Loading...
HomeMy WebLinkAbout1987 Sand Mining Permit (Box #11 #62)J Q. — N : ' Qj P1,vE EL = /3 to (3 /O SUP-VEY LEGENL7 Q STEEL. PIN W/CAF FOUND ® a)7EEL PIN W/GAP SET ALL E LEUI� l i C7N i?E F�RE� K.ED IO D 19Z9 DA7L)),A 1�A 13_, \ m N lI � 9 8 8 7 G N 2 �c12 0 O- 03' '' vv 00 _ \ 900.0' / 1 -- -- /2 �2 \ \\ `_ 8- — / \� \ \ LOGATI OINK — P \\ E\\ ' F mil' SEaASTIAN Q IN, \ \ \ o -- _ —IN, Olt S T I LAKE ,BOTTOM ) � \ 11 V III Hi CAJ "L '.4 --14�� � ' \\ \ i�b� \\ \\\ I CxENE�ZAL LOGATIQN MAP i H\ S/ N.T.L. \ \ / / •� /5� \ \ \ \ \ \ 4 95 0 Locl�TjoN SAN MIMEAIZZA \ �(� Q ,?<A E N T / SURF AREA = 9 • Co 3 Ac. ± \ w 390'* Iv It \AX Q PROPOSED CONST. ' I 1 / / '� — J 7 ` \ \ \ \ 0 W > / TlzA LEl2 I /-� / / LAKE BOTTOM \ \ ` \ /oo \ \ _/ 3 �^ PPOPOSED HAUL 1e0AD -11 SET NAIL /N 5 I \ i v / / / \ \ \ \ \ O 3 I 20' c t`1 L i N UNPAVED W/ 5TA8/L /ZED P/NE EL = /8. 05 / C 512 O/ �LOr�- SURFACE p �� �\ I \ t,2� / \ \ \ \kD 2. sS�o o� l� O ' \� \`�, ��/ , \\\ �/2 VICINITY MAP N•T•S. o �oPG /3\ \ \ \ \\ �� STOCact'��tr�D `THIS AAA ) \ `�/�� / D�� �l SNAIL IN 8" PINE rt Q EX/ST//-!G NATUPJ &Q0UN0 ELEVAT/ON (NRICAL. (D 6HOUL06-I SECTION A --A 5CALC � I" = 50' f40`2-/ I "= 20'veZ1. 51Z r7 17,E zo 7 / J, jop pipe \ ASFHALTJG PRIME COAT a O 0000, 0 17'-- / 8" STAB/L/ZED 00 SC/B-GC�gDE .� �� D E S) T E FLAN ZZOPOSEP NA,-,UL G20,6,,� C�� P ORAL NOTES NOTE PP-OPERTil TO TILE rv0271H, EAST WEST A.IJ ¢•/ EL-//.5 �� �� �� OWNEC� 6Y JJ HENRY FISGHF-Ji 741E- ORTH &OcD I. SURVEY INFORMATION PROVIDED BY JAMES A. FOWLER LAND SURVEYING COMPANY, EA2T AZE INCLUDED I►.i E v SEeASTI/-NN EPtalNo,& S/D. 2/2/87. r — EL 14.0 - GREY EIANO :';Iv SOTS �P��P� JF-_ �E P 2. THERE ARE NO EXISTING STRUCTURES ON SITE AND NO AREAS OF THE PROJECT 1 �p SUBJECTED TO FLOODING. • �0 3 STATEMENT OF EL = /O.O + -c3 -m EL = '- 7. 5 4 1�_ •b Imj1 9� j _'.11 _!II -ilii I i =�I,I-i111�ii11FIE 1 �Il 11 SECTION C-C �1 i=:11 If =1 �i i=11 �lli�l ill= I{�E �Ii =�115 ll�ill �1 �I SECTION D-D i WA-rEg TAeLb A I - EL . 12. 8 - WHITE SAND — EL 10.9 - TAN SAND - SLIGHTLY SILTY EL I?,?- - TAN SAND - SLIGHTLY SILTY —EL. 78 SOIL P120F I L E 'EL = /Z 3 =/7.7 u1 EffIT{ EL = i7.9 = Ili f=al i a SECTION E -E SCsLt I" = 50' H0 / 11' : ZO ' v —, EL 7. 5 Anil_IIIP�il=1T',I�llII=11—IT(iITF-111C111= SECTION F - F r I -EL = /O.O - ,?),;A _ � II�GI = 1' 7 s _ =1 111l- SECTION 6-6 50' Holz. / I" _ ?.O' vErz-C. 0) — Ili� _! =12.8 SECTION H-N MAR 12 19$ • OPERATION METHODS: a. THE PROJECT WILL BEGIN ONCE APPRIJ BY THE CITY OF SEBASTIAN. b. PROPOSED HOURS OF OPERATION WCXJL.D FF BETWEEN 7:00 A.M. TO SUNDOWN, MONDAY THROUGH SATURDAY. c. THE TOTAL ESTIMATED SOILS EXCAVATION IS 160,000 CU.YDS. (IN PLACE). d. METHOD OF EXTRACTING AND PROCESSING THE EXCAVATED MATERIAL WILL BE BY ORDINARY EARTH MOVING FQUIR ENT. e. OPERATING PRACTICES PROPOSED TO MINIMIZE DUST AND AIR CONTAMINANTS WILL BE BY GRASSING AND WATERING TLEE STRIPPED SITE. f. RECLAMATION PLAN - RECLAMATION OF THE SITE WILL BE BY DEVELOPMENT OF A PLANNED RESIDENTIAL COMMUNITY TO INCLUDE ROADWAYS AND LANDSCAPING. g. EROSION CONTROL PLAN - THE NATURAL DRAINAGE OF THE SITE IS FROM EAST TO WEST. EROSION WILL BE CONTROLLED ON SITE BY THE CONSTRUCTION OF THE SANDMINING EXCAVATED BASIN. NO DIRFL? Vi6cP ,KlAa OF W&W- FR vt IAkE, AU. RUNOFF Will, 6E BY OVE12tAh3lp SktEE-r FLOW FOV- M 1TILaA- jcr,- of I nrt Pp C TS n 4. I'L(-LAMATION PLAN: (IN ORDER OF OPERATION) a. REMOVAL AND STORAGE OF THE OVERBURDEN. b. REMOVAL OF TIJE EXCAVATED MATERIAL OFFSITE. C. FINAL SHAPING OF EXCAVATED AREA. d. REPLACING AND CONTOURING THE OVER PURDEN. e. REPLACEMENT OF TOP SOIL (MIN. 4"). f. REPLANTING AND REVEGETATION. g. THREE (3) YEAR CONTINUOUS CONST- P59'00 WITH coiJE=kT 9Z"PWATI0N A"HZATjJ ON GbMIJJ QaaAs Wt7W-17 !nl7F-le,1:�e9J To e-o�x77 /4CTivl7/F.S. 5. ALL SANDMINING OPERATION SHALL BE IN STRICT ACCORDANCE WITH THE CITY OF SEBASTIAN'S LAND DEVELOPMENT CODE, SECTION 20A-5.19. { J SKETQI OF SURVEY A I RTION OF THE NORTHWEST QUARTER OF SECTION 23, TOWNSHIP 31 SOUTH, RANGE 38 T, MORE PARTICULARLY DESCRIBED AS FOLLOWS: C ING AT THE INTERSECTION OF THE EAST LINE OF SAID NORTHWEST QUARTER J D THE NORTHERLY RIGHT-OF-14AY LINE OF THE OLD TRANS-FLORIDA RAILROAD (SAID NE BEING 100 FEET NORTHERLY OF AND PARALLEL TO THE NORTHERLY RIGHT-OF-WAY F COUNTY ROAD 512), RUN SOUTH 38° 28' WEST ALONG SAID RIGHT-OF-WAY 382.85 EET TO THE POINT OF BEGINNING. FROM THE POINT OF BEGINNING, CONTINUE SOUTH 80 28' WEST 800.0 FEET; THENCE NORTH 19' 08' 45" WEST, 435.55 FEET; `THENCE VrH 0° 03' EAST, 900.0 FEET; THENCE SOUTH 89' 57' EAST, 500.0 FELT TO A POINT ON A CURVE CONCAVE EASTERLY HAVING A RADIUS OF 600.0 FEET AND THROUGH vi A RADIAL LINE BEARS SOUTH 680 35' 36" EAST; THENCE RIJN SOUTHERLY ALONG THE ARC OF SAID CURVE, 552.45 FEET THROUGH A CENTRAL ANGLE OF 52° 45' 20"; THENCE SOUTH 310 20' 56" EAST, 179.74 FEET TO THE POINT OF BEGINNING. ALL THE ABOVE SITUATE IN INDIAN RIVER COUNTY, FLORIDA AND CONTAINING 12.92 ACRES, MORE OR LESS. w H Q 0 Z O N_ w cc (D N ti CD 0 Z m O -I 0 w Z w --3 Q Z 3 m 0 01� 0 w "I0 U I U m wcn U.- w < 0 1 I Q W U N1 U Z V! W 0 0 W M � ~N W Q U) UZw0: W o Oz ::) O o W Z J VJ W LL rn Z > LO V+ _ H Q U Q D = W m m F" W Z 0 m Z I L0 O ¢ cr w rn m U) O 1 3 SHEET OF LINE DIRECTION L1 IN 89°24'25" L2 IN 89°39'21" L3 N 00-19'30" 1 L4 20°27'41" 1 L5 EN N 28005'27" 1 L6 N 11038'06" 1 L7 N 11038'06" 1 L8 N 28°05'27" 1 L9 N 04°49'16" L10 N 20°27'41" L11 IN 00°19'30" i L12 N 89°40'30" L13 N 00°19'30" 1 L14 N 20°27'41" L15 N 89040'30" 0 100 200 300 400 C25 C26 20°08'11" 25°16'57" 250.00 225.00 87.86 99.28 87.41 i 44.39 98.48 j 50.46 C27 32"54'43" 150.00 86.16 84.98 44.31 C28 16°27'22" 325.00 93.34 93 _02 47.00 DESCRIPTION All of the Northwest one quarts of Section 23, Township 31 South, Range 38 East, lying West of the Sebastian k.:,r. Said land situate in Indian River County, Florida. Preliminary Plat of San Sebastian West Owner/Developer: Dr. Henry Fischer P.O. Box 68 Sebastian, FL 32958 Prepared By: James A. Fowler, Land Surveying Company 1239 South U.S. Highway No. 1 P.O. Box 1677 Vero Beach, Florida 32961