DATE: March 04, 2024 PROPOSAL #P33567
SUBMITTED TO: Sebastian Public Works, City of
STREET: 1225 Main Street
CITY, STATE & ZIP: Sebastian, F132958
PHONE: (772) 228-7056
FAX: (772) 228-7077
EMAIL: ppatnode@cityofsebastian.org
JOB NAME: 140 Kildare Dr. 36" CIPP
ATTENTION: Phil Pamode
We propose to furnish a crew and all necessary equipment to clean, televise, and install 36" CIPP at the above mentioned job
location. This work will be performed at our following hourly and/or unit prices:
Mobilization (at $300.00 Each) 1 Each $300.00
Heavy Cleaning and Sediment Removal 36" (at $10.25 Per L.F.) 234 L.F. $2,398.50
Storm Drain Video Observation 0-48" (at $6.00 Per L.F.) 234 L.F. $1,404.00
Install 36" CIPP (at $191.22 Per L.F.) 234 L.F. $44,745.48
Estimated Total: $48,847.98
The pricing on this proposal is based off of a piggyback of Shenandoah Construction's Broward College Storm Drain
Cleaning, Repairs, and Maintenance RFP-2018-167-EH
NOTE: Due to the fragile condition of the existing pipe(s), the possibility of the pipe collapsing exists during the construction phase.
If this unlikely event occurs, we will provide you with an additional estimate for a necessary point repair to complete the lining
process. Due to the poor condition of the original host pipe, residual settling may appear at the surface grade, post lining. This
condition is not covered under warrantee.
This proposal may be withdrawn if not accepted within 30 days. Payment terms net 30 days.
(If we encounter an Insurance compliance fee requirement, this fee will be invoiced in addition to the above rates.)
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard
practices. Price above is only an estimate of foreseen conditions. Unforeseen conditions can affect the amount of time to complete
the work, therefore increasing or decreasing estimate. All agreements are contingent upon strikes, accidents or delays beyond our
control. Unless noted above engineering, permits, testing and bonds are not included in the pricing. Owner is to carry fire, tornado
and other necessary insurance. Our workers are fully covered by Workman's Compensation Insurance. Parties to this
proposal/contract expressly waive all tort claims against each other and limit their remedies to breach of contract.
SIGNATURE:
ihu°^4lw"`c—
SHENANDOAH GENERAL CONSTRUCTION CO.
Louis Woska
TITLE DATE
Estimator 03/04/2024
ACCEPTANCE OF PROPOSAL/SIGN & RETURN
The above prices, specification and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified.
SIGNATURE: CAME:COMPANCity of Sebastian DATE:
REPRESENTATIVE:Brian Benton TITLE: City Manager
This document is the property of Shenandoah General Construction. It is Intended only for the use of the individual or entity to which it is addressed and may contain
information that Is non-public, proprietary, privileged, confidential and exempt from disclosure under applicable law or may constitute as attorney work product If you are not
the intended recipient, you are hereby notified that any use. dissemination, distribution or copying of this communication of Ihls document is strictly prohibited. If you have
received this document in error, notify us immediately by telephone (954) 075-0096 or Email help@shenandoahus,com and nosh oy this document immediately, if this is an
electronic communication then delete immediately.
SEBAfT1AN
aMiFMMI1l Quell N
nu-aa
CITY COUNCIL AGENDA TRANSMITTAL
Council Meeting Date: March 20, 2024
Agenda Item Title: Approval for Shenandoah slip lining at three locations throughout the City.
Recommendation: Staff recommends Council approve the proposals provided by Shenandoah to
complete investigation and slip lining repairs of failed culvert piping at three locations throughout the City
(265 Wimbrow Dr., 140 Kildare Dr., and 165 Spring Valley Ave.) for a total of $95,784.75 and authorize the
City Manager to execute the slip lining authorization.
Background: The City of Sebastian uses slip lining as a common practice to repair
Stormwater drainage pipes in high impact areas. Using slip lining to repair the drainage structures in place,
instead of pipe removal and replacement, prevents damage to City property and drastically shortens road
closures. On November 15th, 2023 City Council approved a piggyback extension utilizing Broward College's
Storm Drain Cleaning, Repairs & Maintenance contract, which include slip lining services and pricing. The
current Broward College contract extends through November 26, 2024. We are requesting City Council
approval to move forward with camera investigation and repair of 73 linear feet at 265 Wimbrow Drive, 234
linear feet at Kildare Drive, and 206 linear feet at 165 Spring Valley Avenue. These areas were deemed a
problem from drainage investigations related to the roadway repaving projects as well as Citizen Requests.
See attached pricing proposals for each of the three individual locations for reference. As a part of this
request, City Council approval is sought for the City Manager to execute all appropriate documents.
If Agenda Item Reauires Exuenditure of Funds:
Budgeted Amount: $196,462
Total Cost: $95,784.75
Funding: Discretionary Sales Tax Fund
Attachments:
1. Shenandoah Proposal #P33561 —265 Wimbrow Dr 48" CIPP
2. Shenandoah Proposal #P33567 —140 Kildare Dr. 36" CIPP
3. Shenandoah Proposal #P33569 — 165 Spring Valley Ave. 15" CIPP
4. City of Sebastian Piggyback Agreement
Administrative Services Department Review: q�
City Attorney Reviey�� �JJ
Procurement DivisioVVReview, If applicable:
City Manager Authorization:
Date: V13/a o;ly %