Loading...
HomeMy WebLinkAbout07 - Alternatives Development and CIP PrioritizationCity of Sebastian Stormwater Master Plan Update 7 Alternatives Development and CIP Prioritization 7.1 Previously Identified CIP Projects Many Capital Improvement Program projects were identified in previous Master Plan updates and the full scope and budget estimates for the projects were sometimes unclear. Some of the projects are currently included in the City's Capital Improvement Program for the Stormwater Fund, and for those the scope and status of the projects were reviewed with City staff and evaluated against current modeling results to determine if they should continue to be included in the CIP program. Table 7-1 shows the previously identified projects that were eliminated from the CIP program or replaced with a new or modified project scope. Table 7-1. Previously Identified CIP Projects Eliminated or Replaced Elkcam, George, Repair and/or Replace Seawalls in the Schumann Seawall Elkcam Canal, George Lake, Schumann Lake Repair/Replace Identified in 2018 SWMP, no description. Not $16,000,000 shown in current CIP -it appears this project was replaced with the project below. This is to address major improvements to Major Canal the canals. Sizable amounts are being Current CIP shows $500k/year from FY 21-25, $2500 Improvements programmed for each year so that portions ,,000 funded by Discretionary Sales Tax. Replaced of the work can be initiated. with CIP Project Nos. 4-10. Schumann Pipe Identified in 2018 SWMP, Completed in 2019- Lining Slip lining from Schumann Lake to Elkcam $200,000 2020 FY. Drainage improvements including driveways, swales, road crossing Pelican Island Identified in 2018 SWMP, Completed in 2019- replacements and repaving. Drainage $475,000 Place Drainage 2020 FY. repairs were completed in order to extend the longevity of the road repaving work. Due to erosion of the side slopes, this ditch is difficult to maintain and needs to be improved. The system drains the entire central section of the City and therefore is critical to maintain flow and avoid flooding. Stonecrop The project has been redesigned for open Drainage Ditch conveyance, versus piping, which substantially reduces the estimated costs. A FEMA Hazard Mitigation Grant is being pursued to provide 75% of the expected costs. Stormwater Funds of $215,000 are being allocated for the grant matching amount. Blossom Ditch No description Pipe Identified in 2013 SWMP (Bevan & Laconia culverts) @ $1 M. Shown in current CIP at $860k FY20. Project removed from CIP list because it is currently being bid by the City. The project is a replacement of the Laconia culvert only with a $860,000 12x3' CON/SPAN bridge, with reduction of channel cross section and concrete armoring from Laconia to Stonecrop for stability. Identified in 2004 SWMP as 100LF of 48" RCP $1,000,000 @$43k. Identified in 2013 SWMP @$1M, no description. Replaced with CIP Project No. 27. www.arcadis.com 106 City of Sebastian Stormwater Master Plan Update Table 7-1. Pre viousiy Identified CIP Projects Eliminated or Replaced Identified in 2018 SWMP, Developer of adjacent Empress Canal property has agreed to install a CON/SPAN No description $250,000 bridge with the construction of the development. Piping Therefore, the repair was removed from the City's CIP plan. Shown as twin 36" culverts in 2013 MP @ Landsdowne No description $178,000 $100k. Identified in 2018 SWMP, no description. Box Culvert Project removed because modeling showed it would not result in significant improvement. Identified in 2013 SWMP as Rosebush Terrace Pipe (2-48" RCP @ $100k). Identified in 2018 Rosebush Box No description $242,000 SWMP, no description. Project removed Culvert because modeling showed it would not result in significant improvement. This is a pinch point on a main ditch. The existing road crossing pipes are Identified in 2013 SWMP as 42"x72" box culvert Tulip Box undersized due to minimal road coverage @$100k. Identified in 2018 SWMP, no Culvert over the pipes and need to be replaced. It $232,000 description @$232k. $232,000 shown in FY22 is recommended that the replacement be CIP. Replaced with CIP Project No. 15. accomplished with a CON/SPAN open flow a design to enhance conveyance. Albatross Box No description $178,000 Identified in 2018 SWMP, no description. Not in Culvert current CIP. Replaced with CIP Project No. 16. This is a main ditch pinch point and it needs to be replaced with a CON/SPAN Identified in 2018 SWMP, no description Bayfront Box open flow design. This will prevent the $178 ,000 @$178k. $178,000 shown in FY23 CIP. Culvert existing pipe to become plugged with Replaced with CIP Project No. 17. debris, which causes the existing ditch to overflow into residential properties Benedictine No description $1,515,000 Identified in 2018 SWMP, no description. Not in Ditch Piping current CIP. Replaced with CIP Project No. 18. Bryant/Friar Identified in 2018 SWMP, no description. Not in Court Retention No description $315,000 current CIP. Replaced with CIP Project No. 19. Pond Oyster Point Installation of catch basin in front of the Drainage Box FDOT outfall Hardee Dam RNo description Retrofit Gates Potomac Ditch No description Piping Potomac Baffle Retrofit for Filter No description $100,000 Identified in 2018 SWMP, Project completed. $150,000 Identified in 2018 SWMP, no description. Not in current CIP. Replaced with CIP Project No. 20. Identified in 2013 SWMP, as Potomac Ave $393,000 Lateral Pipe @$200k. Completed in 2016-2017 FY. Identified in 2018 SWMP, no description. City $60,000 removed project from CIP list. Existing Baffle www.arcadis.com 107 City of Sebastian Stormwater Master Plan Update Table 7-1. Pre viousiy Identified CIP Projects Eliminated or Replaced CIP Project Description Estimated Notes Name Cost I Box is functioning well and mostly in dry conditions. Davis Street Identified in 2018 SWMP, no description. Not in Baffle Retrofit for No description $60,000 current CIP. Deleted per City staff. The site is Filter currently utilizing a generation 1 Baffle Box. Rosebush New Stormwater Pond $315,000 Identified in 2018 SWMP. Replaced with CIP Retention Basin Project No. 22. Indian River Realign Mulligan Pipe, Baffle Box at Drive Drainage Southern Outfall, Baffle Box at Jackson $1,000,000 Identified in 2013 SWMP, no description. Not in current CIP. Replaced with CIP Project No. 23. Improvements Outfall/clear outfall area 7.2 Current and Proposed CIP Projects The following is an updated list of proposed CIP projects identified through the modeling work in this Master Plan, those included in prior Master Plan updates and those identified through discussions with City staff. The goal is to produce a 10-year CIP program with the most feasible schedule and strategy to fund those improvement projects with the highest priority and the greatest benefits to the City. The H&H Model was used to evaluate various CIP projects and develop initial recommendations to address drainage issues and reduce surface flooding for the 25yr-24hr design storm event. See Section 3.7 for a detailed explanation of H&H modeling results. The CIP projects were evaluated based on surface flooding reduction, open channel flooding reduction, and cost effectiveness. Design and implementation of the CIP projects should include a review of available survey data, system conditions, and constructability. Table 7-2. Current and Proposed CIP Projects i Shown in current 1 Stormwater Equipment equipment and trucks used in the operation $878 500 CIP, $309,000 from and maintenance of the Stormwater System FY21 to 25 based on their expected useful service lives. Stormwater Heavy Heavy Equipment replacements for the Shown in current 2 Equipment Stormwater Maintenance Program. $119,000 CIP, $595,000 from Replacements include: FY21 to 25 Reconstruction of stormwater swales in ROW Shown in current 3 Roadway Swale Work areas in conjunction with road resurfacing $600,000 CIP, $60,000/year and reconstruction projects. Harbor Point Waterway Dredging and disposal of 3 ft (46,900 CY) of Future CIP, beyond 4 and Collier Waterway sediment from approximately 10,550 LF of $10,987,265 10-year planning North Improvements trapezoidal open channel (12' bottom width, horizon 4:1 side slopes), clear & grub, regrade, and www.arcadis.com 108 City of Sebastian Stormwater Master Plan Update Central Collier Waterway Improvements - North Section Central Collier Waterway Improvements - South Section Schumann Waterway Improvements Table 7-2. Current and Proposed C/P Projects sod approximately 211,000 SF of side slope area. Clearing and grubbing 20' either side of City drainage ROW lines over approximately 8,550 LF of canal banks, demolition and reconstruction of existing dock structures and fences, abandon existing bulkheads in place, installation of approximately 8,550 LF of vinyl sheetpile bulkhead (20 ft panel length) w/ $27,130,362 24x24" concrete cap on water side of existing bulkhead, dredging 3' of sediment from approximately 4,270 LF of canal, regrading and resodding of approximately 171,000 SF of canal easement area (20 ft behind bulkhead). Clearing and grubbing 20' either side of City drainage ROW lines over approximately 11,350 LF of canal banks , demolition of existing dock structures and fences, installation of temporary sheeting where needed for stability, removal of of approximately 5,700 LF of existing seawalls and disposal of transite bulkhead panels, installation of approximately 5,770 LF of vinyl sheetpile bulkhead (20 ft panel length) w/ 24x24" concrete cap, dredging of approximately 5,770 LF of canal, regrading and resodding of approximately 230,800 SF of canal easement area (20 ft behind bulkhead and slope on Stormwater Park property). Clearing and grubbing 20' either side of City drainage ROW lines over approximately 12,200 LF of canal banks , demolition of existing dock structures and fences, installation of temporary sheeting where needed for stability, removal of approximately 12,200 LF of existing seawalls and disposal of transite bulkhead panels, installation of approximately 12,200 LF of vinyl sheetpile bulkhead (20 ft panel length) w/ 24x24" concrete cap, dredging of approximately 6,100 LF of canal, regrading and resodding of approximately 244,000 SF $21, 585, 297 $39,156,096 Future CIP, beyond 10-year planning horizon Future CIP, beyond 10-year planning horizon Future CIP, beyond 10-year planning horizon www.arcadis.com 109 City of Sebastian Stormwater Master Plan Update 8 Schumann Lake Improvements 9 Joy Haven Waterway Improvements Table 7-2. Current and Proposed C/P Projects of canal easement area (20 ft behind bulkhead). Not included in this project is a new culvert at Empress Avenue at the canal to allow continuous flow between North and South portions, which is going to be completed by a developer as they develop the property on the East. Clearing and grubbing 20' either side of City drainage ROW lines over approximately 5,300 LF of lake banks, demolition of existing dock structures and fences, installation of temporary sheeting where needed for stability, removal of approximately 3,500 LF of existing seawalls and disposal of transite bulkhead panels, installation of approximately 5,300 LF of vinyl sheetpile bulkhead (20 ft panel length) w/ 24x24" concrete cap, no dredging of lake, regrading and resodding of approximately 106,000 SF of lake easement area (20 ft behind bulkhead). Clearing and grubbing 20' either side of City drainage ROW lines over approximately 7,400 LF of canal banks , demolition of existing dock structures and fences, installation of temporary sheeting where needed for stability, removal of approximately 2,500 LF of existing seawalls and disposal of transite bulkhead panels, installation of approximately 7,400 LF of vinyl sheetpile bulkhead (20 ft panel length) w/ 24x24" concrete cap, dredging of approximately 3.700 LF of canal, regrading and resodding of approximately 148,000 SF of canal easement area (20 ft behind bulkhead). Future CIP, beyond $13,195,257 10-year planning horizon Future CIP, beyond $23,774,172 10-year planning horizon Removal of approximately 14,800 LF of existing bulkheads, installation of Future CIP, beyond Collier Waterway South approximately 14,800 LF of vinyl sheetpile 10 $51,091,662 10-year planning Improvements bulkhead (20 ft panel length), dredging and horizon vegetation removal of approximately 7,400 LF of canal. 11 Ocean Cove Drainage Reconstruction of approximately 2,000 LF of $571,182 Identified in 2018 Repair trapezoidal ditch between Crystal Mist and SWMP, no www.arcadis.com 110 City of Sebastian Stormwater Master Plan Update Table 7-2. Current and Proposed CIP Projects Carnival Terrace from Clearbrook 5t to description L$278k. Periwinkle to stabilize side slopes and Shown at $300k in maintain conveyance capacity. FY24 CIP Desilt culvert, clear vegetation over 0.25 ac, excavate 3 feet (approximately 3,200 CY) Day Drive Retention Area and regrade approximately 0.80 ac Current CIP shows 12 Restoration (175'x425') retention pond and drainage $1,570,614 $240,000 FY21 CIP swale to design grades to restore proper retention volume. Removal and disposal of approximately 100 LF of existing metal bulkhead and concrete cap, installation of approximately 100 LF of 13 Concha Dam Repair metal sheetpile bulkhead (20 ft panel length) $365,199 w/ 24x24" concrete cap w/ weir, regrading and resodding of approximately 800 SF of canal easement area (20 ft behind bulkhead). Currently in design. Sliplining of existing culvert pipes rather than 14 SWMS Pipe Lining open cut replacement to reduce cost and $200,000 disturbance. Existing twin 36" culverts in Stonecrop Ditch at Tulip Dr. (just E of 798 Tulip Dr.) to be changed to a 4' x 7' concrete box culvert to 15 Stonecrop Ditch - Tulip improve capacity (14.1 SF flow area $239,230 Culvert Replacement increased to 28 SF). This will match the culvert capacity at Albatross assuming Project Number 16 and 17 are completed (culverts downstream of Tulip culvert) Existing 54" culvert in Stonecrop Ditch at Albatross Terrace Oust W of 787 Albatross Stonecrop Ditch - Terrace) to be changed to a 4' x 7' concrete 16 Albatross Culvert box culvert to improve capacity (15.9 SF flow $174,375 Replacement area increased to 21 SF). This will match the culvert capacity at Bayfront Terrace assuming Project Number 17 is completed (culvert downstream of Albatross culvert) Existing twin 40" culverts in Stonecrop Ditch at Bayfront Terrace Oust W of 789 Bayfront Stonecrop Ditch - Terrace) to be changed to a 4' x 7' concrete 17 Bayfront Culvert box culvert to improve capacity (17.4 SF flow $824,663 Replacement area increased to 28 SF) which is similar to the proposed Laconia St CON/SPAN 12ft x 3ft bridge (30SF). This project would also Current CIP shows $250k FY25 www.arcadis.com 111 City of Sebastian Stormwater Master Plan Update Table 7-2. Current and Proposed C/P Projects include regrading and armoring of 657tt open channel from Bayfront Terrace to Laconia St. Increase the conveyance capacity of the Benedictine Area Stormwater Network: Replace existing twin 36" culverts at Barber St crossing South of intersection with Rolling Benedictine Area Culvert Hill Dr, Dredging and expanding the existing 18 open channel from Barber St crossing and $636,163 Improvements the Rolling Hill Drive crossing, replace existing 36" culvert at Rolling Hill Drive Oust N of 414 Rolling Hill Dr.), replace existing 24" culvert at Benedictine Terrace, replace existing twin 24" culverts at Coverbrook Lane. Construct new approximately 1.0 ac retention pond in the property just N of 105 Friar Ct., Bryant/Friar Court appears to be a Park property. Regrade 19 Retention Pond perimeter swales if needed to drain to $282,512 retention pond. There is some modeled flooding in the area - minor regrading may help to focus the stormwater in the park area. Currently has wood panels acting as the Hardee Dam Retrofit gates. These have been leaking beneath the 20 Gates dam and the dam will eventually have to be $25,000 replaced. Per City staff, the concrete is still in ok condition, stoplogs need replacement. Approximately 2.3 ac vacant City -owned 21 Surrey Terrace Retention property S of 737 Surrey Terrace available to $779,055 Basin create an additional retention basin to help with flooding in this area. Approximately 2.5 ac vacant City -owned 22 Rosebush Retention property E of 768 Newhall Terrace available $837,040 Basin to create an additional retention basin to help with flooding in this area Remove existing outfall pipe sections in manhole area, install new precast concrete 4' diameter manhole, install approximately 80 23 Coolidge Outfall LF of A2000 pipe, install inline tide valve and $73,309 Improvements manatee guard on new outfall pipe. Grout fill and abandon in place remaining existing outfall pipe sections under Mulligan's building. Blossom Ditch Drainage 24 Dredge Blossom Ditch and create positive $1,684,839 Improvements drainage in the ditch and in the connecting www.arcadis.com 112 City of Sebastian Stormwater Master Plan Update Table 7-2. Current and Proposed CIP Projects pipes from the N alleviating flooding along Lanco Ave and Blossom Dr. 2006 Construction Plans developed but not constructed. Add 12'x24' NSBB to outfall for quality. Add a culvert crossing at Fordham St to allow flow to travel north to twin ditches, includes 25 Drainage Improvements at Hazel and Lloyd St regrading open channels and upsizing the $755,939 downstream culverts from Fordhams St to Twin Ditches The stormwater pumps are not currently 26 Stormwater Park operated using the Float system and $50,000 Operation therefore do not operate during wet weather events. Repair controls. Modify the control structure. Currently the Stonecrop ditch enters the retention area, at elevations 7.38ft and 7.62ft, two 60inch culverts. The compound weir dimensions are 27 Stonecrop Retention Area summarized below: 2.16ft wide at elevation $100,000 6.557ft and 18ft wide at elevation 9.067ft. The weir elevations prevent free discharge from the Stonecrop Ditch. Add inline tide valves on the two 60" pipes under Stonecrop Dr. Total Estimated Cost $197,686,732 7.2.1 Cost Estimate Criteria A detailed cost estimate was prepared for each proposed CIP project, including a project location map, quantity takeoffs, contingency allowances, and notes referencing calculation assumptions and cost sources. Copies of the estimates are included in Appendix I. 7.3 CIP Prioritization Process/Tool The method for prioritization of maintenance issues was presented in Section 6. CIP prioritization follows a similar methodology but is more detailed and results in a more thorough triple bottom line (TBL) type cost -benefit analysis that considers economic, social and environmental effects. Upon identifying a CIP need, the project priority should be determined by the City Engineer. Issues that without capital improvement pose a safety hazard or create a condition that prohibits the proper function of the SWMS should be prioritized over aesthetic or preventative projects. The amount of time required to address CIP projects ranges from a few weeks to months or even years depending on the severity, complexity, and priority of the project. In certain more complex emergency www.arcadis.com 113 City of Sebastian Stormwater Master Plan Update cases, temporary resolutions should be presented as a stop -gap measure to address public safety or functional issues while a more permanent resolution is determined. The CIP Priority scoring uses a simple calculation to weight the importance of a proposed project based on economic, social and environmental criteria. For each of those three criteria, a criticality score and project effectiveness score is determined through a series of scored queries and an overall percentage of total category score is calculated to determine its priority. CIP projects having the highest overall percentages are the highest priority projects. In the CIP Priority calculation, the score weighting was as shown in Figure 7-1. Economic 0.28 0.32 Social 0.30 0.32 Environmental 0.42 0.36 TOTAL 1.00 1.00 Figure 7-1. CIP Priority Criteria Weighting Once the proposed CIP projects shown in Table 7-2 were identified, scoped, and cost estimates were prepared, a CIP Priority scorecard was prepared for each of them to determine their overall priority ranking. An example of a project scorecard is shown in Figure 7-2. A summary of the final priority scoring is shown in Figure 7-3, and a graph of the final Criticality vs. Effectiveness scoring is shown in Figure 7-4. www.arcadis.com 114 City of Sebastian Stormwater Master Plan Update City of Sebastian Capital Improvement Project Benefit Cost Analysis Scoring Template Project No: 13 Description: Concha Dam Repair Criticality of Issue for LOS Project Effectiveness Criteria Score Description Contexi Score Description Context ECONOMIC 111111M Criticality of Projei Issue for LOS 0 > $10,000,000 2 $5,000,000-$10,000,000 I I 4 $3,000,000 - $5,000,000 (What is the cost (to the City) of the proposed Project Cost 5 $1,000,000 - $3,000,000 project? 8 $500,000-$1,0001000 10 $100,000 - $500,000 12 <5100,000 0 Ve(Y Low 0 Ve(Y Law 1 4 Low (What are the economic impacts (future flooding 1 2 Low lWhat is the potential benefit ofthe proposed Economic Impacts 8 Medium (damages, etc.} ifthe flooding orthe asset 4 Medium projectto increased opportunities for economic 10 High (condition is not addressed? 6 High (development or community enhancements? 12 Very High 8 Very High 0 Excellent 0 No Condition of Existing 1 Good (What is the condition of existing pmate 1 Limited (Will the proposed project fix the private asset Infrastructure Private 2 Fair infrastructure assets in the project area? 2 Partially (conditions in the project area? 3 Poor 3 Mo�}ly 4 Very Poor 4ComeLely 0 Excellent 0 No 4 Good 2 Limited Condition of Existing iat is the condition of existing public i re proposed project fix the public asset Infrastructure Public 8 Fair , �„_L, i the project area? 4 Partially the project area? 10 Poor 5 Mostly Economic Subtotal 28 Very Poor Completely to 0 0 ❑ 0 10 10 18 SOCIAL 0 No potential for injury f loss of life G No 2 Limited potential for injury (What is the current impact on safety from 1 2 Limited (Will the proposed project minimize the impact Safety 4 Some potential for injury! loss of life floodingrassett condition in the project area for 4 Partially on safety in the project area for the intended he intended level of semce? fi Mostly =vel of semce? 6 Reasonable potential for nju iry 8 Great potential hor injury! loss of life 8 Yes 0 None 0 None Number of Properties 1 1 to 5 IHaw many properties are currently impacted by 1 1 to 5 IHaw many properties will have postively Impacted 2 6 to 10 floodingrasset condition in the project area for 2 6 to 10 heneflted from the project for the intended Level I 3 11 to 15 Ithe intended Level of Service? 1 3 11 to 15 lof Service? 4 Greater than 15 4 Greater than 15 ial impact 0 No Traffic Flow on Public 0 No potentHow is traffic affected b °...' . -:: , ... \ Will the proposed project positively affect traffic Streets 2 Se�gpdaryYsem 1 Alternatives Exist fin the project area? 2 Y1N� and flooding conditions in the project area? 4 nmary Vs, em! No Alternative 4 es High Hazard Road 0 a road crossing Are there any high hazard road crossings in the 0 No Will the project postively affect the roadway Crossings in Project Area 2 Yes, one or more crossings IDroiect area? 4 Yes/NA crossings in the project area? Proximity to Critical 0 > 2 miles 0 Facilities (hospitals, police, 4 <2 miles How close to the project area are facilities that Are station, etc provide health, safety or emergency response? 0 -} 8 Located within project area 0 0 1% (100-year) Storm 8 1% (100-year) Storm Degree of Flooding Public 2 4% 25- ear Storm (> what design storm frequency does flooding To what level (design storm) has the project De g g (Public) ( y } 6') typically occur within the project area? 4 4% (25-year) Storm fixed the flooding problem? 4 10% (10 year)Storm 0 10% (10 year)Storm 0 None 0 Livable 1 occupied space 1 Landscape 1 Y yoding (What is the worst case facility flooding for the 1 Crawl s ice! basement! mechanical ,ylhat level offacility flooding is predicted Property Damage (Private) 2 Garage !she � jyeway intended LOS? 2 anis, 1 shed 1 dJr:ay 1 }} i h d d"fl od following project implementation? 1 3 Crawl space basemen mec anical 1 1 3 ansc ape 1 yar o ing 1 4 Livable 1 occupied space 4 None Social Subtotal 30 32 2 2 4 4 0 o 0 0 0 4 0 0 4 10 10 ENVIRONMENTAL 0 None Erosion 1 Limited I 2 Moderate 3 Significant 0 None A Limited Water Quantity Reduction 8 Moderate 12 Significant 0 None Water Quality Improvement 4 Limited 8 Moderate 12 Significant 0 None Habitat Improvement 2 Limited I 4 Moderate 6 Significant 0 None Public Health 1 Limited 2 Moderate 3 Significant 0 None 2 Limited Aesthetic Effects 4 Moderate Significant Environmental Subtotal 42 0 None/NA (What effect will the project have on reducing 1 2 Limited IHow has the project postively affected the (erosion issues within the SWIMS? 14 Moderate (environment? fi Significant 0 None/NA fat effect will the project have on reducing the 2 Limited IHow has the project postively affected t Fstormhe water discharged to receiving (environment? waterhodies? 4 Moderate 6 Significant 0 None/NA Haw, has the project postively affected the . 'hat effect will the project have on improving th- environment? How much CIRL BMAP TN and - , -'y of stormwater discharged to receiving 2 Limited waterbodies? 4 Moderate TP reduction credit will the project he eligible 5 Significant or? 0 None/NA (What effect will the project have on improving thel 2 Limited IHow has the project postively affected the Ihshitat of receiving waterhodies? 14 Moderate lenvironment? fi Significant 0 None/NA What effect will the project have on improving . health parameters in receiving 2 Limited IHow has the project postively affected the waterhodies? 4 Moderate lenvironment? fi Significant 0 None/NA What effect will the project have on improving' 2 Limited IHow has the project postively affected the aesthaadi of the SWIMS and receiving environment? waterbodles7 4 Moderate 36 Significant 1 2 12 6 12 5 5 5 3 fi 4 4 39 19 TOTAL 100 100 59 57 ofTatal Categaryr Scare 59% 57% Figure 7-2. CIP Prioritization Project Scorecard www.arcadis.com 115 City of Sebastian Stormwater Master Plan Update CIP Project No. 4 Description Harbor Point Waterway and Collier Waterway North Improvements Critcality Economic 18 at Issue for Social 11 LOS Scores Environ. 11 Totai 41 Project Effectiveness Economic 2 Social 11 Scores Environ. 5 Total 18 TDTAL SCDRE 59 Score -0.96 5 Central Collier Waterway Improvements- North Sed[on 18 11 12 41 2 11 5 18 59 -a.96 6 Central Collier Waterway Improvements- South Section 18 11 12 41 2 11 5 18 59 -0.86 7 Schumann Waterway Improvements 18 11 12 41 2 11 5 18 59 -0.96 8 Schumann Lake Improvements 18 11 12 41 2 11 5 18 59 -0.96 9 Joy Haven Waterway Improvements 18 11 12 41 2 11 5 18 59 -0.96 10 Collier Waterway South Improvements 18 11 12 41 2 11 5 18 59 -0.96 11 Ocean Cove Drainage Repair 14 20 16 50 16 23 12 51 101 0.57 12 Day Drive Re&ntion Area Restoration 16 17 16 49 16 18 14 48 97 0.43 13 Concha Dam Repair 10 10 39 59 18 10 29 57 116 1.12 15 StonecropDitch -TuIipCuIvertReplacement 16 15 4 35 20 17 6 43 78 -0.27 16 Stonecrop Ditch - Albatross Culvert Replacement 16 15 4 35 20 17 6 43 78 -0.27 17 Stonecrop Ditch - Bayfront Culvert Replacement 16 15 4 35 20 17 6 43 78 -0.27 18 Benedictine Area Culvert Improvements 16 15 4 35 20 17 6 43 78 -0.27 19 Brya nVF ri a r Co u rt Reten to n Pond 16 13 36 65 20 27 26 73 138 1.93 20 Hardy Dam Retrofrt Gaffs 24 17 31 72 22 27 18 67 139 1.96 21 Sutrey Terrace Retention Basin 0 11 19 30 8 17 16 41 71 -0.52 22 Newhall Terrace Retention Basn 0 11 19 30 8 17 71 -0.52 23 Coolidge ❑utfall Improvements 16 15 19 50 20 17 1W 0.65 24 Blossom Ditch Drainage Improvements 18 15 19 52 12 21 105 0.72 25 Drainage Improvements at Hazel and Lloyd St 18 18 21 5T 20 21 12� 116 1.12 26 Stormwater Park operation 4 2 16 22 16 4 56 -1.07 27 Stonecrop Retention Area 20 14 23 57 26 21 124 7.42 MAXfMBM SCORE 28 30 42 100 32 32 36 100 200 Figure 7-3. CIP Prioritization Scoring Summary www.arcadis.com 116 City of Sebastian Stormwater Master Plan Update 100% 90% 80% 70% 0 60% 0 50% 41 40% U U 30% 20% 10% 25 • • • 24 12 0% 0% 10% 20% 30% 40% 50% 6 70% 80% 90% 10D% Effectiveness (% of total scare) Figure 7-4. CIP Prioritization Scoring — Criticality vs. Effectiveness 7.4 Recommended and Prioritized Improvements Projects with high costs and low priority scores were shown in the 10-year CIP plan as "Future", and the CIP planning emphasis was directed towards lower cost, higher priority projects. A copy of the proposed CIP Plan from 2023-2033 including more than $9 million in capital projects is included in Appendix I. A detailed discussion of the funding plan for the CIP projects and the ongoing operations and maintenance of the City's SWMS in included in the next Section. www.arcadis.com 117