Loading...
HomeMy WebLinkAboutProject Monitoring Status ReportSTATE OF FLORIDA DEPARTMENT OF TRANSPORTATION FDOT AVIATION GRANT PROGRAM - ., PROJECT MONITORING STATUS REPORT 725-040-30 AVIATION 11/17 INSTRUCTIONS: Airport Sponsor (AGENCY) or designated representative to complete this form. Note: The Airport Sponsor may supplement this form with their own normal project progress report or FAA Progress Report documents AIRPORT NAME DATES OF REPORT PERIOD FDOT FINANCIAL PROJECT NO. Sebastian Municipal Airport X26 From 03/16/22 To 08/08/22 442004-1-94-01 PROJECT DESCRIPTION X26 Construct Hangar INVOICE ATTACHED: FAA PROGRESS REPORT ATTACHED: OTHER PROGRESS REPORT ATTACHED: Yes ❑ No ® N/A ❑ Yes ❑ No ® N/A ❑ Yes ❑ No ® N/A ❑ PHOTOS ATTACHED: PROJECT NOTICE -TO -PROCEED DATE ESTIMATED PROJECT COMPLETION DATE Yes ❑ No ® N/A ❑ 12/27/18 10/01 /22 TOTAL PROJECT COST GRANT FUNDS EXPENDED TO DATE GRANT FUNDS REMAINING $2,250,000.00 $1,667,097.03 $132,902.97 1. PROJECT STATUS Project nearing completion, but overdue. 6/30/22 was scheduled end date, but Main contractor problems have caused extensive delays. 2. WORK COMPLETED OR IN PROGRESS THIS PERIOD (use a separate sheet of paper if more space is needed) Very little accomplished this period, causing the contractor to fall behind. Drainage diverter valve system and retention pond for the fire sprinkler system have been installed, along with some final site grading. 3. WORK ANTICIPATED FOR NEXT PERIOD (use a separate sheet of paper if more space is needed) Grading, landscaping, concrete sidewalks & drives, along with taxiway & parking lot paving should schedule soon. Electrical checks, started after waiting on FPL for power install, are proceeding and hangar bay doors are becoming operational. 4. PROBLEM AREAS/OTHER COMMENTS (Plan revisions, changes in specifications, delays, difficulties, etc., and actions taken) Power was not brought to the site until 7/26/22. Contractor has had numerous personnel turnover and sub -contractor issues. AIRPORT SPONSOR (AGENCY) OR DESIGNATED REPRESENTATIVE IZI certify that the information provided above is true and correct per the terms of the Public Trans 17rtation Grant Agreement. QDATE PRINTED NAME AND TITLE' SIGNATUR� I / 1 8/22/22 Jeffrey Sabo, Airport Manager ' Only the Airport Sponsor or Designated Representative may sign this form. A non -Airport Sponsor emplot/ee (e.g., consultant) cannot sign this form. COMMENTS/NOTES n. i C VERIFICATION DATE SITE VISIT DISTRICT AVIATION COORDINATOR PRINTED NAME aL Yes ❑ No ❑ N/A ❑ DISTRICT AVIATION COORDINATOR SIGNATURE Distribution: Project File