Loading...
HomeMy WebLinkAboutProposal Meeting MapsM1 �� N-,,-- EXIST. GRASS ARE4 I EXf5T. M.E.S INv=u.ot j a TOB SWL \\ I ` _ EOP III------------------------ pll m EXIST. ASPHALT N II EOP EL]P --SSWW_��----------------- lb to f r l „� F\J�/f—TOB cn cn EXIS p��• � 1 �.38 I I I X6' WDIF z STORMWATE� TM I DETENTION 11 O BASIN (TYP.) I E:817301.88 BM EL=16.74 NAVD'88 I SET MN&TT TP I NO ID I t N:126522I I E:817634.44.44 BM EL=17.54 NAVD'8ER I ~ ZEXIST. GRASS AREA 7 I I f// I I I I O I� Ex,Sa C'C.N� Qll'J J • EXIST T-HANGARS EOP LEGEND EXISTING PAVEMENT REMOVAL - O TAXILANE PAVEMENT MILIN't PAL AIR ORT FUTURE TAXIDRIVE PAVEMENT FUTURE PARKING LOT ® FUTURE HANGAR I —TOFA— 1 TDG 1B OBJECT FREE AREA1E INFRASTRUCTURE CONSULTING & ENGINEERING SET jRN&TT TP NO I :12 649.20 E:917696.86 BM EL=16.93 NAVD'88 a ' } n 4 I GRAPHIC SCALE 6 30 60 )FEET V z V 5550 WEST IDLEWILD AVE SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30M ='gect Name: TAXILANE FOR FUTURE HANGAR DEVELOPMENT & TAXIWAY "A" REPAIR :resigner: Checked by. HJ JG ,#w Technician: ICE Proj. No.: AM 1540.07 Engineer of Record: REVISIONS Description Date By _tarp Name: PROJECT LAYOUT PLAN FAA A.I.P. Project No.: 'DOT Project No.: Date: Sheet Number: AUGUST2020 G1.1 ONDL' '/ER 6" ; NEW 6" FIRE LINE (BID SCHEDULE 2) N: 1264959.53'; E: 817265.35' 1 I^Inco (2) 2" FPL PRIMARY POWER 6" PVC FL T.O.P. EL.=11.65' (2) 2" FPL T.O.P. EL.=14.59' N: 1264953.71 ; E: 817379.53' CLEARANCE=2.77'; COVER=2.4' 6" PVC FL T.O.P. EL.=12.95' EXISTING CANERA CLE (2) 2" FPL B.O.P. EL.=14.39' k CONDUIT 2x2 AB P CLEARANCE=1.44% COVER=3.4' TOP 64 9.85' 14.28 WITH FIBERTERMIMAtiON - ,(-N:1zs4sas.as• .ONDUIT 2x2 'S E: 817501.98' 'I WPBAB TOP EL.=14,59' N 1264%205' } j N: 1264959.53' - 2.5X4 WIRING PULL BOX AS } E. 81T265.40' ,,� _.. _ _ - , E 61790G.87' 1} 2"C WITH 6 STRAND 2 MULTI -MODE FIBER e' - AS FPL AS FPL i 1 Rr I X X 1 FPL POWER \ (2) 2' FPL PRIMARY ONDUIT 2x2 AB' POWER CONDUIT TRANSFORMER arc----v N: 72ti4y4J,V!' - N: 1264947.91'; N: 1264949.85' E: 817251.1T (2)2"C FPL PRIMAR E:817499.69' E: 817501.98' l V POWER CONDUIT T.O.P. EL.=14.28' _ C0VER=2,2' NORTH EQUIPMENT RACK, REFER TO E5.4 (2) 2" FPL PRIMARY - POWER CONDUIT j ' WIRING PULL BOX AS '; N: 1264947.91' Sj 1 - N'%64863.27' E:817499.69' E2.1 r� ii i E 817„67.81' _ ( x I T.O.P. EL =14.54' S COVER=2.0' kt i I .01 CLPICAMERA CONC POLE AS N 1264861 80-- - /y 1j E. 817266.86' j77,��l CONTROLROX AS 'I -- -x — N:1264844 26' _I E.17255.18' �...-= (2)3"C - BURIED 36" SPARE CONDUIT FOR ill FUTURE CHARGING STATIONS (APC) i` SOUTH EQUIPMENT RACK. REFER TO E5.4 -- x — x x LEGEND FOC — FIBER OPTIC CABLE DUCTBANK — BEL — BURIED ELECTRICAL LINE COMM COMMUNICATIONS LINE FPL — FPL PRIMARY POWER UU LU 0 � I x x x i N 0 15 30 KEY NOTES 1. RUN 6-STRAND OUTSIDE PANT RATED MULTI -MODE FIBER FROM NEW COMMUNICATION ENCLOSURE TO EXISTING POLE MOUNTED FIBER TERMINATION CABINET. GENERAL NOTES 1. ALL PRIMARY SERVICE CONDUITS AND FITTINGS, TRANSFORMER, TRANSFORMER PAD, AND HANDHOLES WILL BE SUPPLIED BY FPL. CONTRACTOR SHALL PICK UP ALL FPL PROVIDED MATERIALS AT LOCATION DESIGNATED BY FPL. FPL TO INSTALL ALL PRIMARY CONDUCTORS AND PAD MOUNTED TRANSFORMERS. 2. ALL SECONDARY CONDUITS, FITTINGS. ETC.. SHALL BE SUPPLIED AND INSTALLED BY THE CONTRACTOR. CONTRACTOR SHALL INSTALL SECONDARY CONDUCTORS FROM PROPOSED TRANSFORMER HANDHOLE TO PROPOSED HANGAR SERVICES. PROVIDE 5' OF CONDUCTOR ABOVE GROUND LEVEL, COIL AND PROTECT. FPL TO TERMINATE ALL FINAL CONNECTIONS. 3. CONTRACTOR SHALL INSTALL ALL MANHOLES, DIRECTIONAL BORES, CONDUITS, CONDUIT FITTINGS AND SWEEPS, TRANSFORMER PAD, AND ALL OTHER ITEMS INCIDENTAL TO THE INSTALLATION OF A COMPLETE SERVICE. CONTRACTOR SHALL INSTALL A 500 LB. RATED PULL STRING IN ALL EMPTY SERVICE RACEWAYS. e a ' RECORD DRAWING APRIL 2022 THIS DRAWING HAS BEEN REVISED TO SHOW REPORTED CHANGES _ MADE DURING CONSTRUCTION AND REFLECTS TO THE BEST OF OUR KNOWLEDGE THE FACILITIES AS CONSTRUCTED BASED ON INFORMATION FURNISHED BY THE CONTRACTOR. ICE CANNOT AND DOES NOT WARRANTY ITS ACCURACY. S�Mw MUNICIPAL AIRPORT 60 1E INFRASTRUCTURE CONSULTING & ENGINEERING 5550 WEST IDLEWILD AVE. SUITE 102 TAMPA, FLORIDA 33634 (813) 330-2701 CERTIFICATE OF AUTHORIZATION NO.: 30862 Protect Neme: TAXILANE / SITEWORK FOR FUTURE HANGAR DEVELOPMENT & TAXIWAY "A" REPAIRS Designer: Checked by: Hi JG Technician: ICE Proj, No. - AM 1 15-40.07 Nli T. ip g titcFxa�, a sae IV �S fiOp1V� G� f QAIAL Nate 1. SEE THIS SHEET FOR LEGEND. REVISIONS No Description Date By 1 REVISION 1 29 2 SD 2 REVISION 2 _ _ '0 18 21 SO -Y RECORD DRAWING 41k/22 I DH Drawing Name' ELECTRICAL PLAN FAA A.I.P. Project No.: 3-12-0145-015-2020 FDOT Project No.: 445948-1-94-01 & 445871-1-94-01 Date: Sheet Number: APRIL2021 E1,1