Loading...
HomeMy WebLinkAboutR-21-05 FDOT PGTA Taxiway A Additional RevenueRESOLUTION NO. R-21-05 A RESOLUTION OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE A PUBLIC TRANSPORTATION GRANT AGREEMENT WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) FOR THE INCREASE IN CONSTRUCTION COSTS RELATING TO FM445871- 1-94-01 "CONSTRUCTION OF TAXI LANE" AT THE SEBASTIAN MUNICIPAL AIRPORT; PROVIDING FOR CONFLICT; PROVIDING FOR SCRIVENER'S ERRORS; AND PROVIDING FOR AN EFFECTIVE DATE. Whereas, the Florida Department of Transportation has extended a Public Transportation Grant Agreement (PTGA), FM Project Number 445871-1-94-01 for the Construction of a Taxi Lane and renovation of Section 425 on Taxiway Alpha at Sebastian Municipal Airport (SMA) providing for 5% of the actual project cost, project cost not to exceed $731,046.00 and Whereas, the City of Sebastian agrees to the conditions of such funding, NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SEBASTIAN, as follows: Section 1. AUTHORIZATION. The City Manager is hereby authorized to execute said FDOT PUBLIC TRANSPORTATION GRANT AGREEMENT on behalf of the City. Section 2. CONFLICTS. All resolutions or parts of resolutions in conflict are hereby repealed. Section 3. SCRIVENER'S ERRORS. Sections of this resolution may be renumbered or re -lettered and corrections of typographical errors which do not affect the intent may be authorized by the City Manager, or the City Manager's designee, without need of further action of City Council by filing a corrected copy of same with the City Clerk. Section 4. EFFECTIVE DATE. This resolution shall take effect immediately upon its adoption. The foregoing Resolution was moved for adoption by Council Member Mcpartlan The motion was seconded by Council Member Nun❑ and, upon put to a vote, the vote was as follows: RESOLUTION No. R-21-05 Page 2 Mayor Ed Dodd aye Vice Mayor Jim Hill aye Council Member Bob McPartlan aye Council Member Chris Nunn aye Council Member Fred Jones aye The Mayor thereupon declared this resolution duly passed and adopted this 10th day of March, 2021. ATTEST: L�Jt�Qtaf,la anette Williams, Ciry Clerk CITY OF SEBASTIAN, FLORIDA Mayor EdDo d Approved as to form and legality for reliance by the City of Sebastian only: Mony A n, Jr., iry Attorney sTAU OF"RWA OEMMENT OF T NHPORTATION Pormf]6d40-0I PUBLIC TRANSPORTATION F"'AtE0i0 oMLOPMENT GRANT AGREEMENT EXHIBITS ooc FvrF EXHIBIT A Project Description and Responsibilities A. Project Description (description of Agency's project to provide context, description of project components funded via this Agreement (if not the entire project)): X26 Construct Taxi Lane B. Project Location (limits, city, county, map): Sebastian Municipal Airport/Sebastian, FLgndian River C. Project Scope (allowable costs: describe project components, improvement lypelservice type, approximate timeline, project schedule, project sae): Construct Taxi Lane: As required by 215,971, F.S., this scope of work includes but is not limited to consultant and design fees, survey and geotechnical costs. permltting, construction inspection and material testing costs, mobilization and demobilization, maintenance of traffic, erosion control, demolition. excavation, embankment, subgrade preparation, base course, surface course, joint construction, pavement markings, sirfleld lighting system, signage Improvements (Includes conduits, lights, conductors, cans, lightning protection, and vault upgrades), drainage, stormwater structures, utilities, fencing and gates. and sodding, including all materials, equipment, labor, and incidentals required to complete the project. The Sponsor will comply with Aviation Program Assurances D. Deliverable(s): New taxi lane to provide a connection from the airport's square hangar area to Taxiway -Alpha. The project scope identifies the ultimate project deliverables. Deliverables for requisition, payment and invoice purposes will be the incremental progress made toward completion of project scope elements. Supporting documentation will be quantifiable, measurable, and verifiable, to allow for a determination of the amount of incremental progress that has been made, and provide evidence that the payment requested is commensurate with the accomplished incremental progress and costs incurred by the Agency E Unallowable Costs (including but not limited to): F. Transit Operating Grant Requirements (Transit Only): Transit Operating Grants billed as an operational subsidy will require an expenditure detail report from the Agency that matches the invoice period. The expenditure detail, along with the progress report, will be the required deliverables for Transit Operating Grants. Operating grants maybe issued for a term not to exceed three years from execution. The original grant agreement will include funding for year one. Funding for years two and three will be added by amendment as long as the grantee has submitted all invoices on schedule and the project deliverables for the year have been met. 3 of 4of6 STATE OFF RIW DEPMTNENT OF TRRNEPOR]PTgN Fom]tE-0W-03 PUBLIC TRANSPORTATION oEv¢nvxENr GRANT AGREEMENT EXHIBITS EXHIBIT D AGENCY RESOLUTION PLEASE SEE ATTACHED 6of6