 6,367,750
$ 7,353,189
-
(65,441)
209,476
435,020
669,164
950,439
Note: Begin in 20-21 paying down Loans from Golf Course by $35K per year
LOCAL OPTION GAS TAX FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23.24
FY 24.25
FY 25-26
Local Option Gas Taxes (20-21 Flat, then 4 % Growth)
$
711,023
$ 710,000
$
710,000
$ 738,400 $
767,936 $
798,653 $
830,600 $
863,824
FOOT Lighting Agreement
13,295
13,694
14,105
14,528
14,964
15,413
15,875
16,351
Investment Income
8,902
10,770
13,282
10,257
9,320
7,724
9,236
11,139
Total Revenues
$
733,220
$ 734,464
$
737,387
$ 763,185 $
792,220 $
821,790 $
855,711 $
891,314
R/R Crossing Maintenance
$
48,344
$ 5,400
$
5,400
$ 5,400 $
5,400 $
5,400 $
5,400 $
5,400
Road Condition Assessment
11,500
38,900
Road Signs and Markings
19,011
-
-
_
Sidewalk Construction and Repair
1,350
Total Operational and Maintenance
$
80,205
$ 5,400
$
5,400
$ 5,400 $
44,300 $
5,400 $
5,400 $
5,400
Debt Payment - Final FY22-23
243,187
243,802
243,340
242,801
122,174
Paint Striping Machine/Trailer
Concrete Planer/Dust Vacuum
Indian River Drive Repaving/Improvements
_
53,419
Riverview Park Sidewalks
46,581
Street Repaving
370,643
TOTAL EXPENDITURES FY19
$
747.454
Track Skid Steer
106,000
6 Year Street Repaving Program
108,850
400,000
350,000
600,000
600,000
600,000
600,000
TOTAL EXPENDITURES FY20
$ 510,633
School Zone Lights
46,510
Update City Street Signs
81,000
Sidewalk Construction/Repair
100,000
100,000
100,000
100,000
100,000
100,000
Wheel Loader
130,000
Tandum Axle Dump Truck
115,000
Brush Truck
50,000
Pavement Marking Unit
85,000
TOTAL EXPENDITURES FY21
$
1,006,250
TOTAL EXPENDITURES FY22
$ 863,201
TOTAL EXPENDITURES FY23
$
951,474
TOTAL EXPENDITURES FY24
$
705,400
TOTAL EXPENDITURES FY25
$
705,400
TOTAL EXPENDITURES FY26
$
705,400
BEGINNING FUND BALANCE
$
553,344
539,111
762,942
494,079
394,063
234,808
351,198
501,509
BUDGET RESERVE -5%OFEXPENSES
25,213
13,342
38,146
31,020
41,465
35,270
35,270
35,270
UNRESTRICTED RESERVE BALANCE
$
528,131
$ 525,769
$
724,797
$ 463,059 $
352,598 $
199,538 $
315,928 $
466,239
TOTAL REVENUES
733,220
734,464
737,387
763,185
792,220
821,790
855,711
891,314
TOTAL EXPENDITURES+TRANSFERS
747,454
510,633
1,006,250
863,201
951,474
705,400
705,400
705,400
ENDING FUND BALANCE
$
513,897
$ 749,600
$
455,933
$ 363,043 $
193,343 $
315,928 $
466,239 $
652,153
DISCRETIONARY SALES TAX FUND (DST)
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21 FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
DST Revenue (3.9%> 20-21, then 4.5% Growth)
$
3,524,825 $
3,426,81a $
3,581,025 $
3,742,171 $
3,910,569 $
4,086,544 $
4,270,439 $
4,462,608
Principal from $285,000 Airport Advance 09/29/08
6,730
61999
7,279
7.570
7,873
10,188
10,596
10,596
Interest from $285,000 Airport Advance
11,270
11,001
10,721
10,430
10.127
9,812
9,404
9,404
Principal from $267,511 Airport Advance 01/05/11
1,946
2,024
2,105
8,189
8,517
8,858
9,212
9,212
Interest from $267,511 Airport Advance
10.554
10,476
10,395
10,311
9,983
9.642
9,288
9,288
Investment Income
85,250
42,999
58,678
26,838
33,255
31.261
42,582
59,868
DST PROJECT REVENUE
$
3.640,575 $
3,500,317 $
3,670,203 $
3,805,508 $
3,980.324 $
4.156,306 $
4,351.521 $
4,560,977
Stormwater Debt (Retires 5101/22)
$
402,914 $
401,355 $
400,961 $
234,292 $
- $
- $
-
Server/Host Update
43.196
43,195
43.195
43,195
43,195
City Computers
1,386
10,000
35,000
45.000
35,000
46,000
35.000
45,000
Police Computers
34.376
75,000
-
-
-
-
-
-
Audio Visual Equipment
5,000
75,000
-
-
-
-
-
COSty Equipment
10,000
10,000
10,000
10,000
10,000
10,000
Phone System
100,000
Network Infrastructure
-
26,804
39,000
30,000
30.000
30,000
30,000
30,000
Over -the -Air Connections
-
10,000
20.000
Core and Remote Switches
25,000
20,000
Firewall Software
2,893
Police Vehicles
412,613
355,000
373,500
300,000
305.000
310.000
315,000
320,000
Speed Trailers
13,530
Police Evidence Building/Fixtures
49.904
40,000
Police Dispatch Equipment
73,050
191,000
Street Reconstruction
320,469
500,000
260,000
Roads Division Heavy Equipment
51,462
CavCor Boat Parking Paving Completion
56,810
Facilities Maintenance Truck
65,000
Public Facilities Compound
5,088,899
1,250,000
1,250,000
1,000,000
City Emergency Generators
24,118
175,247
Four Post Hydraulic Lift
11,536
Pickle Ball Courts
120.751
Community Center Offices
40,000
Barber Street Lightning System
24,000
Purchase 190 Sebastian Blvd.
1,842
Harrison Street Park Plaza
270,000
250,000
N. Central Avenue Event Plaza Design
40,000
250,000
250.000
Tree Protection Plan
135,000
135,000
Working Waterfront Phase 2A Enhancements
6,320
25,700
Working Waterfront Phase 3 Parking Lot
19,671
Oyster Pointe Drainage
36.567
Tiki Bar Drainage
43.768
Canal Restoration
250.000
500,000
500.000
500,000
500,000
500.000
500,000
Stonecrop Drainage
12,425
33,645
Slip Lining
100,000
100,000
100,000
100,000
100,000
100,000
Renovate Golf Tees (Transfer to Golf Course)
50,000
Golf Clubhouse Water Hookup (Transfer to Golt Course)
60,000
Airport Master Plan Design/Environmental Study
2,800
Airport Shade Hangars
112,890
Taxiway "C"; D" and "E" Construction
114,D47
64,027
Security Cameras
47.843
Construction of Hangar "D"
13.840
260,000
Taxi Lane/Taxiway Alpha Design
3,199
Construct Taxi Lane
24,963
Establish Sewer Services
200,000
Economic Development Hangar
500,000
Construct Square Hangars
176,679
Rehab Taxiway Alpha Apron
58,000
Rehab runway 05123
110,000
Apron Reconstruction
30,000
TOTAL EXPENDITURES FY 19
Zi
1,61U,046
TOTAL EXPENDITURES FY 20
/,bb5,:tb1
TOTAL EXPENDITURES FY 21
2,9Sb,1519
TOTAL EXPENDITURES FY 22
4,142.1 tiff
TOTAL EXPENDITURES FY 23
2,bb3, 19b
TOTAL EXPENDITURES FY 24
L,U93,19b
TOTAL EXPENDITURES FY 25
1,U10,000
TOTAL EXPENDITURES FY 26
b,wb.y//
BEGINNING FUND BALANCE
$
3.654,598 $
5,584,628 $
1,519,593 $
2.254,178 $
1,917,520 $
3,244,650 $
5,307,760 $
8,649.281
BUDGET RESERVE - 5%OF EXPENSES
80,527
378,268
146,781
207,108
132,660
104.660
50,500
-
RESERVE FOR ADVANCES
614,424
505401
496017
480,258
463,868
444,822
425,014
405,206.
UNRESTRICTED RESERVE BALANCE
$
2,959,647 $
4,700,t $
876S5 $
1,566,811 $
1,320,993 $
2,695,168 $
4,832,246 $
8,244,075
TOTAL REVENUES
3,640,575
3,500,317
3,670,203
3,805,508
3,980.324
4,156,306
4,361,621
4,560,977
TOTAL EXPENDITURES+DEBT+TRANSFERS
1.610,546
7,565,351
2.935,619
4.142,166
2,653,195
2,093.195
1,010,000
-
ENDING FUND BALANCE
$
4.989,676 $
635,925 $
1,611,380 $
1,230,154 $
2,648,122 $
4,758,278 $
8,173,767 $
12,605,052
Cash on Hand
$
5,070,204 $
1,014,192 $
1,758,161 $
1,437,262 $
2,780,782 $
4,862,936 $
8,224,267 $
12,805,052
Advanos F
$285,000 Airport Advance 09/29108
213,919
$267,611 Airport Advance 01105111
191,287
%
405,206
Tax Increment from City
Tax Increment from County
Rents
Clambake Donation to Riverfront Sidewalks
Transfer for Crabby Bill's Roof Repair (From R&R Account)
Lagoon Council Sewer Connection Grant
Investment Income
PROJECTED REVENUE
Waterfront Renovations/Expenses (Crabby Bills)
Facade/Sign Improvement Program
Sewer Connection Program
Special Events
Operating Expenditures
Update CRA Master Plan
Wayfinding Signage
Working Waterfront
Riverview Park Sidewalk Replacement
Tree Plan ConsultanttTree Program
TOTAL EXPENDITURES FY19
TOTAL EXPENDITURES FY20
TOTAL EXPENDITURES FY21
TOTAL EXPENDITURES FY22
TOTAL EXPENDITURES FY23
TOTAL EXPENDITURES FY24
TOTAL EXPENDITURES FY25
TOTAL EXPENDITURES FY26
BEGINNING FUND BALANCE
ANNUALREVENUES
ANNUAL EXPENDITURES
ENDING FUND BALANCE
Detail on Ooeratina Expenditures:
Indian River County Tax Assessor
City of Sebastian Administration
Landscaping
Other Contractual
Submerged Land Lease
Travel
Training and Education
Legal Advertisements
Supplies
CRA Association
Florida Redevelopment Association Dues
Landfill Fee for Fisherman's Landing
Total Operating Expenditures
RIVERFRONT CRA FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19 FY 19-20 FY 20-21 FY 21-22 FY 22-23
$ 183,130 $ 182,732 $ 194,804 $ 204,544 $ 214,771
201,086 220,508 235,065 246,818 259,159
36,000 36,000 36,000 36,000 36,000
3,000
20,457
59,008 100,000 100,000
14,101 18,750 9,209 24,531 24,855
6 516,782 $ 557,990 $ 475,078 $ 611,893 $ 534,785 $
6 35,466 $ 18,753 $ 20,000 $ 20,000 $ 20,000 $
- 15,000 40,000 40,000 40,000
170,253 200,000 - 200,000
43,460 40,000 48,500 48,500 48,500
261,828 270,937 191,717 183,009 185,781
35,780 -
- 113,000
- 45,000
- 32,041
19,705
> 566,492
$ 689,731
$ 345,217
$ 491,509
$ 294,281
FY 23.24 FY 24-25 FY 25-26
$ 225.510 $ 236,786 $ 248,625
272,117 285,723 300,009
36,000 36,000 36,000
100,000
100,000
46,626
50,552
76,476
680,253 $
609,061 $
761,110
20,000 $
20,000 $
20,000
40,000
40,000
40,000
200,000
-
200,000
48,500
48,500
48,500
188,637
191,578
194,608
$ 497,137
$ 300.078
$ 503,108
$ 443,814 $ 394,104 $ 262,363 $ 392.224 $ 512,608 $ 753,112 $ 936,228 $ 1,245,210
516,782 557,990 475,078 611,893 534,785 680,253 609,061 761,110
566,492 689,731 345,217 491,509 294,281 497,137 300,078 503.108
$ 394,104 $ 262,363 $ 392,224 5 512,608 $ 763,112 5 936.228 $ 1,245,210 S 1,503,212
$ 5,000 $ 5,000 $ 5,000 $
90,372 99,076 89,725
156,444 160,000 78,222
- - 10,500
5,480 4,200 4,300
- - 500
395 400
5,000 $ 5,000 $
92,417 95,189
78,222 78,222
4,300 4,300
569
200
1,000
1,000
1,000
365
-
-
-
-
175
175
175
175
175
495
495
495
495
495
2,928
1,396
1,400
1,400
1,400
$ 261,828
$ 270,937 $
191,717
$ 183.009
$ 185,781
5,000 $ 5,000 $ 5,000
98,045 100,986 104,016
78,222 78,222 78,222
4,300 4,300 4,300
1,000 1,000 1,000
175 175 175
495 495 495
1,400 1,400 1,400
$ 188,637 $ 191,578 $ 194,608
Stormwater Fees
Sale of Fixed Assets
Investment Income
TOTAL REVENUE FUND REVENUE
Personnel
Operating Accounts
Landscaping Contract
NPDES 5 Year Permit
Total Operational and Maintenance
Stormwater Master Plan
Concrete Chipping Hammer
Level, Saw and Pin Locator
Pumps, Sod Cutter and Compactor
Mini Excavators
Equipment Trailer
Track Excavator
Zippy Head Mowers
Lowboy Tractor 8 Trailer
Transfers Out to Stormwater Projects Fund
Stormwater Improvements
TOTAL REVENUE FUND EXPENDffURES
BEGINNING FUND BALANCE
BUDGET RESERVE -15% TO 5% OF EXPENSES
UNRESTRICTED RESERVE BALANCE
ANNUAL REVENUES
ANNUAL EXPENDITURES
ENDING FUND BALANCE
Transfers In from Stormwater Revenue Fund
Grants
TOTAL PROJECT REVENUE
Stonecrop Drainage
Roadway Swale/Culvert Work
Tulip Road Crossing
Bayfront Road Crossing
Ocean Cove
Concha Dam
TOTAL PROJECT EXPENDITURES
STORMWATER UTILITY REVENUE FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
$ 2,038,668
$ 2,038,668
$ 2,038,668
$ 2,038,668
$ 2,038,668
$
2,038,668
$ 2,038,668
$ 2,038,668
-
38,250
37,764
36,083
44,844
46,281
39,441
41,764
39,459
40,346
$ 2,076,432
$ 2,113,001
$ 2,083,512
$ 2,084,949
$ 2,078,109
$
2,080,432
$ 2,078,127
$ 2,079,014
$ 848.908
$ 672,310
$ 697,055
$ 714,481
$ 732,343
$
750,652
$ 769,418
$ 788,654
536,318
631,512
734,983
734,983
734,983
734,983
734,983
734,983
78,222
78,222
78,222
78,222
78,222
78,222
7,988
$ 1,385,226
$ 1,303.822
$ 1,510,260
$ 1,527,686
$ 1,553,536
$
1,563,857
$ 1,582,623
$ 1,601,859
200,000
1,868
4,050
16,330
55,000 58,000
25,000
182,793 225,000
48,000
165,000
275,000 100,000 900,000 350,000 350,000 450,000 100,000
133,759
$ 1,537,183 $ 1,761,615 $ 2,052,310 $ 2,427,686 $ 1,958,536 $ 2,196,857 $ 2,032,623 $ 1,701,859
$ 360,464 $ 889,713 $ 1,241,099 $ 1,272,301 $ 929,564 $ 1,049,136 $ 932,711 $ 978,214
76,869 88,081 102,616 121,384 97,927 109,843 101,631 85,093
$ 273,605 $ 801,632 $ 1,138,484 $ 1,150,917 $ 831,637 $ 939,293 $ 831,080 $ 893,121
2,076,432 2,113,001 2,083,512 2,084,949 2,078,109 2,080,432 2,078,127 2,079,014
1,537,183 1,761,615 2,052,310 2,427,686 1,958,536 2,196,857 2,032,623 1.701.869
$ 812,854 $ 1,153,018 $ 1,169,686 $ 808,180 $ 951,210 $ 822,868 $ 876,583 $ 1,270,276
STORMWATER UTILITY PROJECTS FUND
PROJECTED BALANCES
FY 18-19 FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 FY 24-25 FY 25-26
$ - $ 275,000 $ 100,000 $ 900,000 $ 350,000 $ 350,000 $ 450,000 $ 100,000
645,000
$ $ 920,000 $ 100,000 $ 900,000 $ 350,000 $ 350,000 $ 450,000 $ 100,000
$ 860,000
60,000 100,000 100,000 100,000 100,000 100,000 100,000
250,000
250,000
350,000
$ 800,000
$ $ 920,000 $ 100,000 $ 900,000 $ 350,000 $ 350,000 $ 450,000 $ 100,000
RECREATION IMPACT FEE FUNDS
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Recreation Impact Fees
$
129,550
$ 150,000
$ 150,000
$ 150,000
$ 150,000
$ 150,000
$ 150,000
$ 150,000
Investment Income
14,251
7,024
5,000
4,663
7,896
12,791
14,430
19,652
PROJECTED REVENUE
$
143,801
$ 157,024
$ 155,000
S 154,663
5 157,896
$ 162,791
$ 164,430
$ 169,652
Community Center (Paving/Drainage/Ligl $
6,160
$ -
$ -
$ -
$ -
$ -
$ -
$ -
AII Inclusive Dock
-
40,000
Football Field Restrooms
137,172
Pickle Ball (Also See DST)
120,751
302,072
Bark Park Shade Structure
129
13,871
Park Improvements
12,487
20,000
20,000
20,000
20,000
20,000
20,000
20,000
Park Identification Signage
22,990
102,010
30,000
30,000
TOTAL EXPENDITURES FY 19
$
299,689
Barber Street Football Bleachers
20,000
Barber Street Baseball Dugouts
60,000
40,000
Barber Street Fencing
73,000
Playground Improvements
70,000
40,000
40,000
110,000
40,000
80,000
TOTAL EXPENDITURES FY 20
$ 630,953
TOTAL EXPENDITURES FY 21
$ 160,000
TOTAL EXPENDITURES FY 22
$ 90,000
TOTAL EXPENDITURES FY 23
$ 60,000
TOTAL EXPENDITURES FY 24
$ 130,000
TOTAL EXPENDITURES FY 25
$ 60,000
TOTAL EXPENDITURES FY 26
$ 100,000
BEGINNING FUND BALANCE
$
653,069
$ 497,181
$ 23,252
$ 18,252
$ 82,915
$ 180,811
$ 213,601
$ 318,031
TOTAL REVENUES
143,801
157,024
155,000
154,663
157,896
162,791
164,430
169,652
TOTAL EXPENDITURES
299,689
630,953
160,000
90,000
60,000
130,000
60,000
0
ENDING FUND BALANCE
$
497,181
$ 23,252
$ 18,252
$ 82,915
$ 180,811
$ 213,601
$ 318,031
$ 487,683
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
BEGINNING FUND BALANCE:
Zone A
Zone B
Zone C
Zone D
All Zones
Recreation Impact Fees
Zone A
Zone B
Zone C
Zone D
All Zones
Investment Income
Zone A
Zone B
Zone C
Zone D
All Zones
Transfers:
Zone A
Zone B
Zone C
Zone D
All Zones
Ending Balances:
Zone A
Zone B
Zone C
Zone D
All Zones
$
109,404
$
41,809
$
796
$
11,667
$
21,707
$
51,657
$
55,713
$
87,390
136,776
108,781
17,363
796
18,656
58,332
72,847
115,656
114,001
78,474
4,821
558
18,370
38,020
31,137
11,192
292,888
268,116
271
10,230
29,181
37,802
58,904
108,792
S
653,069
$
497,180
$
23,251
$
23,251
$
87,914
5
185,810
$
218,600
$
323,030
$
13,730
$
10,000
$
15,000
$
30,000
$
30,000
$
30,000
$
30,000
$
30,000
28,059
15,000
15,000
40,000
40,000
40,000
40,000
40,000
26,268
30,000
30,000
20,000
20,000
20,000
20,000
20,000
61,491
95,000
95,000
60,000
60,000
60,000
60,000
60,000
$
129,550
S
150,000
$
150,000
$
150,000
3
150,000
$
150,000
$
150,000
$
150,000
$
5,672
$
591
$
171
$
2,340
$
1,950
$
3,556
$
3,678
$
5,316
1,276
1,537
3,734
160
1,676
4,015
4,809
7,036
1,540
1,109
1,037
112
1,650
2,617
2,055
681
5,764
3,788
58
2,051
2,621
2,602
3,888
6,618
S
14,251
5
7,024
$
5,000
5
4,663
$
7,896
5
12,791
$
14,430
S
19,652
$
86,997
$
51,603
$
4,300
$
22,300
$
2,000
$
29,500
$
2,000
$
22,000
$
57,330
$
107,955
$
35,300
$
22,300
$
2,000
$
29,500
$
2,000
$
22,000
$
63,335
$
104,762
$
35,300
$
2,300
$
2,000
$
29,500
$
42,000
$
22,000
$
92,027
$
366,633
$
85,100
$
43,100
$
54,000
$
41,500
$
14,000
$
34,000
$
299,689
$
630,953
$
160,000
$
90,000
5
60,000
$
130,000
$
60,000
$
100,000
$
41,809
$
796
$
11,667
$
21,707
$
51,657
$
55,713
$
87,390
$
100,707
108,781
17,363
796
18,656
58,332
72,847
115,656
140,692
78,474
4,821
558
18,370
38,020
31,137
11,192
9,873
268,116
271
10,230
29,181
37,802
58,904
108,792
141,410
$
497,180
$
23,251
$
23,251
$
87,914
$ 185,810
$
218,600
$
323,030
$
392,682
FY 19
7 Year
Ending
Income
Balances
Thru FYI9
Zone A
796
369,174
Proves We are Spending Income Received Within Past 7 Years
Zone B
17,363
199,445
Zone C
4,821
140,181
Zone D
271
428,098
Payments in Lieu of Parking
Investment Income
PROJECTED REVENUE
Expenditures:
None Programmed
PROJECTED DISBURSEMENTS
NONEXPENDABLE TRUST FUND:
BEGINNING FUND BALANCE
REVENUES
EXPENDITURES
ENDING FUND BALANCE
PARKING IN LIEU OF FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19 FY 19-20 FY 20-21 FY 21-22
FY 22-23
FY 23-24
FY 24-25 FY 25-26
$ - $ 500 $ 3,000 $ 3,000
$ 3,000
$ 3,000
$ 2,500 $ -
1,393 1,344 1,376 1,493
1,601
1,711
1,824 1,928
$ 1,393 $ 1,844 $ 4,376 $ 4,493
$ 4,601
$ 4,711
$ 4,324 $ 1,928
$ 54,598 $ 55,991 $ 57,835 $ 62,211 $ 66,704 $ 71,305 $ 76,016 $ 80,340
1,393 1,844 4,376 4,493 4,601 4,711 4,324 1,928
$ 55,991 $ 57,835 $ 62,211 $ 66,704 $ 71,305 $ 76,016 $ 80,340 $ 82,269
CEMETERY TRUST FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Lot Sales
$
111,350
$ 105,000
$ 105,000
$ 105,000
$
105,000
$
105,000
$
105,000
$ 105,000
Interest Income
24,824
10,453
9,379
8,678
8,265
8,097
8,328
8.422
PROJECTED REVENUE
$
136,174
$ 115,453
$ 114,379
$ 113,678
$
113,265
$
113,097
$
113,328
$ 113,422
Expended from Permanent Endowment:
Cemetery Equipment
-
19,500
-
-
14,000
Cemetery Driveway Resurfacing
15,000
-
-
-
Cemetery Grounds Improvements
-
20,000
20,000
40,000
General Fund Transfer for Operations
55.000
80,000
85,000
90,000
90,000
90,000
90,000
90,000
TOTAL OPERATIONAL EXPENDITURES
$
55,000
$ 80,000
$ 139,500
$ 110,000
$
130,000
$
90,000
$
104,000
$ 90,000
Expended from Non -Endowed (Capital):
Improvements to Sand Hill Section
41,478
150,000
Columbarium Niches
45,000
45,000
PROJECTED CAPITAL DISBURSEMENTS
41,478
150,000
45,000
45,000
-
-
-
-
TOTAL PROJECTED DISBURSEMENTS
$
96,478
$ 230,000
$ 130,000
$ 135,000
$
90,000
$
90,000
$
90,000
$ 90,000
PERMANENT ENDOWMENT:
BEGINNING FUND BALANCE
$
708,034
$ 708,709
$ 681,209
$ 594,209
$
536,709
$
459,209
$
421,709
$ 370,209
ANNUAL REVENUES
55,675
52,500
62,500
52,500
52,500
52,500
52,500
52,500
ANNUAL EXPENDITURES& TRANSFERS
(55,000)
{80,000)
(139,500}
(110,000)
i130,00M
f90,000)
(104,000)
(90,0001
ENDING FUND BALANCE
$
708,709
$ 681,209
$ 594,209
$ 536,709
$
459,209
$
421,709
$
370,209
$ 332,709
NON -ENDOWED (Capital)
BEGINNING FUND BALANCE
$
304,725
$ 343,746
$ 256,699
$ 273,578
$
289,756
$
350,521
$
411,118
$ 471,946
ANNUAL REVENUES
80,499
62,953
61,879
61,178
60,765
60,597
60,828
60.922
ANNUAL EXPENDITURES
(41,478)
(150,0m
(45,000)
f45,000}
-
-
-
ENDING FUND BALANCE
$
343,746
$ 256,699
_V 273,578
$ 289,756
$
350,521
$
411,118
$
471,946
$ 532,868
TOTAL ENDING BALANCE OF TRUST FUND $
1,052,465
$ 937,908
$ 867,787
$ 826,465
$
809,730
$
832,827
$
842,155
$ 865,577
Charges for Services (.5% per year increase)
Proshop Sales
Rents
Other Revenue
Sale of Carts or Equipment
Investment Income
Transfer from DST Fund
PROJECTED REVENUE
Personnel (2.5% per year on Full-time)
Operating Costs
Proshop Cost of Sales
Airport Rent
Capital Lease Principal - Golf Carts
Capital Lease Interest - Golf Carts
Repayment of General Fund Cash Flow Loans
Replace Irrigation Pump
Clubhouse Water Hookup
Renovate Golf Tees
Driving Range Equipment
Irrigation Software Upgrade
Interest Payment to Building Fund
Principal Payment to Building Fund
TOTAL FY 19
TOTAL FY 20
TOTAL FY 21
TOTAL FY 22
TOTAL FY 23
TOTAL FY 24
TOTAL FY 25
TOTAL FY 26
BEGINNING UNRESTRICTED RESOURCES
TOTAL REVENUES
TOTAL OPERATING FUND EXPENDITURES
ENDING UNRESTRICTED RESOURCES
Capital Purchases
Principal on Building Loan
Principal on Golf Cart Loan
Depreciation
Net Increase in Net Investment in Capital Assets
Due to Other Funds Balances
Building Fund Advance Balance
CAM Unrestricted Balance
GOLF COURSE FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20 FY 20-21 FY 21-22
$1,277,094
$1,297,108 $ 1,356,449 $1,363,231
87,462
100,000 105,000 105,000
27,463
30,000 30,000 30,000
4,159
8,060 8,460 8,460
1,512
1,210
3,570
FY 22-23 FY 23-24
$ 1,370,047 $ 1,376,898
105,000 105,000
30,000 30,000
8,460 8,460
111,652 48,605
FY 24-25 FY 25-26
$ 1,383,782 $ 1,390,701
105,000 105,000
30,000 30,000
8,460 8,460
110,000
$ 1,401,260
$ 1,546,378
$ 1,499,909
$ 1,506,691
$ 1,625,159
$ 1,568,963
$ 1,527,242
$ 1,534,161
$ 367,734
$ 373,893
$ 389,913
$ 394,184
$ 398,561
$ 403,048
$ 407,647
$ 412,361
770,339
765,526
790,104
790,104
790,104
790,104
790,104
790,104
64,066
70,000
70,000
70,000
70,000
70,000
70,000
70,000
106,000
106,000
106,135
106,135
106,135
106,135
106,135
106,135
49,997
51,768
53,602
50,801
-
49,997
51,768
53,602
6,394
4,623
2,789
890
-
6,394
4,623
2,789
35,800
26,201
35,000
35,000
35,000
35,000
35,000
35,000
10,892
60,000
50,000
5,290
14,000
8,604
8,213
7,819
7,421
7,015
6,605
6,190
5,767
29,764
30,154
30,547
30,947
31,352
31,762
32,177
32,598
$ 1,449,590
$ 1,546,378
$ 1,499,909
$ 1,490,772
$ 1,438,167
$ 1,499,045
$ 1,503,644
$ 1,508,356
$ (623,866)
$ (672,196)
$ (672,196)
$ (672,196)
$ (656,276)
$ (469,284)
$ (399,367)
$ (375,768)
1,401,260
1,546,378
1,499, 909
1,506,691
1,625,159
1,568,963
1,527,242
1,534,161
(1,449,590)
(1,546,378)
(1,499,909
(1,490,772
(1,438,167}
(1,499,045
(1,503,644)
(1,508,356)
$ (672,196)
$ (672,196)
$ (672,196)
$ (656,276)
$ (469,284)
$ (399,367)
$ (376,768)
$ (349,963)
' Adjust Interest for FY 21-22
(after 5th year)
to 1%
below 20 year
Treasury Bond.
10,892
-
29,764
30,154
30,547
30,947
31,352
31,762
32,177
32,598
49,997
51,768
53,602
50,801
49,997
51,768
53,602
(219,216)
(219,216)
(219,216)
(219,216)
(219,216)
(219,216)
(219,216)
(219,216)
667,959
(500,000)
(473,799)
(438,799)
(403,799)
(368,799)
(333,799)
(298,799)
(263,799)
(1,205,294)
(1,176,140)
(1,144,593)
(1,113,646)
(1,082,294)
(1,050,532)
(1,018,355)
(985,757)
$(1,838,094)
$(2,458,429)
$(2,390,655)
$(2,311,189)
$(2,108,241)
$(1,921,155)
$(1,828,193)
$(1,732,535)
AIRPORT FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
OPERATING FUND:
Fuel Sales Revenue
$ 12,278 $
-
$ -
$ -
$ -
$
-
$ -
$
Pickle Ball Courts Rents
-
6,795
6,795
6,795
6,795
6,795
6,795
6,795
Golf Course Rents
106,000
106,000
106,135
106,135
106,135
106,135
106,135
106,135
Facilities Maintenance Rents
6,000
6,000
6,000
6,000
6,000
6,000
6,000
6,000
Police Storage Area
576
Other Rents (Without Growth)
331,628
347,434
359,685
359,685
359,685
359,685
359,685
359,685
Sale of Fixed Assets
46,450
820
-
-
-
-
-
Investment Income
-
3,250
-
-
-
-
-
-
Other Revenue
84,031
79,819
83,314
83,314
83,314
83,314
83,314
83,314
Transfer from General Fund
-
4,691
-
-
-
-
-
PROJECTED REVENUE
$ 586.387 $
554,809
$ 562,505
$ 561,929
$ 561,929
$
561,929
$ 561,929
$
561,929
Personnel
122,346
69,110
69,888
71,635
73,426
75,262
77,143
79,072
Operating Costs
285,849
181,913
177,251
177,251
177,251
177,251
177,251
177,251
General Fund Management Fee
-
93,485
116,866
120.372
123,983
127,703
131,534
135,480
Fuel Purchases for Resale
8,946
Air Conditioners
18,000
20,000
20,000
AED for Terminal Building
1,286
Paint Terminal Building
21,700
Fire Control Panel
2,268
Update Fuel Terminal
19,253
Weather Reporting System
1,244
Equipment
38,281
Airport Drive East Street Lights
11,000
Transfer to Airport Construction Fund
63,321
-
-
-
-
_
Repayment of General Fund Advance
40,000
25,000
150,000
-
-
Repayment of DST Advances and Interest
30,500
30,500
30,500
36,500
36,500
38,500
38,500
38,500
TOTAL FY 19
$ 596,713
TOTAL FY 20
$
449,289
TOTAL FY 21
$ 562,505
TOTAL FY 22
$ 425,758
TOTAL FY 23
$ 431,160
TOTAL FY 24
$
418,715
TOTAL FY 25
$ 424,428
TOTAL FY 26
$
430,303
BEGINNING RESOURCES
$ (133,240) $
(143,566)
$ (38,046)
$ (38,046)
$ 98,124
$
228,893
$ 372.107
$
509,608
TOTAL REVENUES
586,387
554,809
562,505
561,929
561,929
561,929
561,929
561,929
TOTAL EXPENDITURES+DEBT+TRANSFERS
596,713
(449,289
(562,505
(425,758
(431,160
(418,715)
(424,428)
(430,303
ENDING UNAPPROPRIATED RESOURCES
$ �143,566) $
(38,046)
$ (38,046�
$ 98,124
$ 228,82
$
372,107
$ 509,608
$
641,234
CAPITAL FUND:
BEGINNING RESOURCES
$ 238,526 $
98,956
$ -
$ -
$ -
$
-
$ -
$
_
Grants
2,666,621
1,000,000
1,274,301
1,440,603
2,090,000
120,000
Transfers from Airport Revenue
63,321
Transfers from DST
204,497
250,000
224,963
734,679
110,000
30,000
Airport Master Plan
12,350
Tree Removal
9,000
Shade Hangars
564,451
Hangar D
69,199
1,348,956
Security Gate
7,606
Taxiway C
2,411.403
Contruct Taxi Lane
499,264
Construction of Square Hangars
885,282
Establish Sewer Service
1.000,000
Economic Development Hangar
1,000,000
Rehab Taxiway Alpha Apron
290,000
Rehab Runway 05/23
2,200,000
Apron Reconstruction
160,000
ENDING RESOURCES
$ 98,956 $
-
$ -
$ -
$ -
$
-
$ -
$
-
TOTAL OPERATING AND CAPITAL
$ (44,610) $
(38,046)
$ (38,046)
$ 98,124
$ 228,893
S
372,107
$ 609,608
$
641,234
General Fund Advance Balance
175,000
150,000
-
-
-
-
-
DST Fund Advance Balance
(536,913)
(527,890)
1518,506
502,747
(486,357
(467,311)
(447.503)
(427,695)
CAFR Unrestricted Balance
$ (406,523) $
(415,936)
$ (556,552�
$ 404,623
$ (257,464)
$
(95,204)
$ 62,105
$
213,539
BUILDING FUND
PROJECTED BALANCES
FISCAL YEARS 2021-2026
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
FY 24-25
FY 25-26
Operating Revenue (No Growth)
$ 862,650
$ 874,000
$
862,450
$ 862,450
$ 862,450
$ 862,450
$ 862,450
$ 862,450
Other Revenue
1,417
2,100
2,100
2,100
2,100
2,100
2,100
2,100
Principal on Golf Course Loan
29,764
30,154
30,547
30,947
31,352
31,762
32,177
32,598
Interest on Golf Course Loan
8,604
8,213
7,819
7,421
7,015
6,605
6,190
5,767
Investment Income
15,128
11,500
16,822
16,957
17,220
17,218
16,941
16,379
PROJECTED REVENUE
$ 917,563
$ 925,967
$
919,738
$ 919,875
$ 920,137
$ 920,135
$ 919,858
$ 919,294
Pickup Truck
22,573
Personnel
593,833
Operating Costs
100,861
TOTAL FY 19
$ 694,694
Personnel
612,647
Operating Costs
122.412
TOTAL FY 20
$ 757,632
Personnel
$
733,076
Operating Costs
150,073
Front Counter Renovations
24,000
TOTAL FY 21
$
907,149
Personnel
751,403
Operating Costs
150,073
TOTAL FY 22
$ 901,476
Personnel
770,188
Operating Costs
160,073
TOTAL FY 23
$ 920,261
Personnel
789,443
Operating Costs
150,073
TOTAL FY 24
$ 939,516
Personnel
809,179
Operating Costs
150,073
TOTAL FY 25
$ 959,252
Personnel
829,408
Operating Costs
150,073
TOTAL FY 26
$ 979,481
BEGINNING RESOURCES
$ 350,937
$ 573,806
$
742,141
$ 754,730
$ 773,130
$ 773,006
$ 753,625
$ 714,232
TOTAL REVENUES
917,563
925,967
919,738
919,875
920,137
920,135
919,858
919,294
EXPENDITURES+DEBT+TRANSFERS
694,694
757,632
907,149
901,476
920,261
939,516
959,252
979,481
ENDING UNRESTRICTED RESOURCES
$ 573,806
$ 742,141
$
754,730
$ 773,130
$ 773,006
$ 753,625
$ 714,232
$ 654,044
Depreciation
(21,153)
(21,153)
(21,153)
(21,153)
(21,153)
(21,153)
(21,153)
(21,153)
Capital Purchases
-
22,573
-
Net Decrease in Net Investment in Capital As
31,742
-
-
-
Golf Course Fund Advance Balance
1,205,294
1,175,140
1,144,593
1,113,646
1,082,294
1,050,532
1,018,355
985,757
CAM Unrestricted Balance
$ 1,789,689
$ 1,918,701
$
1,878,170
$ 1,865,623
$ 1,834,147
$ 1,783,004
$ 1,711,434
$ 1,618,648
Capital Improvement Program
FY 2021 t 2026
Presentation of Proposed CIP
Planning and Zoning Commission
Thursday, August 6, 2020
Prepared By:
Ken Killgore, Administrative Services Director/CFO
Proposed
Capital Improvement Program
Packets Include Detailed Documents
Describing Staffs CIP Proposals.
Tonight's Objectives:
Present Highlights of the Program.
Hear Comments and Suggestions.
Consider Motion to Recommend
Proposed CIP to the City Council.
Capitca' Improvement Proorq,ryj
o Schedules of Capital Improvements,
Largely Based on Operational Needs &
Financial Capability.
�> Budget Review Advisory Committee
Reviewed Regarding Entire Operating
Budget and Financial Strategies.
o City Council Review August 26th, Public
Hearings September 14th and 23rd,
Proposed
Capital Improvement Program
CIP Projects-,
General Government:
$914,090 in Technology Additions/Upgrades
to Stay Current &Provide Security. (DST)
$2,,310 Blueprint/Survey Shelving. (GF)
Police Department:
$1,923500 in Vehicles. (DST)
$224,,600 in Police Officer Equipment. (GF)
Proposed
Capital Improvement Program
Community Development: $520,000 Harrison St. Park Plaza & $540f 000
for N. Central Ave. Event Plaza. (DST)
> $45,,000 for Landscaping/Shoreline/Parking
Lot Work at Working Waterfront. (CRA)
$270,000 for Landscaping/Irrigation to
Protect Trees at Riverview Park. (DST)
$16,,500 Equipment in Support of Objectives
for "'Sustainable Sebastian" (General Fund)
$600,000 Septic to Sewer Grant Program
(Matched 50/50 With Grant and CRA Funds.)
Proposed
Capital Improvement Program
Roads Department:
$46510 for School Zone Lights.
$81,,000 to Update Street Signs.
$3,,400,,000 Street Work. (LOGY)
(LOGY)
(LOGY)
$500,000 Street Reconstruction. (DST)
$600,000 Sidewalk Replacements. (LOGY)
$48,400 Roads Equipment. (LOGY)
$380,,000 Roads Heavy Equipment. (DST)
hL- Proposed
Capital Improvement Proqrarg-
Public Facilities Department:
$3,500,000 to Total $8,,588,,899 to Complete
Public Works Compound. (DST)
$17,480 Fleet Equipment. (General Fund)
$33,500 Cemetery Equipment. (CTF)
$80,000 Cemetery Grounds Repairs. (CTF)
$15,000 Cemetery Driveway Repaving. (CTF)
$90,000 Cemetery Columbarium Niches. (CTF)
$20,000 Cemetery Bench Seats & Columbaria
Monuments. (General Fund)
� $118,,500 Maintenance Equip./Vehicle. (GF)
$6,800 Storage Shed Roof. (GF)
Proposed
Capital Improvement Program
Leisure Services Department:
$18,300 Restroom/Office Repairs. (GF)
$$56,,000 Maintenance Equipment. (GF)
$60,000 Park Identification Signage. (RIF)
$40,000 BarberStreet Baseball Dugouts. (RIF)
$75,000 Barber Street Fencing. (RIF)
$136,,000 Replacement Vehicles. (GF)
$350,000 Playground Improvements. (RIF)
$120,000 Park Improvements. (RIF)
$24,000 BarberStreet Lightning System. (DST)
Proposed
Capital Improvement Program
Stormwater Fund:
o $200,,000 Stormwater Master Plan. (SUF)
$583,,150 Equipment. (SUF)
o $600,,000 Slip Lining Pipes.
(DST)
o $600,000 Swale/Culvert Repairs. (SUF)
o $3,000,000 Canal Restoration. (DST)
o $800,000 Concha Dam Repairs. (SUF)
o $250,,000 Tulip Drive Road Crossing. (SUF)
$250,000 Bayfront Road Crossing. (SUF)
$350,000 Ocean Cove Drainage. (SUF)
Proposed
capital Improvement Progrqrr-
Golf Course:
$5,290 Driving Range Equipment. (GC)
$14.,000 Irrigation Software Upgrade. (GC)
Building Fund:
J
$24,000 Front Counter Renovations. (BF)
Proposed
Capital Improvement Program
Airport Projects: 90%FAA, 5% FDOT, 5%DST
$569,264 Construction of Taxiway.
$2,200,000 Rehab Runway 05/23.
Airport Projects: 80% FDOT, 20%DST
$885,262 Construct Square Hangars.
$1,000,,000 West Side Sewer Service.
$290,.000 Rehab Taxiway A Apron.
, $150,,000 Apron Reconstruction.
Airport Projects: 50% FDOT, 50%DST
$1,rOOO,,000 Economic Development Hangar.
Proposed
Capital Improvement Program
Stormwater
Enterprise Funds
Streets/Sidewalks
P/W Compound
Police Equipment
CRA Projects
Leisure Services
New- Technology
All Other
$6,633,150
6,137,836
4,500,000
31500,000
2,148,100
1,991,500
879,300
911,780
956,000
24
22
16
13
8
7
3
3
4
Discretionary Sales Tax
Grants
Local Option Gas Tax
Stormwater Fund
Recreation Impact
General Fund
CRA Fund
Cemetery Trust
Building Fund
Golf Course
Total CIP $2.7, 1166 100 TOM s
$12,953,922
51294,904
4,507,510
3,033,150
645,000
599,890
345,000
218,500
24,000
19,290
Capital Improvement Program
o Questions.?
o Comments or Concerns?
n Motion to Recommend Proposed
Capital Improvement Program to
the City Council.
C CnC#
7
AST
HOME OF PELICAN ISLAND
Community Development Department
Accessory Structure Staff Report
1. Property Owner:
2. Contractor:
3. Requested Action:
4. Project Location:
Mr. Thomas Klooz
Brian Coffey Construction
Approval of a 27' x 37' detached garage (999 sq. ft.)
402 Quarry Lane
Lots 17 & 18, Block 203, Sebastian Highlands Unit 8
5. Current Zoning: RS-10 Current Land Use: Single-family Residence
6. Required Findings:
Does Does Not
COMDIV COME)h
A. No accessory structure shall be constructed until the
construction of the principal structure has been started.
1. House completed 1994 ; or
house under construction
2. Accessory structure to be located on same lot as principal
structure ; or located on second lot that has
- r
V
been combined with principal lot by a unitv of title
Ref. Book # 3155. Pape 1706
•required
B. No accessory structure shall be located in any yard
(setback):
1. Front yard: No detached accessory structure shall extend
beyond the front building line of the principal structure that is
located on the same real estate parcel or lot. Principal
structure setback is 25.0' Accessory structure
setback is N/A
2. Front yard on corner lot: Accessory structures may not be
located in the secondary front yard of an improved corner lot
unless the corner lot is joined in unity of title with an interior
lot that contains the principle structure. However, said
accessory structures shall not be located closer than 25 feet
from the secondary front property line in the RS-10 zoning
district, and in all other zoning districts shall meet required
front yard setbacks. Secondary front yard setback is
20.0' and proposed accessory structure front yard
setback is 25.0'
Does
Comply
3. Side yard: Required side setback is 10,
Accessory structure side setback is 34'
4. Rear yard: The required rear yard is n/a . A detached
accessory structure may encroach into the required rear yard, N/A
provided it meets all the following:
a. It is a minimum 10 feet from the rear property line. N/A
Proposed accessory structure has a setback.
b. It is not in an easement. Rear easement is and N/A
proposed setback is
c. It does not exceed 400 square feet in lot coverage. Proposed N/A
accessory structure is square feet.
d. It does not exceed 12 feet in height. Proposed accessory N/A
structure is feet in height.
Accessory structures which are attached, or do not meet the
above four requirements must meet the standard rear setback N/A
which is Proposed accessory setback is
C. No mobile home, travel trailer or any portion thereof, or
motor vehicle shall be permitted as an accessory structure.
D. Applicant must expressly designate the type of the accessory
structure (i.e. garage, shed, etc.) Garage
E. Must comply with all city codes.
F. The height of accessory structure cannot exceed height of
principal structure. House is approximately 24'
and accessory structure will be 18'-10"
G. Attached or detached Quonset -type or style accessory
structures are prohibited.
H. A residential lot is allowed 5 square feet of accessory building
area (cumulative) for every 100 square feet of lot area, up to a
maximum 1000 square feet.
Property square footage _20.037.6 x .05 =
Allowable sq.ft. of accessory structures 1001.88 (1000 max.)
Existing accessory structures 0
Proposed accessory structure 999
Total existing and proposed 999
Does Not
Compl►
2
7. Planning and Zoning Commission Review:
Any attached or detached accessory building, carport or breezeway over 500 square feet in
area must be reviewed and approved by the Planning and Zoning Commission utilizing the
following criteria:
Does Does Not
ComnlN Comoly
A. Accessory structures may not be constructed or maintained
from corrugated metal or corrugated metal -looking products.
B. The roof of the accessory building must have a minimum pitch
of 3:12.
C. Accessory structures 501 sq.ft. to 750 sq.ft. in size shall be
compatible with the overall general architectural design of the
primary residence, including facade and materials, colors and
trim, roofing materials and pitch.
D. Accessory structures 751 sq.ft. to 1000 sq.ft. in size shall be of
the same architectural design of the primary residence,
including facade and materials, colors and trim, and roofing
materials and pitch. Foundation plantings shall be required
on all sides of the accessory structure excluding entranceways
and doorways, as follows: 1 shrub for every 3 lineal feet and 24
inches in height at planting.
Lineal dimension totals 112 _ 3 =
Total Shrubs Required 38
Review fee has been paid: YES X NO
Additional Considerations:
The location of the proposed garage sits behind the existing home in a secondary lot that is
adjoined by a recorded unity of title. The manner of construction appears to be identical to the
existing home which has a painted stucco finish and metal roof. Items that staff feels need to be
addressed would be that the applicant needs to amend the building department application to
reflect a metal roof to match the existing home; it appears that 112 1.f of perimeter landscaping
would be required which would necessitate the need for 38 shrubs to be planted around the
perimeter of the proposed garage. As the property is a developed on a double lot, the code
requires no less than 15 trees be kept or planted on site at the time of the certificate of completion
for the proposed garage. It should also be noted that a driveway permit has been applied for. Staff
also will require the $100 review fee for the accessory structure is paid prior to issuance of a
building permit.
The home was constructed in 1994, it appears that the proposed roof pitch match those on the
existing home; the finish floor elevation is approximately 1.7' below the finish floor of the home -
aesthetically making the proposed garage less "looming" over the existing home and surrounding
structures. The proposed finish elevation at 22.0' meets city requirements for the garage.
3
The Board must decide if any deleterious effects exist with regard to the applicant's request, and
make any necessary or additional recommendations.
For the Boards Consideration:
Staff recommends approval with the following conditions:
1. The applicant shall amend the building permit to reflect a metal roof to match the roof of the
existing home.
2. The garage shall be painted to match the existing home.
The applicant shall keep and maintain a minimum of 15 trees on the property & perimeter
landscaping around the proposed garage.
4. The $100 review fee will be required prior to issuance of a building permit.
Z� rh
to
0
MYOF
FBA�ST"
HOME OF PELICAN ISLAND
BUILDING DEPARTMENT
1225 MAIN STREET • SEBASTIAN, FLORIDA 32958
TELEPHONE: (772) 589-5537 • FAX (772) 589-2566
PERAIT APPLICATION
ALL OF THE FOLLOWING MUST BE FILLED IN BY APPLICANT, ACCORDING TO FS V35
PERMIT # 0�� TRACKING # DATE: 7 Y 2 O z n
INDIAN RIVER COUNTY PARCEL ID # 3 V 3 O o V o zzb3 vim" v� I �. RECEIVED B W
LOT:17 18 BLOCK: z C 3 SUBDIVISION: J .A t�Orl P & I (o FLOOD ZONE:
TYPE OF WORK: 2aW STRUCTURE []ADDITION []ALTERATION [] REPAIR []DEMOLITIONEI OTHER
WORK INCLUDES: 4TRUCTURAL []ELECTRICAL []PLUMBING EIMECHANICAL []ROOFING - SLOPE:_
[] POOL R ALUMINUM STRUCTURE [] SHED 0 FENCE [] SLAB OR DECK [] OTHER
WORK DESCRIPTION: U 0 I ' Vf al t'
ESTIMATED JOB VALUE: S 0, 3 80 "O O TOTAL S/F ! r
JOB NAME: K ko8 7-
JOB ADDRESS: -1 O;t Q UQI�YL� jnoi e
PROPERTY OWNER'S NAME: -'Cnr \ Vf rn[7 Z
ADDRESS:_ q 0.QA l Cry
CITY/STATE: 5 I-L
UNDER AIR
SUITE/UNIT NO.
PHONE:
ZIP CODE 5-"-Q5 6
CONTRACTOR BUSINESS NAME:$Yv!>ln r-e4 P -u CCa5AG W �%OfN LICENSE #: C [C 1301 q 7 QS
ADDRESS: NCB H 5 5 Sq +-N -lr�m- CONTACT PHONE _ C $G l ol5 315 Q
CITY/STATE: 1 e'm ZIP CODE S� C� n 7
CONTACT E-MAIL ADDRESS:_n(jr tT-r--af' n vn q r�':b r-f-y prl
ARCHITECT/ENyV1>EER: TP r 7- .. l P . PHONE: 7 7-^ , $ $c�`1 y
ADDRESS: 0530 0 u S � v+ K L 5 T
CITY/STATE: I'x: c t ft ZIP CODE: S -Lg1 to
CONTACT E-MATT. ADDRESS:
PRESENT USE: PROPOSED USE: G aracre- OCCUPANTLOAD:
NUMBER OF: OSTORIES []BAYS []UNITS []BEDROOMS LJHEIGHT
TYPE OF CONSTRUCTION: r $S
GROUP OCCUPANCY: AREA
IS THE BUILDING PRESENTLY EQUIPPED WITH AN AUTOMATIC FIRE SPRINKUR SYSTEM? AYES LOCO
BONDING COMPANY: PHONE: _
ADDRESS: _ CITY/STATE:
MORTGAGE LENDER: PHONE:
ADDRESS: CITY/STATE:
FEE SUffLE TITLE HOLDER PHONE:
ADDRESS: .. CITY/STATE:
1
APPLICATION IS HEREBY MADE TO OBTAIN A PERMIT TO DO THE WORK AND INSTALLATIONS AS INDICATED. I
CERTIFY THAT NO WORK OR INSTALLATION HAS COMMENCED PRIOR TO THE ISSUANCE OF A PERMIT AND THAT
ALL WORK WILL BE PERFORMED TO MEET THE STANDARDS OF ALL LAWS REGULATING CONSTRUCTION IN THIS
JURISDICTION. I UNDERSTAND THAT A SEPARATE PERMIT MUST BE SECURED FOR ELECTRICAL WORK
PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS AND AIR CONDITIONERS, ETC.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING
TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND
POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT
WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
A CERTIFIED COPY OF THE RECORDED NOTICE OF COMMENCEMENT SIGNED BY THE OWNER, SHALL BE FILED
WITH THE PERMITTING AUTHORITY IF THE VALUE IS $2,500 OR MORE, EXCEPT HEATING OR AIR CONDITIONING
CHANGE OUTS LESS THAT $7,500.
NOTICE: IN ADDITION TO THE REQUIREMENTS OF THIS PERMIT, THERE MAY BE ADDITIONAL RESTRICTIONS
APPLICABLE TO THIS PROPERTY THAT MAY BE FOUND IN THE PUBLIC RECORDS OF THE COUNTY, AND THERE
MAY BE ADDITIONAL PERMITS REQUIRED FROM OTHER GOVERNMENTAL ENTITIES SUCH AS WATER
MANAGEMENT DISTRICTS, STATE AGENCIES, OR FEDERAL AGENCIES.
ANY CHANGE IN BUILDING PLANS OR SPECIFICATIONS MUST BE RECORDED WITH THIS OFFICE. ANY WORK NOT
COVERED ABOVE MUST HAVE A VALID PERMIT PRIOR TO STARTING. IN CONSIDERATION OF GRANTS, THIS
PERMIT, THE OWNER, AND THE BUILDING CONTRACTOR AGREE TO ERECT THIS STRUCTURE IN FULL
COMPLIANCE WITH THE BUILDING AND ZONING CODES OF THE CITY OF SEBASTIAN.
NOTE: THIS PERMIT APPLICATION IS VOID AFTER 180 DAYS UNLESS THE WORK, WHICH IT COVERS, HAS
COMMENCED. ALL CONTRACTORS MUST HAVE A VALID STATE CERT VON, STATE REGISTRATION, OR
COUNTY COMPETENCY PLUS A COUNTY WIDE LICENSE PRIOR TO OBT IN ERMIT.
(ALL ADDI110 , ALTERATIONS OR REPAIRS MUST HAVE OWNER'S
•�• SIGNATURE OF OWNE ENT
I howt4S J� Klooz
PRINTED NAME OF OWNER/AGENT
DATE: S-5"- Za"
QUALIFIER'S St TORE
IV.rICA C.
PRINTED NAME OF QUALIFIER
DATE: `� " `Sr 2t. 2
COPY OF CONTRACT)
❖ Individuals who sign as the owner's agent must first obtain owner's written authorization to sign on their behalf
STATE OF FLOREDA "NOTARY IS FOR QUALIFIER'S SIGNATURE"
COUNTY OF
I hereby certify that on this S-M day f C l� 20 c cQ personally appeared
r-A t 1 i r +, � r !! who is personally known 4 me or has produced identification.
Type of identification produced:
��,� ,tit►. � (�.� �� �
Official Sign ure of Notary Public Notary Seal
Y CAITLYN SELLANTE
MY COMMISSION # GG043358
`I. EXPIRES October 31, 2020
6iLa5
723- c
arfOf
HOME OF PELICAN ISLAND
ENGINEERING/PUBLIC WORKS
1225 Main Street
Sebastian, FL 32958
(772) 589-5490 Phone
(772) 589-6209 Fax
DRIVEWAY/DRAINAGE PERMIT APPLICATION
Tracking # Permit #: Do - a 5 a a
Applicant's Name: BRIAN COFFEY CONSTRUCTION Phone: 772-473-7153
Address: 402 QUARRY LANE Lot: 17/18 Block: 203 Unit :R
Adjacent Street: Tuup QRlyl= Zoning:
Legal Description: SEBASTIAN HIGHLANDS UNIT 08 BLK 203 LOTS 17 & 18 PBl 6-14
Owner: TH—cMAS KLOOZ Phone:
Contractor: v Phone:
Proposed Construction Start: Finish:
CONDITIONS OF PERMIT
1. The applicant shall be required to follow the procedures and meet the requirements as outlined in City of Sebastian
Code of Ordinance Section 26-2, Section 90-86 and Section 90-87.
2. The applicant must protect affected utilities.
3. The applicant shall not obstruct nor create a hazard to any traffic during execution of the work and shall be
responsible for repair of any damage to existing pavement or other facilities caused by his/her operations.
4. The applicant shall complete construction within 180 days from the date the permit is issued after which time the
permit will be voided.
5. Driveway/Drainage Permit fees will $100.00 payable at time of application submittal.
MINIMUM SKETCH REOUIREMENTS
1. The sketch shall be on paper no larger than I I" x 17"
2. The scale shall be 1 " = 20"
3. The following information (as applicable) shall be in the lower right corner:
Subdivision name, zoning, project location, lot, block, unit number contractor's name and phone number
4. The minimum graphic requirements are as follows:
Location and length of culvert pipe, lot and structure dimensions, street names, north arrow and radius curbing for
commercial, industrial and multi -family uses.
I here by certify that I have read and examined this application and know the same to be true and correct. All provisions
of la dinances governing this type of work will be compiled with the granting of an approval does not presume
tojlrve auth9fity to violate or cancel the provisions of any other state or local law regulating constructions or the
Si ure of Q69ri r or Owner -Builder
_'
I DATE: c� ' d L� P RMJ T#
j APPLICAT ONS RECEIVD
INFORMATION & PERM
CONSTRUCTION PERMIT APPROVAL
OFFICE USE ONLY
�ln Q n _ CofCcfl
Printed Name of Qualifier orpwner-Builder
RECEIPT
DRIVEWAY CLERK
CITY ENGINEER