HomeMy WebLinkAbout1971 GDC Bridge Over MTDD No. 10 at Malabar Rds - - - i l I f ESTIMATED QUANTITIES T E M UNIT QUANT, Concrete 300, Reinforcing steel tbs. 7ogv Concrete piling 14 " Sq. furnished Lin. Ft. i2,3: Concrete piling 14 " Sq. driven Lin. Ft. 11110 Concrete piling 14 " Sq. test driven Lin. Ft. ��— SRD 15" H.S. prestressed deck slab Sq. Ft.�,� H a n d r a i I Lin. Ft. Aga 4 " Slope pavement (Reinforced) Sq. Yd. 8" Approach slab (Reinforced) w/curb Sq. Yd. 77-4 , GENERAL NOTES )esign Specification A.A.S.H.O. 1965 .oading H-20-44 I. All dimensions are to be verified in the field. Any discrepancies, errors or omissions are to be reported to the Engineer for clarification or correction before work is continued. t. Piles are to be driven to'a minimum bearing value of 30 Tons by the Florida S.R.D. formula. Pile shall be driven to a minimum penetration as shown. 3. Backfill must be free of silt or organic matter and relatively free of clay. Backfill is to be compacted in layers of not more than 12" deep. 4. Exposed components such as curbs, end posts and cap ends shall be stripped and rubbed within 24 hours after pouring. 5. Poured -in place concrete shall have a strength of. not less than 3,000 P.S.I. in 28 days: 6. Quantities for piling are based on an estimated length of 20' and 30' piles. 7. Specifications applicable are FLORIDA STATE ROAD DEPARTMENT Standard specifications for road and bridge construction dated 1966. B. Approaches by GENERAL DEVELOPMENT CORPORATION;;. 9. Pavement by GENERAL DEVELOPMENT CORPORATION. 10. Line and grade by.GENERAL DEVELOPMENT CORPORATION. 11. Contractor will give one working'day.notice for need of line & grade. �►:4FY W/A rJ 0 r2 A. i - 2 css Z 2 3 ?, I r, Al SLppr f ,1114, �e�ca1 j �PPA.odc a5�.�1� 3o''J 1 G SUP re yTrt.�cZ,�Arc t,e+o2 Sdr3�TQJ4T'J�r. "%� f VERTICAL CURVE DATA APPROACH APPROACH STA. ELEV. POINT STA. ELEV. POINT