Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Exhibit B
DoesgirmrwP.lo: ttaAemsFcsls+wo-AAopsawEtce4s4a EXHIBIT"B ID (Task Task Name Duration Stan Finish O Mode 1% 4 5 6 7 9 10 11 13 3 14 ss lfi 17 18 19 20 _ 21 22 23 Complete Drawings 35 days Permitting Process 15 days Mobilization 10 days 5Ih fence and grub she 5 days Construct bulltling pad 6days Form, MEP and pour slab 15 days Erect steel bulltling 30 days Exterior Windows and doors 5days Interior metal studs 5days MEP Roughs 15 days Fire System Roughs 14 days Install drywall 9 days Interior finishes 10 days MEP Trim Outs 8days Fire System The Out 8days Final Finshes 2days CommislOn Systems 5days Final inspections/Punch Ust 15days SITE WORN Remove fill / Rough Grade 26 'd Underground Utilities Task Spilt Project: SEBASTIAN HANGER D Nakasone Date: Tue 4/6/21 Summary ProlMsummary Wareal Tasks Predeteszors A"F May 3/28 4/4 4/11 4/18 4/25 5/2 Mon 5/10/21 Fri 6125/21 Mon 6/28/21 Fri 7/16/21 3 Mon 7/19/21 Fri 7/30/21 4 Mon 8/2121 Fri 8/6/21 5 Mon 819/21 Mon 8/16/21 6 Tue 8/17/21 Man 9/6/21 7 Tue 9/7121 Man 10/18/218 Tue 10/19/21 Mon 10/25/219 Tue 10/26/21 Mon 11/1/21 10 Tue 11/2/21 Mon 11/22/2111 Tue 1112121 Fri 11/19/21 11 Tue 11/23/21 Fri 12/3/21 12,13 Mon 12/6/21 Fri 12/17/21 14 Mon 12/2D/21 Wed 12/29/2115 Mon 12/20/21 Wed 12/29/2115 Thu 12/30/21 Fri 12/31/21 16,17 Mon 1/3/22 Fri 1/7122 18 Tue 2/1/22 Mon 2/21/22 19,35 S days Tue 9/7/21 Man 9/13/21 7 18 days Tue9/14/21 Thu10/7/21 25 Fxtered Milestone ♦ Mannal SummaryRollup o..,...... Inactbe Tazk Manval5ummary ^1 ♦ naghe Milestone Smmonly, C �1 Inactive Summary - Flrhshonly H—� Manual Task Deadline Duration -only Progress Page 3 )MRVEnvNopsll) IISABB15 UC 63Da 3pd301EiCB46,a ID Task Name O Mode (Task 22 Constructed Parking Lots 28 Grade recension areas 29 a Air Side Paving 30 a Install Irrigation 31 rq Install Fence 32 a Final Grade site 33 a Install tandsaping/Sod 34 a Striping and signs 35 a ilnai Surveys and inspections Duration Start Flnkh Pmdtl ,[ sots 20 days Fri 10/8/21 Thu 1114/21 26 days Fri 11/5/21 Mon 11/15/21 27 15 days Too 11/16/21 Man 12/6/21 28 4 days Toe 12/7/21 Fri 12/10/21 29 2 days Man 12/13/21 Tue 12/14/21 30 ]days Wed12/15/21Thu12/23/21 31 4 days Fri 12/24/21 Wed 12/29/2132 3 days In. 12/30/21 Mon 1/3122 33 20 days Tue 1/4/32 Monl/31/22 34 April May 512 Task External Milestone • Manual Summary Rollup Split ......................... Inactive Task Manual Summary r�1 Project: SEBASTIAN MANGER D Milestone • Wane Milestone Steal C Date:Tue4/6/21 Summary inactive summary Fiinshonly 3 Prolectsummary Manual Task Deadline Wamal Tasks Dunuonomly Pmgress Page 2