HomeMy WebLinkAbout2024 AgreementITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 1 of 31 AGREEMENT THIS AGREEMENT made and entered into this __________ day of___________, 2024, by and between the City of Sebastian, 1225 Main Street, Sebastian, FL 32958 a Florida municipal corporation (CITY) and Johnson-Davis Incorporated (FEIN:59-1753888) located at 604 Hillbrath Drive, Lantana, FL 33462S, (CONTRACTOR), (Parties); WHEREAS, the CITY desires to retain the CONTRACTOR for the project as expressed in its ITB 24-09-ITB, Riviera Avenue and Gardenia Street Drainage Improvements, which was opened on June 13, 2024; and WHEREAS, the CONTRACTOR has expressed its willingness, ability, capability, experience, and time to perform the necessary Work to accomplish the Project at the cost proposed by the CONTRACTOR. NOW, THEREFORE, the CITY and the CONTRACTOR, in consideration of the mutual covenants and conditions contained herein and for other good and valuable consideration, the receipt and sufficiency is hereby acknowledged, agree as follows: ARTICLE 1 – DEFINITIONS Wherever used in this Agreement or in other Contract Documents, the following terms have the meanings indicated which apply to both the singular and plural forms: 1.1 Agreement – This written agreement between the CITY and the CONTRACTOR covers the Work to be performed at the cost proposed, including other Contract Documents that are attached to or incorporated in the Agreement. 1.2 Application for Payment – The form accepted by the CITY which is to be used by the CONTRACTOR in requesting progress or final payment and which is to include such supporting documentation as is required by the Contract Documents. 1.3 Approve – The word approve is defined to mean review of the material, equipment or methods for general compliance with the design concepts and with the information given in the Contract Documents. It does not imply a responsibility on the part of the CITY to verify in every detail conformance with plans and specifications. 1.4 Bid – The offer or Bid of the CONTRACTOR submitted on the prescribed form setting forth the total prices for the Work to be performed. 1.5 Bid Documents – The Advertisement for Invitation for Bids, the Instructions to Bidders, the Bid Form (with supplemental affidavits and agreements), the Contract Forms, these General Conditions, the Supplementary Conditions, the Specifications, and the Plans, which documents all become an integral part of the Contract Documents. 1.6 Certificate of Substantial Completion – Certificate provided by the CITY certifying that all Work, excluding the punch list items, has been completed, inspected, and accepted by the CITY. 1.7 Change Order – A written order to the CONTRACTOR, signed by the CITY and the CONTRACTOR authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued on or after the Effective Date of the Agreem ent. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 10th July ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 2 of 31 1.8 CITY – The City of Sebastian, Florida, including but not limited to its employees, agents, officials, representative, contractors, subcontractors, volunteers, successors, and assigns, with whom the CONTRACTOR has entered into the Agreement and for whom the Work is to be provided. The Project Manager, or designee, shall be the authorized agent for the CITY unless otherwise specified. 1.9 Contract Documents – The Contract Documents shall consist of the Drawings, Plans and Specifications, Notice of Award, Bid documents, Notice to Proceed, Certificate(s) of Insurance, Payment and Performance Bonds, and any additional documents that are required to be submitted under the Agreement, and all amendments, modifications and supplements, change orders and Work directive changes issued on or after the Effective Date of the Agreement; and as further determined in Article 4 of this Agreement. 1.10 Contract Price – The money payable by the CITY to the CONTRACTOR in the Agreement submitted by the CONTRACTOR to complete the Work and as stated in this Agreement. 1.11 Contract Time – The number of calendar days stated in the agreement for the completion of the Work. The dates on which the Work shall be started and shall be completed as stated in the Notice to Proceed. 1.12 CONTRACTOR – The person, firm, or corporation with whom the CITY has entered into the Agreement, including but not limited to its employees, agents, representatives, contractors, subcontractors, subcontractors, and their other successors and assigns. 1.13 Cost of the Work – means the sum to be paid for the construction and completion of the Work per this Agreement. (See Contract Price) 1.14 Day – A calendar day of twenty-four (24) hours ending at midnight. 1.15 Defective – An adjective which when modifying the word “Work” refers to Work that is unsatisfactory, faulty, or deficient, or does not conform to the Contract Documents or does not meet the requirements of any inspection, test, or approval referred to in the Contract Documents, or has been damaged before the Project Manager’s recommendation of final payment. 1.16 Effective Date of the Agreement – The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the Parties to sign and deliver. 1.17 Engineer of Record – A professional engineer who seals drawings, reports, or documents for the Work. 1.18 Final Completion Date – The date the Work is actually and finally completed, including completion of the final punch list, and delivered along with those items specified in the Agreement , and the Work is inspected and accepted by the CITY. 1.19 Hazardous Materials – (HAZMAT): Any solid, liquid, or gaseous material that is toxic, flammable, radioactive, corrosive, chemically reactive, or unstable upon prolonged storage in quantities that could pose a threat to life, property, or the environment defined in Section 101(14) of Comprehensive Environmental Response, Compensation and Liability Act of 1980 and in 40 CFR 300.6). Also defined by 49 CFR 171.8 as a substance or material designated by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. See the definition of hazardous substance. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 3 of 31 1.20 Hazardous Substance – As defined by Section 101(14) of the Comprehensive Environmental Response, Compensation and Liability Act; any substance designated pursuant to Section 311(b) (2) (A) of the Clean Water Act; any element, compound, mixture, solution or substance designated pursuant to Section 102 identified under or listed pursuant to Section 3001 of the Solid Waste Disposal Act (but not including any waste listed under Section 307[a] of the Clean Water Act); any hazardous air pollutant listed under Section 112 of the Clean Air Act; and any imminently hazardous chemical substance or mixture pursuant to Section 7 of the Toxic Substances Control Act. The term does not include petroleum, including crude oil or any fraction thereof, which is not otherwise specifically listed or designated as a hazardous substance in the first sentence of this paragraph, and the term does not include natural gas, natural gas liquids, liquefied natural gas, or synthetic gas usable for fuel (or mixtures of natural gas and such synthetic gas). 1.21 Hazardous Waste – Those solid wastes designated by OSHA in accordance with 40 CFR 261 due to the properties of ignitability, corrosivity, reactivity, or toxicity. Any material that is subject to the Hazardous Waste Manifest requirements of the EPA specified in 40 CFR Part 262. 1.22 Holidays – Those designated non-workdays as established by the City Council of the City of Sebastian. Includes New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, Veteran’s Day, Thanksgiving Day, the day after Thanksgiving Day, Christmas Eve, Christmas Day, or any other holidays as approved by the City Council. 1.23 Inspection – The term “inspection” and the act of inspecting means the examination of the construction of the Work by the Project Manager or the Project Manager’s designated representative to ensure that it conforms to the design concept and quality expressed in the plans and specifications. This term shall not be construed to mean supervision, superintending, and/or overseeing. 1.24 Notice of Award – The written notice by the CITY to the CONTRACTOR stating that upon compliance by the CONTRACTOR with the conditions precedent enumerated therein, within the time specified, the CITY will sign and deliver this Agreement. 1.25 Notice to Proceed – A written notice given by the CITY to the CONTRACTOR fixing the date on which the Contract Time will commence to run and on which the Contract Time will end. 1.26 Plans – The drawings which show the character and scope of the Work to be performed and which have been prepared or approved by the CITY and are referred to in the Contract Documents. 1.27 Pre-Construction Meeting – A meeting scheduled by the Project Manager following the issuance of the Notice to Proceed. The purpose of the meeting is to discuss the project plans and specifications, any unusual conditions, federal or state requirements, permit requirements, training (if applicable), and any other items that will result in a better understanding among the invol ved parties. In addition, the CONTRACTOR will discuss the schedule of operation, type, and adequacy of equipment, sources of labor and labor requirements, maintenance of traffic, and precautions for the safety of employees and the public. This meeting must be attended by the Project Manager, the CONTRACTOR, key subcontractors, the CITY inspector, and others as deemed necessary by the Project Manager. 1.28 Premises (otherwise known as Work Site) – means the lands, buildings, facilities, etc. upon which the Work is to be performed. 1.29 Project – The total construction of the Work to be provided as defined in the Contract Documents. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 4 of 31 1.30 Project Manager – The employee of the City, or other designated individual who is herein referred to as the Project Manager, will assume all duties and responsibilities and will have the rights and authorities assigned to the Project Manager in the contract Documents in connection with the completion of the Work per this Agreement. 1.31 Proposed Price – The amount proposed by the CONTRACTOR to complete all the Work, which amount induced the CITY to select the CONTRACTOR as the successful Bidder and to whom the Notice of Award will be delivered who be known and considered the successful Bidder. 1.32 Punch List – The CITY’s list of Work yet to be done or be corrected by the CONTRACTOR before the Final Completion date can be determined by the CITY 1.33 Record Documents – A complete set of all specifications, drawings, addenda, modifications, shop drawings, submittals, and samples annotated to show all changes made during the construction process. 1.34 Record Drawings or “As-Builts” – A set of drawings that show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor. These documents will be signed and sealed by the Engineer of Record or a Professional Land Surveyor licensed in the State of Florida. 1.35 Substantially Completed Date – A date that the CITY determines, after the CONTRACTOR has requested in writing, that the Work is ready for an inspection and issuance of a punch list for the Project. 1.36 Work – The entire, completed, delivered product or the various separately- identifiable parts thereof, required to be furnished under the Contract Documents. Work is the result of performing services, furnishing labor, and furnishing and incorporating materials and equipment into the product, all as required by the Contract Documents. ARTICLE 2 - SCOPE OF WORK 2.1 The CONTRACTOR shall furnish and pay for all management, supervision, financing, labor, materials, tools, fuel, supplies, utilities, equipment, and services of any kind or type necessary to diligently, timely, and fully perform and complete all Work as specified or indicated in the Contract Documents in a good and workmanlike manner. The Project for which the Work under the Contract Documents may be the whole or only part is generally described as follows: 24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements 2.2 All Work for the Project shall be constructed per the Drawings and Specifications. 2.3 Brief Description of Project: The City of Sebastian is seeking bids from licensed contractors to install pipelines and fill wetlands within an existing stormwater ditch to prevent erosion of the ditch banks within a single-family development located east of Gardenia Street terminating at Riviera Street to the North and Chelsea Avenue to the South. The Licensed Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, supplies, and expertise necessary for providing services. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 5 of 31 ARTICLE 3 – PROJECT MANAGER 3.1 The Project Manager is hereby designated by the CITY to be: Karen Miller City Engineer 1225 Main Street Sebastian, FL 32958 ARTICLE 4 - CONTRACT DOCUMENTS 4.1 The Contract Documents, which comprise the entire Agreement between the CITY and CONTRACTOR, are attached to this Agreement, are made a part hereof and consist of the following: 4.1.1 This Agreement. 4.1.2 Exhibits to this Agreement. 4.1.3 Performance Bond, Payment Bond, and Certificates of Insurance. 4.1.4 Notice of Award and Notice to Proceed. 4.1.5 General Conditions as amended by the Supplementary Conditions. 4.1.6 Technical Specifications. 4.1.7 Plans 4.1.8 Addenda number 1 inclusive. 4.1.9 Bid documents. 4.1.10 All applicable provisions of State and Federal Law and any modification, including Change Orders or written amendments duly delivered after the execution of the Agreement. 4.1.11 Schedule of Completion and Schedule of Values. 4.1.12 Permits on file with the CITY and or those permits to be obtained shall be considered directive in nature and will be considered a part of this Agreement. A copy of all permits shall be given to the CITY for inclusion in the Contract Documents. Terms of permits shall be met before acceptance of the Work and release of the final payment. 4.1.13 There are no Contract Documents other than those listed in this Article 4. The Contract Documents may only be altered, amended, or repealed per the provisions of the terms of this Agreement. 4.2 In the event of any conflict between the documents or any ambiguity or missing specification or instruction, the following priority is established: Priority 1: Specific direction from the City Manager (or designee). Priority 2: This Agreement dated _____________________and any attachments. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 July 10, 2024 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 6 of 31 Priority 3: Invitation to Bid #24-09-ITB, Riviera Avenue and Gardenia Street Drainage Improvements prepared by the CITY. Priority 4: CONTRACTOR’s response to the Invitation to Bid #24-09-ITB, Riviera Avenue and Gardenia Street Drainage Improvements prepared by the CITY dated 06/13/2024. Priority 5: Schedule of Completion. 4.3 If during the performance of the Work, CONTRACTOR finds conflict, error, or discrepancy in the Contract Documents, CONTRACTOR shall report it to the Project Manager, in writing, within forty- eight (48) hours of the discovery of the conflict, error, or discrepancy. Before proceeding with the Work affected by the conflict, error, or discrepancy, the Contractor shall obtain a written interpretation or clarification from the CITY. 4.4 It is the intent of the specifications and plans to describe a complete Project to be constructed in accordance with the Contract Documents. Any Work that may be reasonably inferred from the specifications or plans as being required to produce the intended result shall be supplied whether or not it is specifically called for. When words that have a well-known technical or trade meaning are used to describe Work, materials, or equipment, such words shall be interpreted in accordance with such meaning. Reference to standard specifications, manuals, or codes of any technical society, organization, or association, or the code of any governmental authority, whether such reference is specific or implied, shall mean the latest standard specification, manual, or code in effect as of the Effective Date of this Agreement, except as may be otherwise specifically stated. No provision, however, of any referenced standard specification, manual, or code (whether or not specifically incorporated by reference in the Contract Documents) shall change the duties and responsibilities of the CITY, the CONTRACTOR, or any of their agents, any subcontractors or employees from those outlined in the Contract Documents. ARTICLE 5 – CONTRACT TIME 5.1 The CONTRACTOR recognizes that TIME IS OF THE ESSENCE. The Contract Time shall commence on the date outlined in a Notice to Proceed issued by the City to the Contractor. The Work shall be completed before July 31, 2026. ARTICLE 6 – GUARANTEED MAXIMUM PRICE 6.1 CITY shall pay CONTRACTOR for the performance of the Work in accordance with Article 7, subject to additions and deletions by Change Order as provided for in this Agreement, the sum, not to exceed NINE HUNDRED FIFTY EIGHT THOUSAND DOLLARS EVEN ($958,000.00). The parties expressly agree that the Contract Price is a lump sum price, in accordance with those items in the Bid, which are subject to unit prices. The Contract Price constitutes the compensation payable to the CONTRACTOR for performing the Work plus any Work done pursuant to a Change Order. All duties responsibilities and obligations assigned to or undertaken by CONTRACTOR shall be at CONTRACTOR’S expense without change in the Contract Price. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 7 of 31 ARTICLE 7 - PAYMENT PROCEDURES 7.1 CONTRACTOR shall submit Applications for Payment in accordance with the Contract Documents. Applications for Payment will be processed by CITY as provided in the General Terms and Conditions (see Section 2.23 of the Bid). 7.2 Progress Payments. CITY may make progress payments on account of the Contract Price. All progress payments will be made on the basis of the progress of the Work completed and consistent with §218.735 Florida Statutes. 7.2.1 First Application for Payment. The first Application for Payment shall be submitted no earlier than thirty (30) days following the issuance of the NTP. Prior to submitting its first Application for Payment, the Contractor shall submit to the City, for its review and approval: 7.2.1.1 A schedule of values based upon the firm/fixed GMP, listing the major elements of the Work and the dollar value for each element; and 7.2.1.2 A complete list of all its proposed subcontractors showing the work and materials involved and the dollar amount of each proposed subcontract and purchase order. 7.2.1.3 These submittals will be used as the basis for the submitted Applications for Payment. 7.2.2 Monthly Applications for Payment. The Contractor shall submit each of its Applications for Payment to the City on or before the 25th day of each month for work performed during the previous month. Invoices received after the 25th day of each month shall be considered for payment as part of the next month's application. Within ten (10) calendar days after receipt of each Application for Payment, the City shall either: 7.2.2.1 Indicate approval of the requested payment; 7.2.2.2 Indicate approval of only a portion of the requested payment, stating in writing the reasons therefore; or 7.2.2.3 Return the Application for Payment to the Contractor indicating, in writing, the reason for refusing to approve the payment. In the event of a total or partial denial of the Application for Payment, the Contractor may make the necessary corrections and resubmit the Application for Payment for reconsideration within ten (10) calendar days of receiving notice of refusal. 7.2.2.4 Monthly payments to the Contractor shall in no way imply approval or acceptance of the Contractor’s work. 7.3 Retainage. Per Florida Statutes 255.078, the City shall retain five percent (5%) of each monthly payment as retainage. Such sum shall be accumulated and not released to the Contractor until final payment is due. Release of any portion or percentage of sums retained before final completion of the Project shall in no way imply approval or acceptance of work. 7.4 Withheld Payments. The City may decline to approve any Application for Payment, or portions thereof, because of subsequently discovered evidence or subsequent inspections. The City may Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 8 of 31 nullify the whole or any part of any approval for payment previously issued and withhold any payments otherwise due the Contractor under this Agreement, to such extent as may be necessary in the City's opinion to protect it from loss because of: (a) defective Work not remedied; (b) third party claims filed or reasonable evidence indicating probable filing of such claims; (c) failure of the Contractor to make payment properly to subcontractors or for labor, materials or equipment; (d) reasonable doubt that the Work can be completed for the unpaid balance of the GMP; or (e) any other material breach of the Contract Documents. If these conditions are not remedied or removed, the City may, after three (3) days written notice, rectify the same at the Contractor’s expense. City also may offset against any sums due the Contractor the amount of any liquidated or un-liquidated obligations of the Contractor to the City, whether relating to or arising out of this Agreement 7.5 Payments to Subcontractors. Per Florida statute, 255.073, “When a contractor receives payment from a public entity for labor, services, or materials furnished by subcontractors and suppliers hired by the contractor, the contractor shall remit payment due to those subcontractors and suppliers within 10 days after the contractor’s receipt of payment. When a subcontractor receives payment from a contractor for labor, services, or materials furnished by subcontractors and suppliers hired by the subcontractor, the subcontractor shall remit payment due to those subcontractors and suppliers within 7 days after the subcontractor’s receipt of payment. This subsection does not prohibit a contractor or subcontractor from disputing, pursuant to the terms of the relevant contract, all or any portion of a payment alleged to be due to another party if the contractor or subcontractor notifies the party whose payment is disputed, in writing, of the amount in dispute and the actions required to cure the dispute. The contractor or subcontractor must pay all undisputed amounts due within the time limits imposed by this subsection.” 7.6 Final Payment. Upon achieving Final Completion of the Work in accordance with the Contract Documents, as they may be supplemented, the CITY shall pay CONTRACTOR an amount sufficient to increase total payments to one-hundred percent (100%) of the Contract Price as may be adjusted by liquidated damages and inspection fees owed by the CONTRACTOR, or other additional charges in accordance with the Contract Documents, unless the City has grounds, pursuant to §218.735(8)(c), Fla. Stat. for withholding all or a portion of the retainage payment; provided, however, not less than five percent (5%) of the Contract Price shall be retained until Record Drawings (as-builts), specifications, addenda, modifications and shop drawings, including all manufacturers’ instructional and parts manuals are delivered to and accepted by the CITY. 7.7 The CITY shall make payment to the CONTRACTOR in accordance with the Local Government Prompt Payment Act, Chapter 218, Florida Statutes, to the extent outlined above and incorporated by reference herein, in its entirety. 7.1 Direct Purchases. The City, as a holder of a current Consumer’s Certificate of Exemption, reserves the right to make direct purchases of any materials and/or equipment included in the project to achieve sales tax savings. The City shall purchase the Pre-Engineered Buildings and all doors as described Section 1.2 of ITB #24-05. The City will coordinate such purchases with the Contractor. To the extent requested by the City, the Contractor will be responsible for coordinating the delivery, safekeeping, protection, insuring (as to those items that will be installed by Contractor), inspection, installation and testing of any materials purchased by the City, and for the management and administration of any warranty claims pertaining to such materials and equipment. Furthermore, to the extent that any furnished and installed materials directly purchased by the City were included in the Contractor’s Guaranteed Maximum Price (GMP), the GMP will be reduced by the amount included for each item. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 9 of 31 ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS In order to induce the CITY to enter into this Agreement, CONTRACTOR makes the following representations upon which the CITY has relied: 8.1 CONTRACTOR is qualified in the field of public construction and in particular to perform the Work and services outlined in this Agreement. 8.2 CONTRACTOR has visited the Worksite, has conducted extensive tests, examinations, and investigations and represents and warrants a thorough and complete familiarization with the nature and extent of the Contract Documents, the Work, locality, soil conditions, moisture conditions, and all year-round local weather and climate conditions (past and present), and, in reliance on such tests, examination, and investigations conducted by CONTRACTOR and the CONTRACTOR’s experts, has determined that no conditions exist that would in any manner affect the Proposed Price and that the Project can be completed for the Proposed Price submitted. Furthermore, CONTRACTOR warrants and confirms that it is familiar with, understands, and obligates CONTRACTOR to comply with all federal, state, and local laws, ordinances, rules, regulations, and all market conditions that affect or may affect the cost and price of materials and labor needed to fulfill all provisions of this Agreement or that in any manner may affect cost, progress or performance of the Work. 8.3 CONTRACTOR has also studied carefully all reports of investigations and tests of subsurface and latent physical conditions at the site or otherwise affecting cost, progress or performance of the Works, and finds and has further determined that no conditions exist that would in any manner affect the Proposed Price and that the Project can be completed for the Proposed Price submitted. 8.4 CONTRACTOR, on its own, has made or caused to be made examinations, investigations, tests and studies of reports and related data in addition to those referred to in Paragraphs 8.2 and 8.3, above, as CONTRACTOR deemed necessary to perform the Work at the Contract Price set by the CONTRACTOR, within the Contract Time and in accordance with the other terms and conditions of the Contract Documents and the Bid made by the CONTRACTOR; and no additional examinations, investigations, tests, reports or similar data are, or will be, required by CONTRACTOR to assure that the Work can be done at the Contract Price set by the CONTRACTOR. 8.5 CONTRACTOR has correlated the results of all such tests, investigations, reports, observations, examinations investigations, tests, reports and data conducted and compiled by the CONTRACTOR and the CONTRACTOR’s experts with the terms and conditions of the Contract Documents. 8.6 CONTRACTOR has given CITY written notice of all conflicts, errors, or discrepancies discovered in the Contract Documents and the written resolution of them by CITY is acceptable to the CONTRACTOR. 8.7 Labor: 8.7.1 The CONTRACTOR shall provide competent, suitable, qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. The CONTRACTOR shall at all times maintain good discipline and order at the site. 8.7.2 The CONTRACTOR shall, at all times, have a competent superintendent, capable of Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 10 of 31 reading and thoroughly understanding the drawings and specifications, as the CONTRACTOR’s agent on the Project, who shall, as the CONTRACTOR’s agent, supervise, direct, and otherwise conduct the Work. 8.7.3 The CONTRACTOR shall designate its superintendent on the job to the CITY, in writing, immediately after receipt of the Notice to Proceed, but no later than at the Pre-Construction Meeting. The CONTRACTOR understands and agrees that the superintendent’s physical presence on the job site is indispensable to the successful completion of the Work. If the superintendent is absent from the job site, the Project Manager may deliver written notice to the CONTRACTOR to stop Work or terminate the Contract in accordance with Article 17. 8.7.4 The CONTRACTOR shall assign personnel to the job site that have successfully completed training programs certified relative to trench safety, confined space, and maintenance of traffic on all roadways and streets, public or private. A certified “competent person” shall be assigned to the job site daily and at all times. Personnel certified by the International Municipal Signal Association with Florida Department of Transportation qualifications are required to maintain traffic on all roadways and streets, public or private. Failure to pursue the Work with the properly certified supervisory staff may result in a Notice to Stop Work or terminate the Contract in accordance with Article 17. 8.7.5 The CONTRACTOR will designate in writing all Certified personnel immediately after receipt of the Notice to Proceed, but no later than at the Pre-Construction Meeting. 8.8 Materials: 8.8.1 The CONTRACTOR shall furnish all materials, including but not limited to, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, and sanitary facilities, and all other facilities and incidentals necessary for the execution, testing, initial operation and completion of the Work. 8.8.2 All materials and equipment shall be new and of good quality, except as otherwise provided in the Contract Documents. Suppliers shall be selected and paid by the CONTRACTOR; the CITY reserves the right to approve all suppliers and materials. 8.9 Work Hours: 8.9.1 Except in connection with the safety or protection of persons, or the Work, or property at the site or adjacent thereto, all Work at the site shall be performed during regular working hours between 8:00 a.m. and 4:30 p.m., Monday through Friday. The CONTRACTOR will not permit overtime Work or the performance of Work on Saturday, Sunday, or any legal holiday (designated by the City of Sebastian) without the Project Manager’s written consent at least seventy-two (72) hours in advance of starting such Work. 8.9.2 If the Project Manager permits overtime Work, the CONTRACTOR shall pay for the additional charges to the CITY, as described herein, with respect to such overtime Work. Such additional charges shall be an additional cost and obligation of the CONTRACTOR and no extra payment shall be made to the CONTRACTOR for overtime Work. The cost to the CONTRACTOR to reimburse the CITY for overtime inspection is established at direct- labor and overtime costs for each person or inspector required. Incidental overtime Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 11 of 31 costs for engineering, testing, and other related services will also be charged to the CONTRACTOR at the actual rate accrued. 8.10 Patent Fees and Royalties: The CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation into the Work, or any invention, design, process, product or device which is the subject of patent rights or copyrights held by others. 8.11 Permits: The CONTRACTOR shall obtain and pay for all permits and licenses. The CONTRACTOR shall pay all government charges which are applicable at the time of opening of Bids. It shall be the responsibility of the CONTRACTOR to secure and pay for all necessary licenses and permits of a permanent or temporary nature necessary for the prosecution and completion of the Work 8.12 Laws and Regulations: 8.12.1 The CONTRACTOR shall give all notices and comply with the terms of this Agreement and all laws, ordinances, rules, and regulations applicable to the Work. If the CONTRACTOR observes that the specifications or plans are at variance therewith, the CONTRACTOR shall give the Project Manager prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification by Change Order. 8.12.2 If the CONTRACTOR performs any Work knowing or having reason to know that it is contrary to this Agreement and such laws, ordinances, rules, and regulations, and without such notice to the Project Manager, the CONTRACTOR shall bear all costs, fees and penalties arising therefrom; and, it shall also be one of the CONTRACTOR’s primary responsibilities to make certain that the specifications and plans are in accordance with such laws, ordinances, rules and regulations. 8.13 Taxes: The CONTRACTOR shall pay all sales, consumer, use, and other similar taxes required to be paid by him in accordance with all laws. 8.14 CONTRACTOR Use of Premises: 8.14.1 The CONTRACTOR shall confine construction equipment, the storage of materials and equipment, and the operations of workmen to areas permitted by law, ordinances, permits and/or the requirements of the Contract Documents, and shall not encumber the premises with construction equipment or other materials or equipment. 8.14.2 The CONTRACTOR shall not enter upon private or public property for any purpose without first securing the written permission of the property owner, furnishing the Project Manager with a copy of said permission. This requirement will be strictly enforced, particularly with regard to such properties as may be utilized for storage or staging by the CONTRACTOR. 8.14.3 The CONTRACTOR shall conduct all Work in such a manner as to avoid and prevent damage to adjacent private or public property. Any damage to existing structures or property of any kind, including permanent reference markers or property corner markers, or the interruption of a telephone, telecommunications, or utility service, shall be immediately repaired or restored by the CONTRACTOR promptly, at CONTRACTOR’s expense, and no expense to the CITY. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 12 of 31 8.14.4 The CONTRACTOR will preserve and protect all existing vegetation such as trees, shrubs, and grass on or adjacent to the site which do not interfere with the Work, as determined by the Project Manager. The CONTRACTOR will be responsible for repairing or replacing anything damaged by the CONTRACTOR including but not limited to any trees, shrubs, lawns, landscaping, and structures that may be damaged due to operation of equipment, stockpiling of materials, tracking of grass by equipment or other Work activity. The CONTRACTOR will be liable for and will be required to replace or restore at no expense to the CITY all structures and vegetation not protected or preserved as required herein that may be destroyed or damaged. 8.14.5 During the progress of the Work, the CONTRACTOR shall keep the premises free from accumulations of waste materials, rubbish, and debris resulting from the Work. Upon the completion of the Work, or more frequently if so directed by the Project Manager, the CONTRACTOR shall remove all waste materials, rubbish, and debris from and about the premises as well as all tools, appliances, construction equipment and machinery, and surplus materials, and shall leave the site clean and ready for occupancy by the CITY. The CONTRACTOR shall restore to their original condition those portions of the site not designated for alteration by the Contract Documents at no cost to the CITY. 8.15 Project Coordination: 8.15.1 The CONTRACTOR shall provide for the complete coordination of the construction effort. This shall include, but not be limited to, coordination of the following: 8.15.1.1 Flow of material and equipment from suppliers. 8.15.1.2 The interrelated Work with affected utility companies. 8.15.1.3 The interrelated Work with the CITY where tie-ins to existing facilities are required. 8.15.1.4 The effort of independent testing agencies. 8.15.1.5 Notice to affected property owners as may be directed by the Project Manager. 8.15.2 Included with its coordination obligations, the Contractor shall locate all existing roadways, railways, drainage facilities, and utility services above, upon, or under the Project site, said roadways, railways, drainage facilities, and utilities being referred to in this Section 2 as the "Utilities". The contractor shall contact the owners of all Utilities to determine the necessity for relocating or temporarily interrupting any Utilities during the construction of the Project. The contractor shall schedule and coordinate its Work around any such relocation or temporary service interruption. Contractor shall be responsible for properly shoring, supporting and protecting all Utilities at all times during the course of the Work. 8.16 Project Record Documents and As-Builts (Record Drawings): The CONTRACTOR shall keep one record copy of all specifications, plans, addenda, modifications, shop drawings, and samples at the site, in good order and annotated to show all changes made during the construction process. These shall be available to the Project Manager for examination and shall be delivered to the Project Manager upon completion of the Work. Upon completion of the project and prior to final payment, an as-built (record drawings) of the Project shall be submitted to the Project Manager. The as-built drawings shall be signed and sealed by a Florida Registered Professional Surveyor and Mapper. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 13 of 31 8.17 Safety and Protection: 8.17.1 The CONTRACTOR shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. The CONTRACTOR shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury, or loss to: 8.17.1.1 All employees working on the project and other persons who may be affected thereby. 8.17.1.2 All the Work and all materials or equipment to be incorporated therein, whether in storage on or off the site. 8.17.1.3 Other property at the site or adjacent thereto, including but not limited to trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designated for removal, relocation, or replacement in the course of construction. 8.17.2 The CONTRACTOR shall comply with all applicable laws, ordinances, rules, regulations, and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. The CONTRACTOR shall notify owners of adjacent property and utilities when prosecution of the Work may affect them at least seventy-two (72) hours in advance of commencing said Work (unless otherwise required). All damage, injury, or loss to any property caused, directly or indirectly, in whole or in part by the CONTRACTOR, any subcontractor, or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, shall be remedied by the CONTRACTOR. The CONTRACTOR’s duties and responsibilities for the safety and protection of the Work shall continue until such time as all the Work is completed and accepted by the CITY. 8.17.3 The CONTRACTOR shall provide and maintain Work environments and procedures which will (1) safeguard the public and CITY personnel, property, materials, supplies, and equipment exposed to CONTRACTOR operations and activities; (2) avoid interruptions of CITY operations and delays in project completion dates; and (3) control costs in the performance of this Contract. 8.17.4 The CONTRACTOR shall provide appropriate safety barricades, signs, and signal lights; comply with the standards established by the Secretary of Labor for OSHA; and ensure that any additional measures the Project Manager determines to be necessary. 8.17.5 Whenever the Project Manager becomes aware of any noncompliance with the requirements of this Agreement or any conditions that pose a serious or imminent danger to the health or safety of the public or CITY personnel, the Project Manager shall notify the CONTRACTOR orally, with written confirmation, and request immediate corrective action. This notice, when delivered to the CONTRACTOR or the CONTRACTOR’s representative at the Premises, shall be deemed sufficient notice of the noncompliance and the corrective action required. After receiving the notice, the CONTRACTOR shall immediately take corrective action. If the CONTRACTOR fails or refuses to take corrective action promptly, the Project Manager may issue an order stopping all or part of the Work until satisfactory Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 14 of 31 corrective action has been taken. The CONTRACTOR shall not be entitled to any equitable adjustment of the contract price or time because of any stop Work order issued under this Section. 8.18 Emergencies: In emergencies affecting the safety or protection of persons or the Work or property at the site or adjacent thereto, the CONTRACTOR, without special instruction or authorization from the CITY is obligated to act to prevent threatened damage, injury or lo ss. The CONTRACTOR shall give the Project Manager prompt written notice of any significant changes in the Work or deviations from the Contract Documents caused thereby. 8.19 Risk of Loss: The risk of loss, injury or destruction shall be on the CONTRACTOR until acceptance of the Work by the CITY. Title to the Work shall pass to the CITY upon acceptance of the Work by the CITY. 8.20 Environmental: 8.20.1 The CONTRACTOR and CONTRACTOR’s experts have fully examined and inspected the Premises and agree to accept the Premises in an “as is” physical condition. The CITY makes no representation or warranty of any kind, including but not limited to, any environmental problems or issues, pollution, or contamination on, in, or about the Worksite. Further, the CONTRACTOR and all entities claiming by, through, or under the CONTRACTOR, release and discharge the CITY from any claim, demand, or cause of action arising out of or relating to the CONTRACTOR’s use, handling, storage, release, discharge, treatment, removal, transport, decontamination, cleanup, disposal and/or presence of any hazardous substances including asbestos on, under, from or about the Premises. 8.20.2 The CONTRACTOR shall not use, handle, store, discharge, treat, remove, transport, or dispose of Hazardous Substances including but not limited to asbestos at, in, upon, under, to or from the Premises until receipt of instructions from the CITY. At such time, a CITY- approved Change Order, which shall not include any profit to the CONTRACTOR, shall authorize the CONTRACTOR to perform such services needed to resolve any such hazardous substance issues. 8.20.3 The CONTRACTOR shall immediately deliver to the Project Manager complete copies of all notices, demands, or other communications received by the CONTRACTOR from any governmental or quasi-governmental authority or any insurance company or board of fire underwriters or like or similar entities regarding, in any manner, alleged violations or potential violations of any Environmental Law or otherwise asserting the existence or potential existence of any condition or activity on the Premises which is or could be dangerous to life, limb, property, or the environment. 8.20.4 For other and additional consideration, the CONTRACTOR hereby agrees, at its sole cost and expense, to indemnify and protect, defend, and hold harmless, the CITY, including but not limited to its respective employees, agents, officials, officers, volunteers, representatives, contractors and subcontractors, successors, and assigns (hereafter the CITY) from and against any and all claims, demands, losses, damages, costs, expenses, including but not limited to mitigation, restoration, and natural restoration expenses, liabilities, assessments, fines, penalties, charges, administrative and judicial proceedings and orders, judgments, causes of action, in law or in equity, remedial action requirements and/or enforcement actions of any kind, including, without limitation, attorneys' fees, expert Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 15 of 31 fees and suit costs for trials and appeals directly or indirectly arising out of or attributable to, in whole or in part, the CONTRACTOR’s use, handling, storage, release, threatened release, discharge, treatment, removal, transport, decontamination, cleanup, disposal and/or presence of a Hazardous Substance on, under, from, to, or about the Premises or any of its employees, agents, invitees, contractors or subcontractors, or any other activity carried on or undertaken on or off the Premises by or on behalf of the CONTRACTOR in connection with the use, handling, storage, release, threatened release, discharge, treatment, mitigation, natural resource restoration, removal, transport, decontamination, cleanup, disposal and/or presence or any Hazardous Substance including asbestos located, transported, or present on, undue, from, to, or about the Premises. This indemnity is intended to be operable under all laws that apply to this Agreement. 8.20.5 The scope of the CONTRACTOR’s indemnity obligations includes, but is not limited to: (a) all consequential damages; (b) the cost of any required or necessary repair, cleanup, or detoxification of the applicable real estate and the preparation and implementation of any closure, remedial or other required plan, including without limitation; (i) the costs of removal or remedial action incurred by the United States government or the State of Florida or response costs incurred by any other person, or damages from injury to, destruction of, or loss of, natural resources, including the cost of assessing such injury, destruction, or loss, incurred; (ii) the clean-up costs, fines, damages, or penalties incurred pursuant to any applicable provisions of law; and (iii) the cost and expenses of abatement, correction or cleanup, fines, damages, response costs, or penalties which arise from the provisions of any other statute, law, regulation, code, ordinance, or legal requirement, state or federal; and (c) liability for personal injury or property damage arising under any statutory or common law tort theory, including damages assessed for the maintenance of a public private nuisance, response costs, or for the carrying on of an abnormally dangerous activity. 8.21 No Damages for Delays: No interruption, interference, inefficiency, suspension, or delay in the commencement or progress of the Work from any cause whatsoever, including those for which City may be responsible, in whole or in part, shall relieve Contractor of its duty to perform or give rise to any right to damages or additional compensation from City. The contractor expressly acknowledges and agrees that it shall receive no damages for delay. The contractor's sole remedy, if any, against the City will be the right to seek an extension to the Contract Time; provided, however, the granting of any such time extension shall not be a condition precedent to the aforementioned "No Damage for Delay" provision. This paragraph shall expressly apply to claims for early completion, as well as to claims based on late completion. In no event shall the City be liable to Contractor whether in contract, warranty, tort (including negligence or strict liability), or otherwise for any extended corporate overhead impact, extended project overhead impacts, project support services, mobilization, demobilization, soft costs, lost profits, special, indirect, incidental, or consequential damages of any kind or nature whatsoever, related to or arising out of any interruption, interference, inefficiency, suspension, or delay in the commencement or progress of the Work. 8.22 Force Majeure and Extensions of Time: Should Contractor be obstructed or delayed in the prosecution of or completion of the Work as a result of unforeseeable causes beyond the control of Contractor, and not due to its fault or neglect, including, but not restricted to, acts of God or of the public enemy, acts of government, fires, floods, epidemics, quarantine regulation, strikes, lockouts, or weather conditions that are abnormal for the period of time in which the Contractor is seeking an extension, which could not have been reasonably anticipated and had an adverse impact on the critical path of the scheduled Work, Contractor shall notify City in writing within forty- eight (48) hours after the commencement of such delay, stating the cause or causes thereof, or be deemed to Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 16 of 31 have waived any right which Contractor may have had to request a time extension. Notwithstanding the foregoing, the Contractor’s schedule shall allow the number of days it deems necessary for rain and bad weather when the Contractor prepares its schedule. The contractor and City acknowledge that any Project site rain gauge measurements will not be relied upon for determining rainfall amounts. 8.22.1 Notwithstanding the foregoing, the City shall have the right, at any time, whether or not the Contractor is behind schedule, to order the Contractor to accelerate its Work. In the event that the City orders the Contractor to accelerate its Work and Contractor (i) is not behind schedule and (ii) believes that acceleration will increase the cost of performance, the Contractor shall be required to submit a Claim for an increased Contract Time and Price pursuant to the Contract Documents. Any such Claim shall be based exclusively and solely on actual and direct increased field costs associated with such acceleration only. 8.22.2 Inclement weather, continuous rain for less than three (3) consecutive days, or the acts or omissions of subcontractors, third-party contractors, material men, suppliers, or their subcontractors, shall not be considered acts of force majeure. 8.23 All of the Contractor’s duties, obligations, and responsibilities set forth in the Contract Documents shall flow down and apply equally to all the Contractor’s subcontractors and suppliers in the same manner as the Contractor is bound to the City. CONTRACTOR shall be obligated to inform all subcontractors of all the provisions of this Agreement, provide them with a copy of this Agreement, obtain written proof thereof, and ensure that all subcontracts contain a similar flow-down provision binding the subcontractor to the Contractor in the same way that the Contractor is bound to the City. ARTICLE 9 – CITY’S RESPONSIBILITIES 9.1 The CITY shall furnish the data required of the CITY under the Contract Documents promptly and shall make payments to the CONTRACTOR after they are due as provided in Article 7. 9.2 The CITY’s duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in the Contract Documents. 9.3 Technical Clarifications and Interpretations: 9.3.1 The CITY shall issue such written clarifications or interpretations of the Contract Documents as it may determine necessary, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. Should the CONTRACTOR fail to request interpretation of questionable items in the Contract Documents, the CITY shall not entertain any excuse for failure to execute the Work in a satisfactory manner. 9.3.2 The CITY shall interpret and decide matters concerning performance under the requirements of the Contract Documents and shall make decisions on all claims, disputes, or other matters in question. Written notice of each claim, dispute or other matter will be delivered by claimant to the other Party but in no event later than five (5) days after the occurrence of the event and written supporting data will be submitted to the other Party within five (5) days after such occurrence. All written decisions of the CITY on any claim or dispute will be final and binding. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 17 of 31 9.4 The CONTRACTOR shall perform all Work to the satisfaction of the CITY in accordance with the Contract Documents and not to exceed the Contract Price. In cases of disagreement or ambiguity, the CITY shall decide all questions, difficulties, and disputes of whatever nature, that may arise under or by reason of this Agreement, or the quality, amount, and value of the Work, and the CITY’s decisions on all claims, questions, and determination are final. ARTICLE 10 - BONDS AND INSURANCE 10.1 Bonds: The CONTRACTOR shall furnish a certified copy of the recorded Performance Bond and a certified copy of the recorded Labor and Materials Payment Bonds (“Bonds”) meeting the approval of the CITY, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all the CONTRACTOR’s obligations under the Contract Documents. The CITY will not make a payment to the CONTRACTOR until the CONTRACTOR has complied with this requirement. These Bonds shall remain in effect one (1) year after the date of final payment, except as otherwise provided by law. All Bonds shall be furnished and provided by the surety and shall be in substantially the same form as prescribed by the Contract Documents and be executed by such sureties as (i) are licensed to conduct business in the State of Florida, and (ii) are named in the current list of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies as published in Circular 570 (as amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department and (iii) otherwise meet the requirements of the CITY and as set forth herein that apply to sureties. All Bonds and other documents signed by an agent must be accompanied by a certified copy of the authorit y to act on behalf of the surety. 10.2 Maintenance Bond: A Surety Bond legally issued, meeting the approval of the CITY, with the CITY named as owner and the CONTRACTOR as principal in an amount not less than the Contract Price of such improvements, that contains the condition that the CONTRACTOR shall maintain and make all repairs to the improvements constructed by him, at his own expense and free of charge to the CITY, for the period of one (1) year after the date of acceptance of the Work by reason of any imperfection of the material used or by reason of any defective workmanship, or any improper, imperfect or defective preparation of the base upon which any such improvements shall be laid; provided that the Performance Bond and Payment Bond and Maintenance Bond may be incorporated into one Bond, at the option of the CONTRACTOR and subject to the approval of the CITY. 10.3 Disqualification of Surety: If the Surety on any Bond furnished by the CONTRACTOR is declared bankrupt or becomes insolvent or its right to conduct business in the State of Florida is terminated or it ceases to meet the requirements of clauses (i) and (ii) of Paragraph 10.1, the CONTRACTOR shall within five (5) days thereafter substitute another Bond and surety, both of which shall be acceptable to the CITY. 10.4 CONTRACTOR’s Liability Insurance: The CONTRACTOR shall purchase and maintain such comprehensive general liability and other insurance as will provide protection from claims set forth below which may arise out of or result from the CONTRACTOR’s performance of the Work and the CONTRACTOR’s other obligations under this Agreement, whether such performance is by the CONTRACTOR, by any subcontractor, by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable. 10.4.1 Claims under workers’ or worker’s compensation, disability benefits, and other similar employee benefit acts; Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 18 of 31 10.4.2 Claims for damages because of bodily injury, occupational sickness or disease, or death of the CONTRACTOR’s employee; 10.4.3 Claims for damages because of bodily injury, sickness or disease, or death of any person other than the CONTRACTOR’s employee; 10.4.4 Claims for damages insured by personal injury liability coverage which are sustained (i) by any person as a result of an offense directly or indirectly related to the employment of such person by the CONTRACTOR, or (ii) by any other person for any other reason; 10.4.5 Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; and 10.4.6 Claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance, or use of any motor vehicle; and 10.4.7 Claims for losses arising out of or related to the indemnification and hold harmless clauses of the Agreement. 10.4.8 The insurance required by Paragraph 10.4 shall include the specific coverage set forth herein and be written for not less than the limits of liability and coverage provided in Paragraph 10.6, or required by law, whichever is greater. The comprehensive general liability insurance shall include completed operations insurance. All such insurance shall contain a provision that the coverage afforded cannot be canceled, materially changed or renewal refused until at least thirty (30) days prior written notice has been given to the CITY. All such insurance shall remain in effect until final payment and at all times thereafter when the CONTRACTOR may be correcting, removing, or replacing defective Work in accordance with Article 11. In addition, the CONTRACTOR shall maintain such completed operations insurance for at least five (5) years after final payment and furnish CITY with evidence of continuation of such insurance at final payment and five (5) years thereafter. All insurance required by this Paragraph 10.4 will name the CITY of Palm Bay as additional insured for both ongoing and completed operations, shall be primary and non- contributory, shall not contain an endorsement prohibiting suits against or amongst named insureds, and shall contain or allow a waiver of subrogation. 10.5 Contractual Liability Insurance: The comprehensive general liability insurance required by Paragraph 10.4 will include contractual liability insurance applicable to the CONTRACTOR’s obligations under Paragraph 10.6. 10.6 Minimum insurance coverage, with limits and provisions, are as follows: 10.6.1 Comprehensive General Liability: The CONTRACTOR shall provide minimum combined single limits of $1,000,000.00 for each occurrence / $2,000,000.00 general aggregate for bodily injury and property damage liability. This shall include premises/operations, personal & advertising injury, products & completed operations, broad form property damage, personal and advertising injury, and contractual liability coverage, and otherwise comply with the requirements set forth in Paragraph 10.4 above. 10.6.2 Automobile: The CONTRACTOR shall provide minimum limits of liability of $1,000,000.00 for each accident, combined single limit for bodily injury and property damage. This shall include coverage for: Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 19 of 31 10.6.2.1 Owned Automobiles 10.6.2.2 Hired Automobiles 10.6.2.3 Non-Owned Automobiles 10.6.3 Umbrella/Excess Liability: The CONTRACTOR shall provide umbrella/excess coverage with limits of no less than $1,000,000.00 excess of Comprehensive General Liability, Automobile Liability, and Employers’ Liability. **This coverage is optional if the CONTRACTOR carries $2,000,000 Commercial General Liability Insurance with a $2,000,000 general aggregate** 10.6.4 Workers’ Compensation: The CONTRACTOR shall provide and maintain Coverage for all employees for statutory limits as required by the State of Florida’s Statutory Workers’ Compensation Law and all applicable Federal laws. The policy(ies) must include the Employer’s Liability with minimum limits of $1,000,000 each accident and a waiver of subrogation. 10.6.5 The CONTRACTOR shall further ensure that all of its sub-contractors maintain appropriate levels of workers’ compensation insurance. 10.6.6 Property Insurance (Installation Floater): The CONTRACTOR shall purchase and maintain in force, at its own expense, an Installation Floater covering the contractor’s materials and equipment, both during transit and while stored at the work site. 10.6.7 Other Insurance Provisions: The CITY is to be specifically included on all Certificates of Insurance as an additional insured (with the exception of Worker's Compensation). Waiver of subrogation is required for Commercial General Liability and Automobile Liability coverages. All certificates must be received prior to commencement of the Work. In the event the insurance coverage expires prior to the completion of this Agreement, a renewal certificate shall be issued thirty (30) days prior to the expiration date. The certificate shall provide a thirty (30) day notification clause in the event of cancellation or modification to the policy. 10.6.8 Deductible Clause: The CONTRACTOR shall declare all self-insured retention and deductible amounts. 10.6.9 All insurance carriers shall be rated “A” or better by the most recently published A.M. Best Rating Guide. Unless otherwise specified, it shall be the responsibility of the CONTRACTOR to ensure that all subcontractors comply with the same insurance requirements spelled out above. The CITY may request a copy of the insurance policy according to the nature of the project. CITY reserves the right to accept or reject the insurance carrier. 10.6.10 All Certificates of Insurance shall be approved by the CITY before the commencement of any Work. ARTICLE 11 - WARRANTY AND GUARANTEE, TESTS AND INSPECTIONS, CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.1 Warranty: The CONTRACTOR warrants and guarantees to the CITY that all Work will be of good quality, free from all defects, and will be performed in accordance with the Contract Documents and the Contract Price proposed by the CONTRACTOR. Prompt notice of all defects shall be given Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 20 of 31 to the CONTRACTOR. All Defective Work, whether or not in place, may be rejected, corrected, or accepted as provided in this Article. 11.1.1 Warranty of Title: The CONTRACTOR warrants to the CITY that it possesses good, clear, and marketable title to all equipment and materials provided and that there are no pending liens, claims or encumbrances against the equipment and materials. 11.1.2 Warranty of Specifications: The CONTRACTOR warrants that all equipment, materials and workmanship furnished, whether furnished by the CONTRACTOR its subcontractors or suppliers will comply with the specifications, drawings and other descriptions supplied or adopted and that all services will be performed in a workmanlike manner. 11.1.3 Warranty of Merchantability (if applicable): The CONTRACTOR warrants that any and all supplies, materials, and equipment to be supplied pursuant to this Agreement is merchantable, free from defects, whether patent or latent in material or workmanship, and fit for the ordinary purposes for which it is intended. 11.2 Tests and Inspections: CONTRACTOR shall give the Project Manager timely (minimum of thirty- six (36) hours) notice for all required inspections, tests or approvals. 11.2.1 If any law, ordinance, rule, regulation, code or order of any public body having jurisdiction requires any Work (or part thereof) to specifically be inspected, tested or approved, the CONTRACTOR shall assume full responsibility, pay all costs in connection therewith, and furnish the Project Manager the required certificates of inspection, testing or approval. The CONTRACTOR shall also be responsible for and shall pay all costs in connection with any inspection or testing required in connection with the CITY’s acceptance of a manufacturer, fabricator, supplier or distributor of materials or equipment proposed to be incorporated in the Work, or of materials or equipment submitted for approval prior to the CONTRACTOR’s purchase thereof for incorporation in the Work. 11.2.2 All inspections, tests or approvals are the responsibility of the CONTRACTOR. 11.2.3 Neither observations by nor inspections, tests or approvals by the Project Manager or others shall relieve the CONTRACTOR from his obligations to perform the Work in accordance with the Contract Documents. 11.3 Uncovering Work: If any Work that is to be inspected, tested or approved is covered without approval or consent of the Project Manager, it must, if requested by the Project Manager, be uncovered for observation and/or testing. Such uncovering and replacement shall be at the CONTRACTOR’s sole expense unless the CONTRACTOR has given the Project Manager timely notice of the CONTRACTOR’s intention to cover such Work and the Project Manager has not acted with reasonable promptness in response to such notice. 11.3.1 If the Project Manager considers it necessary or advisable that Work covered in accordance with Paragraph 11.2.1, 11.2.2 and 11.2.3 be observed by the CITY or inspected or tested by others, the CONTRACTOR at the CITY’s request, shall uncover, expose or otherwise make available for observation, inspection or testing as the Project Manager may require, that portion of the Work in question, furnishing all necessary labor, material and equipment. If it is found that such Work is defective, the CONTRACTOR shall bear all the expenses of such uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction, including compensation for additional Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 21 of 31 professional services, and an appropriate deductive Change Order shall be issued. If, however, such Work is not found to be defective, the CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection testing and reconstruction if he makes a claim therefore as provided in Articles 14 and 15. 11.4 CITY May Stop the Work: If the Work is defective, or the CONTRACTOR fails to supply sufficient skilled supervisory personnel or workmen or suitable materials or equipment or the Work area is deemed unsafe, the CITY may order the CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of the CITY to stop the Work shall not give rise to any duty on the part of the CITY to exercise this right for the benefit of the CONTRACTOR or any other party. The CITY will not award any increase in Contract Price or Contract Time if the Work is stopped due to the circumstances described herein. 11.5 Correction or Removal of Defective Work Before Final Payment: If required by the Project Manager, the CONTRACTOR shall promptly, without cost to the CITY and as specified by the Project Manager, either correct any Defective Work, whether or not fabricated, installed or completed, or, if the Work has been rejected by the CITY, remove it from the site and replace it with non-Defective Work. 11.6 One Year Correction Period After Final Payment: If within one (1) year after the Final Completion Date, or such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents, any Work is found to be Defective, the CONTRACTOR shall promptly, without cost to the CITY and in accordance with the CITY’s written instructions, either correct such Defective Work, or, if it has been rejected by the CITY, remove it from the site and replace it with non-Defective Work. With respect to the correction of any Defective or nonconforming Work, the Contractor shall be liable for all damage to any part of the Work itself and to any adjacent or other property which is caused by the Defective Work or by such corrective work. If the CONTRACTOR does not promptly comply with the terms of such instructions or in an emergency where delay would cause serious risk of loss or damage, as determined by the CITY, the CITY may have the Defective Work corrected or the rejected Work removed and replaced, and all direct and indirect costs for such removal and replacement, including compensation for additional professional services, shall be paid by the CONTRACTOR. 11.7 Acceptance of Defective Work, Deductions: If, instead of requiring correction or removal and replacement of Defective Work, the CITY, at the CITY’s sole option, prefers to accept it, the CITY may do so. In such a case, if acceptance occurs prior to the Project Manager’s recommendation of final payments, a Change Order shall be issued incorporating the necessary revisions in the Contracts Documents, including appropriate reduction in the Contract Price; or if the acceptance occurs after such recommendation, an appropriate amount shall be paid by the CONTRACTOR to the CITY. 11.8 CITY May Correct Defective Work: If the CONTRACTOR fails within a reasonable time determined by the CITY after written notice of the Project Manager to proceed to correct Defective Work or to remove and replace rejected Work as required by the Project Manager in accordance with Paragraph 11.5, or if the CONTRACTOR fails to perform the Work in accordance with the Contract Documents, the CITY may, after seven (7) days written notice to the CONTRACTOR, correct and remedy any such deficiency. In exercising its rights under this paragraph, the CITY shall proceed expeditiously. To the extent necessary to complete corrective and remedial action, Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 22 of 31 the CITY may exclude the CONTRACTOR from all or part of the site, take possession of all or part of the Work, suspend the CONTRACTOR’s services related thereto and take possession of the CONTRACTOR’s tools, construction equipment and materials stored at the site or elsewhere. The CONTRACTOR shall allow the CITY’s representative agents and employees such access to the site as may be necessary to enable the CITY to exercise its rights under this paragraph. All direct and indirect costs of the CITY in exercising such rights shall be charged against the CONTRACTOR in an amount verified by the Project Manager, and a Change Order shall be issued incorporating the necessary revisions in the Contract Documents and a reduction in t he Contract Price. Such direct and indirect costs shall include, in particular but without limitation, compensation for additional professional services required and costs of repair and replacement of Work of others destroyed or damaged by correction, removal or replacement of the CONTRACTOR’s defective Work. The CONTRACTOR shall not be allowed an extension of the Contract Time because of any delay in performance of the Work attributable to the exercise by the CITY of the CITY’s rights hereunder. ARTICLE 12 – INDEMNIFICATION 12.1 Disclaimer of Liability: The CITY shall not at any time, be liable for injury or damage occurring to any person or property from any cause, whatsoever, arising out of CONTRACTOR’s fulfillment of this Agreement. 12.2 Indemnification: For other and additional good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the CONTRACTOR agrees as follows: 12.2.1 To the maximum extent permitted by Florida law, the Contractor shall defend, indemnify, and hold harmless the City and its officers, agents, representatives, council members, volunteers, employees, successors, and assigns (hereinafter the “City”) from any and all liabilities, claims, damages, penalties, demands, judgments, actions, proceedings, losses, or costs, including, but not limited to, reasonable attorney fees and court costs, whether resulting from any claimed breach of this Agreement by Contractor or from personal injury, property damage, direct or consequential damages, or economic loss, to the extent caused by the negligence, recklessness, or intentional wrongful misconduct of Contractor or its subcontractors, or anyone employed or utilized by them in the performance of the Work on the Project. The duty to defend under this Section is independent and separate from the duty to indemnify, and the duty to defend exists regardless of any ultimate liability of the Contractor, City, or any indemnified party. The duty to defend arises immediately upon presentation of a claim by any party and written notice of such claim being provided to the Contractor. The Contractor’s obligations to defend and indemnify under this Agreement will survive the expiration or earlier termination of this Agreement until it is determined by final judgment that an action against the City or an indemnified party for the matter indemnified hereunder is fully and finally barred by the applicable statute of limitations. 12.2.2 CONTRACTOR agrees to indemnify, defend, save and hold the CITY harmless from any type whatsoever, including but not limited to damages, liabilities, losses, claims, fines, costs, expenses and fees, and from any and all suits and causes of actions of every name, or description that may be brought against CITY, on account of any claims, fees, royalties, or costs for any invention or patent and/or for the infringement of any and all copyrights or patent rights claimed by any person, firm, or corporation. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 23 of 31 12.2.3 CONTRACTOR shall pay all claims, losses, liens, settlements, or judgments of any nature in connection with the foregoing indemnifications including, but not limited to, reasonable attorney's fees and suit costs for trials and appeals. 12.2.4 If any Subcontractor, supplier, laborer, or materialmen of CONTRACTOR or any other person directly or indirectly acting for or through CONTRACTOR files or attempts to file a mechanic's or construction lien against the real property on which the Work is performed or any part thereof or against any personal property or improvements thereon or make a claim against any monies due or to become due from the CITY to CONTRACTOR or from CONTRACTOR to a Subcontractor, for or on account of any Work, labor, services, material, equipment, or other items furnished in connection with the Work or any change order, CONTRACTOR agrees to satisfy, remove, or discharge such lien or claim at its own expense by transfer to bond, payment, or otherwise within five (5) days of the filing or from receipt of written notice from the CITY. Additionally, until such time as such lien or claim is satisfied, removed, or discharged by CONTRACTOR, all monies due to CONTRACTOR, or that become due to CONTRACTOR before the lien or claim is satisfied, removed or otherwise discharged, shall be held by CITY as security for the satisfaction, removal, and discharge of such lien and any expense that may be incurred while obtaining the discharge. If CONTRACTOR shall fail to do so, CITY shall have the right, in addition to all other rights and remedies provided by this Agreement or by law, to satisfy, remove, or discharge such lien or claim by whatever means CITY chooses at the entire and sole cost and expense of CONTRACTOR which costs and expenses shall, without limitation, include attorney's fees, litigation costs, fees, and expenses and all court costs and assessments, and which shall be deducted from any amount owing to CONTRACTOR. In the event the amount due CONTRACTOR is less than the amount required to satisfy the CONTRACTOR’s obligation under this, or any other article, paragraph, or section of this Agreement, the CONTRACTOR shall be liable for the deficiency due the CITY. 12.2.5 The CONTRACTOR and the CITY agree that they waive any defects in the wording of this Article that run afoul of any Florida statutory section. ARTICLE 13 - CHANGES IN THE WORK 13.1 Without invalidating this Agreement, the CITY may, at any time or from time to time, order additions, deletions, or revisions in the Work through the issuance of written Change Orders. Upon receipt of a written Change Order, the CONTRACTOR shall proceed with the Work involved. All Work shall be executed under the applicable conditions of the Contract Documents. If any Change Order causes an increase or decrease in the Contract Price or an extension or shortening of the Contract Time, an equitable adjustment will be made as provided in Article 14 or Article 15 on the basis of a claim made by either Party. 13.2 The Project Manager may authorize minor changes in the Work not involving an adjustment in the Contract Price or the Contract Time, which are consistent with the overall intent of the Contract Documents. Such changes must be in writing and signed by both the CITY and the CONTRACTOR. 13.3 If notice of any change affecting the general scope of the Work or change in the Contract Price is required by the provisions of any Bond to be given to the Surety, it will be the CONTRACTOR’s responsibility to so notify the Surety and the amount of each applicable Bond shall be adjusted Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 24 of 31 accordingly. The CONTRACTOR shall furnish proof of such adjustment to the CITY. ARTICLE 14 - CHANGE OF CONTRACT PRICE 14.1 The Contract Price may only be increased by a Change Order when Work is modified in accordance with Article 13 and approved by the CITY in writing. Any claim for an increase in the Co ntract Price resulting from a Change Order shall be based on written notice delivered to the Project Manager within ten (10) days of the occurrence of the Change Order giving rise to the claim. Notice of the amount of the claim with supporting data shall be provided in writing and delivered within twenty (20) days of such occurrence unless the Project Manager allows an additional period of time to ascertain accurate cost data. Any change in the Contract Price resulting from any such claim shall be incorporated in the Change Order that was originally issued by the City. 14.2 Cost Breakdown Required: Whenever the Cost of the Work is to be determined pursuant to this Article, the CONTRACTOR, upon request of the CITY, will submit in a form acceptable to the CITY an itemized cost breakdown together with supporting documentation. Whenever a change in the Work is to be based upon mutual acceptance of a lump sum, whether the amount is an addition, credit, or no-change-in-cost, the CONTRACTOR shall, upon request of the CITY, submit an estimate substantiated by a complete itemized breakdown: 14.2.1 The breakdown shall list quantities and unit prices for materials, labor, equipment, and other items of cost. 14.2.2 Whenever a change involves the CONTRACTOR and one (1) or more subcontractors and the change is an increase in the agreed compensation, the overhead and profit percentage for the CONTRACTOR and each subcontractor shall be itemized separately. ARTICLE 15 - CHANGE OF THE CONTRACT TIME 15.1 The Contract Time may only be changed by a Change Order. Any claim for an extension in the Contract Time shall be based on written notice delivered to the Project Manager within five (5) days of the occurrence of the event giving rise to the claim. Any change in the Contract Time resulting from any such claim shall be incorporated in a Change Order. 15.2 The Contract Time will be extended in an amount equal to the time lost due to delays that are more fully described in Section 8.22 of this Agreement if a claim is made therefore as provided in Paragraph 15.1. 15.3 All time limits stated in the Contract Documents are of the essence. The provisions of this Article 15 shall not exclude recovery for damages by the CITY for delay caused by the CONTRACTOR. 15.4 Delays caused by or resulting from entities, contractors, or subcontractors who are not affiliated with the CONTRACTOR (non-affiliated Contractors) shall not give rise to a claim by the CONTRACTOR for damages for increases in material and/or labor costs. Such entities, contractors, and subcontractors include but are not limited to, the CITY’s contractors and subcontractors, Florida Power and Light Company. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 25 of 31 ARTICLE 16 - LIQUIDATED DAMAGES 16.1 Upon failure of the CONTRACTOR to complete the Work by the Substantial Completion Date the CONTRACTOR shall pay to the CITY the sum of One Hundred Dollars ($100) for each and every calendar day until the Work reaches the Substantial Completion Date, as fixed and agreed liquidated damages and not as a penalty. The Parties agree and recognize the impossibility of precisely ascertaining the amount of damages that the City will sustain in the event that the Contractor fails to timely achieve the Substantial Completion Date. On the occasion where the contractor is in default of the Agreement, or any material provision thereof, or fails to remedy any deficiency in performance, the City may procure the necessary supplies or services from an alternative source and hold the contractor financially responsible for any excess costs incurred. The difference between the Bid price of the product or service and the actual price paid may be deducted from any current or future obligations owed to the contractor as liquidated damages. ARTICLE 17 - SUSPENSION OF WORK AND TERMINATION 17.1 CITY May Suspend Work: The CITY may, at any time and without cause, suspend the Work or any portion of the Work for a period of not more than ninety (90) days by notice in writing to the CONTRACTOR which shall fix the date on which Work shall be resumed. The CONTRACTOR shall resume the Work on the date fixed. The CONTRACTOR will be allowed an extension of the Contract Time directly attributable to any suspension if the CONTRACTOR makes a claim as provided in Article 15; provided, however, the CONTRACTOR shall not be entitled to any extended or delay damages as set forth in Paragraph 8.21. 17.2 CITY May Terminate for Convenience: The CITY retains the right to terminate this Agreement, without cause, with thirty (30) days prior written notice. In the event of such termination for convenience, the Contractor’s recovery against the City shall be limited to that portion of the Contract Price earned through the date of termination, together with any retainage withheld and demobilization costs incurred. The Contractor, however, shall not be entitled to any other or further recovery against the City, including, but not limited to, any other form of payment or damages not specifically set forth herein or any anticipated or lost profits on portions of Work not performed. 17.3 CITY May Terminate for Cause: The City may terminate this Agreement following fifteen (15) days’ notice and an opportunity to cure upon the occurrence of any one or more of the following default events: 17.3.1 If the CONTRACTOR commences a voluntary bankruptcy action or a bankruptcy petition is filed against the CONTRACTOR under any chapter of any Bankruptcy Code, or if the CONTRACTOR takes any equivalent or similar action by filing a petition under any federal or state law relating to the bankruptcy or insolvency. 17.3.2 If the CONTRACTOR makes a general assignment of its assets or receivables for the benefit of creditors. 17.3.3 If a trustee, receiver, custodian, or agent of the CONTRACTOR is appointed under applicable law or under Contract, whose appointment or authority to take charge of property of the CONTRACTOR is for the purpose of enforcing a lien against such property or for the purpose of general administration of such property for the benefit of the CONTRACTOR’s creditors. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 26 of 31 17.3.4 If the CONTRACTOR persistently fails to perform the Work in accordance with the Contract Documents, including but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule as same may be revised from time to time. 17.3.5 If the CONTRACTOR repeatedly fails to make prompt payments to subcontractors or for labor, material, or equipment. 17.3.6 If the CONTRACTOR repeatedly disregards proper safety procedures. 17.3.7 If the CONTRACTOR disregards any local, state, or federal laws or regulations. 17.3.8 17.3.8 If the CONTRACTOR otherwise violates any provisions of this Agreement. 17.4 CITY’s Rights After Termination for Cause: 17.4.1 Following termination for cause, the CONTRACTOR may be excluded from the Premises and the CITY may take possession of the Work and of all the CONTRACTOR’s tools, appliances, construction equipment, and machinery at the site and use them without liability to the CITY for trespass or conversion and incorporate them in the Work, and all materials and equipment stored at the site or for which the CITY has paid the CONTRACTOR but which are stored elsewhere, and finish the Work as the CITY may deem expedient. In this instance, the CONTRACTOR shall not be entitled to receive any further compensation until the Work is finished. 17.4.2 The liability of the Contractor following termination for cause shall extend to and include the full amount of any and all sums paid, expenses and losses incurred damages sustained, and obligations assumed by the City in good faith under the belief that such payments or assumptions were necessary or required in completing the Work and providing labor, materials, equipment, supplies, and other items therefor or re-letting the Work, and in settlement, discharge or compromise of any claims, demands, suits, and judgments pertaining to or arising out of the Work hereunder. 17.4.3 If, after notice of termination of Contractor for default pursuant to Section 17.3 above, it is determined for any reason that Contractor was not in default, or that its default was excusable, or that the City did not have the right to terminate the Contractor, then such termination shall be deemed a termination for convenience and the Contractor’s remedies shall be the same as and limited to those afforded under Section 17.2 above. 17.5 If the Contractor commits a default due to its insolvency or bankruptcy, the following shall apply: 17.5.1 Should this Agreement be entered into and fully executed by the parties, and funds have been released to the Contractor by the City (Debtor) files for bankruptcy, the following shall occur: 17.5.1.1 In the event the Contractor files a voluntary petition under11 U.S.C. 301 or 302, or an order for relief is entered under 11 U.S.C. 303, the Contractor shall acknowledge the extent, validity, and priority of the lien recorded in favor of the City. The Contractor further agrees that in the event of this default, the City shall, at its option, be entitled to seek relief from the automatic stay provisions in effect pursuant to 11 U.S.C. 362. The City shall be entitled to relief from the Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 27 of 31 automatic stay pursuant to 11 U.S.C. 362(d)(1) or (d)(2), and the Contractor agrees to waive the notice provisions in effect pursuant to 11 U.S.C. 362 and any applicable Local Rules of the United States Bankruptcy Court. The Contractor acknowledges that such waiver is done knowingly and voluntarily. 17.5.1.2 Alternatively, in the event the City does not seek stay relief, or if stay relief is denied, the City shall be entitled to monthly adequate protection payments within the meaning of 11 U.S.C. 361. The monthly adequate protection payments shall each be in an amount determined in accordance with the Note and Mortgage executed by the Contractor in favor of the City. 17.5.1.3 In the event the Contractor files for bankruptcy under Chapter 13 of Title 11, United States Code, in addition to the foregoing provisions, the Contractor agrees to cure any amounts in arrears over a period not to exceed twenty-four (24) months from the date of the confirmation order, and such payments shall be made in addition to the regular monthly payments required by the Note and Mortgage. Additionally, the Contractor shall agree that the City is oversecured and, therefore, entitled to interest and attorney’s fees pursuant to 11 U.S.C. 506(b). Such fees shall be allowed and payable as an administrative expense. Further, in the event the Contractor has less than five (5) years of payments remaining on the Note, the Contractor agrees that the treatment afforded to the claim of the City under any confirmed plan of reorganization shall provide that the remaining payments shall be satisfied in accordance with the Note and that the remaining payments or claim shall not be extended or amortized over a longer period than the time remaining under the Note. 17.5.2 Should this Agreement be entered into and fully executed by the parties, and the funds have not been forwarded to the Contractor, the following shall occur: 17.5.2.1 In the event the Contractor files a voluntary petition pursuant to 11 U.S.C. 301 or 302, or an order for relief is entered under 11 U.S.C. 303, the Contractor acknowledges that the commencement of a bankruptcy proceeding constitutes an event of default under the terms of this Agreement. Further, the Contractor acknowledges that this Agreement constitutes an executory contract within the meaning of 11 U.S.C. 365. The Contractor acknowledges that this Agreement is not capable of being assumed pursuant to 11 U.S.C. 365(c)(2) unless the City expressly consents in writing to the assumption. In the event the City consents to the assumption, the Contractor agrees to file a motion to assume this Agreement within ten (10) days after receipt of written consent from the City, regardless of whether the bankruptcy proceeding is pending under Chapter 7, 11, or 13 of Title 11 of the United States Code. The Contractor further acknowledges that this Agreement is not capable of being assigned pursuant to 11 U.S.C. 365(b)(1). 17.6 Should the CONTRACTOR’s services be terminated by the CITY, the termination shall not affect any rights of the CITY against the CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of money due to the CONTRACTOR by the CITY will not release the CONTRACTOR from liability. 17.7 CONTRACTOR understands and agrees that the CITY may immediately terminate this contract upon written notice if the CONTRACTOR is found to have submitted a false certification or any Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 28 of 31 of the following occurs with respect to the CONTRACTOR or a related entity: (i) for any contract for goods or services in any amount of monies, it has been placed on the Scrutinized Companies that Boycott Israel List, or is engaged in a boycott of Israel, or (ii) for any contract fo r goods or services of one million dollars ($1,000,000) or more, it has been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List, or it is found to have been engaged in business operations in Cuba or Syria. 17.8 The CONTRACTOR has no right, authority, or ability to terminate the Work except for wrongful withholding of any payments due to the CONTRACTOR from the CITY. ARTICLE 18 – NOTICES 18.1 All notices required by any of the Contract Documents shall be in writing and shall be deemed delivered upon mailing by certified mail, return receipt requested to the following: TO THE CITY: City Manager Procurement/Contracts Manager City of Sebastian City of Sebastian 1225 Main Street 1225 Main Street Sebastian, FL 32958 Sebastian, FL 32958 TO THE CONTRACTOR: Johnson-Davis Incorporated William Cryer, Vice President 604 Hillbrath Drive Lantana, FL 33462 ARTICLE 19 – LIMITATION OF LIABILITY 19.1 Limitation of Liability: The City desires to enter into this Agreement only if in so doing the City can place a limit on the City’s liability for any cause of action arising out of this Agreement. For other and additional good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Contractor expresses its willingness to enter into this Agreement with the knowledge that the Contractor’s recovery from the City to any action or claim arising from the Agreement is limited to a maximum amount of the contract value less the amount of all funds actually paid by the City to Contractor pursuant to this Agreement. Nothing contained in this paragraph or elsewhere in this Agreement is in any manner intended either to be a waiver of the limitation placed upon the City’s liability as set forth in Section 768.28, Florida Statutes or to extend the City’s liability beyond the limits established in said Section; and no claim or award against the City shall include attorney fees, investigative costs, expert fees, suit costs or pre-judgment interest. This section shall not prevent the City from taking corrective action against the Contractor. ARTICLE 20 - GOVERNING LAW / VENUE / WAIVER OF JURY TRIAL 20.1 The rights of the Parties hereto shall be construed, subject to, and in accordance with the laws of the State of Florida. THE PARTIES HEREBY WAIVE THE RIGHT TO A TRIAL BY JURY IN ANY ACTION, PROCEEDING, OR COUNTERCLAIM BROUGHT OR FILED BY EITHER OF THEM AGAINST THE OTHER. The venue for any suit filed arising out of or related to this Agreement shall be in a court of competent jurisdiction in Indian River County, Florida. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 29 of 31 ARTICLE 21 – MISCELLANEOUS 21.1 The duties and obligations imposed by this Agreement and the rights and remedies available to the parties and, in particular but without limitation, the warranties, guaranties, and obligations imposed upon the CONTRACTOR and all of the rights and remedies available to the CITY, are in addition to and are not to be construed in any manner as a limitation of any rights and remedies available to any or all of them that are otherwise imposed or available by laws or regulations, by special warranty or guarantee or by other provisions of the Contract Documents. Furthermore, the provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents, and the provisions of this Paragraph will survive final payment and termination or completion of this Agreement. 21.2 Liens for Materials and Subcontractors: The Contractor agrees to ensure that no liens for materials or materialmen shall exist upon completion of the Project and that all subcontractors have received payment for services due relating to the Project and indemnify the City for same. 21.3 Disadvantage Business Enterprise (DBE): The DBE requirements of applicable federal and state laws and regulations apply under this agreement, as defined in 49 C.F.R. Part 26. DBEs should have a fair and equal opportunity to compete for dollars spent by the City of Sebastian to procure construction-related services. The Contractor shall use good faith efforts to ensure opportunities to compete for and perform contracts are available on the Project. 21.4 The CONTRACTOR shall not assign or transfer this Agreement or its rights, title, or interests. The obligations undertaken by the CONTRACTOR pursuant to this Agreement shall not be delegated or assigned to any other person or firm. Violation of the terms of this Paragraph shall constitute a material breach of the Agreement by the CONTRACTOR and the CITY may, at its discretion, cancel this Agreement and all rights, title, and interest of the CONTRACTOR which shall immediately cease and terminate. 21.5 The CONTRACTOR and its employees, agents, representatives, officers, volunteers, and agents shall be and remain independent contractors and not agents or employees of the CITY with respect to all of the acts and services performed by and under the terms of this Agreement. This Agreement shall not in any manner be construed to create a partnership, association, or any other kind of joint undertaking or venture between the Parties. 21.6 The CITY reserves the right to audit the records of the CONTRACTOR relating in any way to the Work to be performed pursuant to this Agreement at any time during the performance and term of this Agreement and for a period of five (5) years after completion and acceptance by the CITY. If required by the CITY, the CONTRACTOR agrees to submit to an audit by an independent certified public accountant selected by the CITY. The CONTRACTOR shall allow the CITY to inspect, examine, and review the records of the CONTRACTOR at any and all times during normal business hours during the term of this Agreement. 21.7 The City is a public agency subject to Chapter 119, Florida Statutes. The Contractor shall comply with Florida’s Public Records law. Specifically, the Contractor shall: 21.7.1 Keep and maintain public records required by the public agency to perform the service. 21.7.2 Upon request from the public agency’s custodian of public records, provide the public agency with a copy of the requested records or allow the records to be inspected or copied Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 30 of 31 within a reasonable time at a cost that does not exceed the cost provided in this chapter or as otherwise provided by law. 21.7.3 Ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the contractor does not transfer the records to the public agency. 21.7.4 Upon completion of the contract, transfer, at no cost, to the public agency all public records in possession of the contractor or keep and maintain public records required by the public agency to perform the service. If the contractor transfers all public records to the public agency upon completion of the contract, the contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the contractor keeps and maintains public records upon completion of the contract, the contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the public agency, upon request from the public agency’s custodian of public records, in a format that is compatible with the information technology systems of the public agency. 21.7.5 The failure of the Contractor to comply with the provisions set forth in this section shall constitute a material breach of the Agreement and shall be cause for immediate termination of the Agreement. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT JEANETTE WILLIAMS, THE CUSTODIAN OF PUBLIC RECORDS AT 772-388-8215 OR EMAIL jwilliams@cityofsebastian.org. CITY OF SEBASTIAN, 1225 MAIN STREET, SEBASTIAN, FLORIDA 32958 21.7.6 The remedies expressly provided in this Agreement to the CITY shall not be deemed to be exclusive but shall be cumulative and in addition to all other remedies in favor of the CITY now or later existing at law or in equity. 21.7.7 Should any part, term, or provision of this Agreement be decided by the courts to be invalid, illegal, or in conflict with any state or federal law, such part, term, or provision shall be severed and the validity of the remaining portions or provisions of this Agreement shall not be affected. Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 ITB #24-09-ITB Riviera Avenue and Gardenia Street Drainage Improvements Page 31 of 31 IN WITNESS WHEREOF, the parties hereto have made and executed this agreement on the respective dates under each signature: the City through its City Council taking action on the _______ day of __________________, 2024, and the Contractor signing by and through its duly authorized corporate officer having the full and complete authority to execute same. ATTEST: JOHNSON-DAVIS INCORPORATED By: ________________________________ ________________________________ John Stanley, CFO Jim Amsler Date: _____________________ ATTEST: CITY OF SEBASTIAN, FL By: __________________________ ________________________________ Jeanette Williams, MMC Brian Benton, City Manager City Clerk Date: ______________________ For the use and reliance of the City of Sebastian only. Approved as to form and legal sufficiency. ______________________________ Jennifer D. Cockcroft, Esq. City Attorney Docusign Envelope ID: A42B6DAD-9A15-4C87-A220-CC60E13DCF61 7/10/2024 | 10:31:37 AM PDT Docusign Envelope ID: C5BF2601-9698-4B31-9785-A7C0E6DEB523 July 10th 7/17/2024 | 1:02:17 PM EDT