Loading...
HomeMy WebLinkAboutConstruction Change DirectiveCONSTRUCTION CHANGE DIRECTIVE (CCD) MUNICIPAL AIRPORT Project: Taxilane/Sitework for Future Hangar Number: CCD — 002 Development & Taxiway `A' Repairs To: Loren Jock Trucking, Inc. From: Infrastructure Consulting & Engineering (ICE) Re: As -built Waterline Easement Acquisition/Recording Date: 11-19-21 CCD Description: As -built Waterline IRC Easement Acquisition/Recording Applicable Drawing(s): N/A Applicable Specification(s): Section 01720 3.2.1) & 3.2.E.3 Applicable Shop Drawing(s): N/A Reason for Directive: Finalizing waterline/ Fireline IRC permit. Instructions: ICE has drafted a sketch with two benchmarks and a legal description of the utility easement which will be referred to as Exhibit "A". ICE will be coordinating with the city and IRC for issuing an easement for the mentioned Fireline. LIT is requested to provide pricing from his surveyor BETSY LINDSAY, Inc. to review, sign and seal Exhibit "A" provided by ICE. Any possible comments on exhibit "A" from Surveyor will be addressed by ICE based on direction from BETSY LINDSAY, Inc. ICE Representative: Harried Marian Signed: Hamed „wa Contractor Acknowledgment: Signed: Page 1 of 1 Date: 11/19/2021 Date: ASS VX6' TAPPING SLEEVE AND VALVE ASSEMBLY ON EXISTING 8' WATER LINE: _ N:1264972.83 E'M7175.84 i TOP ELEV: 8.92' - COVER: 5.8' w GATE VALVE: N: 1264973.22 E: 817176.49 TOP ELEV: 9.98• EXHIBIT "All �I ASS FIRE HYDRANT VALVE ASSEMBLY N: 1264963.68 E: 817627.53 GATE VALVE ASSEMBLY N: 1254958.87 E: 8176M.81 TOP ELEV' 185d ASS 22-1IY'SEND N .30 E:1729s.09 TOP ELEV. 1 COVER 8.11 � j■FIll- ) �__----W `�R\\ - - - �2 .- - ASS, u-1R' BEND N:1264953.69 ASS 45'BEND J E:817281.55 N:1284953.71 TOP ELEV: 12.08' E:817617.79 N44.195TE COVER: to TOP ELEV: 14.W 13.94'- COVER 2.9 TAXILANE N 0 50 100 200 DESCRIPTION OF 10 FOOT WIDE FIREUNE EASEMENT BEING 5 FEET ON EACH SIDE OF THE FOLLOWING CENTERUNE DESCRIPTION: A TEN FOOT FIREUNE EASEMENT SITUATED IN THE WESTERN PORTION of SEBASTIAN AIRPORT IN INDIAN RIVER COUNTY, FLORIDA SET MNBTT TP BEGINNING AT A POINT AT THE CONNECTION OF AN EXISTING WATERLINE NO ID LOCATED AT THE PROVIDED COORDINATE POSITION RELATIVE TO THE FLORIDA EAST COAST - N: 126420• E:81744- - .N25' - - PROJECTION AND BASED ON THE NORTH AMERICAN DATUM OF 1983 (HAD 83) OF THE ELEv: ts.74. .7a• RAvnee UNITED STATES NATIONAL SPATIAL REFERENCE SYSTEM OR NAD 83 (2011/MA31/PA23) EPOCH AT NORTH : N:1264972.83 FEET AND EAST: 817175.64 FEET, SAID POINT OF BEGINNING BEING NORTH 22DEG52'3r WEST DISTANCE OF 324.7S FROM NGS CONTROL MARK "SEAPORT' PID-AF7421; THENCE NORTH 89DEG29'52" EAST ALONG THE CENTER LINE OF A 10 FOOT WIDE EASEMENT AND ALONG THE CENTER OF A 61NCH FIRELINE A DISTANCE OF 60,45 FEETTO A POINT AND CHANGE OF DIRECTION; _ THENCE SOUTH 67DEG44'14" EAST ALONG THE CENTER LINE OF A 10 FOOT WIDE �- EASEMENT A DISTANCE OF 49.12 FEET TO A POINT AND CHANGE OF DIRECTION; i LJ LJ JJ L . THENCE NORTH 89DE659'48" EAST ALONG THE CENTER LINE OF A 10 FOOT WIDE EASEMENT A DISTANCE OF 336.24 FEET TO A POINT AND CHANGE OF DIRECTION; +NGS CONTROL MARK SEBAP PID: AFT421 N: 1%1206.8723' E: 811445.9925' I � I I I -THENCE NORTH 44DEG39'53" CONTINUING ALONG THE CENTER LINE OF SAID 10 FOOT 1 ` WIDE EASEMENT A DISTANCE OF 23.94 FEET TO THE POINT OF TERMINUS AND THE CENTER OF AN EXISTING FIRE HYDRANT, SAID EASEMENT SHALL EMEND 5 FEET FROM FACE OF - _ HYDRANT. CONTAINING 4,597.52 SQUARE FEET OF LAND, BE THE SANE MORE OR LESS. BEARINGS AS SHOWN HEREON ARE BASED ON STATE PLANE COORDINATES, U.S. SURVEY FEET, NORTH AMERICAN DATUM OF 1983/2011 (N.A.D. 83/11), FLORIDA EAST ZONE, REFERENCE A BEARING OF NORTH 90"00'00" EAST ALONG THE CENTERLINE LINE OF THE TAXILANE. ELEVATIONS AS SHOWN HEREON REFERENCE NORTH AMERICAN VERTICAL DATUM 1988 (N.A.V.D 88). REFERENCE ON SITE BENCHMARKS PROVIDED BY THE CLIENT, ELEVATION = 16.74 FEET AND ELEVATION = 16.93 FEET. ELEVATIONS AS SHOWN HAVE BEEN MEASURED TO AN ESTIMATED VERTICAL POSITIONAL ACCURACY OF 0.06 FEET. THIS IS NOT A BOUNDARY SURVEY. "Certified SBE SFWMD" On Fri, Nov 19, 2021 at 5:52 PM Hamed Jafarian <hamed.iafarian@ice-ene.com> wrote: 10 Specification Section 01720, 3.2.D & 3.2.E.3 clearly state the record's requirement to meet the IRC standards and permit stipulation. ICE is neither claiming that a new property boundary survey is required nor locating and surveying the entire airport property to generate an easement. Maybe this was misunderstood by UT. As for expediting and clarification, ICE has provided an exhibit (refer to attached CCD 002 page 2 of the pdf) to meet the IRC requirements for issuing an easement for Fireline. ICE has generated a Work Change Directive ( 002) with all requirements clarified in instruction section. We can also discuss this at on weekly progress meeting next Monday 22"". Thank you, Regards, Harried Jafarian P.E. I Senior Project Manager Hamed.Jafarianra)ice-ene.com "INFRASTRUCTURE CONSULTING & ENGINEERING 5550 W. Idlewild Ave Suite 115 1 <Tampa, Fl- 33634> 813-305-0164 (Main) 1 813-317-7702 (Cell) www.ice-ene.com From: Bill Gore <bill@loreniocktruckine.com> Sent: Wednesday, November 10, 20214:17 PM To: Harried Jafarian <hamed.iafarian@ice-ens.com> Cc: Bruce Smith <bruce@loreniocktruckins.com>; Doug Hambrecht <dou¢.hambrecht@ice-enz.com>; Jeffrey Long <ieffrev.lon¢@ice-enQ.com>; Scott Baker <RBaker@citvofsebastian.or¢>; Steven Chandler <steven @ Io ren iocktruckine.com> Subject: Re: Sebastian TL Waterline Permit Harried, LJT is aware of your reference. If you recall, this was brought to your attention by UT in the beginning of the project when we were trying to secure the project permits that this note existed. It was discussed and understood that UT would inform the field inspector when the waterline was ready for inspection and testing and ISS would coordinate with Indian River County. The requirement to generate an asbuilt was discussed in the field and understood with the exception of the statement to locate the waterline in accordance with the property boundary. UT is not disputing that asbuilts are required, but did ask for clarification of the need for a property boundary, versus the project boundary for asbuilts as those are two very different things. During our progress meeting, nobody was able to provide this clarification as that knowledge could not be clearly ascertained within the contract documents. It should also be understood that, UT previously asked for you to provide the existing property boundary asbuilts in CAD since the only records we were provided for the project is the project boundaries so we could determine if they could be utilized for the project asbuilts. To date, UT has not been provided this information so it is assumed it does not exist. Further, if you are claiming that it was understood by the FOR and the City at bid time that a new property boundary survey would be required to be performed under this contract, that information should have been clearly identified to the bidders. Please understand, UT has already stated an asbuilt with the information on the location of the waterline will be produced, based on the project boundaries and the costs for those can be absorbed. What is being disputed is having our surveyor locate and survey the entire airport property in order to generate an asbuilt for the waterline and then prepare an easement acquisition/recording. Nothing in the contract documents clearly identifies this magnitude of effort should have been expected. The fact that it took further communications between the City and County to generate some sort of understanding is further evidence that there was no reasonable way for UT to have accounted for this effort in the project bid. Please generate a Work Change Directive with all requirements clarified and UT will submit to you the cost and time impacts accordingly. F-cott Baker From: Hamed Jafarian <hamed jafarian@ice-eng.com> Sent: Monday, December 06, 2021 2:59 PM To: Scott Baker Cc: Doug Hambrecht; Jeffrey Long Subject: RE: Sebastian TL Waterline Permit - CCD 002 Fireline Easement Scott, See Bill's request below for a waterline easement. This will be changed order 3. Thanks -H From: Hamed Jafarian <hamed.jafarian@ice-eng.com> Sent: Tuesday, November 30, 2021, 7:41 AM To: Bill Gore <bill@lorenjocktrucking.com>; Mark Jock <mark@lorenjocktrucking.com>; Katie Crimmins <Katie @ lorenjocktrucking.com> Cc: Bruce Smith <bruce@lorenjocktrucking.com>; Doug Hambrecht <doug.hambrecht@ice-eng.com>; Jeffrey Long <jeffrey.long@ice-eng.com>; Scott Baker <RBaker@cityofsebastian.org>; Steven Chandler <steven@lorenjocktrucki ng.com> Subject: Re: Sebastian TL Waterline Permit - CCD 002 Fireline Easement Thanks, Bill. From: Bill Gore <bill0loreniocktruckin¢.com> Sent: Tuesday, November 30, 2021, 7:29 AM To: Hamed Jafarian; Mark Jock; Katie Crimmins Cc: Bruce Smith; Doug Hambrecht; Jeffrey Long; Scott Baker; Steven Chandler Subject: Re: Sebastian TL Waterline Permit - CCD 002 Fireline Easement Hamed, Please see the attached, executed CCD 02 for your use. NOTE: Our surveyor is able to complete the easement based on this CCD for $1,000.00. Total price for this work to be incorporated via Change Order is as follows. Surveyor $1000.00 UT Mark Up 10% $100.00 P&P Mark Up 2% $22.00 Total RFCO $1,122.00 Please confirm receipt of this email and issue a Change Order to the project to allow UT to proceed with the Waterline Easement Work. Thank you, Bill bore Executive Vice President Cell: 941.735.4088 Bill 6D LorenJockTruckin¢.com 4140 SE Robert Loop Road Stuart, Florida 34997 10 =- - - - - - t "Certified SBE SFWMD" On Mon, Nov 29, 2021 at 10:51 AM Harried Jafarian <hamed.iafarian(@ice-en¢.com> wrote: Here you go Bill. From: Bill Gore <bill(@loreniocktruckina.com> Sent: Thursday, November 25, 2021 9:55 AM To: Hamed Jafarian <hamed.iafarianPice-ene.com> Cc: Bruce Smith <bruce@loreniocktruckine.com>; Doug Hambrecht <doue.hambrecht@ice-en¢.com>; Jeffrey Long <ieffrev.lon¢Ca)ice-ene.com>; Scott Baker <RBaker(a)citvofsebastian.or¢>; Steven Chandler <steven(@Ioreniocktruckine.com> Subject: Re: Sebastian TL Waterline Permit - CCD 002 Fireline Easement Hamed, The CCD 002 is missing your signature. Please sign and return so I can formally acknowledge. Thank you, Bill bore Executive Vice President Cell: 941.735.4088 BiII(@LorenJockTruckin¢.com 4140 SE Robert Loop Road Stuart, Florida 34997 Thank you, Bill Gore Executive Vice President Cell: 941.735.4088 Bill@ Lore nJockTruckinR.com 4140 SE Robert Loop Road Stuart, Florida 34997 "Certified SBE SFWMD" On Wed, Nov 10, 2021 at 3:08 PM Hamed Jafarian <hamed.iafarian@ice-ene.com> wrote: Please refer to section 01720, you can see also see section 3.2 and sub -section E.3 . From: Bill Gore <bill@loreniocktruckinR.com> Sent: Wednesday, November 10, 20212:49 PM To: Hamed Jafarian <hamed.iafarian@ice-ene.com> Cc: Bruce Smith <bruceMore niocktrucking.com>; Doug Hambrecht <douR.hambrecht@ice-enR.com>; Jeffrey Long <ieffrev.lonR@ice-enR.com>; Scott Baker <RBaker@citvofsebastian.orR>; Steven Chandler <steven @ to ren iocktruckine.com> Subject: Re: Sebastian TL Waterline Permit Hamed, To further address your email, please identify where in the bid documents all bidders were made aware additional surveys, easements and asbuilts would be needed and under what line items are they paid from. A requirement to coordinate with utilities and other municipalities does not constitute a requirement to include costs for efforts entirely unknown during the bid phase. If the City and the Engineer of Record were aware of these requirements, they had a responsibility to make this known to all bidders. Generating an asbuilt drawing specifically for the waterline installation is an element of cost for UT's surveyor but is a function that can be mitigated. Directing an easement recording to be generated, which includes property corners that have not been provided will require much more effort and is an increased scope. Please process a Work Change Directive with all additional scope elements clearly identified and UT will provide all cost and time impacts for authorization to proceed. Thank you, Bill Gore Executive Vice President Cell: 941.735.4088 BillftLore nJockTruckine.com 4140 SE Robert Loop Road Stuart, Florida 34997 "Certified SBE SFWMD" On Wed, Nov 10, 2021 at 2:04 PM Bill Gore <bill(@loreneocktruckine.com> wrote: Hamed It is not UT responsibility to generate easement language. Also, please identify the property corners that are to be used. Our drawings only have project boundaries. Call me to discuss further. Thank you Bill Gore 941.735.4088 On Wed, Nov 10, 2021 at 1:30 PM Hamed Jafarian <hamed.iafarianC&ice-ene.com> wrote: As discussed in Monday's weekly progress meeting, Scott reached out to the county and for the closeout of the waterline permit, you need to get your surveyor to draft a sketch with two property corners and a legal description of the easement which will be referred to as Exhibit "A". John mentioned they want a 15-foot-wide easement (Need to be confirmed) Once done we can help you send and coordinate with the county. The county will eventually have a standard language for the easements which will state it's a utility easement as described in Exhibit A, which will be the sketch and legal description that your surveyor did, and at the end, UT can pay for the recording fee. Ps: 1 think you are aware that your survey as -built information was collected on the fire hydrant line by your surveyor and that should expedite the process. Thank you, Regards, Hamed Thank you, MI core Executive Vice President Cell: 941.735.4088 BiIICd LorenJockTruckina.com 4140 SE Robert Loop Road Stuart Florida 34997 "Certified SBE SFWMD" This email has been scanned for spam and viruses by Proofpoint Essentials. Click here to report this email as spam. 8