HomeMy WebLinkAboutR-22-30 Square HangarsRESOLUTION NO. R-22-30
A RESOLUTION OF THE CITY OF SEBASTIAN, INDIAN
RIVER COUNTY, FLORIDA, AUTHORIZING THE CITY
MANAGER TO EXECUTE A PUBLIC
TRANSPORTATION GRANT AGREEMENT (PTGA)
WITH THE FLORIDA DEPARTMENT OF
TRANSPORTATION FOR FUNDING THE COST OF
FM445949-1-94-01 "CONSTRUCT SQUARE HANGARS"
AT THE SEBASTIAN MUNICIPAL AIRPORT;
PROVIDING FOR CONFLICT; PROVIDING FOR
SEVERABH.TTY; PROVIDING FOR SCRIVENER'S
ERRORS; AND PROVIDING FOR AN EFFECTIVE DATE.
Whereas, the Florida Department of Transportation (FDOT) has extended a Public
Transportation Grant Agreement (PTGA), FM Project Number 445949-1-94-01 for the Design
and Building of four (4) square hangars at Sebastian Municipal Airport providing for 80% of the
actual project cost, project cost not to exceed $1,570,000.00 and
Whereas, the City of Sebastian agrees to the conditions of such funding,
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
SEBASTIAN, as follows:
Section 1. AUTHORIZATION. The City Manager is hereby authorized to execute
said Public Transportation Grant Agreement #FM445949-1-94-01 on behalf of the City.
Section 2. CONFLICTS. All resolutions or parts of resolutions in conflict
are hereby repealed.
Section 3. SEVERABHdTY. The provisions of this Resolution are intended to be
severable. If any provision of this Resolution is determined to be void or is declared illegal,
invalid, or unconstitutional by a Court of competent jurisdiction, the remainder of this Resolution
shall remain in full force and effect.
Section 4. SCRIVENER'S ERRORS. Sections of this Resolution may be
renumbered or re -lettered and corrections of typographical errors which do not affect the intent
maybe authorized by the City Manager, or the City Manager's designee, without need of further
action of City Council by filing a corrected copy of same with the City Clerk.
Section 5. EFFECTIVE DATE. This resolution shall take effect immediately upon
its adoption.
The foregoing Resolution was moved for adoption by Council Member
MCPartlan
The motion was seconded by Council Member Munn and, upon put
to a vote, the vote was as follows:
Mayor Jim Hill
aye
Vice Mayor Fred Jones
aye
Council Member Bob McPartlan
aye
Council Member Chris Nunn
aye
Council Member Ed Dodd
aye
The Mayor thereupon declared
this resolution duly passed and adopted this
t 2th day of October, 2022.
CITY OF SEBASTIAN, FLORIDA
Mayor Jim
A1TFES�T�:"
Yanette Williams, City Clerk ---
Approved as to form and legality for
reliance by the City of Sebastian only:
:y
DocuSign Envelope ID: 09A3DE6F-0CC5-419A-BA90-484BA6CB9005
05/08/2024 | 7:27 AM EDT
STATE OF FLOMM OEPARWENT OF TMNSPORT ON F.-12 .-0
PUBLIC TRANSPORTATION sR Mjc
pEMLMYENT
GRANT AGREEMENT EXHIBITS oworm
EXHIBIT A
Project Description and Responsibilities
A. Project Description (description of Agency's project to provide context, description of project components funded
via this Agreement (if not the entire project)): X26 Construct Square Hangar
B. Project Location (limits, city, county, map): Sebastian Municipal Airport/Sebastian, FL/Indian River
C. Project Scope (allowable costs: describe project components, Improvement type/service type, approximate
timeline, project schedule, project size): As required by 215.971, F.S., this scope of work includes but is not limited to
consultant and design fees, survey and geotechnical costs, permitting, construction inspection and material testing
costs, mobilization and demobilization, maintenance of traffic, erosion control, demolition, pavement (access
roadways, parking lots, and sidewalks), drainage, utilities, primary and back-up power supplies, buildings (foundation,
structure, roof, MEP, drainage, fire prevention, and protection), pavement marking, lighting and signage, fencing and
gates, landscaping (Including outdoor lighting), and indoor/outdoor security systems, including all materials,
equipment, labor, and incidentals required to complete the T-Hangar project. The Sponsor will comply with Aviation
Program Assurances.
D. Deliverables):
The project scope identifies the ultimate project deliverables. Deliverables for requisition, payment and invoice
purposes will be the Incremental progress made toward completion of project scope elements. Supporting
documentation will be quantifiable, measurable, and verifiable, to allow for a determination of the amount of
Incremental progress that has been made, and provide evidence that the payment requested is commensurate with
the accomplished incremental progress and costs Incurred by the Agency.
E. Unallowable Costs (including but not limited to):
F. Transit Operating Grant Requirements (Transit Only):
Transit Operating Grants billed as an operational subsidy will require an expenditure detail report from the Agency that
matches the Invoice period. The expenditure detail, along with the progress report, will be the required deliverables for
Transit Operating Grants. Operating grants may be issued for a term not to exceed three years from execution. The
original grant agreement will include funding for year one. Funding for years two and three will be added by
amendment as long as the grantee has submitted all invoices on schedule and the project deliverables for the year
have been met.
Page 3 of 7
VATS OF FLORIDA OePMTMENT OF TRANSPORMON F-2MM-02
PUBLIC TRANSPORTATION OeVELOPue IC sLOPME is
GRANT AGREEMENT EXHIBITS acc07m
EXHIBIT G
AUDIT REQUIREMENTS FOR AWARDS OF STATE FINANCIAL ASSISTANCE
THE STATE RESOURCES AWARDED PURSUANT TO THIS AGREEMENT CONSIST OF THE FOLLOWING:
SUBJECT TO SECTION 215.97, FLORIDA STATUTES: —
Awarding Agency: Florida Department of Transportation
State Project Title: Aviation Grant Program
CSFA Number: 55.004
'Award Amount: $1,256,000
'The award amount may change with amendments
Specific project information for CSFA Number 55.004 is provided at: httos://aoos.6dfs.cam/fsaalsearchCalaloo.asox
COMPLIANCE REQUIREMENTS APPLICABLE TO STATE RESOURCES AWARDED PURSUANT TO THIS
AGREEMENT:
State Project Compliance Requirements for CSFA Number 55.004 are provided at:
httos://aoos.fldfs.com/fsaa/searchComoliance.asDx
The State Projects Compliance Supplement is provided at: httos://aoos.fidfs.w ifsaa/comoliance.asox
Page 7 of
OM1 V
SEBASTuW
HOME OF PELICAN ISLAND
CITY COUNCIL AGENDA TRANSMITTAL
Council Meetine Date: September 28, 2022
Aeenda Item Title: FDOT Public Transportation Grant Agreement (PTGA) — Construct Square
Hangars
Recommendation: Staff recommends adoption of Resolution R-22-30, approving Public
Transportation Grant Agreement for FM Project Number 445949-1-94-01 reflecting funds for the design and
building of four (4) Square Hangars at Sebastian Municipal Airport. Authorize the City Manager to execute
appropriate documents.
Background: This grant was previously awarded for the construction of 2 Square Hangars
on the recently prepared sites at the west side of Sebastian Municipal Airport. Inflationary pressures on
materials and design pushed the project significantly over the intended budget and negotiations with the
selected contractor were terminated. After further discussions with FDOT, the grant has been reissued with a
new, higher allocation, for the purpose of constructing four Square Hangars on the prepared sites. This
Resolution will accept the FDOT grant 80% portion in the amount of S 1,256,000. The larger project will help
us to draw new, additional bidding interest in the process.
If Aoend. Item Reunites Exnenditure of Funds:
Total Budgeted Amount: $1,570,000
Total Cost: State 5% _ $1,256,000
Local 5% _ $341,000
Attachments:
1. PTGA FM445949-1-94-01
2. Resolution # R-22-30
Administrative Services Department rew'j : 1
City Attorney Review: �!i1"�J+�.f
Procurement Division Review, if applicable:lif �.�7n I 1 w—
City Manager Authorization:
Date: %� �s