Loading...
HomeMy WebLinkAbout2001 - (#53) Riverview Expansion Shoreline Restoration7, ARMOR STONE SHALL BE 16-IN. TO 18-IN• SIZE COQUINA ROCK AND SHALL HAVE A MINIMUM UNIT WEIGHT OF 125 PCF BEDDING STONE SHALL BE 2-IN, TO 6-IN, SIZE C❑QUINA OR WASHED ANGULAR ROCK, B. THE SELECTION OF BEDDING AND ARMOR RIP -RAP SHALL BE REVIEWED WITH AND APPROVED BY THE CITY OF SEBASTIAN PROJECT ENGINEER, 9. THE STONES SHALL BE PLACED IN SUCH A MANNER THAT THEY WILL BE PROPERLY INTERLOCKED WITH THE UNDERLYING OR ADJACENT STONES TO RESIST DISPLACEMENT BY WAVE ACTI❑N AND FORM A UNIFORM AND COMPACT SECTION, EACH STONE SHALL BE FIRMLY SET AND WELL -SUPPORTED BY UNDERLYING AND ADJACENT STONE. HEAD SIZED ROCK AND CHINK ROCK SHALL BE PLACED WITHIN THE INTERSTICES OF ARMOR STONES; NO HEAD SIZE OR SMALLER STONES MAY BE FREE ON THE SURFACE. 10. FILTER CLOTH SHALL BE NON-W❑VEN FABRIC, AM❑C❑ 4551, AS SUPPLIED BY ATLANTIC C❑NSTRUCTI❑N FABRICS (❑R EQUAL AS APPROVED BY THE CITY PROJECT ENGINEER). THE CLOTH SHALL BE PLACED WITH LONG DIMENSION PERPENDICULAR TO THE EMBANKMENT, THE FILTER CLOTH STRIPS SHALL BE FIELD SEWN OR PLACED TO PROVIDE A MINIMUM WIDTH OF 36' OF OVERLAP FOR EACH J❑INT, GENERAL NOTES - 1, THE CONTRACTOR SHALL BE RESP❑NSIBLE FOR L❑CATING ALL EXISTING UTILITIES. THE CONTRACTOR SHALL CALL SUNSHINE STATE ONE CALL AT 1-800-432-4770 AND THE UTILITY OWNERS AT LEAST 48 HOURS PRI❑R TO DIGGING NEAR UNDERGROUND, UTILITIES 2. ELEVATIONS AND ABOVE GROUND FEATURES SHOWN ARE BASED ON SURVEY BY CITY OF SEBASTIAN; ALL ELEVATIONS SHOWN ARE BASED ON NATI❑NAL GEODEDIC VERTICAL DATUM, 3. MEAN HIGH WATER ELEV. = 0.6 AND MEAN LOW WATER ELEV. = 0.2 PER F,D.E,P, SURVEYING AND MAPPING, TALLAHASSEE, FL. (JULY, 1998). 4, THE CONTRACTOR SHALL BE RESP❑NSIBLE FOR INSTALLATI❑N AND MAINTENANCE OF EROSI❑N AND SEDIMENTATION CONTROLS IN ACCORDANCE WITH ST, JOHNS RIVER' WATER MANAGEMENT DISTRICT AND CITY OF SEBASTIAN REQUIREMENTS, EROSI❑N CONTROL SHALL CONSIST OF PLACEMENT OF HAY OR TUBIDITY BARRIERS ON THE DOWN SLOPE SIDE OF DISTURBED AREAS AT P❑INTS OF CONCENTRATED RUNOFF. FL❑ATING TURBIDITY BARRIERS SHALL BE INSTALLED PRIOR TO COMMENCING SHORELINE STABILIZATI❑N WORK. FLOATING TURBIDITY BARRIERS SHALL REMAIN IN PLACE UNTIL LANDWARD GRADING IS COMPLETED AND MULCH IS IN PLACE, C❑NSTRUCTI❑N NOTES; 1. REMOVE ALL CONCRETE AND ❑THERE DEBRIS WITHIN 20'+/- UPLAND FROM THE SEAWALL AND ALONG THE SEAWALL ON THE LAGOON SIDE 2, REMOVE SEAWALL 3. STRIP TURF AND LEVEL GRADE UPLAND 20'+/- FROM THE WATER 4, CONSTRUCT SLOPE APPR❑XIMATELY AS SHOWN 5. ALL STONE SHALL BE HARD, DURABLE QUALITY STONE SUCH THAT IT WILL NOT DISINTEGRATE UNDER THE ELEMENTS AND IT WILL NOT BREAK DURING HANDLING, ALL STONE SHALL BE CLEAN AND FREE FROM EARTH DUST, OR OTHER REFUSE. THE FACES OF INDIVIDUAL PIECES OF STONE SHALL BE ROUGHLY ANGULAR, NOT ROUNDED, IN SHAPE. THE LEAST OF EACH STONE SHALL NOT BE LESS THAN ONE-THIRD (1/3) OF THE GREATEST DIMENSI❑N OF THAT STONE. 6. BEDDING STONE MAY BE CRUSHED DEBRIS CONCRETE IF IT IS LOGISTICALLY FEASIBLE AND COST EFFECTIVE EXISTING GRADE 11. BUILD WAVE BREAK COQUINA ROCK PYRAMID APPR❑XIMATELY AS Sf (EXTENTS OF COQUINA ROCK ALONG THE SHORELINE AND WAVE BRE ARE SHOWN ON SHEET 1) ]OWN AK h REF. PAGES 33 AND 34 OF THE SUBMERGED LAND LEASE 10' 10 ' Rio - UPLAND PROMENADE „ L❑CATI❑N (REF.) 6 DEEP SWALE C❑QUINA ROCK 4 — WA E BREAK RIP RAP HABITAT 3' MHW (REF,) FILTER CLOTH \ -- -- -- - __. - - MHW \\\\ (REMOVED) SEAWALL L❑CATI❑N (WATER —SIDE) K (REF.) I THIS PROJECT _ DET-061-350084 L� a V_ K PIS; L 1 j w • i REVISI❑NS DATE z a H Q z o z � H nn�L_ 1l� H X LLJ � Q � W LLJ Q � n W z LL LLJ fH U W H co Lo m m 0 �m z Q LncD �Wo m � Q J co I co v�zz �Ln U-) � <z v `D -- Lo Ld >- Lo Q z -- I—cuas ox F-{RJW =Q U ---IM ALL. 1JKAWN BY BAJ APPROVED DATE 10-26-01 SCALE JOB NO, SHEET 2 OF 2