Loading...
HomeMy WebLinkAboutITB 23-10 Addendum No. 3Page 1 of 3 ADDENDUM NO. 3 TO THE BIDDING/CONTRACT DOCUMENTS FOR THE CITY OF SEBASTIAN PROJECT NAME: RUNWAY 5-23 REHABILITATION AT SEBASTIAN MUNICIPAL AIRPORT (Bid Submittal ITB #23-10) FROM: Don Wixon, City of Sebastian, 1225 Main Street Sebastian, Florida 32958 dwixon@cityofsebastian.org (772) 696-0117 TO: All Prospective Bidders DATE: May 30, 2023 DELIVERY: Posted with Bid Documents on www.cityofsebastian.org, DemandStar.com, and Vendorlink.com This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents as noted below. Acknowledge receipt of this Addendum in the space provided on Page BF-6 of the section 11 Forms. Failure to do so may subject a Bidder to disqualification. This Addendum consists of 3 pages. I. Questions 1. Question: Bid documents state the contractor is responsible for the condition of the haul roads. During the site visit it was noted the haul roads are in poor condition. To what extent is the contractor responsible for the condition of the haul roads, given the roads are already in poor condition. Response: Haul routes at the west and south side of the airport (Airport Dr. W. and Main St.) are in good condition. The North haul route inside the airport is cracked pavement and is not a concern. Contractors are advised to take pre-construction pictures and record videos of haul routes. Any associated costs for pre-construction photos or videos shall be incidental to the project. 2. Question: Detail on C1.1 titled “Runway 5-23 – Overlay Proposed Conditions Typical Section” shows a 2” asphalt overlay on top of the existing 6” concrete edge light maintenance pad. Based on previous experience the 2” of new asphalt will develop a reflect crack where the existing asphalt meets the concrete pad. Can you please confirm this cracking will not be brought up as a warranty item? Response: Confirmed. 3. Question: Specification 401-6.2e, outlines the requirements of a Profilograph testing. This testing equipment can be expensive and seems redundant to the straight edge test specified elsewhere in the specifications and a rolling straight edge. Can the Profilograph testing requirements be removed from the contract? Response: No. Administrative Services Department Procurement Division 1225 Main Street Sebastian, FL 32958 (772) 388-8232 ITB 23-10 Addendum No. 3 May 30, 2023 Page 2 of 3 4. Question: Specification section P-101 outlines the requirements to clean and surface prep the existing asphalt. In lieu of cleaning the existing asphalt, could the existing asphalt me milled 0.5”, then crack sealant applied, asphalt leveling course then P-401 asphalt be placed? Basically, would milling 0.5” be an acceptable surface and cleaning preparation technique? By using the mill to prep the surface there would be no additional steps or equipment needed to remove the pavement markings as part of the surface preparations. Response: This is NOT acceptable as the existing pavement in some locations is too thin. 5. Question: Drawing Sheets C4.1-C4.6 outline the requirements and thicknesses for a leveling course of asphalt over the existing asphalt. The Leveling Asphalt is specified in specification section P-403. The largest aggregate size in the mix design is 3/8”. Because of the aggregate size the minimum thickness P-403 can be laid and density achieved is ¾” and we would recommend no thinner than 1” for optimum results. In lieu of the design leveling course of asphalt, which can not be laid at some of thicknesses specified, could the existing asphalt be profile milled and then an asphalt wedge be put in continuously across the runway with P-403, then topped with 2” of P401? By profiling the existing runway with the mill leveling asphalt could be minimal and still achieve the 1.2% cross slope. Response: No. Leveling can be feathered to less than ¾”. Only areas of leveling more than 1½” will be cored for testing per specification P-403, Section 403-6.1d. 6. Question: Specification section P-101 outlines the requirements to clean and crack seal the existing asphalt runway. In lieu of crack sealing and cleaning prior to the leveling course, could the existing asphalt (thickness varies from 1.5" to 2" according to Geotech report) be milled off completely and a new 2” thick layer of asphalt (P-401) be installed at the specified 1.2% cross slope? This would eliminate the requirement of the crack sealing, asphalt surface preparation, asphalt leveling course, paving over the existing 6” concrete light maintenance pad, the spacer ring on new edge lights, and the topsoil being added to the shoulder of the runway? Response: No Runway must be strengthened to a minimum thickness of 4” per FAA guidelines. 7. Question: Is the current FDOT Fuel & Bituminous Adjustment at bid time in effect for the duration of this project? Response: No. No fuel or Bituminous Adjustment is in this contract. 8. Question: Is erosion control required for this project? If so, please provide the bid items and quantities? Response: No. 9. Question: Is Diamond Grinding required for this project? If so, please provide the bid item and quantity? Response: No. ITB 23-10 Addendum No. 3 May 30, 2023 Page 3 of 3 10. Question: Please provide asphalt coring data for this project. Response: Pavement core logs are provided in the appendixes of the Geotechnical Report under the Section 13 (Appendix B) of the Project Manual. Section Data also has been provided in the plan sheets G3.2 & G3.3. 11. Question: Please provide the detailed computations that were utilized to generate the asphalt overbuild quantities, including but not limited to the locations, lengths, widths and thicknesses, etc. Response: Quantities of leveling was calculated using Civil 3D design Software. 12. Question: The DBE Good Faith Effort could substantially exceed the 20 page limit for bid submittals as detailed on Page 7, Section 2. If the good faith effort is submitted with the bid, as required on Page 11, Section 6, the bidder will be considered non-responsive. Will the City considering waiving the 20 page limit? Response: Yes. If you have any questions regarding this correspondence, please contact Don Wixon at dwixon@cityofsebastian.org The City shall reserve all rights to award this bid in whole or in part; whatever, is in the best interest of the City. END OF ADDENDUM NO. 3