HomeMy WebLinkAbout2002 - WA # 4 - Design Phase - Kimley HornCITY OF )3.�$T[e N, FLORIDA
Work Authorization for professional Services
Project Identification: Engineering Services for Design of Alleyway Improvements
Work Authorization No.: #4
IT IS AGREED to undertake the following work in accordance with the provisions of
our Master Agreement for Professional Services dated November 30, 2000:
Description of Assignment:
See EXHIBIT "A" Scope of Services, attached
Basis of Comnensation/Period of Services
Basis of Compensation will be on an hourly basis with a not to exceed amount of
$28,000, as provided for in the Master Agreement.
Period of Services, work will commence upon execution of this Work Order by the
parties, and completion of the work will take place no later than ninety (90) consecutive
calendar days henceforth.
�p''���A�GGR�E�ED�as to scope of services, time. schedule, and budget this day of
U 2002.
CITY OF SEBASTIAN,
A Florida municipal corporation
By:
Paul Wagner, GeneEaf Services
Administrator/Asst. to City Mgr.
(Seal)
Attest:
Sally A. Mlate, CIVIC
City Clerk
(Seal)
IQMLEY HORN AND ASSOCIATES, INC.
Its: / VVeWB.Mullisl (`
tee -President
Approved as to Forth and Content for
Reliance by the City
of
Sebastian Only:
Richeity Attom�y
u,s.em��wnn..nw,n a.m a, r,�raaaw Smicn_Jx
❑_I 1 KimleyHorn
1 and Associates, Inc.
January 31, 2002
Mr. Paul Wagner
Purchasing and Contract Administrator
City of Sebastian
1225 Main Street
Sebastian, FL 32958
RE: CR512 Alleyway
Dear Mr. Wagner:
Fldubit "A" which
Includes the Attached
4 Pages.
Kimley-Horn and Associates, Inc. is pleased to submit this scope and fee proposal
for general engineering services related to the development of construction plans
for the improvement to the 20 ft. alley running parallel to CR512 between Laconia
Street and the terminus just east of Wimbrow Street. The approximate length is 2
miles.
The scope of services, fee and schedule for this work order are provided in the
attached Exhibit "A" through Exhibit "C". Any additional services such as
additional analysis, permitting or construction assistance that we may be able to
assist you with can be handled in an additional work order.
We appreciate this opportunity to work with the City of Sebastian. Should you
have any questions or wish to discuss please contact me at 561/562-7981.
Sincerely,
KIMLEY-HORN AND ASSOCIATES, INC.
3 `Jffi�6.Mullis,�)�� 03
Vice-President
cc: Terrence Moore
Tom Yonge
■
TEL 561 562 7981
FAX 561 562 9669 K:N1RKiNMl4 t=\—WW Tda
■
suite 400
60121st Street
Vern Be 'Florida
3M
EXMIT "A"
SCOPE OF SERVICES
Task 1—Survey
We will obtain a topographical survey of existing conditions for the alleyway. It
will include:
• Establish horizontal and vertical control along the project area.
• Topographical cross -sections at one hundred feet intervals.
• Additional survey data delineating grade breaks and drainage patterns to
include picking up any drainage pipe and/or structures in the area with their
perspective outfalls.
• Obtain topographical data of alleyway to include utilities (water valves, fire
hydrants, power poles etc.) and existing pavement.
This information will be compiled into a base map for use in the design.
Task 2 —Engineering and Design
Construction plans will be prepared to propose paving an eleven (11) feet wide
lane in the alleyway. These improvements will include horizontal and vertical
control of the lane such that private property is avoided and existing drainage
patterns we considered. The construction plans will allow for the following
information suitable for public bidding:
• Development of a Key sheet delineating the project.
• Provide General Notes and Quantities.
• Development a Typical Section with pavement design.
• Construction plan sheets depicting the alleyway improvements.
• Plans will be produced in English units at a 1"=40' scale on 11"x 17" sheets.
• Plans will be submitted to the City for review and comment at the conceptual,
permit and final design stages.
• Upon completion of construction of the project and receipt of the AsBuilt
drawings from the contractor, we will make any necessary certifications to the
permitting agencies.
Task 3 — Drainage/Permitting
Stormwater runoff is currently being conveyed in roadside swales. It is
anticipated that it will be handled in the same manner in this design. Hydraulic
analysis and evaluations will be performed to ensure that current drainage patterns
are retained and problematic areas addressed. This may require designing the
installation of drainage collection and outfall systems along the corridor.
Stormwater permitting will be coordinated through the local governing agencies to
include St. John's River Water Management District (SJRWMD). if permitting is
required by SJRWMD, applications will be prepared by Kimley-Horn with the
City of Sebastian as the applicant.
EXHIBIT`B"
FEE
We will accomplish the service outlined in Tasks 1 through 3 for the lump sum of
$28,000. All fees will be inclusive of expenses.
SCHEDULE
The schedule for the work as described in Tasks I and 2 will be completed in
approximately 99 days. Subsequently the permit application under Task 3 will
promptly be submitted.
11/OT102 1T:03 FAX 561 562 9669 KRA URG VERO a 002
KImley-Horn
and 4sGdates, Inc.
November 7, 2002
■
David Fisher, P.E.
smie ago
Cl Engineer
City g
60121s15b
Vop3 mForitla
City of Sebastian
329ao
1225 Main Street
Sebastian, FL 32958
RE: Sebastian Highlands Alleyway
Construction Phase Services
Dear Mr. Fisher:
Kimley-Hom and Associates, Inc. is pleased to submit this scope and fee
proposal for general engineering services related to the bidding and
construction of the Sebastian Highlands Alleyway.
The scope of services, fee and schedule for this work order are provided in
the attached Exhibit "A" clirough Exhibit "C". Any additional services
beyond those described in Exhibit A that we may be able to assist you with
can be handled in an additional work order.
We appreciate rhis opportunity to work with the City of Sebastian. Should
you have any questions or wish to discuss please contact me at 772/794-
4058.
Sincerely,
KMXY-HORN AND ASSOCIATES, INC.
/�///�� Fait. : ffPF Mhtuf
Jeff, Mullis, P.E.
Vice -President
cc Jeff Palmquis;E1T-
\'L069ERTVOLM0.G'fK'I W.ISCLMRRTC\Sebumn'iFul Is
■
?EL 561 H2 *61
W R1 He m
11/07/02 17:04 FAX 561 582 9689 RNA IBG VERO Q008
N,r Devid fi$MT Nov=W 1, 2002, ft r
❑�❑ Kinnley-Wotn
and AssocIOs, Inc.
ENIUBIT "A„
SCOPE OF SERVICES
Task I —Bidding and Construction Phase Services
We will attend the Pre -Bid meeting along with the City. This will include
preparation and attendance of the meeting with prospective bidders. We
will answer any questions that the bidders may have in regard to the
technical aspects ofthe plans.
We will participate in the Pre Construction Meeting apon selection of a
contractor. For that meeting we will be prepared to discuss the project,
permits, specific areas of interest, schedule and answer questions from the
contractor.
Upoa commencement of construction we will provide construction phase
assistance to the City. It is understood that the City will provide the day to
day observation of the project and that we will provide assistan e, as
requested by the City. This is expected to include; addressing issues as
they arise, review of shop drawing and certifrcatioa submittals, respond to
RFI's, periodic field reviews and clarification of design where and if
required. For estimation purposes, this level of assistance is estimated at
10 hours per week on average.
When construction has been completed we will participate in a final walk
through with the City to identify punch list item and note deviations or
variance from the intent of the design and plans. We will also review the
construction As-Builts as provided by the Contractor and final project
close out
_11/07/02 17:04 FAX 561 562 9659 KRA ORG VERO 12004
,M, Ce dFah , N.v.ba 7, 2de2, Pg.3
-❑ -Ho and As rn
� and Associates, Inc.
Mime "B°
Fee
IWA will provide The services described in Task 1 as indicated below,
inclusive of expenses. The fees will be on an hourly basis with a not to
exceed amount as indicated below:
Task Labor Budget
Task 1 — Bidding and Construction Phase Services $15,000
Total Fee $15,000
11/07/02 17:04 FAX 501 562 9669 ARA LIRG VERO 1,005
Mr. omd Fisl¢q NV eMbU7,200Z 44
Klmlay-Horn
and Associates, Inc.
EXHIDIT "C"
SCHEDULE
The schedule for the work as described in Tasks 1 is based on a
contractor's construction schedule of 90 days and an additional 30 days for
project closeout.