9.1 Operational Recommendations
1. Increase SWMS Maintenance Activities
The number and types of maintenance activities indicated in the proposed O&M Plan represent the minimum level
of maintenance effort needed to properly maintain the City's SWMS.
2. Implement the CMMS and Improve SWMS Documentation
The City does not currently have a CMMS system and has had issues with NPDES MS4 permit documentation.
As an interim measure, an MS -Excel CMMS system has been developed for the City's use along with SOPs and
documentation protocols to help improve documentation of SWMS assets and maintenance activities performed.
3. Increase Stormwater Department Staffing
Based on the labor needs to perform the minimum level of maintenance on the City's SWMS, ten additional FTE
positions will be needed. The Arcadis departmental financial model assumes these positions would be added
over a three-year period.
4. Modernize and Increase the Capital Equipment Fleet
The current Stormwater Department fleet consists of 24 light vehicles and heavy equipment, of which 5
(21 %) appear beyond their useful life. It is recommended that a detailed fleet analysis be conducted to
determine an appropriate operational life for each fleet item based on maintenance data and usage
rates, and to plan for future replacement needs and costs.
• Based on the equipment needs to perform the minimum level of maintenance on the City's SWMS, five
fleet items need to be replaced and one additional vactor truck and one additional backhoe are needed.
The addition of more energy efficient light vehicles (i.e., EVs) should be considered for activities that only
involve visual inspections.
5. Increase Available Canal Storage Volume
• Include an adjustable weir in the Concha Dam replacement design to allow the City to decrease canal
water elevations by approximately 1.5 feet. This will increase the storage capacity of the canal system
available at the beginning of a storm event and will reduce peak discharges to the South Prong of the St.
Sebastian River. The adjustable weir should be designed so that stored stormwater in the canals will
slowly discharge through the weir and the canal storage volume will recover within 14 days following a
storm event. Decreasing the peak discharge will also improve downstream water quality by reducing the
dilution effect of the fresh water on salinity levels in the St. Sebastian River and the Indian River Lagoon.
• Replace the wood stoplogs on the Hardee Dam with new ones, and lower the control elevation in the
Collier Canal by 1.5 feet. Hardee Dam current control elevation of 15.06 ft NGVD29 based on the 2006
Collier Canal Stormwater Retrofit Permit Drawings provided in Appendix I.
6. Coordinate Maintenance of the Hardee Dam Spillway with SJRWMD
The SJRWMD was granted a conservation easement dated January 17, 2002, from Collier Club, Inc. and the
Collier Club Homeowner's Association during the development of the Collier Club property. According to the
easement document, the purpose of the conservation easement is to "assure that the Property will be retained
www.arcadis.com 142
City of Sebastian Stormwater Master Plan Update
forever in its existing natural condition and to prevent any use of the Property that will impair or interfere with the
environmental value of the Property'.
Unfortunately, the conservation easement includes the flow path from the Hardee Dam, which has been in place
for decades, and based on discussions with City staff, the SJRWMD considers the easement area a "natural
area" and does not intend to maintain the original grades and cross section of the flow path. Over time, the flow
path will fill in with sediment and vegetation, which will reduce or completely stop the discharge flow from the
Hardee Dam during storm events. Without the discharge flow over the dam, the only other way for water to
escape from the Collier Canal North is to increase stage to approximately elevation 14 feet, NAVD88 and
discharge south through the 48-inch diameter culvert under Sebastian Blvd. This represents a significant
reduction of discharge capacity from the Collier Canal North and modeling results indicate that flooding in the
area draining to the canal would increase during the 10-year or larger storm events.
After reviewing the easement document, it appears that two problems exist, and it is recommended that these
problems be brought to the attention of the SJRWMD:
The area of the conservation easement is not natural, as it is a flow way from the Hardee Dam, which was
likely constructed in the 1950's or 1960's when the Collier Canal North was constructed during the
development of the Sebastian Highlands. An inherent conflict exists between the competing uses of
drainage and conservation of existing condition.
2. The easement document contains conflicting prohibitions in Section 2, as prohibitions 2.(c) and (d) appear
to directly conflict with 2.(f).
2.(c). Removing, trimming or destroying trees, shrubs, or other vegetation.
2.(d). Excavating, dredging or removing loam, peat, gravel, soil, rock or other material substances in such a
manner as to affect the surface.
2.(f). Activities detrimental to drainage, flood control, water conservation, erosion control, soil conservation, or
fish and wildlife habitat preservation.
It is also recommended that an additional analysis be performed, but if the intention was to maintain the flow way
according to the lines and grades present at the time the conservation easement was recorded, that would not
appear to be contrary to the terms of the easement and would likely be sufficient for ongoing drainage maintenance.
7. Obtain TMDL Load Reduction Credits for BMAP Activities
To date, 16 projects have been completed by the City or are currently underway, resulting in load reduction credits
of 5,223 lbs./year of TN (15.7% of required reduction) and 620 lbs./year of TP (10.3% of required reduction). While
the City's performance appears to be lower than the overall progress reported for CIRL Project Zone SEB, it should
be noted that the City has not yet received reduction credits for seven completed projects, including the Stormwater
Park. That single project may account for a significant part of the City's required reduction goals. It is recommended
that the City continues to obtain TMDL load reduction credits for BMAP activities.
8. Establish a Certification Program for Private Systems
Ensuring that privately -owned BMPs are properly operated and maintained is very important, as they typically
discharge into the City's SWMS. For this reason, it is recommended that the City establish a program for annual
certifications for all privately -owned stormwater systems. Such a program may include:
www.arcadis.com 143
City of Sebastian Stormwater Master Plan Update
• A certification fee, additional revenue to the City's Stormwater Department, to offset processing costs
• Requiring an annual inspection report by a Florida -licensed professional engineer and accompanying
digital time -stamped photographs.
• Requiring a certification form, signed and sealed by a Florida -licensed professional engineer documenting
that the system is properly maintained and operating as designed and permitted.
• The City has a certification program in its existing Stormwater Fee Credit program for private systems
exceeding SJRWMD standards, which could be used to incorporate this recommended maintenance
certification for private systems.
9. Reduce Costs Where Possible
• On vacant parcels that have "Quarter Round" installed, the City crews must hand clean the Front Yard
swale to prevent damage to the PVC, which is labor-intensive and costly to the City. It is recommended that
the City considers removing the "Quarter Round" in these vacant parcels at the next cleaning and eliminate
the need for hand cleaning, as the conveyance benefits of the PVC pipe quarters are outweighed by the
additional maintenance costs to the City, estimated at approximately $140,000 per year.
• It is recommended that the City considers the need to identify other funding sources for activities
unrelated to the SWMS such as sidewalk replacements.
10. SWMS Survey Information Needs
• Continue the development of a City-wide survey monument network that is needed to allow for rapid
elevation checks of SWMS components.
• Perform a full bathymetric survey of all canals, waterways, and retention/detention ponds in the SWMS to
verify whether dredging is needed to restore the original design grades and storage and conveyance capacity.
9.2 Policy and Local Ordinance Recommendations
Policy 1-2.3.2 — Incorporate Innovative Techniques in the Land Development Code — In accordance with this
policy, it is recommended that the City considers allowing the use of stormwater harvesting tanks as a method for
residential and commercial properties to meet their required stormwater detention volumes. Such systems should
be designed to recover no more than half their available volume within 24 hours following a storm event and
recover their full volume within 72 hours.
Code of Ordinances - Section 54-2-7.15(d)
Paragraphs (2) and (3) of this Code section establish that the property owner is responsible for the maintenance
of all drainage features on a property, including front yard swales, driveway culverts, side yard swales, and back
yard ditches to maintain the proper flow of surface water. For several years, the City has contracted with an
outside contractor for the mowing and maintenance of the side yards and back yards. Consider revising the Code
to reflect the change in maintenance responsibility.
Code of Ordinances - Sec. 54-3-12.5. - Exemptions.
The City's stormwater system does not have sufficient storage and conveyance capacity to prevent localized
flooding in a 10-year storm event, as evidenced by modeling results. The system is operating beyond its design
capacity, and in order to improve existing drainage issues, it is recommended that the City consider amending its
Land Development Code exemptions as discussed below.
www.arcadis.com 144
City of Sebastian Stormwater Master Plan Update
Sec. 54-3-12.5. currently provides that the following activities shall be exempt from the surface water
management permitting requirements herein established:
(a) Any maintenance, alteration, renewal, repair, use or improvement of an existing structure which does not change
or affect the rate or volume of stormwater runoff, or the construction of any structure or addition thereto which does
not create an impervious surface exceeding ten percent of the site or 5, 000 square feet, whichever is less.
The clause "or the construction of any structure or addition thereto which does not create an impervious surface
exceeding ten percent of the site or 5,000 square feet, whichever is less. "could be deleted or modified, as it
allows for the addition of up to 5,000 square feet (SF) of impervious area without any offsetting storage. The
rainfall depth for the 25yr-24hr storm event is 9.17 inches, and in that storm a 5,000 SF concrete slab (or
structure) would result in approximately 3,821 cubic feet (28,580 gallons) of runoff, with no storage requirement.
The City's SWMS does not have the capacity to convey or store such additional runoff loads, so detention storage
of at least the 25-year, 24-hour runoff volume could be required for any additional impervious area.
Code of Ordinances - Sec. 54-3-12.10. - Type "A" permit, stormwater management (drainage)
The requirements for the Type "A" stormwater permit should be modified to include detention storage of at least the
25-year, 24-hour runoff volume as explained above. Per Sec. 54-3-12.1. —Applicability, this requirement would
then be applicable to all new construction, development or redevelopment requiring updated code compliance