Loading...
HomeMy WebLinkAboutAgreement^« SUILDINE!TIME .CONSTRUCTION LLC BTC nun,nN< ri IIII State Certified General Contractor License Number CGCA09534 Jim Harris772-532-4053 Emailjimmyj232@comcast.net PROPOSAL February 9, 2023 Project: City of Sebastian 1225 Main Street Sebastian, FI 32958 Attention: Wayne Eseitine Building Official 772-589-5537 Office SCOPE OF WORK: Remodel Building Permit area and adjoining office per plan submitted by Building Time Construction LLC. • Remove existing workstations • Relocate workstations creating a larger waiting area • Install ballistic glass wall. n (3) 81" x 48" Fixed Panels (1) 48" x 48" Sliding Window (4) 16 W x 12 D x 7 H trays • Remove additional walls as needed and replace in new location per plan. • Move lighting, HVAC, Fire Sprinklers, and ceiling grid as needed. • Provide new Electric outlets as needed • Provide new LED 2 x 4light fixtures replacing the existing 2 x 4 light fixtures • Provide 3575 sq k Philadelphia Commercial- Hard News 24" x 24" with 4" cove base Tweed Color • Provide four Intercom systems through Complete Hearing Solutions one for each station. Proposal Amount: One hundred & eighty-six thousand eight hundred and seventy-four dollars Total S186.874.00 Thankyou Jim Harris 772-532-4053 Building Time Construction LLC Mailing Address: P.O. Box 780412 Sebastian, FL 32978 DESIGN BUILD GUARANTEED MAXIMUM PRICE (GMP) WORK SERVICES AGREEMENT RFQ 22-06: Design Build Building Department Office Improvements AGREEMENT APPROVED BY CITY COUNCIL: 3 - 8 - ALl%3 AGREEMENT EFFECTIVE DATE: 1. Parties: City of Sebastian, a municipal corporation of the State of Florida, (City). and Building Time Construction (BTC), LLC (Design Builder). 2. Designated Contact Person as to Cam: 3. Designated Contact Person as to Design Builder Wavne Eseltine. Project Mamorer(ChiefBuildina Jim Harris. Owner Officia11225 Main Street Sebasti-� Florida 32958 Building Time Constructinn (RTC). LLC Phone: 589-5539 674 Dot Circle E-Mail: weseltine(ircitwl'sebastian.ore Sebastian. Florida 3295R Phone: 772-532AO53 E-Mail: iimmvi232rcomcasimet 4. Guaranteed Maximum Price (GMP). The Design Builder's GMP for the Work is a total of One Hundred Eighty One Thousand and Eight Hundred Seventy -Four dollars ($I86,874.00), The Design Builder shall be entitled to no increase. This price is for the performance of the Work in accordance with the Agreement Documents listed in Section 6. 5. Project Time. The Design Builder shall achieve Substantial Completion of the Work and issue Certification of Occupancy no later than August 01, 2023. Time is of the essence in the performance of this Agreement. NOTE: The City reserves the right to allow for any approved extensions. 6. Agreement Document Exhibits. • Exhibit "A^ — Building Time Construction (BTC) Proposal • Exhibit "B" - Building Time Construction (BTC) GMP Agreement • Exhibit"C" — Special Conditions • Exhibit "D"— Building Time Construction (BTC) RFQ Submittal Additional Agreement Documents include the Supplemental General Conditions, Notice to Proceed (MP), Purchase Order(s), Contract Amendments and Change Order(s). 7. Liquidated Damages. If the Design Builder fails to achieve Substantial Completion of the Work within the Contract Time listed above, the City shall be entitled to retain or recover, as liquidated damages and not as a penalty, the sum of S 100.00 oer calendar day. Liquidated Damages will be sought starting on the first day following expiration of the Contract and continuing until the actual date of Substantial Completion. Such liquidated damages are hereby agreed to be a reasonable estimate of damages the City will incur as a result of delayed completion. The City may deduct liquidated damages from any unpaid amounts due the Design Builder under this Agreement. Any liquidated damages not so deducted from any unpaid amounts due the Design Builder shall be payable to the City at the demand of the City, together with interest from the date of the demand at the maximum allowable rate. 8. City Foods. If sufficient funding is not available for the Design Builder to complete the Work, City reserves the right to modify the terms and conditions of the Agreement to change the Scope of Work to reduce the cost to match any available funding. If such modifications to the Scope of Work are not feasible, or if funding has been totally exhausted prior to Design Builder's completion of its Work, the Agreement shall be terminated on terms reasonably acceptable to both parties. uty or eeoasuan, rionoa t (ow), Luc, tUMP) RFQ 22-06, Design Build Building Department Office Improvements Project Page 1 of 5 9. Project Team. Design Builder will provide names and roles of the Project Team assigned for approval by the City. If any member of the Project Team discontinues service on the Project for any reason whatsoever, Design Builder shall promptly replace such team member with a qualified individual approved by the City, in writing, which approval will not be unreasonably withheld. 10. City's Project Manager. City shall designate a Project Manager. All Work done by the Design Builder shall be subject to the review, inspection and acceptance of the Project Manager and the City. Any and all technical questions which may arise as to the quality, completeness and acceptability of Work performed, or Work to be performed, interpretation of plans/specification; and all technical questions as to the acceptable fulfillment of the Agreement on the part of the Design Builder shall be referred to the City Manager who will resolve such questions. All Work shall be subject at all times to inspection and review by the Project Manager and the City. 11. Schedules, Reports and Records. Design Builder shall submit to City cost schedules, progress schedules, estimates, records, reports, and any other dam, as related to the provision of the Work covered under the Agreement. Furthermore, City reserves the right to inspect and audit Design Builder's books and records relating to the Agreement, when deemed appropriate by City. All schedules, reports and records of Design Builder, as they relate to the Agreement, shall be retained by Design Builder for a period of three (3) years from the date of final payment under the Agreement. 12. Design Builder Initiated Changes. If the Design Builder initiates a substitution, deviation or change in the work which affects the scope of work or the expense of other trades, Design Builder shall be liable for the expense thereof, and my incidental extra work created by the change. 13. Termination for Convenience. Upon thirty (30) days' written notice in Design Builder, the City may, for its convenience and without cause, elect to terminate this Agreement. In the event of termination, City will be responsible for compensating Design Builder only for the Work satisfactorily completed or partially completed up to the date of termination. Design Builder shall not be entitled to compensation for loss of anticipated profit. 14. Insurance. During the tern of the Agreement, Design Builder, at its sole expense, shall obtain and maintain insurance of such a type and with such terns and limits as noted below. Providing and maintaining adequate insurance coverage is a material obligation of Design Builder. Design Builder shall provide City a certificate(s) of insurance, evidencing such coverage. It is the Design Builder's responsibility to ensure that the City has current Certificate(s) of Insurance at all times during the duration of the agreement, including renewal terms. 14.1 Minimum Insurance Requirements. The coverage's, limits or eadorsements required herein pmlect the primary interests of City, and these coverage's, limits or endorsements shall in no way be required to be relied upon when assessing the extent or determining appropriate types and limits of coverage to protect Design Builder against arty loss exposures, whether as a result of the Project or otherwise. All insurance policies shall name and endorse the following as additional insured(s): the City of Sebastian and its City Council members, officers, employees and agents. an amount not less than: Commercial General . $1,000,000 General Aggregate Limit; Each Aggregate Limit; Products & Liability . Completed Operations; and Personal & Advertising Injury $50,000 Fire Damage Limit $5,000 Medical Expense Limit Professional Liability an amount not less than: (Errors &Omissions) $500,000 Each Occurrence, covering any damages caused by an error, omission or 1 any negligent acts. 1 an amount not less than: Automobile Liability • $1,000,000 Each Occurrence & Combined Single Limit • $5,000 Medical Expense Limit In accordance with Florida Statutes 440, maintain worker's compensation insurance to Worker's the extent required by law for all their employees to be engaged in work under this Compensation contract. City of Sebastian, Florida I (BTC), I.I.C. (GMP) RFO 22-06, Design Build Building Department Office Improvements Project Page 2 of 5 15. Payments. 15.1 Prompt Payment. City shall make payment of a payment request in accordance with Chapter 218, Pan VD of the Florida Statutes "Local Government Prompt Payment Act" from the date which a properly received payment request/invoice is recorded as received by City, for Work completed to the satisfaction of City. 15.2 Direct Purchases. The City reserves the right to make direct purchases of any materials and/or equipment included in the project. The City shall coordinate such purchases with the Design -Builder. To the extent requested by the City, the Design -Builder will be responsible for coordinating the delivery, safekeeping, protection, insuring (as to those items that will be installed by Design -Builder), inspection, installation and testing of any materials purchased by the City, and for the management and administration of any warranty claims pertaining to such materials and equipment. Furthermore, to the extent that any famished and installed materials directly purchased by the City were included in the Design -Builders GMP, the GMP will be reduced by the amount included for each item. 15.3 Payment Requests/Invoices. Requests for payment for the provision of the Work provided under the Agreement shall be submitted no more frequently than once per month, unless stipulated differently in the Agreement or solicitation documents. All requests for paymentlinvoices shall be submitted in sufficient detail to demonstrate compliance with the terms of the Agreement and to allow for the proper pre -audit and post -audit thereof Upon receipt of Design Builder's payment request/invoice, the City will review to ensure completeness and that the Work covered under the payment request has been completed in accordance with this Agreement. If it is found that the payment request/invoice is not complete, or the Work covered under the payment request does not satisfy this Agreement, the payment request may be rejected. 15.4 Progress Payments. 154.1 1" Application for Payment. The first Application for Payment shall be submitted no earlier than thirty (30) days following the issuance of the NTP. Prior to submitting its first Application for Payment, Design Builder shall submit to City, for its review and approval: (1) A schedule of values based upon the GMP, listing the major elements of the Work and the dollar value for each element: and (2) A complete list of all its proposed subcontractors showing the work and materials involved and the dollar amount of each proposed subcontract and purchase order. These submittals will be used as the basis for the submitted Applications for Payment. 15A.2 Monthly Applications for Payment. Design -Build Firm shall submit three (3) copies of each of its Applications for Payment to the City on or before the 25th day of each month for work nerfonned donne the previous month. Invoices received after the 25th day of each month shall be considered for payment as pan of the next months application. Within ten (10) calendar days after receipt of each Application for Payment, the City shall either: (1) Indicate approval of the requested payment; (2) Indicate approval of only a portion of the requested payment, stating in writing the reasons therefore; or (3) Retum the Application for Payment to the Design Builder indicating, in writing, the reason for refusing to approve payment. In the event of a total or partial denial of the Application for Payment, the Design Builder may make the necessary corrections and resubmit the Application for Payment for reconsideration within ten (10) calendar days of receiving notice of refusal. Monthly payments to Design -Build Firm shall in no way imply approval or acceptance of Design - Build Firm's work. 15.4.3 Retsivage. City shall retain five percent (5%) of the gross amount of each monthly payment request or five percent (5%) of the portion thereof approved by the City for payment, whichever is less, up to fifty percent (50%) completion. Thereafter, if on schedule, the City shall retain two point five percent (2.5%) of the gross amount of each payment request. Such sum shall be accumulated and not released to Design Builder until final payment is due. Any interim interest on such sums shall accrue to City. City of Sebastian, Florida I (BTC), U-C, (GMP) RFQ 22-06, Design Build Building Department Office Improvements Project Page 3 of 5 Due to circumstances beyond the Design Builder's control and at the City's sole discretion, a percentage of the amount remind from the gross amount of each monthly payment may be reduced prior to final completion of the Project and said percentage released to the Design Builder upon receiving a certificate of completion and approval from the Architect/Engineer. Release of any portion or percentage of sums retained prior to final completion of the Project shall in no way imply approval or acceptance of work. 15 A Withheld Payments. The City may decline in approve any Application for Payment, or portions thereof, because of subsequently discovered evidence or subsequent inspections. The City may nullify the whole or any part of any approval for payment previously issued and withhold any payments otherwise due the Design Builder under this Agreement, to such extent as may be necessary in the City's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims filed or reasonable evidence indicating probable filing of such claims; (a) failure of Design Builder to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the GMP; or (a) any other material breach of the Contract Documents. If these conditions are not remedied or removed, City may, after three (3) days written notice, rectify the same at Design Builder's expense. City also may offset against any sums due Design Builder the amount of any liquidated or on - liquidated obligations of Design Builder to City, whether relating to or arising out of this Agreement. 15A.5 Final Payment. City shall make final payment to Design Builder within thirty (30) calendar days after the Work is inspected and accepted by City in accordance with Section 10 herein provided. Design Builder's acceptance of final payment shall constitute a full waiver of any and all claims by Design Builder against City arising out of this Agreement or otherwise relating to the Project, except those previously made in writing and identified as unsettled at the time of the final Application for Payment. Neither the acceptance of the Work nor payment by City shall be deemed to be a waiver of City's right to enforce any obligations of Design Builder's hereunder or to the recovery of damages for defective Work not discovered by the City at the time of final inspection. 16. Public Records: Design Builder will keep and maintain public records required by the City to perform the service. Upon request from the City's custodian of public records, Design Builder will provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time and at a cost that does not exceed the cost provided in Chapter 119, Florida Statues, or as otherwise provided by law. Design Builder will ensure that the public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the term of the Agreement and following completion of the Agreement if Design Builder does not transfer the records to the City. Upon completion of the Agreement, Design Builder will transfer, at no cost, to the City all public records in possession of the Design Builder or keep and maintain public records required by City to perform the service. If Design Builder transfers all public records to City upon completion of the Agreement. Design Builder shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If Design Builder keeps and maintains public records upon completion of the Agreement, Design Builder shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology system of the City. If Design Builder does not comply with the City's request for public records, the City shall enforce the provisions of the Agreement in accordance with the terms of the Agreement and may cancel the Agreement. IF DESIGN BUILDER HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO DESIGN BUILDER'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, CONTACT JEANETTE WILLIAMS, CUSTODIAN OF PUBLIC RECORDS, AT 1225 MAIN STREET, SEBASTIAN, FL 32959; EMAIL: jwilliams@cityofwbastian.org; PHONE: 772-388-8215. 17. Indemnification _The DESIGN BUIDER or its SUB -CONTRACTORS shall indemnify and hold harmless the CITY, and its officers and employees, from all claims, demands, liabilities, damages, losses, and costs, including, but not limited to, reasonable attorneys' fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of the DESIGN BUILDER or its SUB -CONTRACTORS and other persons employed or utilized by the DESIGN BUILDER or its SUB -CONTRACTORS in the performance of the agreement; regardless of the negligence of the indemnity or its officers, directors, agents, or employees. However, such indemnification shall not include claims of, or damages resulting from, gross negligence, or City of Sebastian, Florida I (BTC), I.I.C. (GMP) RFO 22-06, Design Build Building Department Office Improvements Project Page 4 of 5 willful, wanton or intentional misconduct of the indemnity or its officers, directors, agents or employees. Upon request of the CITY, the DESIGN BUILDER or its SUB -CONTRACTORS shall, at no cost or expense to the CITY, indemnify and hold the CITY harmless of any suit asserting a claim for any loss, damage or liability specified above, and DESIGN BUILDER OR ITS SUBCONTRACTORS shall pay any cost and reasonable attorneys' fees that may be incurred by the CITY in connection with any such claim or suit or in enforcing the indemnity granted above. Nothing in this agreement shall be construed as the CITY waiving its sovereign immunity pursuant to 768.28, et seq., Florida Smmtes, or any other sovereign or governmental immunity. 18. Severability. If a court deems any provision of the Agreement void or unenforceable, that provision shall be enforced only to the extent that it is not in violation of law or is not otherwise unenforceable and all other provisions shall remain in full force and effect. 19. Survival. All express representations, waivers, indemnifications, and limitations of liability included in this Agreement will survive completion or termination of the Agreement for any reason. 20. Authority. Each person signing the Agreement warrants that he or she is duly authorized to do so and to bind the respective party to the Agreement. IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year noted above. /ATTTEST (SEAL): L_ 4Ianeue Williams, MMC TY CLERK BUILDING TIME CONSTRUCTION (BTC), LLI ("Design Builder') ;Mfiance roved as to rm and le o ity of ti Anbn Jr sq. Y ATTO EY THE CITY OF SEBASTIAN : City of Sebastian, Florida i (BTC), U-C, (GMP) RFO 22-06, Design Build Building Department Office Improvements Project Page 5 of 5 EXHIBIT C. SPECLU, TERMS AND CONDITIONS 1.1 General: Any increase to the work shall be performed only after execution of a written change order by the authorized Project Manager and a revised purchase order. The awarded Design-Builder/Contractor shall leave all work sites in a neat and orderly fashion at the end of each workday. The awarded Design-Builder/Contractor shall be responsible for the pick-up of all rubbish and/or debris. Rubbish and/or debris will not be deposited into the City's facilities refuse containers. At completion of work each day, the awarded Design-Builder/Contractor will remove all work materials, tools, construction equipment and machinery from the work site and will leave the City facility in ready to use condition. The City of Sebastian reserves the right to inspect all work prior to payment. The awarded Design- Builder/Contractor shall promptly correct all work rejected by an authorized City of Sebastian representative as defective. The awarded Design-Builder/Contmctor shall bear all costs of connecting such rejected work. The awarded Design-Builder/Contractor shall at all limes enforce strict discipline and good order among their employees, agents, and sub-eomuactors and will not employ anyone unskilled in the task assigned to them. The City of Sebastian sites are drug and alcohol free. The awarded Design-Builder/Contractor who performs contractual services on the premises must advise their persomel for compliance purposes. The awarded Design-BuildedContractor will be responsible for the appearance of all working personnel assigned to the project at all times and their compliance with City's Policies and Rules. 1.2 Air Ouality: Appropriate air quality shall be maintained in each facility. As such, the awarded Design- Builder/Contractor must vacuum affected areas rather dim sweeping. Ventilation as needed is to be arranged with the City of Sebastian designated Project Manager. Plastic sheeting shall be used to divide areas so dust, fumes, gasses, or volatile organic compounds etc., is maintained in the immediate work area. 13 Floor Prep aration/Reuairine: he Tawarded Contractor shall be responsible for preparation of the existing Boor to meet manufacturer's installation requirements. Floor shall be clean and free of dust, oil, grease, Iailance, loosely bonded topping, loose particles or my other deleterious substances and debris which may prevent or reduce adhesion. 1.4 Other Preparation/Rer,air Work: The awarded Design-Builder/Contractor will be responsible for any other preparation or repair work that is required to complete the installation. 1.5 A minimum ten-(10) year warranty for flooring commencing on the date of completion. Completion shall be determined by the authorized City of Sebastian Project Manager. During the warranty period, the awarded Contractor most repair and/or replace product without cost to the City of Sebastian with the understanding that all replacements shall carry the same guarantee as the original product. The awarded Design-Builder/Contractor shall make any such repairs and/or replacements immediately upon receiving notice from City of Sebastian. I of 1.6 A lifetime warranty shall apply to any moisture mitigation system. The awarded Design-Builder/Contractor must repair and/or replace product without cost to the City of Sebastian with the understanding that all replacements shall carry the same guarantee as the original product. The awarded Design- Builder/Contractor shall make any such repairs and/or replacements immediately upon receiving notice by the City of Sebastian. 1.7 All bidders must include a written factory certification from the flooring manufacmer in their submittal. The written factory certification must state they are certified to install product(s) listed in the bid sheet submittal. Failure to include written factory certification from the flooring manufacturer may result in disqualification. 1.8 Service Reauirements: Employees, agents, or sub -contractors of the awarded Design-Builder/Contractor must sign in at the Building Department main office and report to the Chief Building Official, or his/her designated individual on staff prior to commencing any work and must sign out at the front desk prior to leaving the Building Department. Due to the fact the design-builder/contractor will be entering a City building, the City requires performance times for goods and services. The contractor shall notify the City's project mamager within 24 (twenty-four) hours if service requirements will not be met as specified in the Notice to Proceed. Performance/Work times are as follows: 8:00 A.M. Local Time to 4:30 P.M. Local Time. Mondav through Friday. The Building Department is omen to weekend and evening installation times that will limit the amount of emplovees within the building at one time. 1.9 Onsite Safetv Reauirements: While performing services for the City of Sebastian, the awarded Design-Builder/Contractor shall be responsble for any damage to the City of Sebastian property, personal property or visitor property due to negligence on the part of the awarded Design-Builder/Contractor, their employees or other agents. The awarded Design-Builder/Contractor agrees to repair, at its own expense, any damage that was caused by the awarded Design-Builder/Contractor, their employees or their agents. The Design-Builder/Contractor must not drive or park equipment on grass, sidewalks, or patios, etc. If concerns are raised about excessively wet conditions on grassy areas, the Design-Builder/Contractor must contact the Project Manager for recommendations or workarounds prior to commencing the work. The Design-Builder/Contractor must show reasonable attempt, after notifying the Project Manager, to avoid damage to City property under all conditions. Any damages, including damage to finished surfaces and spilled liquids, resulting from the performance of the Agreement shall be repaired and/or cleaned to the satisfaction of the Project Manager, The City shall incur no costs for damage repairs. Any property damaged by the Design-Builder/Contractor or a representative during the services shall be repaired or replaced to the satisfaction of the Project Manager or City. The Design-Builder/Contractor understands that all services described in this solicitation document shall be coordinated with the Project Manager and performed with minimal disruption to the functions of the department and Project Manager. The Design-Builder/Contractor shall ensure that the performance of services shall not interfere with the department's services. All services shall meet safety requirements for the department personnel, pedestrian and vehicular traffic and shall be left clean and in an orderly manner. Adequate barricades shall be erected and maintained all around areas where equipment and materials are stored and used. 2of4 The Design-Builder/Contractor shall ensure there is adequate ventilation for the type of coating, cleaning materials, or chemicals used. This project within facilities that me occupied, necessary precautions are required and shall be made to ensure fumes, gasses, or volatile organic compounds used shall be low VOC so as not to spread throughout the facility through ventilation equipment. if necessary, the awarded contractor shall consult product labels for recommendations and shall follow all product recommendations. Low VOC shall mean a product with VOC < 1 I GIL, 1.10 Protection of Worksite: The Design-Builder/Contractor must protect all existing and newly installed work, materials, equipment, improvements, utilities, sidewalks, patios, grass, structures, and vegetation during the execution of goods and services under this Agreement. Adequate barricades shall be erected and maintained around areas where equipment and materials are stored and used. Any Design-Builder/Contractor-damaged property shall be repaired or replaced to the satisfaction of the Project Manager or City. The Design-Builder/Contractor most report to the City's Project Manager any damage found to any work at the job site. The Design-Builder/Contractor shall be responsible for any loss or damage to its own materials, supplies and equipment, and to the personal property of its employees while they are maintained on the work site. A project shall not be completed until incurred damages, if any, have been repaired and the worksite is cleaned to the satisfaction of the Project Manager or City. 1.11 Debris: It shall be the sole responsibility of the Design-Builder/Contractor to dispose of all construction debris at an authorized landfill and all incurred costs shall be home by the Design-Builder/Contractor. Material cleared and disposed on adjacent or nearby property will not be considered as having been disposed of properly. The Design-Builder/Contractor shall keep the premises free of debris and unusable materials resulting from their work. As work progresses, or upon request by the Project Manager, the Design-Builder/Contractor shall remove such debris and materials from the property. The City dumpsters or recycling containers shall not be used. If the City's Project Manager determines Design-Builder/Contractor is using the City's dumpster, Design-Builder/Contractor shall incur pickup and dump fee. 1.12 Oversite1quatity of Services: A City Project Manager will be assigned to oversee all assigned work (services) for adherence to schedules and service quality throughout the project's progression and submittal of final payment. The Project Manager will periodically inspect the work being performed to ensure compliance with the requirements of the Agreement. If the requirements are not satisfactorily being maintained, the City shall require the Contractor to correct any discrepancies, inconsistencies, or faults immediately at no additional cost to the City. The Design-Builder/Contractor shall understand and agree to the following: 1) The Design-Builder/Contractor shall be solely responsible and assume all liability for the supervision, direction of all work, and for all means, methods, techniques, sequences, procedures, and coordination for all services under the Agreement; 2) The Design-Builder/Contractor shall be responsible for all scheduling, receiving, storage, and placement of all materials; 3) The Design-Builder/Contractor shall ensure that enough personnel, materials, means of transportation, and an adequate supply of tools and equipment to perform the services; 4) The Design-Builder/Contractor shall provide a responsible, knowledgeable, English speaking worksite supervisor or representative, who has decision -making authority, at all times; 3 of 4 5) All services including modifications of required services requires the Design-Builders/Contractor's written approval; 6) The Design-Builder/Contractor shall be solely responsible to the City for the acts and omissions of them subcontractors, agents, employees, and any other persons performing any service under this Agreement; 7) The practice and materials utilized in the work within or adjacent to any structure must conform to all current Florida Building Codes in addition to any applicable local, state and federal regulations, codes and any City requirements. Design-Builder/Contractor shall abide by all State of Florida Statutes; and 8) The Design-Builder/Contractor shall assist the City in identifying the best repair considerations, determining materials, and the quantities thereof for each project and obtain approval form the City's Project Manager. 9) The City will remove all breakables, sensitive equipment, and disconnect and reconnect electronic equipment. 10) The Design-Builder/Contractor shall be required to use a Utility Knife or Razor Knife and cut at a downward angle behind the existing vinyl cove so any damage is extremely limited or completely avoided. 11) Products can be stored along the edges of the hallways inside the PD where the materials will be installed. 12) We can do as much as possible to limit the traffic. We are open to weekend and evening installation times that further limit the amount of employees within the building at one time. 1.13 Warranty: The Design-Builder/Contractor shall warrant and guarantee all goods and services for a period of no less than ten-(10) year from the date of acceptance and shall replace or repair all defects in material or workmanship during the warranty period. The Design-Builder/Contractor shall bear all labor, product replacement, and transportation costs for warranted goods and services. Labor shall be warranted for no less than one (1) year from the completion date and all rework shall be at no cost to the City of Sebastian. A "No Charge" invoice shall be submitted on all warranty repairs detailing the replaced goods including dimensions and quantity. The Design-BuildedContractor shall respond to all warranty requests within twenty -Cow (24) hours of notification. Repeated failure to meet the established and repair timeframes will be considered unsatisfactory under the terms of this agreement. Excessive instances of unsatisfactory service shall be cause for default. Warranty repairs must be accomplished within the service response time of twenty-four (24) hours and shall be fully completed to the satisfaction of the Project Manager and City within seven (7) working days. REMAINDER OF PAGE INTENTIONALLY LEFT BLANK 4of4 or�l�ina L_ � B 1 CGfi 1111 BUILDIRNG TTIWO CONSTUCTI�N BUILDING TIME CONSTRUCTION LLC Date: 5-23-2D22 firm Name: 13014ng Time Covistraction LLC Jim }{orris 10D07o Owner Phone: 772-532-4053 ;✓mAd iimmwigA?,d-)c0mcAst.v1et FEIN 5(o-2D53523 Wl?zm Sec 1.2 'PrincipAl Office: 04 Vot Circle Sebastian, FL 326155 We, have a vminitmatm of 30+ years of commercial experience Noy sgperintcndevit Also has 30+ years of commercial experience We have all the state required insurance and workvman's cotmpensation. Architective: Jeff-PA4 License No, f?R614G53 6112 22"4 -Place Vero 'DeAch,'FL 3261(-D Page I 1 QUABTC BUILDING TIME ,.'ON STRUCT ION J. BUILDING TIME COINSTRUC°I'ION LLC -Pate: 5-23-ZDZZ firm NAMe: 8uildiny Time, Construction LLC Jive 44arris 1 DD07o Owner Phone: 772-53Z-4053 EMAU iivnvnui237.a')cotmcast.net FEIN 5(v-2053527 Min?zq Sec 1.2 Principal office: 04-Pot Orcle Sebastian, fL 326158 We have a vninivnavn of 30+ years of commercial experience 1M4 saperintendevrt also has 3D+years of commercial experience We have all the state required insurance and workvnan's compensation. ArcWtecture: Jeff -Pay License No, ARg4fv53 6112 ZZI Place Vero 'Peach, FL 3261(vD Chris Crawford {architect Vero'Peich Page I 1 TA'6LE Of CONTENTS 1. firm Qmalificmions Z. List of a few of the baildivngs build in Sebastian and Vero over 30 years 3. Team Qualifica+ions 4. Reference Leters 5. Required forms A'6, C, V, E, f, 6 and 44 FnM QUALIFICATIONS 8uildin9 Time Construction LLC incorpora+ed oh febraary 5, 2 021, Prior to that date I was part of and one of the qualifiers for Builders Showcase Inc for approximately 5 years. Before 1uilders Showcase Inc, the company name and license were Jive J }}arris CCIC{10g534 individual Certified 6jeneral Contractor Z. As'Puilders Showcase period • TC 44 ihRoseland TWA, • 64ers Vestal Office, remodel Vero'6each • Seacoast Bank at Oslo'Road and US 1 Vero to Voctors office for -Pr Morel, and Vr. farmin • Ventist Avid 'Exam rooms for TCC44 in fellsmere, • Water's Edge Vermatolo9y in Vero Beach, • Puilding Time covistn4eflovi built Pepper &. Salt -D13Q in Vero Vieach, Page 12 Sebastian and Vero Jobs over 35 years Lic #CfACADA534 • building 11mr, Construction built Yeppor & Salt 138Q in Vero 'beach, • c156161 Gator drive creating an office / bathroom and storage area. • ?zvnodeled the loallf ield bathrooms for the City of Sebastian on 'barber Street • Sebastian Car wash 33 years ago US1 Sebastian • Fat Boys 8Y Q presently Country }{am on US1 • Catholic Church on Us 1 Sebastian currently rectory • Catholic Schools classrooms for Father I-Asage • Strunk Funeral }{ome built in 16152 on 1(v*`' Street • barnett'bank in 1g53 for Lola Maroon Village Shops Vero • KFC on US1 Sebastian currently Jalisco restaurant • }{anger and flight school building for Jack Vrew at the Sebastian airport 3. JDAWIOIAAL ON Total number of persommel 18 including Sub Contractors Superintendent managed commercial projects more than 30 years Sub -Contractors to include, Electrical, Glaziers, Framing, Drywall, -Fainting, Granite, Flooring, Tile, Cabinetry, 44VAC., Millwork, Trim Carpentry. Note the qualifier for 13ailding Time Construction LLC Tim {{arris has over 40 years experiences and maintained State Certified General Contractors License the entire time. }le's had 3 offices in Sebastian over the years including two offices on MAIM Street. 44e received a Yroclawwl ion from the wlayor of Sebastian Tim Gallagher in January 16155 and an Appreciation Award for serving on the S6astiam Construction Board as Chairman on flugust 11, IC155 from Ww4or Jim Gallaher. Page 13 Or�ami;=.a+iowai Chary Jim }{arris'Presidewt Certified General Comtrac+or 1DD°7o Owwer Ur/# CCACAOC1534 Employees Jay Planchard Coms+rmetiovi Vvlaviager amd Superintendent 40 + years' Experienee Joe Cox Carpenter 15 years field Experievice Sub-Cowiractors: • Smyder -Plumbing Vero Peach • Shom'Prooks }{eatimg Avid p it Comditiomimg Vero Peach • Mamning Electric Vero Peach . framing Metal Wos+ers Eerrprises Sebastian • }{'5S Inc 6laaimg avid windows • Vero Millworks Trim avid specialty doors . (aa+or Puildivig Smpply Materials Sebas+iavi • creative floorimg and Tile Vero Peach . Me+ro-Fire 'PrDtac-flovi Services • Como Oil &'Propane Vero'6each • WS Tvisulatiovi Vero Peach • 'ParicsT zotal Vero Peach . Toby Lamm'Painting • Servic&Wfrigeratiovi Vero Peach Page 14 -MS —(A ohm 44arris lborn 'December 14,1g45 State License C4emeral Contractor Florida Since 1g75 Education Graduated BocAT4+Dn }}igh School {tdditiomal Education Miami Sheet metal Union 4 years Training 1Moved to Sebastian in 1g3q and started building homes till the mid 1g80's Wlid 1g30's I built many commercial projects in Vero and Sebastian which included the original Catholic Church as well as many well know building still in use today. The first car wash in Sebastian still operating after 33 Nears. Stramk pumeral 44ome in Vero beach built im 16152 'basically, I've worked im the construction industry my entire adult life. I'm the son of a plastering Contractor long before anyone heard of drywall. I've lived io the ON of Sebastian continuously since 161761 and have had 3 offices within the city. I served on the construction Board for the city for cl years much of that time as chairman. I was told I was the first State Certified Gemeral Contractor in Sebastian when I arrived BU�DINC TIME CONSTRUCTION LLC P.O. Box 780412 Sebastian, FL 32978-0412 Phone 772-532-4053 License fl CGCA09534 To: Don Wixon Procurement / Contracts Manager 772-388-8231 From: Jim Harris Building Time Construction LLC 772-532-4053 Project: Building Department Office Improvements April 7, 2022, Pre -Bid Meeting Questions: • Selections such as flooring and tile will there be allowances or specific selections for pricing. • Countertop height is42" on the customer side except4' for handicap Is 36" • Countertop height on the employee side is 30' • Supports for the employee side countertop shall be partitions between employees' space • Plan measurements need to be field verified to Insure accurate location of counter • New 30' x 48" in the new office doesn't need a mull separating the glass Into 2 pieces • Building Permit will be at the contractor's expense • Ballistic Glass and frame can be ordered and put In last if not readily available • Project is scheduled for 120 days • The contractor will have access to work area during regular working hours • Do you have a dumpster location selected? • Dust protection for adjoining areas • All city files and furniture moved by the city • Contractor employee parking and access to the project. • Are there special procedures to work late or early If needed? Wng was helpful and informative. BUILDING DEPARTMENT 1225 MAIN STREET • SEBASTIAN, FLORIDA 32958 TELEPHONE: (772) 6895537 • FAX g72) 689-2586 LOCAL BUSINESS TAX RECEIPT Tax Year October 1, 2021 to September 30, 2022 11M HARRIS (772)532-4053 Address. 674 DOT CIR SEBASTIAN, FL 32958 Adivlty. Home Businesses - Senllces- Contractor. General Building Issued to: BUILDING TIME CONSTRUCTION U.0 JIM HARRIS 674 DOT CIR SEBASTIAN, FL 32958 NON -TRANSFERABLE No. 2021.81 Date: 10/1/2021 Business Tax Receipt Total Paid: $66.00 Linda M. Lohsl, CBTO i I I STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD TI IE GENERAL CONTRACTOR HEREIN 15 CERTIFIED UNDER THE PROVISIONS OF CHAPTER 499. FLORIDA STATUTES HARRIS, JIM J BUILDING TIME CONSTRUCTION. LLC 674 DOT CIRCLE SEBASSTIAN FL3295H LICENSE NUMBER CGCA09534 EXPIRATION DATE AUGUST 31, 2022 fk: /: vttty L¢r. r, oNl•: as YVFbrtlal:ccr.�emn Dn not aim lhb Jotmrent in.my Fenn. This is Yuut k: r.e Itnl.nlawfollcr.m.uneathat dim the llttnsoe to ase VA, (I unlent. Sebastian -Payment Receipt 1225 Main Street, Sebastian, FL 32958 Telephone:(772) 589-5537 Fax: (772) 589-2566 2021.81 674 DOT CIR SEBASTIAN R. 32958 Paid By. BUILDING TIME CONSTRUCTION LLC JIM HARRIS 674 DOT CIR SEBASTIAN, FL 32958 PaymerdlD: 4051133 Received Date: 101112021 PaymentType: Cash Reference Number. JIM HARRIS Descripilon: Crntr;:ctor Ge^zr,lymltlino $66,00 PaymentTotal $66.00 $ FORM I RFQ 422-06 101Af0F"1CANe1A10 DESIGN -BUILD —BUILDING DEPARTMENT OFFICE IMPROVEMENTS CONTACT INFORMATION SHEET DUE DATE: Proposals are due on o ! SOLICITATION RELEASE CONTACT: before 2,00 PM Loc Time on No.: DATE: Don wlxon Thursday, April 28, 2022 RFQ #22-06 Thursday, P o urementfContracts March 24, Manager 2022 (772) 388-8231 Check Addenda for revised due dates SOLICITATION TITLE: before submitting your Proposal- Late Proposals will not be accepted. DESIGN -BUILD Building Department Office Improvements Flrm's Name and "Doing Business As", 6 applicable: Federal Tax Identification BiA tt 1'3IM 1= TAME CQT-- LKC''T\O t-.A Number: 19j„"2053 S 2-7 Address: (o-14 T-ir�T ri Rc uF City. 9E AS TI a_. 1 State: I__7L 529 Jr,21P Code: Telephone No: iZz 53Z 4053 Fax No: J O EAMall Address of Authorized Representative: I t + 1 y J 232 P ComCQS T . N ET MINIMUM REQUIREMENTS Firms that do not meet the minimum requirements as determined by the City, at its sole discretion, will be deemed nonresponsive and not considered for award (refer to page 5, Section 1.2). By placing a checkmark next to each requirement, Proposer is confirming the requirement is met. ❑ Currently licensed in the State of Florida as a Professional Engineer in accordance with Section 471.023, Florida Statue; and Office ynthi0150 miles of Ci J in which the work will be done; and A minimum of five (5) years' experience in Deslan-Bulid Office construction; and Experienced and qualified team of professionals capable of performing the required services; and PROPOSAL CERTIFICATION I certify that I have carefully examined the RFQ document and associated documents, including Addenda, accompanying or made a part of this solicitation. I further certify that all information contained in this proposal is truthful to the best of my knowledge and belief and that I am duly authorized to submit this proposal on behalf of th"mpany named above and that the company is ready, willing, and able to perform if selected. T 4AARPIS nr_ nd b Pdnrec me r Tide ►1 M 22 ne bare , -_ie Cily reserfe�s a right to reject any and all proposals, or to accept any proposal or portion thereof deemed to b in the best nte,ea nr the r.ry, and to waive an(ynon-substantial irregularities. -JnalSa]ail _pa�jnare (e ]aay aG jliara and auhmn this Information ShM ot y. result m-meaum otthe proposal Page 18 of 27 FORM MEPRFQ #22-06 ems+ + DESIGN -BUILD —BUILDING DEPARTMENT OFFICE IMPROVEMENTS Proposer's Name: �� J µ�J I Phone#: 11Z-53i- 405 j RFQ This: Design -Bulk!- Building Depanment Ot6m RFQF#: 22-M Immyements Proposer shall indicate below all Addenda received. Acknowledgement confirms receipt and understanding of Issued Addenda. Proposer understands that failure to acknowledge any addenda issued may cause their Proposal to be considered non -responsive. To confirm the number of addenda (if any), Proposer may contact the Procurement Division at (772) 388-8231. ADDENDDUM # DATE RECEIVED 1 A-� 5 %2wu 2 12,ZU27� 3 4 1 5 6 7 8 9 10 I',- No Addenda was received in connection with this solicitation. Title Signature: Print Loor7-� Da ��l Nam5) 23 Z )27� g/ M te: �) ��IS ' ( 1 Fallure to fully mmolete sign and submit this For, may m of In relection of the moo. I Page 19 of 27 O R �C+i!:: A;. aril F� N \ Atlminlehative Soc ices D t DiviseM Y y; ` Procurement Division 1225 Main Sheet _�^._yam ► Sebastian, FL 32955 FIOhtE OF PELICAN BLAND (772) 389A232 April 8, 2022 ADDENDUM #1 TO THE CONTRACT DOCUMENTS FOR THE CITY OF SEBASTIAN PROJECT NAME AND NUMBER: RFQ 22-06, Design-BuBd Building Department Office Improvements FROM: Don Wixon City of Sebastian 1225 Main Street Sebastian, Florida 32958 TO: AB Parties Who Attended The Mandatory Pre -Proposal Conference: Q: Do we submit a price for the project at this time? A: No, please read the eutire RFQ document thoroughly and pay strict attention to Section 2, Proposal Format & Requirements, and Section 3, Evaluation Process. Q: Please provide material finishes for tile and carpet, If material finishes are not (mown, please provide material allowances? A: The City has enough green tiles that are leftover from the City Hall project that can be used. Carpet will be approximately $8 per square foot which includes removal of existing carpet, removal of existing vinyl cove base, floor prep, in stallation of square file carpet with a ten year wear and stain commercial warranty and installation of vinyl cove base Q: Countertop height is 42" on the customer side except 4' for handicap is 36" A: Yes Q: Countertop height on employee side is 30" A: Yes Q: Supports for the employee side rountertop will be partitions between employees' space? A: Yes Q: Plan measurements need to be field verified to ensure accurate location of roumW A: Yea Q: New 30" x 48" in the new office doesn't need a mull separating the glass into 2 pieces? A: No Q: Building permit shall be at the contractor's expense? A: Permit fees will be paid internally by the City. Pagel of2 Q: Ballistic Glass and frame can be ordered and put in last if not readily available? A: Yes Q: Will the contractor have access to work area during City's working hours? A: To be coordinated with the Building Official. Q: Do you have a dumpster location selected? A: To be determined Q: Is dust protection required for adjoining areas? A: Yes, City has a roll of plastic that can be used. Q: Will all City files and furniture be moved by the City? A: Yes Q: Where will contractor employee parking and access to the project be? A: Parking will be random in the parking lot. We would like to hold the parking spots open that are closest to City Hall for residents and clients. Q: Are there special procedures to work late or early, if needed? A: To be determined. Will require City employee supervision. Q: Can framing be metal instead of wood? A: Yes Q: What is the thickness of the ballistic glass? A: Per manufacturers specifications. Q: Project is scheduled for 120 days? A: Yes STATEMENT: Please read the entire document and nav attention to Section S. Pronosal Checklist, Section 2. Pronosal Format & Reuuirements. and Section 3. Evaluation Process. Please don't hesitate to contact me if cou have additional ouestions. Page 2 of 2 o a ,£.-_ �. r"❑ Administrative Services Department Procurement Division 1225 Main Street Sebastian, FL 32950 HOME OF PELICAN ISLAND (772) 388-8232 April 12, 2022 ADDENDUM #2 TO THE CONTRACT DOCUMENTS FOR THE CITY OF SEBASTIAN PROJECT NAME AND NUMBER: RFQ 22-06, Design -Build, Building Department Office Improvements FROM: Don Wixon City of Sebastian 1225 Main Street Sebastian, Florida 32958 772-388-8231 TO: All Parties Who Attended The Mandatory Pre -Proposal Conference: Please read carefulh and make a specific note of the chances: The new o uestions deadline is Monday. Mav 2.2022 at 2:00 PM, Local Time. The new RFO onenine due date and time is Wednesdav, Mary 25, 2022 at 2:00 PM, Local Time. All proposals shall be due no later than Wednesday. May 25. 2022 by 2:00. Local Time. Proposals can be submitted to the City of Sebastian, Procurement Division m-person (physically) or mailed. All proposals shall contain one (1) clearly marked original, four (4) copies, and one (1) electronic copy on a USB drive. Proposals will be opened in the City of Sebastian Council Chambers at City Hall. The V Evaluation Meetlne is Friday, June 10, 2022 at 10:00 AM. Local Time. STATEMENT: Please READ the Er TIRE DOCUMENT and make note of Section S. Proposal Checklist, Section 2. Proposal Format & reumrements, and Section 3. Evaluation process. Pagel of 2 PLEASE MAKE NOTE OF THE FOLLOWING FROM PAGE S: The Guaranteed Maximum Price (GMPI price will be discussed and negotiated for the Project following approval of the ranking of the Proposers and authorization to begin negotiations by the City Council. Prior to negotiations, the top ranked Design Build Firm (DBF) will provide a Schedule of Values to the City of Sebastian. The total of the Schedule of Values including a 15% contingency will be the guaranteed maximum price (GMP) contract amount In accordance with (IAW) Florida State Stage 28ZO55 (5), Consultants Competitive Negotiations Act (CCNA), the proposed Guaranteed Maximum Price (GMP) price will be negotiated with the most qualified firm for a price which the City determines is fair, competitive, and reasonable in order to reach an agreed upon fee, terms and conditions. This negotiation will be conducted far no more than three (3) weeks maximum, with the top ranked firm. If the City is unable to negotiate a satisfactory contract with the fire considered to be the most qualified at a price the agency determines to be fair, competitive, and reasonable, negotiations with that firm must be formally terminated, IAW F.S. 28ZO55 (5). The agency shall then undertake negotiations with the second most qualified firm Please don't hesitate to contact me if you have additional auestions. Page 2 of 2 5 rug r� ltm O FoRFQ #22-06 "a^r�' vrnrls - DESIGN -BUILD —BUILDING DEPARTMENT OFFICE][MPROVEME'NTS SUB-CCOONSULTANT/CONTRACTOR LIST Proposer's Name:-&rr o,.te IIM�_ �ew �TQurrreN LL(' P1110MIX: 772-53Z-Ao 53 RFQ Title: DeslgM16utd - Sugding Depertmerd Office Improvements RFQ #: 22-0e NOTE: List all sub-contractoralconsuitants. If sub -consultants will not be used on this agreement, check the box below. Form must be submitted with your Proposal. Use additional sheets if necessary. The City's selection of the Proposer will be based, in part, on the qualifications and capabilities of their defined sub -consultants, which acts as a substantial inducement and material consideration in the selection. Unilateral changes of sub -consultants anytime during the process, and after award, will not be authorized unless specifically approved in writing by the City. The City reserves the right to reject any Proposals if the Proposer names sub -consultants who have previously failed in the proper performance of an award, or failed to deliver on time contracts of a similar nature, or who is not in a position to perform under this award. Company Work To Be Contact Telephone Name I Performed Person Number I ✓�fblt{�d.Q.tcte_r� �1.t=tTRfGRL god MANNtrs( T7Z-5(o3-8B39 2 r or r eK 7'.FlAtl H05 lr C—VcZI►4G F66VACeaen Jlz-SYz T12- 5 b1-1441 I atkm that S Mraetodemultar4 will nat be used to complete projects under this agreement. Title Signature. Prig I Dot Name: �� i�7hk_uLt5 e: Z3 2pZy Page 20 of 27 FORM D _ RFQ #22-06 �+ DESIGN -BURR —BUILDING DEPARTMENT OFFICEIMPROVENIENTS REFERENCE LIST List a minimum of three (3) client references who can speak to the Proposers experience and performance, withfn the last five (5) years. The City will send Reference Check Surveys via email to the references provided. If the contact Information is Incorrect the Proposer will lose points awarded for this criterion. Company Name: Location (City, State): Contact Person: Contact Number: Email Address: Dates of Service: Services Provided: Company Name: Location (City, StateJ: Contact Person: Contact Number: Email Address: Dates of Service: Services Provided: Company Name: Location (City, State): Contact Person: Contact Number: Email Address: Dates of Service: Services Provided: Reference #f MA.IEC'" -Crtl1 Sce�Ic�s VERII jCjd0ZH eL EL`(51A RR9 NNAM. -7-72- 404- 1221 ELMS IA • 3REM WA tJ (-) mikI Es't Y-tt}LE •Ce sn 2.o 02) fl=nabDf_-1 �fvTll2t o, FteC Referre�nce#2 I Rr"M(zr l I)H52 l.elMMllaJ tT`r hr6ALTN TNP VE t r ,Sea S-f MO t l l S wlt3�C V1 P.1(I So Ll t_F l7,2 - 2c)-s - 92Ac VSout_r— r—� TGe..iA INI C. • n2 C, IDE.ftT%5r t OFVtM t�EMDOFI- Reference #3 C" fWARC �SDLLRCCS \12%) t? EPf)44 V1. SI MWA l.I M' (C'A tvr- �r,t,vN rW S F1RNwtnwl c� rN tt D G0.lL R E C d v112 C ESt R• QRb MPtJ�f YRo ICCT.0 6�GQ to jEAQ Page 21 of 27 FORM E RFO fl22-06 The undersigned certifies under oath the truth and correctness of all statement: and all answers to questions made hereinafter. Additional sheets may be attached if required. Proposers NAddress:4,w 1 6 TMi V�NS(Qu�ttDrl Ur ,_ Address: '14- CbT C'.\l2Ct� AA r� SER#Nn contact Pam.: �nrl i-�aet�(s Time: SOl£ 1�8'R Phone No.: Email donNAddress: j r MNt-f zit �a CCerIRY�ST , IU[T Federal memmcetlon No..: J � This Business Is: () An lftdWual 1 I A Piu ership (µ<Corporadon Proposers ucarme No., na..ff. : S-VPcfE CCRTI F I it C C c c g o 95 3 4 'Attach certificate of status, competency, andfor state registration (1) Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any at reg ry agency or I professional association within the last five (5) yean:7 YES NO (2) Has your firm, or any member of your firm, been declared In default, terminated or removed from a contract or job related to the services our firm rovldes in the regular course of business within the last five (5) years? YES NO (3) Has your firm had against It, or filed any request for, equitable adjustment, contract claims, proposal protest, or litigation in the past five (5) years that Is related to the services your firm provides In the regular course of business? YES NO D MI (4) Describe each affiliation or business relationship with an employee, board member, elected official(s) or an Immediate family member of any such person of the City of Sebastian. If none, write NONE. (5) Describe ANY other affiliation or business relationship that may cause a conflict of Interest If none, write NONE. If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts or extended contract time Involved. are (rue and I agree and understand that any misstatement or shall be cause for fortelturs of rights for further consideration of Date Page 22 of 27 :_ ATTK aonei hover a nhxaNaharn DESIGN -BUILD —BUILDING DEPARTMENT OFFICE IMPROVEMENTS Effective January 1, 2021, public and private employers, contractors and subcontractors will be required to register with, and use the Employment Eligibility Verification System (E-Verify) to verify the work authorization status of all newly hired employees. The E-Verify system can be obtained at the U.S. Department of Homeland Security webstte: hltpYhvawldhs,gov/E-Verify. "Contractor" means a person or entity that has entered or is attempting to enter into a contract with a public employer to provide labor, supplies, or services to such employer in exchange for salary, wages, or other remuneration (also referred to as Vendor or Consultant). "SubcontractoP means a person or entity that provides labor, supplies, or services to or for a contractor or another subcontractor in exchange for salary, wages, or other remuneration (also referred to as Sub - Vendor or Sub -Consultant). Vendor/Consultant/Contractor acknowledges and agrees to utilize the U.S. Department of Homeland Security's E-Verify System to verify the employment eligibility of: • All persons employed by Vendor/Consultent/Contraclor during the term of the contract, (including assigned sub-vendors/sub-consultants/sub-contractom), to perform employment duties within Florida and any work In pursuant to the contract with the City. By entering into a contract with the City, the Vendor/ContrecmrlConsultant becomes obligated to comply with the provisions of Section 2. Section 448.095, Fla. Stat, "Employment Eligibility,' as amended from time to time. This includes, but is not limited to, ulization of the E-Verily System to verify the work authorization status of all newly hired employees, and requiring all subcontractors to provide an affidavit attesting that the subcontractor does not employ, contract with, orsubcontracf with, an unauthorized alien. The contractor shell maintain a copy of such affidavit for the duration of the contract Failure to comply will lead to termination of resulting contract or If a subcontractor knowingly violates the statute, the subcontract must be terminated immediately. Any challenge to termination under this provision must be filed In the Circuit Court of Indian River County, Florida no later than 20 calendar days after the date of lamination. If the resuling contract Is terminated for a violation of the statute by the Contractor, the Contractor may not be awenled a public contract for a period of 1 year after the date of termination. I hereby acknowledge and agree that use of the U.S. Department of Homeland Security's E-Verify System during the term of the contract is a condition of the resulting contract with the City of Sebastian. Company ,c-Tt0 L Z e' Titre: \nL9 IV\DC Date: 5/23 I Z 0-4-L_ State of County of r•t This instrument was acknowledged before me on �acw_ W. ALICIA HJALMEBV (Date) Notary Public _ �tMedFbatla l JCam"na HIf070 2 Notary Public Sig ure r amhres 7/19/7a7A Fuplato. Mana ttbmtt this ' n osW Page 23 of 27 FORM G RFQ #22-06 .r :r•. 17-Mi Ajkn2 —Souz 1"\13Q (Prim Authorized Name) (Ilse) —T— � Of �u�l,Dr Ne \ICE � RH C'C IOhI (Company Name) Affirm that I read and understand, as well as accept all requirements and regulations listed in sections 4.27 — 4.35 of the above referenced solicitation document to include the following notifications: • Conflict of Interest • No lobbying • No Collusion • Immigration Laws • Drag -Free Workplace • Public Entity Crimes • De ent and Suspension i S utinized Vendor •i Pe o ance Evaluation Date: 5 23 2C) State of V\'c-C7'7. 0 gl'^ — / County The foregoing Affidavit was acknowledged before me on tU�1(i `, IDATEj. AA�l..�ICIAHJALMF9Y �, VEXPIMSMRIM24 ebllcState of Ronde Notary PuCmmr HH020622 0 Page 24 of 27 RFQ #22-06 xwa artucw ewm DESIGN -BUILD —BUILDING DEPARTMENT OFFICE IMPROVEMENTS f,rT3Sl�iLl SOLICITATION INFORMATION FORM Please submit this forth to assist us in learning more about how our solicitation opportunities are most often found. Company's Name: IRu IL.ytrlr TUA6 ON>('0U C-"A,% file Company Address: 614 es C)aAg� �E' �A—n m 0l 3295,16 Phone No: Z72- Please tell us how you found out this Request for Qualifications was released/available (mark all that applies(: Indian River Press Journal (rCPalm) DemandSrar/Onvia City of Sebastian Web Site Other (please specify below) END OF SOLICITATION FORM REQUEST FOR QUALIFICATIONS 922-06 Page 25 of 27 I jroi • • ♦ • d ' N rr tiaiAt■e~►de«.f tlM stNUANw►f'at ra N •tereola/ earrt7: and • • / f [ • S. fae Nwlrhr CMSPw"O$$d bow Ne• too aallep"67 &r he uowe� AIaI r • t • t A S. r■e.r Off"" Ar rN MAaAr •f Al ra•aotAu Ate erAdar rsreetpees too 9adryrNr dutet or too "O"Alte. "a r r r• S A I The Cite N SaadetAda rs••r/ N lwtt of Nrra <a tts LehalT AM N too t+srolf et dll of toe tet■ree•ry let trvelatla• mad NM/N •iN rNa1�1 ►eAAd•e tetrwttleA Nd aalAeTte iarNa •arayi"S of ■aboarlaft. s C r T a S■• r LaA Aetletste wwafed to rlerAda do aereav Prot) 1a11MAAv "&oogo of to togs, drllce Cod aefwled Jtr rA ST•rrl Dr■AIA POST^A CArGOf LOCISA 7Ar•S A■ r f 1■ r S: q hAnd And Carud too •flAAad this Ard day o; PA ATTEST Deborah C, ■ragos. CAty Ctar! immyj232@comcast.net From: Vicki Soule <VSoule@TCCHINCORG> Sent Monday, May 23, 2022 4:20 PM To: Jim Hams Subject Work Experience To Whom It May Concern, It Is my pleasure to recommend Jim Halls as Building Contractor. Jim has provided supervision to several Jobs for Treasure Coast Community Health over almost decade. He ensured the demolition and complete rebuild of our location at the Roseland Plaza, on time and with several suggestions that made a positive Impact during the project. He Is trustworthy and knowledgeable In pdcing, regulations and what it takes to ensure a good outcome. If1Inn Harris is chosen, you will not be dlsappointedl Sincerely, Vick/Soule' Chle ftecutive Ojj mr '�—I-Zreasure coast Community Health, Inc. 1555Indian River Blvd. Suite B-210 I Vero Beach. FL 32960 ICI 772-205-9249 Sent by ohone-ols excuse tvrwsl From: Brennan, Elysia<Elysia.Brennan@majestytitle.com> Sent: Thursday, April 14. 2022 12:09 PM To: jimmyj232@oomcast.net Subject: Recommendation for Interior build To whom it may concern: I had the pleasure of working with Mr. Hams when we built our office 3.5 years ago. My office space is 2000 feet and was formerly a yoga studio so there was a lot of work to be done as it was a mostly one, large open space. I would pop by to check the status of things often, and most of the time Jim was there ready to answer my questions, show me what had recently been completed, etc. He's very easy to work with and very organized. This was my first office buildout in which I was responsible for the decisions, and Jim made that very easy on me. Our office was completed just a couple months later. Jim had added a second bathroom and turned the space into 3 offices, a reception area, and three conference rooms. One year later, we added an additional office and a decorative, shiplap wall. Jim executed that perfectly as well. I would highly recommend Jim for any office build, renovation, or alteration. The scope of his knowledge is invaluable, and the ease I experienced in working with him was refreshing. Best, Elysia Brennan Elysia Brennan Relationship Manager �-/MAJESTY TITLE 1IaTICIS .wrw.s,.e..ua m: (772) 404-1221 p: (772) 410-2491 f: (813) 868-3751 ii- R E s U R C E s Mission Statement To elewie and roinoie the Mghest quality eadydtlldhood demloarentandeduotbnin IndonR.—Covnt, fxmmgon«.,o afly challenged childrzn and 6m1.c Board of Directors President Jim Beindorf May 24th, 2022 President Elect Jennger Peshke Immediate Past President Patrick Farrah To Whom It May Concern: Treasurer Kyle Thorn I are happy to wide a letter of reference in support of Mr. Secretary Jim Harris of Building Time Construction, LLC We have Tracy Sorzano engaged is his services of construction management several Officers at Large times since 2015. Jim is a knowledgeable and trustworthy Brian A. Baker construction professional. whom weare grateful to work Helen BoehmJohnson whb. We have found Jim to be responsive, and thorough. Susan Donovan We have consistently been satisfied with the work Trustees- completed. MarySue Brown David W. Griffis Christine HammarskJold Barbie Horton As long-time clients, we have great respect for Jim's Matthew McCain expertise and professional reliability. Should you have any Amanda Robinson further questions, please do reach out to me, as I am happy I ianorarg Board to serve as a reference. Nancy Hopwood andy Kahle Jack &Anne Kelsey Sincerely, Kathy Marshall Baker Zp Carolyn Veeneman ,,VV Sherry Waddell S on McGuire Bo Executive Director Executive Director Shannon McGuire Bowman, MA, CFRE ChlldcereResoureesillorti 772-567-3202 2300 Firth Avenue. Butte 149 Vero Beach, FL 32960 p'1OMIV1 TAX HELP To Whom It May Concern, I am writing to recommend Jim Harris and his company Building Tlme Construction, LLC for additional construction services with future prospective clients. I have had the pleasure of working directly with Mr. Harris on a number of projects in the past and most recently at Omni Tax Help located in Vero Beach. Bullding lime Construction, LLC has Illustrated their attention to detail, quality and safety on a number of occasions. It Is the policy of this company to strive for the highest safety standards. Working safely requires a serious commitment by everyone within the organization Including subcontractors. Mr. Harris has met and exceeded our safety guidelines. Scheduling within the construction Industry is typically an art form in Itself and Mr. Harris has been able to effectively meet projectschedule requirements. He and his crew have been able to quickly adapt to schedule changes from other subcontractors in order to keep his schedule on time and aligned with the overall project schedule. In addition, Building Time Construction, LLC has been exceptionally accommodating when dealing with unforeseen conditions and potential change orders. Please consider Building Time Construction, LLC for your construction service needs. I recommend them and look forward to working with them again Sincerely, //LLCAU— 9.al Michael Batty Property Manager 1 ATP 2300 Fifth Avenue - Vero Beach, FL 32960 Ph: 800-707-806S - Fax: 772-925-3398 • NAEA www.omnitaxhelp.com GERISE$ P.L., LLC 13230 U51, SebaSHA4 F132958 Teleftme M2) 5$9-0300 F..(772) 5894550 May 2V, 2022 Subject:. Recommendation for Mr. Jim J. Harms To Whom It May Concern: I take.great pleasure in recommending Jim as a general contractor and builder. He was instrumental overseeing, and coordinating the construction project of our medical office at Vero Beach. The quality of his job earn praises of our happy patients every day. He is a very honest and reliable person, always available to answer any question or solve any problem. Our experience working with him during the whole process and even after completion could not have been better. The building Is located at 752 S. Us #1, Vero Beach. Sincerely, i 11 Guiller F. Morel, MD Internal Medicine/Geriatrics President, Geriseb LLC Pape f Of 1 A ROC & CERTIFICATE OF LIABILITY INSURANCE osizfinozz THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTFFI ATE HOLDER THIS CERTIFICATE DOES NOT AFFRNATSELY OR NEGATIVELY ANEW. EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORGED REPRESENTATIVE OR PRODUCER AND THE CERTIFICATE HOLDER IMPORTANT: If the rerUacafe hdtlu Is an ADDITIONAL INSURED, the I Dlicities) mud have ADDITIONAL INSURED proWslons, or be endorsed If SUBROGATION IS WAIVED, subject to the bums anti conditions of the policy, certain Policies may require an endorsement A mebmmt on this certificate does cot confer rights to She cerliftcate holder In neu of such andorsamvLVML mooucm BIBERK PNoNI, 84 4172.0967 !Ak 203=654.3613 P.O. Box 113247 (A .so. E.n wc.xec Ewe customerservIMVWBEAR.com Stamford, LT 06911 AomBs _ aL9M(JAWVInmMWYDNOE NAM:e RNwW�1Eoo INSUAVIR A: aeWnrbMawry tlnC amv�n¢Dmglry - ID391 nullnlnff Time Coluhvdion LLC INW ETIa: IYsu .cr 674 Dot Circle I.RAN o: Sebastian, FL 3295RA303 INYJNEN E: W WRERF: COVERAGES CERTIFICATE NUMBER REVISION NO ER THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HIVE SEEN SSUFD TO TIE INSLREp NAKED ABOVE -OR THE POULY PEMOI INDICATED. NOTNITHSTAMNO ANY REOUSELENT. TERA1 OR DONOTION OF Aff CONTRACT OR OTHER O,CUN,K WITH RESPECT TO WHICH TIB' CERTIFICATE MY BE ISSUED OR NAY PERTAIN, THE INSUUNCE AFFORDED BY TIE POLICIES DESCRIBED 1EREN IS SUBJECT TO ALL 111E lEfO1F EXOLUBghDAMcaamdRs OF SUCH POIIOEB.11BI381pWN MAY WAVE BEEN REELICFDm PAIDQAINS. "I— I I I 119131%476634 awL AngnEaarEusarARIASPER Poum❑M ❑LOD X WHEIt AWDAKSIIEIANSImV ANYAIRO - o.Wrm — soEnMm AVfW W.Y r.IR05 IY✓® NONUeM9 NIrW n'LLV AUTOSONLY Le6flk3lA WB gE� QCFSLNN ® INE19aCNi WCNrSNanNP@aarYM AND E'IAAMBIB WI®Lm ANronnPREfWNMIE6iIRECVINE YIN OifICEgMEYeEA IXC11KEDi ❑ NIA Professional Liability (Errors fl Omissions): (3alms-f4ade BAMafx`APRBrE i 1,000,0DO DWACEt0AEf1TD IEr.ilcewxnl Is 50,000 Dsras2a22 a5(2512025 I®EXIa 51000 I {e+WnaaAwirum - -E Included gealNLAaogmArE : 1,000,000 IRCOUCfe. WR®APAGD a x,000,a00 s W .—ft aces MT 1MBBOOeIEYtlINLIJRra'N i ®LYIWJRrIM1,vffi4 { d'esomvN-....__ �i e HL11aSNdB1LE �f I 2AARUT I ISN' I_ EL USEASE-MUMUYES F EL CINEASE. AAA.Y UNIT I F Per Occurrence/ Aggregate DOl1NIpXwDPBr/nlMIILOG1tlNtIMaC1A tAlMDta. MGthminroNMaY,mrgeiry W @aep a son rpra N,puMl CERTIFICATE HOLDER 3Im Harris CRY of Sebastian 1225 Main Street Sebastian, FL 3295E CANCELLATION WOULDAW OFTHE ABOVE DEscana a PDULES BE DANCELI Y 9EEVRE THE EXPIRATION DATE THEREOF, NOTICE WAL BE DELNEN® IN aCCONWNL4 WIINIHE PIXILY PRONSIDIO. avmonvmteEVREeanlmE 019804D1S ACORD CORPORATION. All rights reserved. ACORD 26(2014183) The ACORD name and logo are mgis[ered marks of ACORD Ne p 0 a CERTIFICATE OF LIABILITY INSURANCE nq 172122YYM �OS/26/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AM CONFERS NO RIGHTS UPON THE CERIIFl TE XOIDER TXIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, E%TEND OR ALTER THE COVERAGE AFFORDED BY THE POLICES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN WE ISSUING WSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCE7, AND THE CERTIFICATE HOLDER IMPORTANT: HIM certificate Hdtler Is an ADDITIONAL INSURED, the policy(I ) must haw ADDITIONAL INSURED pmWslons or be end.-t If SUBROGATION IS WAIVED, subject to IM terms and condition P/tle policy, cartels poikles may refulm an enhancement. A atatenWd an this catdficate does not cons rights to the certificate bsMNr In Ilou or such erMorsemem(a). PadoU ER llli� BIBERK RtaaE 844-472-0967 - -- FNI 203-6543b13 w P.O. Box 113247 uN.10.F+n _-- -. - _ jNLu Mn, Ea. customerscvlcA®b(BERK.cum Stamford, Cr 06911 AOCREsx sIWA8f1{IAR0Rae9WVBW0E "of aOaaelA: Bek:art xMewp el,e¢4mnic OfmFnry 10391 ru ng Time Construction- wul�le: 674 DDt Orde IlraalelD: Sebastian, FL 329SBA383 NENN9I E: a®eFAF: Z*VERAGES CERTIFICATE NUMBER REVISION NUMRF,jt THIS IS TO CERTIFY "TIRE POLICIES OF INSURANCE LISTED BELLOW INVE BEEN ISSUED TO 1FE INSURm NEMFD ABI FFCCRN 11£ POLICY PERIOD INDICATED. NOTWNISTANDNO ANY REOUIIELENi, TERM OR COfDG10N OF ANY CONTRACT OR OYHER DOCUMENT WTTR RESPECT TO W lOf TICS CERTIFICATE NAY SE ISSUED OR MAY PERTNN. THE IN6URNJCE AFFOImEO BY 11E POLICES DEZORSED HEREIN IS SUBJECT TD NJ. TIE TEFWS, E%CLUSIONSAHIDCOlLYTONS OF SUCH MUCIES.Umn SI10YA1 MAYHAVEBFFl1 RGAICEDSY PAIDOLKINS. LIM TPewsewANR AOR B0. Id�'N�Q — _IR`T1Z1'13f- Ib1q:YdP uera weRBouaENlauLUAeLm F/ptgCGONtQCE f 1,000,000 ' pN1.61MflE ®� OAUACETO gFxrFD - ' . I PREINg¢as31fBIM1 i NfD ExP(NyaepmiQ a _ Pe1LIXIKENNOMMY i ieIXLIGGRftS11E111lr APRIF8f9t (@IBIN. K.ORFWTE _ li L,000,000 Faum ❑ J°RDe:T ❑Lac FRCOLCTe.mLVAPAOa f mNm s .Moe -amstnT W. �emislelEuruT f ANYAUm BEALr INUPlOw pmmi if AmWVyY Allm9 MMYLYIIWRY gM aHxryf �060hAY Na�NaNN�EOY OINME f F W.AR Wa X OCCUR FKNOLCMgEH(E { 1,000,000 A ® LUa pNMtiW W MUMS41802 05/25120M OS/25/2023 AOIRHiATE I s 1,000,000 .WWRM01IOA0A 11 WFxRAfTS O [f .EYRAE1010eW MIA 11.FIlH ACpISIT { ELOG16E-FAEIi ELO9FASE. HxYY{111I { { ranwwanin _ OiWPno,,FOSiATI.. Professional UabilitY (Errors 6 Per Oonemence/ Omissions): Oelms-Made Aggregate aDOUFfANOFOFf1UTWE1 WrJ1TegITOEaIaF fMIeYF.nryb�nM Hawe¢vakrtquhtl) iK01etM,AYibYIttlW CERTIFICATE HOLDER CANCELLATION ENOmDANY OFTIEABOVE DRpN9m POLIpEa BE CANCELLED BEFORE Jim Harris THE IMPIRI IDN DAM TiEREDF, NOTICE WE1 BE DELIVERED m ACLORDIINCE WfIXTNE FQJCY PROVIBwIA. City of Sebastian 1225 Main Street AUIIERZEDRS hB9rTADFE Sebastian, FL 32958 ,ia �hh-J1o� ®T90B401SACORDCORPORATION. AO rights reserved. ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD ACORO® CERTIFICATE OF PROPERTY INSURANCE `./ 05/26/2022 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RISHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATNELY OR NEGATNELY AMEND, EIITEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BkIWEEN THE ISSUING INSURM 481, AUTHORDED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER Now. N1�MFA[I y°N°icRlm.¢FD. (644)472-0967- _, W (203)654.3613 BIBERK �. _1;; upport0biberk.mm P.O. Box 113247 meuGcaR - _ - Stamford, Cr 06911 xx11nD hfteHat away gectIma8 130 weuaRA:BeHanire Hathaway Direct lnsuranoe Compel 238130 leaumra: -- — Building Time CarletivWon LLC 674 Dot Circle- Sebastian,IL. 32958-4383 moo' _ ..a; ll*AIRBIF: COVERAGES ;ERTIFlCATE NUMBER REVISION NUMBER: LCGIocatlant60iLFtClrcieSebatlam, L3295 AOIx.bE4w1Wnab&IUWM.anUngMbnxHMf Lootlon: 674 Dot CIICIe.Sebastlan, FL 329584383 Bldg #GD1: Carpentry - 7422101 TEHISI ISE CERIIFICATCEENMAYBE HHTAiAITa!ENPoG ADAAG' ERPERTAIN. DTRIHAEINSURANCE ARKW NSURANCEARKWIiONNYCEBFBYAENENr LAPOVLEICOElSOTDlOE1REPCgR•LESEIaKEODOENRgFAJ1MNNFDM AStBOaLVHEECRPoTETSROPTENCI1ETPTTDOIEUTERMS. PEMECWSIDN6AND CIXIDITION5OFSLICIMUCIFb. UMRb SHONRMYMVBEENI REIX1CmBPAN) OLMMS. O D UNLIED RMAY Nxr lYF£aFNNMIL£ PoLKYHM®l_ _ {OI Mmaerw IIXFrammrxxi'. LTR dlepabn'YYYfjiDglEiWm'YYYn Cgr131PD MCreaIY LYIa GII>i uoaB I C®Um" —.� 9l♦1111I0 X s{rnR mwrelra arAnl'1-PIQ: lxxo xLArnwnam GabEBOFL� lur®Fans CAME IYPE or RHAY ....�..-,.» _....5/21)23 anaHt[WOxp1Yl mIY1B1r9aE11aXlYIM BFHx.1L�Itxd/oI1BIGW6UG6 IA4MDIM.PEGtlLMSIRmintr Stl,mua,xy Y9W [aFla * ALS up to 12 months. $ERTIFICATE HOLDER 11m Harris City or Sebastian 1225 Main Street Sebastian, FL 32958 ACORD 24 (2016W) CANCELLATION II L P<PFgIKOMRRrY it + aJ91ES111CC'IE t iIXrMFFErPE •{ ' Rertri VKLE I n/a BDMxrF Mp { n/a ayaaRRmaw I n/a s 1 f { 1 s 1 1 aHOW.OANTOPIHEABOVE Ol6G6E0 POLK19aBGMCN.EUa6PoRE TIE QRMTpN Gl! TI@IEM, NOf ICE WLL BE O[LMIIED M ACCORGNCa xRIrT1FPOLWY MIONBON3 AVrraal®r ATNE 01985 -20 15 ADO RD DORPO RA TION. All rights reserved. The ACOF D name and logo are registered marks of ADO RO Una NNINNINNow— HOME OF PELICAN ISLAND CITY COUNCIL AGENDA TRANSMITTAL Council Meeting Date: Mamh 8, 2023 Agenda Item Title: Approve Building Time Construction, LLC Design -Build proposal for a Guaranteed Maximum Price Work Services Agreement for the Building Department Office Improvements Recommendation: Staff recommends City Council approve Building Time Construction, LLC negotiated Work Services Agreement with a Guaranteed Maximum Price of $186,874.00 for the remodel of the existing front counter, installation of ballistic glass panels and create new office space. Background: On July 13, 2022, City Council approved the selection of Building Time Construction, LLC as the Design Build firm to be used in response to RFQ-22-06, Design -Build Building Department Office Improvements. Staff has approved the Design Build concept and plans for the Building Department front counter renovations that will provide accessible seating, ballistic glass panels with pass-thm openings, new office space and include carpet replacement for the entire Building Department and Growth Management work areas. If A enda Item Rlqaires Exppenditure of Funds: Budgeted Amount: $116,000.00 Total Cost: $186,874.00 Funds to Be Utilized for Appropriation: Building Department Enterprise Fund Attachments: 1. Building Time Construction (BTC) Proposal 2. Building Time Construction (BTC) GRIP Agreement 3. Special Conditions 4. Building Time Construction (BTC) RFQ Submittal Administrative Services Department R ew: City Attorney Review: _ �� Procurement Division Review, fapplicable: t4 _ Ct_/ City Manager Authorization: Date: -714 A � 1/�/