ADDENDUM NO. 1
March 12, 2024
ITB 24-06 Rehabilitation of Asphalt Aprons at Sebastian Municipal Airport
The original Invitation to Bid shall remain in full force and effect, except as modified herein,
which shall take precedence over any contrary provisions in the prior documents.
This addendum is being issued to address questions received.
SECTION 1: QUESTIONS
1. Question: Will any plans be available for this project?
Answer: Please see Section III Attachments.
2. Question: Would you be able to tell me the number of days to reach substantial
completion for this project?
Answer: Please see page 19, section 3.4 of the bid document.
3. Question: Bid documents state: "If a bidder cannot achieve the DBE contract goals
stated in the bid document, he is required to submit the following for m: DBE Form 4,
DBE Unavailability Certification" What is the DBE contract goal for this project?
Answer: The City has an overall 10.00% race-neutral DBE goal. This means that the
City’s goal is to spend at least 10.00% of the dollars with Certified DBE’s as prime
Contractors or as subcontractors. Race -neutral means that the City believes that the
10.00% overall goal can be achieved through the normal competitive procurement
process. The City has reviewed this project and assigned a DBE availability goal of
10.00% for this project. Although not a contract requirement, the City believes that this
DBE percentage can realistically be achieved on this project based on the number of
DBE’s associated with the different types of work that will be required.
4. Question: Is certified payroll required? If so, please provide Davis -Bacon wage rate
table for the project.
Answers: No.
SECTION II: REVISION TO SOLICITATION
The Bid Price Form has been revised. Please see Section II, SECTION 8 - REVISED
BID PRICE FORM
Finance Department
Procurement Division
1225 Main Street
Sebastian, FL 32958
(772) 388-8231
Page 2 of 4
Attachment A – Federal Clauses, pages 10-11, “Certificate of Buy American Compliance
for Manufactured Products”, shall be removed from the ITB. Buy American Compliance
is not required
SECTION III: ATTACHMENTS
Design Plans for Aprons
Sincerely,
Jessica Graham, CPPB
Procurement/Contracts Manager
Acknowledgment of Addendum No. 1 by Contractor
The Respondent hereby acknowledges receipt of the following Addendum:
This addendum shall be completed and signed by an authorized representative and returned
with the solicitation submittal. The Acknowledgement of the Addendum receipt will become an
integral part of the solicitation document. In acknowledging receipt of this Addendum, the
undersigned understands and accepts the foregoing solicitation c hanges and clarifications.
All other bid terms, conditions, and specifications as originally issued remain unchanged
_____________________________________ _____________________________________
Printed Name Signature
_____________________________________ _____________________________________
Title Date
ITB #24-06
Page 40
SECTION 8 - REVISED BID PRICE FORM
I the undersigned have become familiar with all of the bidding documents incorporated herein, hereby propose
to perform everything required to be performed in strict conformity with the requirements of these documents,
meeting and exceeding the City’s specifications, manufacturer’s written specifications and instructio ns, and
industry standards. The price(s) quoted is (are) inclusive of any Addenda which may have been issued prior to
this submittal. By the signature below the vendor agrees that this bid is made without any other understanding,
agreement, or connection with any person, corporation, or firm submitting a bid for the same purpose and that
the bid is in all respects fair and without collusion or fraud.
If awarded any work under this bid, the Vendor agrees to enter into said agreement within ten (10) consecu tive
calendar days’ notice by the City, and agrees to all the terms and conditions of all documents stated herein
with the City of Sebastian for the below stipulated price which shall remain firm for ninety (90) days following
the bid opening date.
___________________________________________ ___________________________________________
Authorized Signature Printed Name
___________________________________________ ___________________________________________
Company Date
Item
No. Spec. No. Item Description QTY Unit Unit Price Extended
Amount
1 C-105 Mobilization 1 LS
2 02000 Pre-Construction Survey 1 LS
3 02000 As-built Survey 1 LS
4 S-141-1 Bituminous Surface Removal (1” TO 2”) 6740 SY
5 S-141-2 Aircraft Tie-Down Removal 30 EA
6 S-141-3 Exist. Base Removal (1" To 4.2") 6740 SY
7 Fine Grading, Compact/ Roll Exist. Base 6910 SY
8 P-401 /
FDOT 334
3 Inch Asphalt Surface Course
The City will accept P-401 or FDOT 334 1125 TON
9 P-602/
FDOT 300
Bituminous Prime Coat
The City will accept P-602 or FDOT 300 1675 GAL
10 P-620-1 Reflective Pavement Marking (Yellow) 1220 SF
11 P-620-2 Non-Reflective Pavement Marking (Black) 3250 SF
12 T-904 Sodding 405 SY
13 T-905 4” Topsoil Placement 50 CY
TOTAL BID AMOUNT