Loading...
HomeMy WebLinkAboutCO # 4 Spare PartsDocuSign Envelope ID: 7F393778-6DDF-4GFD-8170-60BE3EBF1FA3 S E BAS T I A N Finance Department � Procurement Division 1225 Main Street CENTENNIAL (ELEBRATION Sebastian, FL 32958 (772)388-8231 CHANGE ORDER FORM Change Order # 4 Project Name Runway 5-23 Rehabilitation Purchase Order # 10450 Project # A2351 Contractor: Ranger Construction Industries, Inc. Contact Name Travis Gates Address: 4510 Glades Cutoff Road, Ft Contract Date 12 July 2023 Pierce, FL 34981 By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are enjoined and in full force while executing the changes) stipulated as follows: DESCRIPTION: This change order includes the acquisition of essential spare parts for runway lighting systems, including (3) three Threshold Light Units, complete, (3) three Edge Light Units, complete, (1) one REIL LED Optical Assembly, (1) one In -Pavement Light Unit, (1) one Yellow Light Assembly for an In -Pavement Unit, and (1) one White Light Assembly for an In -Pavement Unit. A. Contract price prior to this change Net increase (decrease) resulting from this change New contract price including this change order B. Contract time prior to this change (number of days) Net increase (decrease) resulting from this change (number of days) New completion date including this change AGREED: �"�a1712d Digital"igned by Hamed Jafanan ENGINEER: Jafarlan Date:16:41:414141z4.osso -04'00' Hamed Jajarian P.E. Senior Project Manager Aviation Name, Title Date: 2024105130 Anorovals by City of Sebastian Staff: CONTRACTOR: Travis R Gate¢9 ��- _-._ Name, Title Date: $ 3,201,466.93 $6,890.43 $ 3,208,357.36 132 Days 0 Days 132 Days CITY OFSEBASTIAN: rOzuyMp- BIM cvF C�ty 16naH.�g& tfaW,p.,,rPTC14 PM EDT City Manager Authorization — cumulative amount less than 15% of contract price or $15,000 single change order. City Council Authorization — cumulative amount exceeds 15% of the contract price or $ I5,000 single change order. CITY COUNCIL MEETING: N/A CITY OF SEBASTIAN Project Manager Finance City Attorney Procurement Manager .fS as to engineering Cas to budget as to legal as to purchasing Ieanere'tlliams, City Clerk Date: 6/7/2024 1 4:02:40 PM EDT MOP" www.rangerconstruction.com a•�—// CHANGE ORDER REQUEST No.: 4 tilted To: Infrastructure Consulting & Date: Engineering act: Hamed Jafarian P.E. Job Name: BILLING REVISION DETAIL DESCRIPTION X26 Change Order -Spare Parts See following sheet for description of parts and quantities. ED: ices, specifications and conditions are satisfactory and are hereby accepted. 28-May-24 Sebastian Airport 5-23 Rehabilitation QUANTITY UM UNIT PRICE EXTENSION 1.00 LS $ 6,890.43 $ 6,890.43 ESTIMATED TOTAL = 1 $6,890.431 1 Days Requested CONFIRMED: Ranger Construction Industries, Inc. Authorized Siqnature DocuSign Envelope ID: 7F393778-6DDF-0CFD-8170-6DBE3E8F1EA3 Change Order #V Spare Parts Sebastian Municipal Airport Sebastian, FL Runway 5-23 Rehab PRECISION APPROACH LLC. Per request from the airport, this change order consist of the fumishment of the below spare parts: 3ea- Threshold Light Units, complete 3ea- Edge Light Units, complete lea- REIL LED Optical Assembly lea- In -Pavement Light Unit lea- Yellow Light Assembly for an In -Pavement Unit lea- White Light Assembly for an In -Pavement Unit These items will be shipped to the below: Jeff Sabo (Airport Maintenance) 303 Airport Drive East, Sebastian FL 32958 Item Unit Qty Unit Price Totals Material L861 EMIS LED 14" R/G 60HZ 1.5CPLG EA L861 EMIS LED 14" W/Y 60HZ 1.5CPLG EA OPTICAL ASSY, LED REIL EA 3 $ 335.67 $ 1,007.01 3 $ 293.57 $ 880.71 1 $ 558.26 $ 558.26 L852D(L) F,12",S,WIY,NM,1CORD EA 1 $ 1,085.78 $ 1,085.78 LIGHT ENG TWY YELLOW L852D(L) AXON EA 1 $ 129.40 $ 129.40 LIGHT ENG TWY WHITE L852D(L) AXON EA 1 $ 133.63 $ 133.63 Freight EA 1 $ 125.00 $ 125.00 Sub Total $ 3,919.79 Tax 7.00% $ 274.39 Material Total $ 4,194.18 Cost Sub Total (70% of Total) $ 4,194.18 Overhead & Profit (30% of Total) I $ 1,797.50 30% Total I I $ 5,991.68 5/24/2024