HomeMy WebLinkAboutCO #2 Runway Edge Lighting Extensions Finance Department Procurement Division 1225 Main Street Sebastian, FL 32958 (772) 388-8231 CHANGE ORDER FORM Change Order # 2 Project Name Runway 5-23 Rehabilitation Purchase Order # 10450 Project # A2351 Contractor: Ranger Construction Industries, Inc. Contact Name Travis Gates Address: 4510 Glades Cutoff Road, Ft Pierce, FL 34981 Contract Date 12 July 2023 By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are enjoined and in full force while executing the change(s) stipulated as follows: DESCRIPTION: Remobilization, and Rearrangement of Previously Installed Runway Edge Light Extensions, and Spacers Along with Locating Cores for In-Pavement Lights, and Cold Patch Application (Including Labor, Equipment, And Light Plants For Night Work). Additionally Purchase of New Extensions, Spacers and or Flange Rings For Seven (7) In-Pavement Lights, Six (6) In-Pavement J-Cans And Five (5) Threshold Lights. All Described Measures Are Necessitated by Inaccurate Survey Data Supplied by KMA. A. Contract price prior to this change $ 3,131,239.37 Net increase (decrease) resulting from this change $ 70,227.56 New contract price including this change order $ 3,201,466.93 B. Contract time prior to this change (number of days) 120 Days Net increase (decrease) resulting from this change (number of days) 0 Days (No Change) New completion date including this change 120 Days AGREED: ENGINEER: CONTRACTOR: CITY OF SEBASTIAN: Hamed Jafarian P.E. Senior Project Manager Aviation _____________________________ _____________________________ Name, Title Name, Title Brian Benton, City Manager Date: 2024/05/07 Date: ________________________ Date: ________________________ Approvals by City of Sebastian Staff: City Manager Authorization – cumulative amount less than 15% of contract price or $15,000 single change order. City Council Authorization – cumulative amount exceeds 15% of the contract price or $15,000 single change order. CITY COUNCIL MEETING: CITY OF SEBASTIAN _______________________________ Project Manager ___________ as to engineering Jeanette Williams, City Clerk Finance ___________ as to budget Date: ________ City Attorney ___________ as to legal Procurement Manager ___________ as to purchasing Hamed Jafarian Digitally signed by Hamed Jafarian Date: 2024.05.07 13:13:47 -04'00' Travis R Gates Digitally signed by Travis R Gates DN: CN=Travis R Gates, dnQualifier=A01410D00000182925336F5000062CF, O=RANGER CONSTRUCTION INDUSTRIES, C=US Date: 2024.05.07 13:21:49-04'00' DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 X May 22, 2024 5/24/2024 | 4:18:01 PM EDT 5/28/2024 | 7:37:08 AM EDT CHANGE ORDER REQUEST No.:2 R4 Submitted To:Infrastructure Consulting & Engineering Contact:Hamed Jafarian P.E. ITEM No.DESCRIPTION QUANTITY UM UNIT PRICE EXTENSION X26 Change Order 1.00 LS 70,227.56$ 70,227.56$ NOTE:Time extension pending in-pavement ESTIMATED TOTAL = $70,227.56 Days Requested To Be Determined ACCEPTED:CONFIRMED: Ranger Construction Industries, Inc. Owner Authorized Signature Signature Date of Acceptance Name & Title Travis Gates - Project Manager The above prices, specifications and conditions are satisfactory and are hereby accepted. BILLING REVISION DETAIL Date:30-Apr-24 Job Name:Sebastian Airport 5-23 Rehabilitation 1200 Elboc Way Winter Garden, FL 34787 Phone: (407) 656-9255 Fax: (407) 656-3188 www.rangerconstruction.com RCISCO-01 REV51021010 A Page 1 of 1 DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 X26 Change Order #2 Labor Breakdown:Updated Blue Book Equipment Breakdown: Labor Rate/Hr Qty.Hours Total Classification Description Qty.Hours Hourly Rate Total -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ Total Equipment Cost -$ -$ -$ Materials: -$ Description Qty.Unit Total -$ Price -$ -$ -$ -$ Subtotal Labor Cost -$ -$ Subtotal Burden -$ -$ Total Material -$ Total Labor Cost -$ Subcontractor: Mark-up Breakdown:Qty.Unit Unit Total Total Labor (17.5%)-$ -$ Price Total Equipment (17.5%)-$ -$ 4,200.00 ED 0.81$ 3,402.00$ Total Materials (17.5%)-$ -$ 8,400.00 ED 0.26$ 2,184.00$ Total Subcontractor (10%)63,843.24$ 6,384.32$ 1.00 LS 52,992.24$ 52,992.24$ Total Mark-up Cost 6,384.32$ Apogee Survey 1.00 LS 5,265.00$ 5,265.00$ 1.00 LS 5,000.00$ 5,000.00$ Subtotal Labor, Equipment, & Mark-up Cost 70,227.56$ Ranger Professional Courtesy 1.0 LS (5,000.00)$ (5,000.00)$ Bond -$ Total Subcontractor 63,843.24$ GRAND TOTAL 70,227.56$ Description Valtir - Base Orange Barricades (beyond contract) Valtir - Light for Orange Barricades (beyond contract) Precision Approach Ranger PM/Survey - Reshoot Cans RCISCO-01 REV51021010 B Page 1 of 1 DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 Change Order #2 Sebastian Municipal Airport Sebastian, FL Runway 5-23 Rehab PRECISION APPROACH LLC. Breakdown Item Unit Qty Unit Price Totals Remobilization Remobilization LS 1 9,500.00$ 9,500.00$ Remob. Total 9,500.00$ Material New 868B Extensions, Spacers, and or Flange Rings (Per Location) EA 13 $ 400.00 $ 5,200.00 New 867B Extensions and or Spacers (Per Location) EA 15 $ 300.00 $ 4,500.00 Asphalt Cold Patch (Per Location)EA 28 $ 8.93 $ 250.00 Miscellaneous (Silicone Sealant & Tape for Edge Light Asphalt Operation Protection)LS 1 150.00$ 150.00$ Sub Total 10,247.26$ Tax 7.00% 717.31$ Material Total 10,964.57$ Equipment Core Drill (For 2" Locate Cores)WK 1 750.00$ 750.00$ Light Plants (For Night Work Conducted in the 5-23 & 10-28 Intersection)WK 1 1,250.00$ 1,250.00$ Sub Total 2,000.00$ Tax 7.00% 140.00$ Equipment Total 2,140.00$ Labor Hours QTY Rate / HR Total Rearrangement of Previously Order and Installed Edge Light Extensions & Spacers (23ea Locations)30 1 315.00$ 9,450.00$ 2" Locate Core & Cold Patch (28ea Locations)16 1 315.00$ 5,040.00$ Labor Sub Total 14,490.00$ Cost Sub Total 37,094.57$ Overhead & Profit 30%15,897.67$ Total 52,992.24$ Summary: Before the contract start date, Precision Approach worked with Ranger’s survey team to collect existing elevation data for all existing lights and junction cans in this projects scope. Once this data was collected, it was then compared to the final grade data, and the  appropriate extensions and spacers were ordered for all light and junction can locations. These extensions and spacers were then  received and stored onsite. In January, Precision Approach removed all existing lights (edge, t‐hold, & in‐pavement) in Phases 1 & 2,  and performed demo cores at all in‐pavement locations in Phases 1 & 2. In addition, the extensions and spacers were installed on all  edge lights. On 2/2, Precision Approach received an email stating that KMA had found a bust in their survey data that would directly  affect the elevations for all light & junction can locations in this projects scope. Subsequent to this news, Precision Approach  received and worked through new survey data sets to determine what extensions and spacers could be reused and what needed to  be reordered. After being informed that the new survey data had survey errors, it was decided that the best course of action was to  wait for the inline paving to be completed to finalize existing and final grade data for all light locations. On 4/5, Precision Approach  received this "final" survey data from Ranger. From there, Precision Approach complied the data to determine what extensions and  spacers could / could not be reused, and produced a change order proposal to Ranger.  After discussion during the 4/15 progress  meeting, ICE  announced they would be performing on‐site measurements for all edge lights and their currently installed  extensions/ spacers. On 4/16, ICE conducted these on‐site measurements for all edge light locations and provided Construction  Change Directive #1 (see attached) on 4/24/24. Precision Approach will rearrange previously installed edge light extensions and  spacers as directed by the CCD #1.                                                                                                                                                                                                                                                Clarification: The items detailed below have been added to this change order as a direct result of the incorrect KMA survey data that  was provided in both the project plans and survey data sets:                                                                                                                                   •  Rearrangement of the previously installed edge light extensions and spacers (as directed by CCD #1). • 2” locate cores & cold asphalt patching for the in‐pavement lights 7ea, in‐pavement Jcans 6ea, and T‐hold lights 15ea. This will be  done to ensure the correct extensions and spacers are ordered / utilized for the in‐pavement and T‐hold locations. • Night installation of extensions & spacers located within the 5‐23 & 28‐10 intersection.                                                                                •The purchase of new extensions, spacers, and or flange rings for the  in‐pavement lights 7ea, in‐pavement Jcans 6ea, and T‐hold  lights 15ea.  4/30/2024 DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 SUBCONTRACTOR PAYMENT REQ Invoice Date 2/26/2024 No. 241023-1 Bill To: Ranger Construction Attn: Accounts Payable 101 Sansbury's Way West Palm Beach, FL 33411 Terms Net 15 Project: Sabastian Airport 3205563 Thank you for your business.Total Due: Phone: (561) 441-5354 Fax: (866) 425-2032 email: apogeeservices@bellsouth.net 703 SW 24th Avenue Boynton Beach, FL 33435 Date Service Work Description QtyRate Amount Due 1/23/2024 Survey Services Office/CAD: begin record drawing, downloads, calculate control 2135.00 270.00 1/24/2024 Survey Services Field: gridded and graded East 1000 feet phase 1 9135.00 1,215.00 1/25/2024 Survey Services Field: calculate baseline profile and cross slopes phase 1 4135.00 540.00 1/26/2024 Survey Services Field: gridded phase 1 every 25 feet, observed elevation bust error 8135.00 1,080.00 1/30/2024 Survey Services Field: benchrun 8135.00 1,080.00 1/30/2024 Survey Services Field: benchrun reconcile 2135.00 270.00 $4,455.00 Initial Survey not additional work DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 SUBCONTRACTOR PAYMENT REQ Invoice Date 3/18/2024 No. 241035-2 Bill To: Ranger Construction Attn: Accounts Payable 101 Sansbury's Way West Palm Beach, FL 33411 Terms Net 15 Project: Sebastian Airport 3205563 Thank you for your business.Total Due: Phone: (561) 441-5354 Fax: (866) 425-2032 email: apogeeservices@bellsouth.net 703 SW 24th Avenue Boynton Beach, FL 33435 Date Service Work Description QtyRate Amount Due 2/28/2024 Survey Services Field: revised asphalt fills 8135.00 1,080.00 3/1/2024 Survey Services Field: regrade runway west of intersection 9135.00 1,215.00 3/2/2024 Survey Services Field: calculate new runway grades 4135.00 540.00 3/11/2024 Survey Services Field: grid out phase 3 7135.00 945.00 3/12/2024 Survey Services Office: calculate grades 5-23 phase 2 and 3 2135.00 270.00 3/12/2024 Survey Services Field: grades 5-23 phase 2 and 3 7135.00 945.00 3/16/2024 Survey Services Field: field fit Taxi Bravo 8135.00 1,080.00 $6,075.00 This work was related to the revised plans, re-calculating grades, regrading runway, and field fitting Bravo due to existing topo tie in points not matching what Apogee shot. DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 Can #Currently Installed (in.) Inventory (in.) Tolerance (in.) from EOP 1 3 2 3 11/16 3/4 high 3 5 3/8 3/4 high 4 5 5/16 < 5% slope 5 3 9/16 < 5% slope 6 4 13/16 1/8 low 7 5 5/16 1/4 high 8 Inpavement 9 GOOD < 5% slope 10 GOOD < 5% slope 11 GOOD 5/8"< 5% slope 12 GOOD < 5% slope 13 Inpavement 14 None < 5% slope 15 Inpavement 16 1 & 1/16 3 3/8 high 17 Inpavement 18 5/8 & 1 1/4 high 19 1/2 & 1/16 < 5% slope 20 GOOD < 5% slope 21 3/4 3/4 high 22 GOOD 2 23 1/16 & 1/16 24 7/8 & 1/16 1/16 25 3/4 & 1/16 26 ? 27 5/8 28 1 3/4 EXT 29 3 1/8 30 1/8 < 5% slope 31 GOOD < 5% slope 32 1/2 3/8 high 33 2 < 3/4 high 34 1/2 & 1/16 2 7/16 EXT 1/16 low Install 3" from 1(I) Install 3 7/8" from 46(I) Install 2 5/8" from 54(I) Install 1" from 18 to the top of current ext/spacer height to the top of current ext/spacer height Install 3 5/8" from 51 Install original 2 7/16" (I) T -HOLD field measured adj. needed *+/- 3/4" to the top of current ext/spacer height T -HOLD field measured adj. needed *+/- 1 1/2" T -HOLD field measured adj. needed *+/- 1 1/8" T -HOLD field measured adj. needed *+/- 7/8" T -HOLD field measured adj. needed *+/- 2" Install 3 3/4" from 49 T -HOLD field measured adj. needed *+/- 5/8" Install 3 3/8" from 53 Install 3 15/16" from 43 T -HOLD field measured adj. needed *+/- 15/16" T -HOLD field measured adj. needed *+/- 1 1/16" T -HOLD field measured adj. needed *+/- 2 1/2" Install 5/8" from 18 to the top of current ext/spacer height CONSTRUCTION CHANGE DIRECTIVE #1 ATTACHMENT RELOCATION OF PA INSTALLED EXTENSIONS AND SPACER Install 3 1/8" from 29(I) Install 3 11/16" from 2 to the top of current ext/spacer height to the top of current ext/spacer height Install 1/2" from 32 & 1/16" from 16 Install TWO 1/16" from 23(I) Install 2 7/8" from 55(I) Relocation Directive Should be available after edge light relocates*REVISIONS IN RED DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3 37 3/8 & 1/16 level 38 Inpavement 39 GOOD < 5% slope 40 GOOD < 5% slope 41 GOOD < 5% slope 42 GOOD < 5% slope 43 3 15/16 9/16 high 44 3 1/16 level 45 4 5/16 1/2 high 46 3 7/8 level 47 4 11/16 3/4 high 48 3 15/16 7/16 high 49 3 3/4 1/2 Low 50 2 15/16 < 5% slope 51 3 5/8 52 3 5/16 53 3 3/8 54 2 5/8 55 2 7/8 56 3 1/8 Install 2" from 33 Install 3 1/16 from 44 Install 3/4" from 21 to the top of current ext/spacer height to the top of current ext/spacer height to the top of current ext/spacer height to the top of current ext/spacer height *Field measured the depths at T-HOLD locations with nail driven to the top of mud plate near the center not the lowest edge, inserted location flag pin, removed with finger tips at grade then measured to make sure inventory extensions and spacers could be used for RW edge light adjustments T -HOLD field measured adj. needed *+/- 1/2" T -HOLD field measured adj. needed *+/- 3/4" T -HOLD field measured adj. needed *+/- 5/8" T -HOLD field measured adj. needed *+/- 3/4" T -HOLD field measured adj. needed *+/- 1/2" T -HOLD field measured adj. needed *+/- 3/4" Install 2 15/16" from 50 Install 1" from 16 & 7/8" from 24 GOOD no adj. <5% to the top of existing can Install 3" from 16(I) Install 1 3/4" from 28(I) Install 3 5/16" from 52(I) DocuSign Envelope ID: 1D879B68-55E0-4F53-B74A-A7444C75AFC3