Loading...
HomeMy WebLinkAboutExhibit A - GMP ProposalEXHIBIT "A" RFQ 18-09: Design Build of City Garage and Public Facilities Storage Building Compound M/ 6� SGiEgGwdYius iiaOY February 12, 2021 Scott Baker Public Facilities Director; Airport Director City of Sebastian 1225 Main Street Sebastian FL 32958 RE: GNP Proposal for Design Build Project of the City of Sebastian Public Works Complex Dear Scott, Wright Construction Group would like to thank you for this opportunity to present you with our GMP (Guaranteed Maximum Price) proposal for the above referenced project. GMP Proposal includes the following: Based on design meetings with the City of Sebastian, CAI, BSSW, Emerald Engineering and Wright Construction Group we have develop the Project Bid Documents and established the GMP. Below are general inclusions and exclusions. 1. Division 1-General Conditions a. Includes General Conditions for twelve months b. Included added fees for wetland mitigation & credits, tortoise study, permit and relocation. Included allowances of $24,330.00 for the wetland mitigation credits and $61,698.00 for the tortoise permit and relocation 2. Division] & 4 Concrete & Masonry a. Includes slabs & foundations as designed, tie beams, setting of embedded steel for wind beams and operable wall supports b. Includes 8.67' CMU wall wainscot at perimeter of the buildings with a 1.33' tie beam, 2- hour fire wall between the office and back of house and dumpster enclosure 3. Division 5-Miscellaneous Steel a. Includes bollards, wind beam support angles and embedded plates, operable wall support steel 4. Division 6-Woods a. Includes parapet blocking for copings, in -wall blocking and door & window bucks b. Includes plastic laminate base & wall cabinets with solid surface countertops throughout c. Include solid surface windowsills in office areas 5. Division 7-Thermal & Moisture Protection a. Core fill insulation in the 2-hour CMU fire wall b. Sound batt insulation in Wall Type Am indicated and 2" mineral wool board insulation in Wall Types WI and R-30 PEMB roof insulation c. Includes Henry Bloc 06WB on the interior side of the exterior walls and Henry Blueskin at the perimeters of exterior windows and doors 6. Division 8-Doors & Windows a. Includes hollow metal doors & frames, wood doors and hardware as specified b. Includes hollow metal borrowed lites c. Includes electrified hardware required for door access d. Includes Bawneer Series 501 insulated impact storefront with fluoropolymer color with clear insulated impact glass with SN68 low E coating and IR350 storefront doors e. Includes transaction window by Quick Serve with deal tray and amplified speak thru E Includes %d' clear laminated tempered door glass as scheduled g. Includes OHD's as shown and scheduled. Door wind pressures are as indicated on the structural drawings +28/-34, with a powder coat finish and'h HP motor operated. Excludes wind pressure of 170 PSF per FL 15960.1 7. Division 9-Finishes a. Includes 20-gauge framing at 16" o.c. throughout, 5/8" drywall, abuse drywall below the reception desk, file backer board at showers. b. Drywall exposed to view will have a light textured knockdown finish c. Ceilings are framed with either 1-5/8" or 3-5/8" 20-gauge metal framing with 5/8" drywall d. Includes 2-coat, 5/8" stucco with textured finish on all exterior CMU walls and dumpster enclosure. Includes PVC trims and beads e. Includes acoustical ceiling tiles Armstrong Ultima High NRC 1942-2'x2'x7/8" with regular edge -white and Armstrong Suprafine 7500 2x2x9/16" intermediate duty suspension system -white f. Includes ceramic floor the in all restrooms and lockers rooms and 3'-4" high wall tile wainscot on wet walls only and full height wall file in the showers only. Floor file is CT- 2 Dal -Tile Dignitary and wall tile to be Dal -Tile Modern Dimensions with a matte finish g. Includes 2'x2' carpet tile (TBD) h. Includes LVT Armstrong Parallel 20, 12"x24" i. Includes Armstrong or equal base, straight at carpet areas and coved at LVT and sealed concrete areas as indicated j. Painting -Includes all interior drywall walls and ceilings, interior CMU walls, hollow metal door frames and hollow metal doors. Wood doors are factory finished. Includes exterior stucco and bollards k. Includes sealed concrete floors using H&C clear sealer 8. Division 10-Specialies a. Includes solid plastic toilet partitions and urinal screens b. Includes toilet accessories including grab bars at ADA toilets and showers, soap dispensers, hand sanitizer dispensers, 18"x36" mirrors, paper towel dispensers at locations without hand dryers, toilet paper dispensers, mop & broom holders with shelves, shower curtains, ADA shower seats and Dyson Hand dryers. Excludes sanitary napkin / tampon venders and diaper changers c. Includes FEC/FE and wall mounted FE as shown Page 2 of 5 d. Includes PVC corner guards at outside comers of drywall partitions e. Includes metal single tier lockers with solid wood locker benches as shown, includes one ADA locker in each locker room f. Includes suspended aluminum canopies and main entry canopy as shown by Perfection Architectural g. Includes an allowance of $9,230.00 for interior & exterior building signage, excludes monumental signage h. Includes operable wall partition with 4'x4' markerboards on each panel, excludes a pass door 9. Division 11-Equipment a. Includes one refrigerator at an allowance of $1,800.00 b. Includes vehicle maintenance equipment as listed on sheet EQ.1.A1 and our GMP. We have allowed an allowance of $135,000.00 for this equipment furnished and installed, pricing will vary based on final equipment selections. This is an item of work typically provided by the owner of the facility c. Includes oil lubrication system, includes (2)-500-gallon new oil tanks and (1)-1000- gallon recycled oil tank with required emergency vents and piping from flammable storage room to hose reels with electronic metered handles. Include one waste oil drum with pump to pump into the 1000 gallon recycle holding tank d. Includes Fuel tank and dispensing equipment, includes (1)-16,000 gallon -three compartment double wall fiberglass storage tank, (2)-helix three product six hose dispensers with Franklin fueling UPP piping, accessories, and EVO monitoring system e. Includes one vacuum system and carwash wand system f. Include one 24'x96' canopy system over the fuel and carwash areas including lighting, excludes a fire suppression system 10. Division 12-Furnishings a. Includes 1" mini blinds at all exterior window except for the main entrance and seven full lite door windows b. Includes an allowance of $158,190.00 for the office furniture and an allowance of $15,000.00 for furnishings. Pricing will vary based on final furniture selections. This is an item of work typically provided by the owner of the facility 11. Division 13-Special Construction a. Includes the PEMB frames (galvanized) and secondary framing (purlins & girts with G90 galvanizing) with 3" insulated wall panels above the 8" CMU/Stucco wainscot wall and 24 gauge standing seam galvalume roof system with standard gutters & downspouts with R-30 long tab roof insulation in all concealed and exposed areas. All exterior exposed ceiling areas (20' overhang At covered heavy equipment maintenance area) to have a 26- gauge white liner panel 12. Division 21-Fire Protection a. Includes a complete wet fire protection system for the building and overhangs b. Includes a clean agent system for MDF room 1-106 only c. Excludes fire protection system at the fuel / carwash area based on Florida Fire Prevention Code Chapter 30 d. Excludes pipe insulation where exposed at the exterior per Wayne Eseltine Sebastian Building Director / Fire Marshall who confirmed Sebastian is not considered a freeze zone e. Includes painting of exposed sprinkler piping Page 3 of 5 13. Division 22-Plumbing a. Includes all PVC waste lines and vent piping as shown b. Includes all CPVC water pipe system c. includes all plumbing fixtures as scheduled on sheet P6.01 d. Includes electric 80-gallon water heater and instantaneous water beaters e. Includes recirculating hot water pump and mixing valve system as indicated f. Includes the 1000-gallon oil / sand interceptor for the trench drain system g. Includes the air compressor system, including the air dryer and combination filter / separator using copper supply lines to hose reels h. Includes HVAC condensate line 14. Division 23-HVAC a. Includes a complete sheet metal ducted supply and return system, including the DX split systems, VAV's, exhaust fans, grilles & diffusers, louvers, and shop fans using one of the acceptable manufactures b. Includes fire and smoke dampers c. Includes portable fume extractors d. Includes stand-alone programable thermostats, DDC controls are excluded as well as a BACnet system / BAS System 15. Division 26-Electrical a. Includes interior and exterior lighting as scheduled b. Includes FPL primary conduits from ROW to transformer as well as communication conduits c. Includes three EVR charging stations, Leviton EVR-Green EVR30-BCI with pedestals d. Includes 1200 AMP 3-Phase and 100AMP 3-Phase 120/208 main power to serve panels e. Includes all distribution wiring in conduits or MC cable as allowed by code f Includes conduiting and back boxes for all low voltage systems g. Includes power to HVAC equipment and ionization system h. Includes all switches and receptacles as indicated i. Includes a complete point addressable Fire Alarm system j. Includes the UPS system as specified, sized for 7 minutes at full load k. Includes lightning protection system 1. Includes 300 KW generator and transfer switches 16. Division 27Systems a. Includes access controls and cameras furnished and installed by Bit Direct. Up to 30 cameras and 9 door access points b. Include the hearing loop for the two classrooms and reception speaker at the teller window by Complete Hearing Solutions c. Includes two projectors and motorized screens 60"x144" as sized on sheet EQ.IAI d. Includes 14 TV's and two Smart Boards e. Includes speakers and amplifier f Includes cabling for card access and cameras g. Includes cabling for only for WAPs by others h. Includes all cabling and cover plates for V/D and TV's i. Includes phone system with 3-year service agreement. j. Excludes computers and monitors 17. Division 31/32/33 a. Includes erosion control measures and MOT Page 4 of 5 b. Includes cut / fill and import to all subgrades c. includes using full depth coquina rock ILO of stabilization, 16" for HD asphalt and 12" for LD asphalt d. includes 1.5" of SP12.5 for LD asphalt and 2-lifts of 2.5" SP1.5 for the HD asphalt, includes parking bumpers and pavement markings e. Includes storm piping and structures as indicated f. Includes on site gravity sanitary sewer system as indicated, excludes future lift station and all off FM and gravity sewers as shown on sheet C-9 g. Includes fire water and domestic water services as shown on sheet C-9 h. Include 8' high galvanized chain link, two 24' motor operated slide gates and one 30' motor operated swing gate and 2-man gates. Excludes barbwire at perimeter fencing i. Includes 4" thick concrete sidewalks reinforced with fiber mesh as indicated on sheet C- 2, includes ADA ramps and turndown edges j. includes Type D curbing as shown on sheets C-2 & C-3 It. Includes stabilized overflow and equipment storage areas 18. Contingency and Fee a. Project includes a 3.0% contingency b. The Project contingency will be managed by the project team with the entire unused portion returned to the Owner upon completion and close out of the final pay application. The Project contingency will not be spent without approval from the Owner. c. Project includes a 6.5% CM Fee. Total Base Bid including all Previously Accepted Alternates is $9,161,495.00 (Nine Million One Hundred Sixty -One Thousand Four Hundred Ninety -Five Dollars) Respectfully Submitted, Scott b Loiacanoa ,.,_„., Scott Loiaceno Senior Project Manager Page 5 of 5