AIRPORT NAME
DATES OF REPORT PERIOD
FDOT FINANCIAL PROJECT NO.
Sebastian Municipal Airport X26
From 03/16/22 To 08/08/22
442004-1-94-01
PROJECT DESCRIPTION X26 Construct
Hangar
INVOICE ATTACHED:
FAA PROGRESS REPORT ATTACHED:
OTHER PROGRESS REPORT ATTACHED:
Yes ❑ No ® N/A ❑
Yes ❑ No ® N/A ❑
Yes ❑ No ® N/A ❑
PHOTOS ATTACHED:
PROJECT NOTICE -TO -PROCEED DATE
ESTIMATED PROJECT COMPLETION DATE
Yes ❑ No ® N/A ❑
12/27/18
10/01 /22
TOTAL PROJECT COST
GRANT FUNDS EXPENDED TO DATE
GRANT FUNDS REMAINING
$2,250,000.00
$1,667,097.03
$132,902.97
1. PROJECT STATUS
Project nearing completion, but overdue.
6/30/22 was scheduled end date, but Main contractor problems have caused extensive
delays.
2. WORK COMPLETED OR IN PROGRESS THIS PERIOD (use a separate sheet of paper if more space is needed)
Very little accomplished this period, causing the contractor to fall behind. Drainage diverter valve system and retention pond for the fire
sprinkler system have been installed, along with some final site grading.
3. WORK ANTICIPATED FOR NEXT PERIOD (use a separate sheet of paper if more space is needed)
Grading, landscaping, concrete sidewalks & drives, along with taxiway & parking lot paving should schedule soon. Electrical checks,
started after waiting on FPL for power install, are proceeding and hangar bay doors are becoming operational.
4. PROBLEM AREAS/OTHER COMMENTS (Plan revisions, changes in specifications, delays, difficulties, etc., and actions taken)
Power was not brought to the site until 7/26/22. Contractor has had numerous personnel turnover and sub -contractor issues.
AIRPORT SPONSOR (AGENCY) OR DESIGNATED REPRESENTATIVE
IZI certify that the information provided above is true and correct per the terms of the Public Trans 17rtation Grant Agreement.
QDATE
PRINTED NAME AND TITLE' SIGNATUR� I / 1
8/22/22 Jeffrey Sabo, Airport Manager
' Only the Airport Sponsor or Designated Representative may sign this form. A non -Airport Sponsor emplot/ee (e.g., consultant) cannot sign this form.
COMMENTS/NOTES
n.
i
C VERIFICATION DATE SITE VISIT DISTRICT AVIATION COORDINATOR PRINTED NAME
aL
Yes ❑ No ❑ N/A ❑
DISTRICT AVIATION COORDINATOR SIGNATURE
Distribution: Project File