8 Funding Plan and Grant Management
8.1 City Stormwater Department Revenue Sufficiency Analysis
8.1.1 Overview
As part of this Master Plan Update, Arcadis prepared a Revenue Sufficiency Analysis and forecast for the City of
Sebastian's (City) Stormwater Department (Department) for the period FY2022 through FY2031. The
Department's fiscal year runs from October 1st to September 30th. The purpose of this section is to present the
Revenue Sufficiency Analysis and forecast, including the projection of revenues and expenses. Arcadis
developed the projected CIP project needs for FY2022 through FY2031 based on modeling results and previously
identified issues, and it is assumed that all funding for capital projects during the forecast period will come from
the City's Discretionary Sales Tax (DST) Fund or another means of outside financing (grants, etc.). Relevant
assumptions related to the development of the Revenue Sufficiency Analysis and associated forecast are also
included throughout this section.
The financial forecast represents an estimate of the probable results of operations and reflects the Department's
judgment as to the most likely set of conditions and course of action based upon present circumstances. Arcadis
worked closely with the City and Department to obtain the information necessary to prepare the Revenue
Sufficiency Analysis, and various financial and system information was provided to support the development of
the analysis.
8.1.2 General Methodology
The Revenue Sufficiency Analysis is a determination of the annual revenue from rates which, combined with other
sources of funds, will provide sufficient funds to meet the fiscal requirements of the system. The Revenue
Sufficiency Analysis does not include a determination of the actual rates and charges of the system but provides a
forecast of the total system rate revenue needs as well as increases in rate revenue, if any, that are projected for
each year of the forecast.
The process employed in the Revenue Sufficiency Analysis results in the identification of revenue requirements of
the system, such as operating expenses, capital expenses (minor and major, transfers out and the maintenance
of both restricted and unrestricted reserves at appropriate levels. These revenue requirements are then compared
to the total sources of funds during each year of the forecast period to determine the adequacy of projected
revenues to meet requirements. To the extent that the existing revenue stream is not forecasted to be sufficient to
meet the annual revenue requirements of the system, a series of rate revenue increases are calculated to provide
revenue sufficient to meet those needs. The overall goal of the Revenue Sufficiency Analysis is to determine the
revenue necessary over the forecast period to:
1. Meet the operating and capital revenue requirements of the stormwater system, including funding of the CIP
14. Build up a working capital reserve level of 4-months of operating expenses
The CIP, including the timing of projects and estimated costs, was developed by Arcadis to fit within the funding
limits defined by City staff; thus, the CIP and revenue enhancements were fully integrated into the Revenue
Sufficiency Analysis.
www.arcadis.com 118
City of Sebastian Stormwater Master Plan Update
8.1.3 Data Used in the Analysis
This section of the report provides a summary of data used in the analysis as well as general assumptions made
as part of the forecast. Where available, the analysis uses data sources from City planning documents such as
the Comprehensive Annual Fiscal Report (Annual Report), Department projected operating results for FY2022,
and the CIP.
8.1.3.1 Data Items
Key data items reviewed, discussed with the Department, and incorporated into the Revenue Sufficiency Analysis
include the following:
• Financial management goals of the Stormwater Utility
• The beginning fund balance from the FY2022 Budget Book has been used as the beginning balance
available in FY2022 (year 1 of the analysis).
• Sources of Funds from FY2022 projected operating results and the FY2023 Proposed Budget in the
2022/2023 Annual Budget
• Uses of Funds from FY2022 projected operating results and the FY2023 Proposed Budget in the
2022/2023 Annual Budget
• Capital Improvement Plan
• Arcadis' O&M modeling tool
• General assumptions related to:
- Customer growth
- Cost escalation factors
A discussion of the use of each of the above data items is presented below.
8.1.3.2 Working Capital Reserves and Balances
To better understand what funds the Stormwater Utility had on hand to start the forecast period, a detailed review
of Stormwater's Working Capital Reserves and other cash balances associated with the FY2022 Budget Book
was conducted. These data sources represent funds available at the end of FY2021, and therefore at the
beginning of FY2022.
8.1.3.3 Sources of Funds from FY2022-2023 Draft Stormwater Budget
The City provided the FY2022-2023 Draft Stormwater Budget. From this document line -item revenue detail is
obtained and serves as the basis for projecting financial performance in FY2022. In addition, line -item projected
revenues for FY2023 through FY2031 are developed using the FY2022 projected revenues, provided by the City,
as the basis.
8.1.3.4 Uses of Funds from FY2022-2023 Proposed Stormwater Budget
The City provided FY2022 projected expenses and the FY2023 Proposed Budget, and associated line -item
expense detail, as the basis for the projection of financial performance for the forecast period. In addition, line -
item projected expenses for FY2024 through FY2031 were developed using cost escalation factors for each line-
www.arcadis.com 119
City of Sebastian Stormwater Master Plan Update
item. Cost escalation factors were reviewed by staff and were used to project line -item costs beyond the 2023
projections. For details on specific cost escalation factors see section 1.3.7.
8.1.3.5 Capital Improvements Plan (CIP)
The Department provided Arcadis with a forecast of annual funding (cash expenditure) requirements associated
with the CIP for the FY2022 through FY2031 forecast period. Annual funding and cash expenditure provided in
the CIP differs from "appropriated expenditure" in that the financial forecast considers the amount of actual costs
projected to be expended in each year (whether paid for with cash or debt).
8.1.3.6 Arcadis O&M Model
City staff did not have an estimate of the total labor and equipment costs incurred by SWMS maintenance
activities, nor an estimate of the total time necessary to complete them. Therefore, Arcadis developed an MS -
Excel O&M model that calculates the full labor and equipment cost per hour and applies those costs to each
activity based on labor crew size and composition and equipment used, details of which were provided by City
staff. Costs for maintenance activities performed by City contractors are also included in the total cost
calculations. The model then generates a breakdown of total costs and full-time equivalent labor required for
each maintenance activity on an annual basis. The model also generates a side -by -side comparison of budget
costs relative to existing budget costs to show deviations.
New Full Time Employee (FTE) Positions and Associated Benefits
The O&M model prepared by Arcadis estimates that the Department has a need of approximately twenty FTEs
versus the fourteen FTEs currently budgeted. To incorporate these six additional FTEs into the forecast, Arcadis
has assumed an additional two FTEs per year for three years starting in FY2024. Not inclusive of additional costs
associated with cost escalation assumptions, the addition of six FTEs is expected to add $179,988 per year of
costs by FY2026 (approximately $60,000 per year between FY2024 and FY2026).
Additionally, Arcadis has incorporated the associated increase in costs for employee benefits as a result of the six
additional FTEs using the same methodology as described in the previous paragraph. The addition of six FTEs is
expected to add $110,310 per year of benefits costs by FY2026 (approximately $37,000 per year between
FY2024 and FY2026).
Other Contractual services
The O&M model prepared by Arcadis assumes that the Contract Mowing Services cost will be $87,000 beginning
in FY2024 (an increase of $78,380 from what was budgeted in FY2023) as a result of additional routine pond
cleaning and Stormwater Park pump maintenance. New contracts are expected to be negotiated after every
three-year period in the forecast, with each new contract incorporating a 10% increase in costs at the start of the
contract and an additional 3% increase in the final year of the contract (based on the structure of the City's current
contracts allowing an adjustment for inflation of up to 3% in the final year of its current contracts). FY2024,
FY2027, and FY 2030 are the new contract years incorporated during the forecast period, with the total cost
increasing to $111,681 by FY2031.
Contracted Mowing Services
The O&M model prepared by Arcadis assumes that the Contract Mowing Services cost will be $853,000 in the
final contract year of FY2024 (an increase of $231,158 from what was budgeted in FY2023) as a result of optional
mowing services that may be requested by the City. New contracts are expected to be negotiated after every
three-year period in the forecast, with each new contract incorporating a 10% increase in costs at the start of the
contract and an additional 3% increase in the final year of the contract (based on the structure of the City's current
www.arcadis.com 120
City of Sebastian Stormwater Master Plan Update
contracts allowing an adjustment for inflation of up to 3% in the final year of its current contracts). FY2025,
FY2028, and FY 2031 are the new contract years incorporated during the forecast period, with the total cost
increasing to $1,205,191 by FY2031.
Operating equipment
The O&M model prepared by Arcadis assumes an increase in need of operating equipment associated with
maintenance activities due to increased maintenance frequencies for some activities and the resulting projected
operational hours of equipment. Not inclusive of additional costs associated with cost escalation assumptions, the
need for additional operating equipment associated with the planned maintenance activities is expected to add
$224,502 per year of costs by FY2026 (spread across three years at approximately $75,000 per year between
FY2024 and FY2026).
Sod/Cement/Culvert Pipes
The O&M model prepared by Arcadis assumes that these costs will be reduced by a combined total of $52,267
per year starting in FY2024 due to reductions in material usage projected by the O&M model based on
discussions with City staff.
8.1.3.7 General Assumptions
To develop the financial and rate projections, certain assumptions were made regarding elements of the Revenue
Sufficiency Analysis. A summary of those assumptions is presented below.
Growth
Based on discussion with the Department and reviewing the City's Comprehensive Plan, it was determined that
1.5% annual growth in the utility customer base would be projected during the forecast period.
Cost Escalation Factors
Based on discussion with the Department, the following annual cost escalation factors were applied starting in FY2024:
• General Inflation - 3.11 % (5-year Average using the CPI-U Index)
• Labor and Benefits — 3.00% (all personnel related costs)
• Utilities - 5.00% (water/sewer, electric, trash pickup/hauling)
CIP
All capital projects and capital outlay (vehicles, equipment, etc.) during the forecast period assume full funding via
the DST Fund or an alternative third -party funding source. No capital in the financial model is currently being
funded from operating revenues or fund balance/cash reserves.
8.1.4 Financial Management and Goals of the Stormwater Utility
8.1.4.1 Minimum Working Capital Reserves in the Operating Fund
In order to maintain an appropriate level of liquidity, utilities typically establish some form of working capital target.
This target typically ranges from an amount equal to 3 to 12 months of operating expense, depending on the
unique operating/financial characteristics of the utility.
While maintaining sufficient levels of unrestricted reserves, or working capital, is critical to maintaining financial
flexibility, it is also an important factor used by rating agencies to determine creditworthiness of utilities. While no
singular criterion determines a utility's credit rating, liquidity is one of several important factors.
www.arcadis.com 121
City of Sebastian Stormwater Master Plan Update
Utilities that keep too much cash on hand, while borrowing at the same time, can be viewed as building excessive
cash reserves and paying interest expense in lieu of spending existing cash. However, the buildup of cash
reserves beyond the 3 to 12-month level does not necessarily indicate excessive reserves so long as there is a
plan to spend those funds in the near future on capital projects in lieu of additional borrowing.
The analysis presented herein considers a goal of an unrestricted working capital reserve amount greater than, or
equal to, 4-months of operating expenses by FY2026.
8.1.5 Results of the Baseline Stormwater Revenue Sufficiency Analysis
After a thorough review of the above -mentioned data elements, and working through several alternative financial
plans, Arcadis developed a plan which provides for the continued financial strength of the stormwater utility. The
resulting financial plan is presented and described in the following sections, and reflects the analysis and
assumptions noted above. Should there be any change to the data or assumption used, this plan would need to
be updated accordingly.
8.1.5.1 Summary Pro Forma and Revenue Increases Required
The revenue requirements and financial goals of the Department during the forecast period identified the need for
additional revenue. The annual adjustments required during the forecast period are as follows:
• October 1, 2023: 41.00% revenue increase. If applied to the Stormwater Fee, the monthly fee would
increase approximately $4.10 per customer, from $10.00 to $14.10.
• October 1, 2024 (and annually thereafter): 3.00% revenue increase
Table 8-1 presents a summary stormwater pro forma financial forecast, including necessary revenue increases to 1)
meet stormwater revenue requirements and 2) establish unrestricted cash reserves at targeted levels.
www.arcadis.com 122
City of Sebastian Stormwater Master Plan Update
Table 8-1. Summary Pro Forma
Line
Fiscal Year Ending September 30th
Ho.
Oescriotion
FY1022
FY2023
FY2D24
FY2025
FY2028
FY202T
FY2029
FY2D2.9
FY20M
F12D31
Revenues
1
Rate Rini
5
1,955,9D5 5
1,985,244 5
2015,022 $
2,883,799 5
S014,855 5
3,151,8M 5
S295,147 5
S444,911 5
3,801,483 $
S7135,1T0
2
Rate Ru:Yru.. tam lnaea;e
-
-
828,19
Sd 514
90,446
94.557
98,854
1OS347
102,044
112%5
3
Me cdI enacts Revenue
37,880
37,588
37,588
37,588
37,588
37,588
37,588
37,588
37,588
37,588
4
Transfers In
5
Interet Income
B
Total Revenues
$
1,993,785 5
2022832 $
2878,79 $
3,007,9D1 $
3,142902 $
3.M4,098 3
3,431,589 $
3,585,847 $
3.747.115 $
3,915,713
Revenue Requimrnents
7
Operating Expense
$
1,T42,340 $
2149.474 $
2831,935 $
2,97D,732 $
a172613 $
3,27B,444 S
3,440,871 $
a91aOW $
3,827,6513 $
3,811,388
8
N-Opaatirg Expe-
_
_
_
_
_
_
_
_
_
_
9
Transfers Out
10
Mina Capdal Expense
-
-
-
-
-
-
-
-
-
-
Debt Service
11
Exstirg Debt Serice
12
New -Revenue Bond
13
Nav-General Obligation Bad
14
Nm State Reading Loan Ford
15
Total Debt Service
S
- S
16
Capdal Protect Funded wdh Cash
-
-
-
-
-
-
-
-
-
-
17
Total Revenue Requimments
S
1,T42,340 S
2149.474 S
2831,935 S
2,910,732 $
317a813 $
3,2iB,444 S
3,440,871 $
S51-2 OW $
3,827,6513 $
S811,388
18
Revenues Dver jUndeq Expenses
5
251,445 S
{125,842} S
248,834 S
87,19 $
{W,711) $
7.94 S
{9,281} 5
72211 $
119,400 $
104,325
19
Beginning Bala-
5
718,980 $
9W.425 S
843,723 S
1,090,817 $
1, 157,788 $
1.127.075 S
1.134,870 $
1, 125 389 $
1,197,BO0 $
1,317,OB0
2D
Re-ues Dyer{ll n der♦ Ex pen ses
251,445
{12B,B42j
248,834
67,19
(30,711j
7.94
{9,281j
72211
119,40D
104,325
21
Ending Bala-
S
970,425 $
84a783 $
1,090,817 $
1, 157,7813 $
1,127,076 $
1,134.UM $
1, 125, 329 $
1,197,800 $
1,317,O00 $
1,421,385
www.arcadis.com 123
City of Sebastian Stormwater Master Plan Update
Stormwater Utility Revenue Fund - Revenues vs. Expenses
$4.5
$4.0
$3.5
c $3.0 �- -
$2 0
$1.5
—Cash In —Cash ❑ zc
2022 202; _024 2025 2Ci26 2�-,27 202s; ?02.'=1 213C. 2031
Figure 8-1. Revenues vs. Expenses (including annual revenue increases)
Stormwater Utility Revenue Fund - Fund Balance
$1.5
+ Current Scenario
c
a
$0.o
2022 2023 _1W4 2025 207c. 20, 102� '0
Figure 8-2. Stormwater Utility Revenue Fund — Fund Balance (including annual revenue increases)
C37 2031
www.arcadis.com 124
City of Sebastian Stormwater Master Plan Update
8.2 Grant Funding Overview
Identifying the appropriate funding sources is essential for determining the types of financial assistance available.
Revenue from the stormwater utility can be used to cover the local matching requirements for potential grants.
This section provides information on key agencies administering grant and loan programs, as well as a summary
of how these programs best align with the CIP projects and long-term goals of the City. External funding sources
are ideal opportunities to supplement capital budgets. The resources include federal and state grants, low- or no -
interest loans, and special financing available for Water Infrastructure and Mitigation programs. While most of the
programs identified in this section are managed by state agencies, both state and federal agencies administer
grant and loan programs. Although some programs may be similar, each funding agency has its own eligibility
criteria to determine which potential applicants can and cannot participate in the program.
Most state and federal funding opportunities are published on an annual basis through congressional and state
appropriations, as well as after a major disaster declaration. State and federal agencies commonly replace or
revise existing programs to incorporate innovative design and new regulatory requirements into eligibility
qualifications. Changes in funding allocation, program criteria, and eligibility will be reflected in the most current
issue of the publication, NOFO, or NOFA. It is important to note that the criteria established in prior year's
announcements may not be applicable for the current year and these changes may impact the project scope. The
City of Sebastian is encouraged to monitor new programs and opportunities and sign up for agency newsletters
and/or Listservs to receive notifications directly.
Finally, due to unforeseen and unprecedented global events including the COVID-19 pandemic as well as the
subsequent aftermath, the federal government has passed legislation to increase funding and expand
programmatic criteria to help state and local governments adequately respond to and address many of the
challenges and setbacks resulting from these events. Note, federal assistance to support infrastructure projects is
considerable. With the authorization of the Bipartisan Infrastructure Law (BIL), existing federal programs have or
will receive an infusion of funding that will allow agencies to expand their eligibility criteria. The increased
allocation for various federal programs also allows agencies to evaluate a broader range of projects and provide
greater level of assistance. In addition, BIL funds are available to eligible applicants potentially at a greater federal
share for projects that can demonstrate benefits to eligible disadvantaged communities. The sources outlined
below include the expanded guidance (as applicable) for existing federal programs.
8.2.1 Federal Funding Opportunities
8.2.1.1 Florida Department of Environmental Protection State Revolving Fund
Program Summary: Funded through the EPA, Florida's State Revolving Fund (SRF) is made up of three
programs:
Clean Water State Revolving Fund: The Clean Water State Revolving Fund (CWSRF) program
provides low -interest loans to local governments to plan, design, and build or upgrade wastewater,
stormwater, and nonpoint source pollution prevention projects. CWSRF loan terms include a 20-year
repayment and low -interest rates. Financing rates vary based on a variety of factors. Projects
funded/awarded through the Bipartisan Infrastructure Law (BIL) are eligible to receive funds in the form of
a grant, principal forgiveness loan, or low -interest loan. Eligible projects include Sea walls;
Levees/dikes/berms; installation of flood attenuation; diversion, retention infrastructure within or beyond
the footprint of a treatment works that protects the treatment works including floodwater
www.arcadis.com 125
City of Sebastian Stormwater Master Plan Update
channels/culverts; green infrastructure; and natural systems capable of mitigating a storm surge (e.g.,
barrier beach and dune systems, tidal wetlands, and living shorelines).
Drinking Water State Revolving Fund: The Drinking Water State Revolving Fund (DWSRF) program
provides low -interest loans to local governments and private utilities to plan, design, and build or upgrade
drinking water systems. Discounted assistance (e.g., very low interest rates, grants, etc.) for
disadvantaged communities is available. Interest rates on loans are below market rates and vary based
on the economic wherewithal of the community.
State Revolving Fund Management: The SRF Management Program supports the Drinking Water SRF
and Clean Water SRF programs by writing loan agreements, reviewing financials, approving
procurement, processing disbursements and managing billing.
Eligibility: Local governments (city and county) and special districts are eligible to apply for and receive loan
funds. For drinking water projects, private utilities are also eligible. Under the Bipartisan Infrastructure Law, grant
funds may be awarded to applicants for project that benefit disadvantaged communities equitably from
investments in water infrastructure. The BIL requires that (at minimum 49-percent of) CWSRF General
Supplemental Funding must be provided as grants and forgivable loans to applicants that meet the state's
affordability criteria or certain project types.
Submission Requirements: Applying for SRF funding (CWSRF and DWSRF) requires the submission of a
Request for Inclusion form, which can be submitted any time during the year. The information in the form is used to
establish a project's eligibility for funding, including any principal forgiveness, and priority score which is then used
for placement on the funding list ("priority list"). Projects are funded, in order of their priority score or until funds are
exhausted. Once the project is included on the funding list, the process for applying for the loan may begin.
Eligible Activities:
• Publicly owned wastewater collection and treatment facilities
• Publicly owned stormwater Best Management Practices
• Living shorelines
• Upgrades, Repair, Replacement, or Installation and Construction
• Infrastructure projects that make water systems more resilient to all threats
8.2.1.2 Water Infrastructure Finance and Innovation Act
Program Summary: The WIFIA Program is a federal credit program administered by the EPA for eligible water
and wastewater infrastructure projects. The WIFIA program offers loans with low, fixed interest rates, and a length
of up to 35 years. WIFIA loans can be combined with private equity, revenue bonds, corporate debt, grants, and
SRF loans. The EPA is permitted to provide credit assistance in the form of secured (direct) loans or loan
guarantees. The maximum amount of WIFIA credit assistance to a project is 49% of eligible project costs in
almost all instances (total federal assistance may not exceed 80% of a project's eligible costs). The minimum
project amount for large communities is $20 million, and the minimum project amount for small communities
(population of 25,000 or less) is $5 million.
Eligibility: Borrowers may include local, state, tribal, and federal government entities, partnerships and joint
ventures, and corporations and trusts.
www.arcadis.com 126
City of Sebastian Stormwater Master Plan Update
Submission Requirements: For a projects to be considered during the availability period, EPA must receive a
Letter of Intent (LOI) via SharePoint. LOI submission can begin on September 6, 2022.
Eligible Activities: The WIFIA program can fund projects that are eligible for the CWSRF (notwithstanding the
public ownership clause) and projects that are eligible for the DWSRF that support the following activities (but not
limited to):
• Brackish or seawater desalination, aquifer recharge, alternative water supply, and water recycling
projects
• Acquisition of property (if it is integral to the project or will mitigate the environmental impact of a project)
• A combination of projects secured by a common security pledge or submitted under one application by an
SRF program
Eligible development and implementation activities include:
• Development phase activities, including planning, preliminary engineering, design, environmental review,
revenue forecasting, and other pre -construction activities
• Construction, reconstruction, rehabilitation, and replacement activities
• Acquisition of real property or an interest in real property, environmental mitigation, construction
contingencies, and acquisition of equipment
• Capitalized interest necessary to meet market requirements, reasonably required reserve funds, capital
issuance expenses, and other carrying costs during construction
8.2.1.3 Florida Department of Environmental Protection Nonpoint Source Funds
Program Summary: Funded through EPA, the Nonpoint Source program supports projects that reduce pollution
from nonpoint sources, with a focus on impaired water bodies and goals identified in Total Maximum Daily Loads
and restoration plans. Under this program, applicants can request funding through the following grant opportunities:
Federal Clean Water Act Section 319(h) Grants: Federal funds to address nonpoint source pollution.
Approximately $6 million is awarded annually to the department by the Environmental Protection Agency (EPA)
through section 319(h) of the Clean Water Act. The grant stipulates that a minimum of 50% (—$3 million) of the
state's grant funds must go towards projects that implement adopted EPA -approved nine element Watershed Based
Plans (WBPs), e.g., Basin Management Action Plans (BMAPs) or Reasonable Assurance Plans (RA Plans). The
remaining 50% or less of the funding is not limited to projects that implement the BMAPs but are mostly used by the
state administratively to run the grant program, therefore these funds are more limited for project use.
State Water -quality Assistance Grants (SWAG): Funds allocated by the state legislature to implement best
management practices to reduce pollutant loads to have urban stormwater discharges meet water quality
standards. Approximately $5 million is appropriated annually to the department through the Florida legislature for
our State Water -quality Assistance Grant (SWAG). Projects must be shovel ready capital improvement
construction projects treating impaired waters.
Eligibility: All local government including county and municipal governments, special districts, water
management districts, other state agencies, public universities/colleges, and national estuary programs located in
Florida are eligible to apply for funding. Federal -funded projects (319h Grants) generally require a minimum 40%
non-federal match (Section 319(h) funding should generally not exceed 60% of the total eligible project cost).
CWSRF loan funds can be the match.
www.arcadis.com 127
City of Sebastian Stormwater Master Plan Update
Submission Requirements: Applications for submission to Florida DEP may be submitted any time. Submissions
are reviewed in the fall and spring or as needed. Applications with higher local matches are more competitive.
Eligible Activities: eligible activities include but are not limited to:
• Projects that reduce nonpoint source pollution in priority watersheds including demonstration and
evaluation of Best Management Practices
• Stormwater treatment
• Stormwater Infrastructure
• Measures to manage, reduce, treat, or recapture stormwater or subsurface drainage water
• Groundwater protection
• Hydrologic restoration
8.2.1.4 Florida Department of Environmental Protection Coastal Management
Program
Program Summary: The Florida Coastal Management Program (FCMP) and its activities are funded annually by
the National Oceanic Atmospheric Administration (NOAA). Each year, the FCMP makes a portion of NOAA funds
available as pass -through grants for projects and activities that protect and manage natural & cultural resources and
improve waterfront communities along Florida's coast. The FCMP awards grants through two competitive programs:
Coastal Partnership Initiation (CPI) Grant: Coastal Partnership Initiative (CPI) Grants CPI grants provide funds
ranging from $10,000 to $60,000 for innovative local coastal management projects that inspire community action
and promote the protection & management of coastal resources in the following three areas:
• Resilient Communities: projects that prepare for and respond to effects of climate change, natural hazard
events and disasters.
• Coastal Resources Stewardship: projects that promote local stewardship and appreciation of fragile
coastal resources.
• Access to Coastal Resources: projects that revitalize, renew, and promote local interest in their waterfront
districts.
Eligibility: Funding for the CPI program is available for local projects specifically for state agencies & water
management districts. Eligible applicants include local governments within the 35 coastal counties required to
include a coastal element in the local comprehensive plan. Public colleges, universities, regional planning
councils, non-profit groups and national estuary programs may also apply as long as an eligible local government
agrees to participate as a project partner.
Submission Requirements: Each year in August or September, the FCMP publishes a Notice of Availability of
Funds in the Florida Administrative Register to solicit proposals from eligible local government, education, and
non-profit entities.
Eligible Activities: CPI funds are available to support habitat restoration, parks, waterfronts, public access
facilities, environmental education and coastal planning.
State Agency and Water Management District Grant Program: The FCMP provides federal NOAA funds for
state agencies and water management districts for projects related to coastal resource protection. Projects must
contribute to the protection, management and enhancement of Florida's coastal resources.
www.arcadis.com 128
City of Sebastian Stormwater Master Plan Update
Eligibility: Projects must be completed within a 12-month period. Project proposals should be between $15,000
and $74,000, with anticipated start dates in July 2022.
Submission Requirements: FY23 application cycle information currently not available. The FY 2022-23 grant
application cycle closed on Nov. 30, 2021.
Eligible Activities: Eligibility activities include but are not limited to: Construction, Land Acquisition, Planning,
Design and Coordination Activities, Habitat Restoration, Invasive exotic plant removal and habitat restoration.
8.2.1.5 Florida Division of Emergency Management Building Resilient Infrastructure and
Communities Grant Program
Program Summary: The FEMA BRIC program is an annual recurring program administered by the FDEM that
provides funding to eligible entities to reduce natural hazard risks and future losses caused by acute events and
chronic stressors, driven by climate change, which are either observed or expected. For FY 2022, the priorities for
the program are to incentivize natural hazard risk reduction activities that mitigate risk to public infrastructure and
disadvantaged communities; incorporate nature -based solutions including those designed to reduce carbon
emissions; enhance climate resilience and adaptation; and increase funding to applicants that facilitate the
adoption and enforcement of the latest published editions of building codes. BRIC projects are eligible under
separate program categories including:
State/Territory Competition: The Capability -and -Capacity -Building program provides financial assistance for
activities that will enhance the knowledge, skills, expertise of the current workforce to expand or improve the
administration of mitigation assistance. The maximum allocation for a state or territory under this category is
$2,000,000, covering all activities/projects.
National Competition: Mitigation Projects grant funds are available to support cost-effective projects designed to
increase resilience and public safety; reduce injuries and loss of life; and reduce damage and destruction to
property, critical services, facilities, and infrastructure (including natural systems) from a multitude of natural
hazards and the effects of climate change. Applicants may submit an unlimited number of project applications
each valued up to $50,000,000. All National Competition projects must meet the rigorous quantitative and
qualitative criteria and capture one or more of the following:
• Is an infrastructure project
• Incorporates of nature -based solutions for hazard mitigation
• Has mandatory state-wide building code adoption requirement
• Has Building Code Effectiveness Grading Schedule (BCEGS) Rating of 1 to 5
• Is generated from a previous FEMA HMA Project Scoping award or any other federal grant award, or the
subapplicant is a past recipient of BRIC non -financial Direct Technical Assistance
• Has a non-federal cost share of at least 30% or, for Economically Disadvantaged Rural Communities a
non-federal cost share of at least 12%
• Any community with a Centers for Disease Control and Prevention Social Vulnerability Index (CDC SVI)
of 0.60 to 0.79, designated as an Economically Disadvantaged Rural Community, or any community with
a CDC SVI of 0.80 or higher.
Eligibility: State, local and tribal entities are eligible to apply for funding. Mitigation projects must comply with
federal environmental and historic property (EHP) regulations, laws, and executive orders, as applicable, and
www.arcadis.com 129
City of Sebastian Stormwater Master Plan Update
must align with the State Mitigation Plan and Local or Tribal Mitigation Plan. Subapplicants are required have a
FEMA-approved Local or Tribal Hazard Mitigation Plan by the application deadline and at the time of obligation of
grant funds for mitigation projects (with the exception of mitigation planning). Mitigation activities are required to
demonstrate cost-effectiveness. Applicants applying for mitigation projects must provide a BCA or other
documentation that validates cost-effectiveness.
Submission Requirement: FY23 application cycle information currently not available. FY22 application cycle
closed. Deadline to submit subapplication to the state was November 14, 2022 by 5:00 P.M. The Notice of
Interest was due to FDEM no later than September 20, 2022 for the FY22-23 application period. Cost Share/Local
Match requirement is a minimum of 25% non-federal sources for the local match portion and federal funding is
available for up to 75% of eligible costs. Small, impoverished communities are eligible for cost share up to 90%
federal/10% non-federal.
Eligible Activities: BRIC activities include but are not limited to the following:
• Building codes activities (State/Territory Competition C&CB)
• Partnerships, project scoping (State/Territory Competition C&CB)
• Hazard mitigation planning and planning related activities, and other activities (State/Territory Competition
C&CB)
• Non -critical Structure Elevation (National Competition Mitigation Projects)
• Dry Floodproofing (National Competition Mitigation Projects)
• Mitigation Reconstruction (National Competition Mitigation Projects)
8.2.1.6 Florida Division of Emergency Management Flood Mitigation Assistance
Program
Program Summary: The FEMA FMA program is administered by the FDEM and provides funding to eligible
entities including local governments —cities, townships, counties, special district governments, state agencies, and
federally recognized tribes. FMA funding is available annually regardless of whether a disaster has occurred in
the previous year. FMA funds are available to support projects that either reduce or eliminate the risk of repetitive
flood damage to buildings insured by the NFIP. Eligible project types include:
Individual Flood Mitigation Projects: Grant funds can support projects that will 1) mitigate flood damage to at
least 50% of structures that meet the definition of a severe repetitive loss (SRL) property, 2) mitigate flood
damage to at least 50% of structures that meet the definition of a repetitive loss (RL) property, or 3) mitigate flood
damage to at least 50% of structures that meet the definition of an SRL property. Project must also demonstrate:
• Substantial Damage: Structures that were determined Substantial Damage by the community within five
(5) years of the submission deadline.
• CDC Social Vulnerability Index (SVI): CDC Social Vulnerability Index (SVI) and NFIP Properties:
Projects that benefit area(s) with average SVI score of greater than or equal to 0.6 (greater or equal to 0.8
maximum scoring).
Severe Repetitive Loss (SRL)/Repetitive Loss (RL) Property
Localized Flood Risk Reduction Project: All Localized Flood Risk Reduction projects must demonstrate that the
proposed project benefits NFIP insured properties. Projects are eligible to receive up to $50 million of federal share. All
Localized Flood Risk Reduction subapplications submitted for funding must demonstrate or incorporate the following:
www.arcadis.com 130
City of Sebastian Stormwater Master Plan Update
• NFIP policy that is active as of the FMA application start date and is verified within the benefitting area of
the project.
• CDC Social Vulnerability Index (SVI): CDC Social Vulnerability Index (SVI) and NFIP Properties: Projects
that benefit area(s) with average SVI score of greater than or equal to 0.6 (greater or equal to 0.8
maximum scoring).
• Consideration for Climate Change and Other Future Conditions
• Incorporation of Nature -Based Solutions
• Severe Repetitive Loss (SRL) and Repetitive Loss (RL) Properties
• National Violation Tracker (NVT): Communities in good standing in the NFIP
• Community Rating System (CRS) Participation: Community floodplain-management activities that exceed
the minimum National Flood Insurance Program standards.
• Cooperating Technical Assistance Partners Program (CTP) Participation
• FEMA Generated Projects or Other Federal Grant Award: Application generated from a previous federal
grant award.
• Capability and Capacity Building (C&CB): C&CB activities should result in a resource, strategy, or
tangible mitigation product that will reduce or eliminate risk and damage from future flooding, increase
resilience, and promote a culture of preparedness, and projects must demonstrate that it will reduce flood
claims against the NFIP based on the following (but not limited to):
• CDC Social Vulnerability Index (SVI) and NFIP Properties: Projects that benefit area(s) with average SVI
score of greater than or equal to 0.6 (greater or equal to 0.8 maximum scoring)
• National Violation Tracker (NVT): Communities in good standing in the NFIP
• Community Rating System (CRS) Participation: community floodplain management activities that exceed
the minimum National Flood Insurance Program standards.
Eligibility: State Agencies, Federally -Recognized Tribes, Local governments, and Federally -recognized Native
American Tribal Governments are eligible to submit a subapplication. Owners of structures, residential or non-
residential, that have been previously flooded must consult with their local or Native American Tribal government
about submitting an application on their behalf for grant funds. All subapplicants must be participating in the NFIP,
and not be withdrawn, on probation, or suspended. Structures identified in the subapplication must have an NFIP
policy in effect at the application start date and must maintain it through completion of the mitigation activity and for
the life of the structure. Community Flood Mitigation Projects are only eligible for 75% of the federal cost share.
FEMA may contribute 100% of the federal cost share for Individual Mitigation Projects that include SRL properties
and up to 90% of the federal cost share for RL properties. Mitigation projects must comply with federal EHP
regulations, laws, and executive orders, as applicable. The EHP review process must be completed before funds are
released to carry out the proposed project. Mitigation activities are required to demonstrate cost-effectiveness.
Applicants applying for mitigation projects must provide a BCA or other documentation that validates cost-
effectiveness. Subapplicants must have a FEMA-approved Local or Tribal Hazard Mitigation Plan by the application
deadline and at the time of obligation of grant funds for mitigation projects (with the exception of mitigation planning).
Project scoping, community flood mitigation projects, individual flood mitigation projects, and technical assistance
applications must be consistent with the goals and objectives identified in the current FEMA-approved State or Tribal
www.arcadis.com 131
City of Sebastian Stormwater Master Plan Update
(Standard or Enhanced) Mitigation Plan, and the local mitigation plan for the jurisdiction in which the project is
located. The FMA program will prioritize assistance that benefits disadvantaged communities.
Submission Requirements: FY23 application cycle information currently not available. FY22 application cycle
closed. Deadline to submit subapplication to the state was November 14, 2022 by 5:00 P.M. The Notice of
Interest was due to FDEM no later than September 20, 2022 for the FY22-23 application period.
Eligible Activities: FMA activities include but are not limited to the following:
• Localized flood control (Local Flood Risk Reduction)
• Floodwater storage and diversion (Local Flood Risk Reduction)
• Floodplain and stream restoration (Local Flood Risk Reduction)
• Stormwater management (Local Flood Risk Reduction)
• Wetland restoration/creation (Local Flood Risk Reduction)
8.2.1.7 Florida Division of Emergency Management Hazard Mitigation Grant Program
Program Summary: The FEMA HMGP is administered by the FDEM and provides funding to eligible entities
including state, local, tribal, and territory governments to support rebuilding efforts that reduce or mitigate future
disaster -related losses. Grant funding through the HMGP is only made available following a presidentially
declared disaster. HMGP funds are available for a broad range of uses, and projects do not have to align with a
specific disaster (i.e., if a flood declaration is issued, an applicant can submit a project for tornado protection).
Eligible project types and activities include:
• Flood Control and Drainage Improvement projects to reduce potential flood damage
• Utility Mitigation
Eligibility: The process of selecting eligible mitigation projects to be submitted for funding consideration has been
delegated to each county's Local Mitigation Strategy Working Group (LMSWG) Grant -funded projects must
comply with federal EHP regulations, laws, and executive orders, as applicable. The EHP review process must be
completed before funds are released to carry out the proposed project. Mitigation activities are required to
demonstrate cost-effectiveness. Applicants applying for mitigation projects must provide a BCA or other
documentation that validates cost-effectiveness. Applicants also must have a FEMA-approved Local or Tribal
Hazard Mitigation Plan by the application deadline and at the time of obligation of grant funds for project, project
scoping, and technical assistance subapplications. Federal funding is available for up to 75% of eligible costs and
the remaining 25% of eligible costs must be derived from non-federal sources (local match).
Submission Requirements: The grant application cycle for all HMGP disaster declarations are closed.
Eligible Activities:
• Retrofitting of existing buildings to make them less susceptible to damage from a variety of natural hazards.
• Development and adoption of hazard mitigation plans, which are required for state, local, tribal, and
territorial governments to receive funding for hazard mitigation projects.
• Aquifer storage and recovery, floodplain and stream restoration, flood diversion and storage, or green
infrastructure methods to reduce the impacts of flood and drought.
• Utility and infrastructure retrofits to reduce risk of failure caused by natural hazards
www.arcadis.com 132
City of Sebastian Stormwater Master Plan Update
• Acquisition of hazard -prone property to remove people and structures from harm's way.
• Slope stabilization projects to reduce risk to people and structures
8.2.1.8 Florida Department of Economic Opportunity CDBG-DR
Program Summary: The Community Development Block Grant Disaster Recovery (CDBG-DR) program
provides funding after Presidentially Declared Disaster for projects that focus on long-term recovery efforts.
Grants may fund Disaster Relief, Long Term -Recovery, Restoration of Infrastructure, Housing, and Economic
Revitalization. Funds may also be used to address an unmet need that arose from a previous disaster. Eligible
projects include (but not limited to):
• Infrastructure: Replacement, relocation, or repair of damaged public facilities except for buildings for the
general conduct of government.
• Planning and Capacity Building: Studies, analysis, data gathering, preparation of plans, and identification
of actions to implement plans.
• Preparedness and Mitigation: Rebuilding activities, preparedness and mitigation measures.
Eligibility: Funds are awarded to state and local governments which become grantees. Those who receive grant
money include state agencies, non-profit organizations, economic development agencies, citizens and businesses.
All projects supported by HUD CDBG assistance must meet one of the CDBG's three National Objectives: benefiting
low -and -moderate income (LMI) persons, addressing a severe and recently arising urgent community welfare or
health need, and preventing or eliminating slum and blighting conditions. Cost share not required.
Submission Requirements: Following future disasters, subapplicants should consult with FDEO for program
deadlines and submission guidance. Variable (disaster -dependent)
Eligible Activities:
• Construction
• Acquisition
• Preconstruction (design, engineering, planning)
• Rehabilitation/reconstruction
• Road and Bridge Repair — Water & Wastewater Facilities
• Job training and workforce development
• Loans and grants to businesses
• Improvements to commercial/rental districts
8.2.1.9 Florida Department of Economic Opportunity CDBG-MIT
Program Summary: The Community Development Block Grant Mitigation (CDBG-MIT) program provides
assistance to areas impacted by recent disasters to carry out strategic and high -impact activities to mitigate long-
term disaster risks, reduce future loss, and protect community services that benefit human health and safety or
economic security. Programs include:
General Planning Support Program (GPS): support high -quality mitigation planning that will build a
foundation for continuous coordination and data -driven outcomes.
www.arcadis.com 133
City of Sebastian Stormwater Master Plan Update
Critical Facility Hardening Program (CFHP): critical facilities are defined as the buildings/structures that
serve a public safety purpose for local communities.
• General Infrastructure Program (GIP): funding to units of general local government to, upgrade water,
sewer, solid waste, communications, energy, transportation, health and medical and other public
infrastructure projects.
Eligibility: Local government including educational institutions, state agencies, and non -profits are eligible to
apply. Projects must be in conformance with the State Mitigation Plan and Local or Tribal Mitigation Plan,
beneficially impact HUD or state designated Most Impacted and Distressed (MID) areas, be cost-effective, and
meet one of the CDBG's three National: benefiting low -and -moderate income (LMI) persons, addressing a severe
and recently arising urgent community welfare or health need; or preventing or eliminating slum and blighting
conditions. Cost Share not required.
Submission Requirement: Following future disasters, subapplicants should consult with FDEO for program
deadlines and submission guidance. Application deadline for Round II is closed, however there is a future round -
Round III (note: General Infrastructure Program (GIP) for Hurricane Michael closed on June 24, 2022). Round III will
commence in 2022 with $150 million in funding, plus all remaining unobligated funds being available for allocation.
Eligible Activities: eligible activities include but are not limited to:
• Dry and wet proofing (CFHP)
• Energy resiliency Participant outreach (CFHP)
• Construction (GIP)
• Rehabilitation or construction of stormwater management systems (GIP)
• Improvements to drainage facilities GIP
• Modernization and resiliency planning (GPS)
• Comprehensive, capital improvement, and community development mitigation planning (GPS)
• Floodplain and wetland management plans (GPS)
• Upgrading mapping, data and other capabilities to better understand evolving disaster risks (GPS)
• Planning and public service activities necessary to reduce flood insurance premiums in the National Flood
Insurance Program's (NFIP) voluntary Community Rating System incentive program (GPS)
8.2.1.10 Florida Department of Economic Opportunity Small Cities CDBG Program
Program Summary: The Florida Department of Economic Opportunity (DEO) administers the Small Cities CDBG
Program. This competitive grant program awards funds to local governments in small urban and rural areas. The
program provides an opportunity for communities to obtain funds for projects that they cannot otherwise afford.
CDBG funds can also provide administrative support for local governments that may not have the staffing
resources necessary to administer their projects. Examples of CDBG-funded projects include (but not limited to:
• Water and Sewer Improvements
• Drainage and Stormwater Improvements
Eligibility: Activity must meet at least one of the following National Objectives: benefiting to Low -and Moderate -
Income Persons, eliminating of Slum and Blight, and addressing an Urgent Need. The condition must have
www.arcadis.com 134
City of Sebastian Stormwater Master Plan Update
occurred within 18 months of application. Local governments applicants must demonstrate an inability to finance
the activity on its own and that other funding is not available.
Submission Requirements: FY23 application cycle information currently not available FY22 application cycle
closed (June 6, 2022 and closes July 21, 2022).
Eligible Activities: eligible activities include but are not limited to:
• Construction
• Rehabilitation or construction of stormwater management systems
• Improvements to drainage facilities
• Modernization and resiliency planning
• Capital improvements
8.2.1.11 EDA Public Works and Economic Adjustment Assistance Program
Program Summary: Public Works program provides funding to build, design, or engineer critical infrastructure
and facilities that will help implement regional development strategies and advance economic development goals.
Under the American Rescue Plan, the Economic Development Administration (EDA) allocated $313 in
supplemental funding to assist communities nationwide. Funding includes support for economic development
assistance to support long-term community economic recovery planning and project implementation,
redevelopment and resilience. Projects must be aligned with a current CEDS (Comprehensive Economic
Development Strategy) or equivalent EDA-accepted regional economic development strategy and clearly lead to
the creation or retention of long-term high -quality jobs. Funds may be used for a wide variety of infrastructure
projects including water and sewer system improvements. The goal of the program is to support projects that:
lead to the creation and retention of jobs and increased private investment, advance innovation, enhance the
manufacturing capacities of regions, provide workforce development opportunities, and grow ecosystems that
attract foreign direct investment.
Eligibility: State, county, tribal, city and township, and special district governments, Institutions of higher
education and Nonprofits are eligible to apply for funding. Cost share requirements include federal: 50% local:
50%. Projects may receive an additional amount up to 30% of the total project cost, based on the needs of the
region in which the project will be located.
Submission Requirements: There are no submission deadlines under this opportunity. Applications will be
accepted on an ongoing basis until a new NOFO is published, this PWEAA NOFO is cancelled, or all funds have
been expended. Applications for submission to EDA are available on Grants.gov. Applicants must register prior to
submitting the application.
Eligible Activities:
• Construction
• Non -construction
• Planning
• Technical Assistance
• Revolving Loan Fund
www.arcadis.com 135
City of Sebastian Stormwater Master Plan Update
8.2.1.12 US Treasury State and Local Fiscal Recovery Funds
Program Summary: American Rescue Plan Coronavirus State and Local Fiscal Recovery Funds (SLFRF)
program funds are intended to provide support local governments to facilitate the ongoing recovery from the
COVID-19 pandemic. Funds can also be used to make necessary investments in water, sewer, and broadband
infrastructure to address the consequences of deferred maintenance in drinking water systems and removal,
management, and treatment of sewage and stormwater, along with additional resiliency measures needed to
adapt to climate change. The State of Florida, through the Florida Division of Emergency Management (Division),
will disburse Coronavirus Local Fiscal Recovery Funds to non -entitlement units of local government through the
Supplemental Resilient Florida Grants program. All county governments in the State of Florida (regardless of
population) will receive funding directly from Treasury and must apply directly to Treasury to receive such funding.
Eligibility: Eligible entities include Counties, municipalities and other eligible entities as identified in Florida
statute, local governments designated as non -entitlement. Cost share not required. Projects must be complete by
Dec. 31, 2026 (no extensions permitted).
Submission Requirements: The City may request their allocation of Coronavirus State and Local Fiscal
Recovery Funds through the Treasury Submission Portal (https:Hapi.id.me/en/session/new).
Eligible Activities:
• Planning
• Pre -construction
• Implementation projects that address risks of flooding or sea level rise
8.3 State Funding Opportunities
8.3.1 St. Johns River Water Management District Districtwide Cost Share
Funding Program (FY2023-24)
Program Summary: The Cost Share Program is a partnership between the District and local governments to
ensure the completion of shovel -ready stormwater/flood protection projects designed to reduce flooding risks and
improve water quality. The cost -share funding can support the following project types:
• Improved nutrient treatment processes of existing wastewater treatment facilities
• Pumping stations and storage facilities
• Transmission and distribution systems
• Improved landscape irrigation efficiencies
• Low impact development (LID) projects with a net water quality benefit
• Regional flood control projects
• Natural systems restoration and enhancement
Eligibility: Applications for cost -share funding for projects that benefit the District's core missions from Dec. 1,
2022, through 5 p.m. on Jan. 31, 2023. Projects are eligible for a maximum district cost -share of $3 million per
project or per applicant and funding is limited exclusively to construction -related costs. Projects should be
completed within two years and must start no later than June 30, 2023. The district will fund up to 25 percent of
www.arcadis.com 136
City of Sebastian Stormwater Master Plan Update
the construction costs for selected alternative water supply, water quality, flood protection, and natural systems
projects and up to 50 percent for water conservation projects.
Submission Requirements: Applications due January 31, 2023 at 5 p.m. through the Online Application System.
Eligible Activities:
• Construction
• Construction engineering and inspection services
• Water quality best management practices
• Retrofitting of stormwater outfalls with tidal backflow prevention valves
• Reconstruction of weirs, construction of watershed management collection and stormwater treatment systems
• Stormwater management system expansion and reconstruction
• Plumbing retrofits (conservation -related)
• Piping and other materials directly related to construction of the project
8.3.2 Florida Department of Environmental Protection Resilient Florida
Program
Program Summary: The Resilient Florida Grant Program includes a variety of grants that are available to
counties, municipalities, water management districts, flood control districts and regional resilience entities aimed
to address the impacts of flooding and sea level rise that the state faces, eligible applicants may receive funding
assistance to analyze and plan for vulnerabilities, as well as implement projects for adaptation and mitigation.
Statewide Flooding and Sea Level Rise Resilience Plan: Grant program aimed to effectively address the
impacts of flooding and sea level rise that the state faces, eligible applicants may receive funding assistance to
analyze and plan for vulnerabilities, as well as implement projects for adaptation and mitigation. Beginning
December 1, 2021, and each December 1 through 2024, the Florida Department of Environmental Protection will
develop a Statewide Flooding and Sea Level Rise Resilience Plan. The plan must consist of ranked projects that
address risks of flooding and sea level rise to coastal and inland communities in the state. All eligible projects
submitted to DEP must be ranked and included in the plan.
Supplemental Resilient Florida Grants: state -directed American Rescue Plan Act Coronavirus State and Local
Fiscal Recovery Funds (SLFRF). $20 million allocated for planning and pre -construction. SLFRF funds are a one-
time appropriation to the program. The projects funded by the SLFRF are subject to legislative review and
approval and must be submitted to the Legislature by Dec. 1, 2022. The projects can be awarded when funds are
released by the U.S. Department of Treasury
Eligibility: Counties, municipalities, water management districts, flood control districts and regional resilience
entities. Local governments are eligible to apply for implementation project funding after conducting a vulnerability
assessment, evaluation, report, or other similar document that demonstrates a risk of flooding or risks due to sea
level rise to a critical asset or the project area. Minimum of 50% match unless qualified as a financially
disadvantaged small community. Project to be considered for eligibility must be included in the Statewide
Flooding and Sea Level Rise Resilience Plan and or Plan update. By September 1 of each (through 2024, county
and local government entities, and special districts must submit to DEP a list of proposed projects that address
and mitigate the risks of flooding or sea level rise on water supplies or water resources of the state. Each project
www.arcadis.com 137
City of Sebastian Stormwater Master Plan Update
included in the plan must have a minimum 50-percent cost share unless the project assists or is within a
financially disadvantaged small community.
Submission Requirements: FY23 application cycle information currently not available. FY22 application cycle closed.
Eligible Activities:
• Planning
• Pre -construction
• Implementation projects that address risks of flooding or sea level rise
8.4 Grant Funding Recommendations
The project recommendation list was developed in an effort to pair CIP projects with external funding sources.
Identifying appropriate funding agencies was key in determining the types of support available. Both state and
federal agencies administer programs that may align with of the long-term funding goals of City. The completion
of this assessment revealed that any funding opportunities selected would need to support repair and
replacement costs associated with aging infrastructure, while also requiring limited or no cash contributions by the
City ("local match").
Once the City is prepared to move forward from prioritization and project selection to proposal development, it will
be critical to establish clear milestones to ensure that planning, design, and construction timelines align with
application requirements and deadlines. To avoid missing out and the substantial grant funding opportunities
available including BIL funding, each project scope/description must clearly demonstrate that the proposed
activities are eligible and meet the primary objectives of the federal or state program. While the projects included
in the funding table below appear to be in the best position to move forward with an application, eligibility is
ultimately determined by the funding agency and each funding agency has their own eligibility criteria.
To strengthen the competitiveness of any application, it may be useful to link the primary need to repair aging City
infrastructure with other beneficial outcomes including, for example, enhancing protection against threats in areas
that are or have been susceptible to natural hazards or disaster -related events; and/or demonstrating the project
will be located in or benefit small or disadvantaged communities. Making the case that the project will reduce
hazards and impact vulnerable communities will increase the range of funding options available to the City. For
example, the City may be eligible to apply for grant funding offered by FEMA through any of the mitigation and
resilience programs if the project can demonstrate the following factors:
• The project is located in a floodplain
• The project will reduce or eliminate flood risk to residents and/or buildings and structures insured under
the National Flood Insurance Program (NFIP)
• The project will reduce or eliminate risk to a natural hazard, the facility or equipment has failed or become
damaged as a result of extreme weather events and chronic stressors
• The project will cost beneficial and minimize any expected future losses, or
• The project includes studies/plans (ex. project scoping, mitigation planning) yet to be conducted but
necessary for pending upgrades or replacement of the facility or equipment.
Based all of the information provided and gathered, including the fiscal needs and challenges identified by the
City, the table included below provides an overview of funding that could potentially support CIP projects.
www.arcadis.com 138
City of Sebastian Stormwater Master Plan Update
Table 8-2. Funding Recommendations by Project Type
Share Funding Cap
Funding Funding Application
Project Type Source Mechanism Eligible Activities Requirements (Per Deadline
(Federal/Local) application)
Stormwater Best
Management Practices
FY22
Retrofits of Stormwater BMPs
Low -interest
Application
Bulkhead
Low -interest
Stream Restoration
loans with an
Project
Closed. FY23
Dredging
CWSRF
Loan
Buffer Restoration
interest rate at
dependent
submission
Upgrades, Repair,
3%
info not
Replacement, or Installation
available.
and Construction
Planning and Feasibility
Analysis
Environmental Review
Permitting
Preliminary Engineering and
Low-cost
Up to $20M
Credit
Design Work
supplemental
or
LOI
Bulkhead
(S)/WIFIA
Assistance
Construction, Reconstruction,
loan (0% interest
$5M for Small
Submission
Rehabilitation, and
to market rate)
Community
Open
Replacement
Acquisition of real property
including water rights or land
relating to the project
Construction, Reconstruction,
Rehabilitation, and
Replacement of Stormwater
Bulkhead
Nonpoint
Grant
Infrastructure
60:40
Project
Application
Dredging
Source
dependent
Cycle Open
Activities to Manage, Reduce
or Recapture stormwater or
subsurface drainage water
Use of Dredge
Material (from
BRIC
canals,
(National
waterways,
Competition)
etc.)
Bulkhead
FMA
Dredging
Dredging CDBG-DR
Dredging CDBG-MIT
(Round III)
www.arcadis.com
Grant
Grant
Grant
Grant
Floodplain Restoration
Mitigation Reconstruction
Localized flood control
Floodwater storage and
diversion
Floodplain and stream
restoration
Stormwater management
Preparedness and Mitigation
Construction
Acquisition
Preconstruction (design,
engineering, planning)
Rehabilitation/reconstruction
Construction
Rehabilitation or construction
of stormwater management
systems
FY22
Application
75:25 Up to $50M Closed. FY23
submission
info not
available.
75:25
Up to $100K
Multi -Hazard
Mitigation
Plans
$900K Project
Scoping
$300K C&CB
FY22
Application
Closed. FY23
submission
info not
available.
Consult with
Project
N/A
FDEM for
dependent
submission
Consult with
Project
N/A
FDEO for
dependent
submission
139
City of Sebastian Stormwater Master Plan Update
Material (from
canals,
waterways,
etc.)
Table 8-2. Funding Recommendations by Project Type
EDA Public Construction, Design, and
Works Grant Engineering of Critical 50:50 Up to $30M Open
Infrastructure
Bulkhead SLFRF Grant I Resiliency measures needed N/A
Dredging to adapt to climate change
Any
St. Johns
(Stormwater & RWMD Cost Grant
Flood
Protection) Share Program
Construction and
Construction engineering
Reconstruction of Weirs
Construction of Watershed
Management Collection and N/A
Stormwater Treatment
Systems
Stormwater Management
System Expansion and
Reconstruction
Table 8-3. Funding Recommendations by Source/Opportunity
'State, Tribal
Government,
Bridge Investment Program MPOs (> 200,000
people), Local
httos://www.fdot.aov/Dlannina/policy/legislation/Bipartisan- Governments
Infrastructure-Law-(BIL).shtm Special Purpose
District
Promoting Resilient Operations for Transformative,
Efficient, and Cost -Saving Transportation (PROTECT)
httos://www.fdot.aov/glannina/Dolicv/leaislation/Bioartisan-
I nfrastru ctu re-Law-(BIL ). s htm
State, Tribal
Government,
MPOs (> 200,000
people), Local
Governments
Special Purpose
District,
Consult with
FDEM
Open
Consult with
FDEM for
submission
Applications
Up to $3M due January
31, 2023
Administered by FDOT
Pending release of guidance: grant (BIL) program to support
replacement or rehabilitation of culverts to improve flood
control and improve habitat connectivity for aquatic species.
Planning, Large Project (>$100M), and Project (<$100M)
competitive grant program open June to September
Up to 5% of funds available for solely culverts
Cost Share: TBD
Administered by FDOT
Pending release of guidance: grant (BIL) program to support
planning, resilience improvements, community resilience and
evacuation routes, and at -risk coastal infrastructure to
increase resilience from the impacts of sea level rise,
flooding, wildfires, extreme weather events, and other natural
disasters.
Cost Share: TBD
Local and Regional Project Assistance Grants (RAISE) State, Tribal Administered by FDOT
httoGovernment,
s://www.fdot.aov/Dianninci/Dolicv/leaislation/Bipartisan- Pending release of guidance: grant (BIL) program to support
Infrastructure-Law-(BIL).shtm Local
Government projects to replace or rehabilitate a culvert or prevent
www.arcadis.com 140
City of Sebastian Stormwater Master Plan Update
Table 8-3. Funding Recommendations by Source/Opportunity
Special Purpose stormwater runoff for the purpose of improving habitat for
District aquatic species.
Cost Share: TBD
State, Tribal
Administered by FDEM
Government,
Grant program to support recovery from major disasters or
FEMA-PA
Local
emergencies declared by the president for debris removal
httos://www.floridadisaster.ora/dem/recoverv/public-
Governments,
and emergency protective measures, repair, replacement or
assistance-proaram/
Private Non-
restoration of disaster -damaged, publicly owned facilities. PA
Profit
funding information for Hurricane Ian and Nicole pending.
Organizations
Cost Share/Local Match: 75%/25% (federal/non-federal)
State, Tribal
Administered by FDEM
FEMA-HMGP
Government,
Grant program to support rebuilding efforts that reduce or
httos://www.floridadisaster.ora/dem/mitioation/hazard-
Local
mitigate future disaster related loses. Only available following
mitiaation-Grant-proaram/
Governments,
a presidentially declared disaster, however projects do not
Private Non-
have to align with a specific disaster. HMGP funding
Profit
information for Hurricane Ian and Nicole pending.
Organizations
Cost Share/Local Match: 75%/25% (federal/non-federal)
State and State
CDBG-DR
Agencies, Local
Administered by DEO
httos://floridaiobs.ora/community-olannina-and-
Governments,
Grant program to support disaster relief, long-term recovery,
develooment/assistance-for-Governments-and-
Non-Profit
and restoration of infrastructure in a Presidentially declared
organizations/disaster-recovery-initiative
Organizations,
area for the covered disaster. CDBG-DR funding information
Economic
for Hurricane Ian and Nicole pending.
Development
Cost Share/Local Match: 100% (federal)
Agencies
State Agencies, Administered by DEO
Local Grant program to support disaster mitigation projects
CDBG-MIT Governments, in areas impacted by presidentially declared disasters.
httDs://floridaiobs.ora/rebuildflorida/mitioation Non -Profits, CDBG-DR funding information for Hurricane Ian and Nicole
Educational pending.
Institutions Cost Share/Local Match: 100% (federal)
Notes:
The funding opportunities presented in this Table 2 reflect funding that may potentially be available in 2023 to support various mitigation and
infrastructure projects. At the time of this report, limited information was available on the specific program criteria, funding cycle timelines, and
funding availability. The City is strongly encouraged to review and monitor these programs periodically.