HomeMy WebLinkAbout2025-CSA -15 Terminal Apron Expansion ProjectCITY OF SEBASTIAN, FLORIDA WORK AUTHORIZATION FORM CONSULTANT SERVICE AGREEMENT (CSA) Infrastructure Consulting and Engineering, Inc. (ICE) 5500 W. Idlewild Ave Suite 115, Tampa, FL 33634 Work Authorization No: CSA - # 15 Proiect Title: Construction Services for Terminal Apron Expansion IT IS AGREED to undertake the following work in accordance with the provisions of the Infrastructure Consulting & Engineering Master Agreement entitled "Non -Exclusive Agreement for Continuing Professional Engineering Consulting Services" Dated October 27. 2021, and amended on September 6"', 2024. Description of Assignment: Infrastructure Consulting and Engineering will provide professional engineering services for the Expansion of the Terminal Apron at Sebastian Municipal Airport. This scope represents the design efforts for the expansion of the terminal apron to increase its capacity and improve pavement conditions. The work/project will include new pavement, installation of new tie -downs, and new light poles. The design will include FAA coordination and OE/AAA submittals, including CSPP. 1. Preliminary Planning N/A. 2. Permitting & Inspections FAA OE/AAA submittal including CSPP. 3. Contract Administration N/A 4. Vendor's Responsibility (include estimated hours, if applicable) Description Estimated Hours 4.1 Construction Plans, Specifications, and Bidding Documents N/A 4.2 Engineer's Report N/A 5. Pricing Description Quantity Contracted Unit Price TOTALS 5.1 Preliminary Planning N/A N/A N/A 5.2 FAA Permitting (OE/AAA submittal including CSPP) 1 Included in 5.4 Included in 5.4 5.3 Contract Administration N/A N/A I 5.4 Construction Plans, Specifications, and Bidding Documents 1 $204,825.77 $204,825.77 5.5 Engineer's Report 1 Included in 5.4 Included in 5.4 Deliverables Provided to the City (surveys, plans, etc.) Description Quantity a. 30% Plans, and Engineer's Report. 1 b. 60% Plans, and Engineer's Report. 1 c. 90% Plans, Specification, and Engineer's Report. 1 d. Final Plans, Specification, Bid Documents, and Engineer's Report. 1 Basic of Compensation/Period of Services: The above referenced description for CSA #15 will be performed for a lump sum fee in the amount of $204,825.77. AGREED: VEND 7 Date: Do g F�mbrecht Infrastructure Consulting & Engineering Attest: ��%ID: A� ... G(l Digitally signed by Jeanette Jeanette Williams, MMC,;0,r-�myofsebastian.org> June 11, 2025 03:39 PM EDT CITY OF SEBASTIAN: &Ull LID: BBC39EBB-61DF-... 06/1 /2025 Digitally signed by Date: Brian Benton of iaii oenwn <bbenton@cityofseba stGbrManager June 11, 2025 12:56 Approved as to FUWr€tW6nd Content for Reliance by the Citv of Sebastian Only: Digitally signed by Jennifer Cockcroft Jennifer Cockcroft, City�ttorney June 11, 2025 11:42 AM EDT Approved by City Council on June 9, 2025. Document ID: 97DO24F27577898AA5A7B976890196B4 CITY OF 1E Sfj3ASTI_AN INFRASTRUCTURE CONSULTING & ENGINEERING HOME OF PELICAN ISLAND EXHIBIT "A" SCOPE OF WORK TERMINAL APRON EXPANSION SEBASTIAN MUNICIPAL AIRPORT PROJECT DESCRIPTION Infrastructure Consulting and Engineering will provide professional engineering services for the Expansion of the Terminal Apron at Sebastian Airport. This scope represents the design efforts for the development and expansion of the existing terminal apron to increase its capacity, improve pavement conditions, and conduct improvements to the site lighting. The existing terminal apron area includes approximately 31,975 square feet of pavement. The apron parking space at the Sebastian Municipal Airport is _ severely limited and will not accommodate the needs of future A traffic volumes. As a result of the severely limited terminal apron area and a substantial amount of transient activity that occurs, aircraft are often parked in grassed areas or alongside the Taxilane which leads to the terminal apron area. This arrangement can create congestion and also makes it difficult for transient and based aircraft to access the self-service fuel facilities. The expansion project is a practical solution to the airport's current limitations and a necessary step to ensure that the airport is prepared for future growth. These additional parking I ,. _ _ ..•~ w+►—�`` spaces will help improve safety, avoid congestion, reduce delays, and ultimately contribute to a more efficient and effective airport operation. The analysis revealed that the existing apron should currently be 39,172 SF which means that it is already about 7,197 square feet less than is needed to accommodate the airport's current peak -hour traffic needs. According to the forecast, this deficit continues to increase year -over -year until a shortfall of approximately 9,239 square feet is needed by 2034. The expansion will thereby enhance the overall airport experience. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 1 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 1E INFRASTRUCTURE CONSULTING & ENGINEERING Phase 1— 30% Plans: CITY OF S EB�'STI�N HOME OF PELICAN ISLAND ICE proposes to perform a structural and functional evaluation of the apron pavement to assess the condition of the pavement and determine if it requires additional structural overlay. ICE proposes to perform a combination of nondestructive testing (NDT) and coring for a cost-effective and comprehensive evaluation of the pavement. This preliminary engineering phase is intended to identify the cause of the pavement structure deficiencies and provide different engineering & construction alternatives for the Terminal Apron Expansion and includes various studies which generally will include Existing Pavement Structure strength evaluation, evaluation of pavement failures, determination of rehabilitation alternatives, cost analysis for the rehabilitation alternatives. Preliminary Engineering activities include: 1. Perform Site Visits in order to assess existing pavement and subgrade conditions including the identification of all surface and subsurface deficiencies contributing to the pavement's poor performance. a. Ground Penetrating Radar (GPR). GPR provides continuous measurement of pavement thickness at highway speed (ASTM D6087). b. Coring. Core samples are proposed to be extracted from the pavement at selected areas to examine the condition of the pavement layers as well as debonding between the layers. Core results will also be used to verify the GPR data. c. Borings shall be approximately 15' deep. Cores shall be only to the bottom of the pavement in order to define the existing pavement section, with a frequency of one per 10,000 sf per FAA's "AC 15/5320-6G, Airport Pavement Design and Evaluation". A report will be generated in order to analyze and describe all materials encountered, with identification of pavement failures and pavement recommendations. d. Perform borings to obtain the permeability rates at 1'-4' and 7'-9' depths below the grade. 2. Develop an AutoCAD drawing from DTM survey for use in modeling the Apron Expansion. 3. Obtain and review any available historical documents: construction documents, as-builts from previous projects to determine existing pavement structure. 4. Analyze the existing pavement section. 5. Evaluation of apron pavement based on geotechnical investigation above. 6. Drainage Evaluation. 7. SJRWMD Pre -Application Meeting. 8. Incorporate results into the Preliminary Engineering Report. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 2 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 1E INFRASTRUCTURE CONSULTING & ENGINEERING CITY OF S EB�'STI�N HOME OF PELICAN ISLAND 9. Complete the Preliminary Engineering Report including the various study elements: a. Project Narrative. b. Topographical survey. c. Geotechnical investigation. d. Existing Soil and Pavement Strength Evaluation. e. Design alternatives. f. Drainage Evaluation. g. Conduct construction cost estimates. h. Provide recommendations for preferred construction methods. 10. Conduct in-house Quality Review for acceptable design practices and constructability. 11. Attend the Pre -design Conference and review findings and discuss recommendations with airport personnel and FDOT/FAA as required. 12. Coordinate with the Airport Staff to optimize available construction monies and minimize the impacts in day-to-day operations of the airport. 13. Develop Projected Project Budgets. Phase 1 services will involve preliminary design and the production of 30% Plans. The design considerations shall include: • Geotechnical Investigation, • Field Survey, • General Coordination with Airport Staff, • Pavement Design/Analysis, • Drainage Analysis, • Horizontal and Vertical Geometries, • Preliminary Cost Estimates, • Engineer's Report, The Consultant will prepare a revised Construction Cost Estimate, a 30% Engineer's Report, and the Preliminary Plans, which will include: Cover Sheet Typical Sections Profile Sheets Project Layout Plan Staking and Demolition Plan Deliverables: Three (3) copies of the Preliminary Plans in 11 "XI 7"format and 30% Engineer's Report will be submitted to the CITYfor distribution to airport staff. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 3 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 1E INFRASTRUCTURE CONSULTING & ENGINEERING Phase 2 — 60% Plans CITY OF S EB�'STI�N HOME OF PELICAN ISLAND The Consultant shall address any changes requested by the airport at the 30% Review Meeting in this Phase. Upon issuance of the Notice to Proceed, the Consultant will proceed with the 60% Plans to include the following: • Site Electrical Design, Wire Sizing, Load Cables, • General Coordination, • Preliminary Drainage & Grading, • OE/AAA submittal, • Construction Safety and Phasing Plan, • Updated Cost Estimates, • Engineer's Report. The Consultant will prepare a revised Construction Cost Estimate, a 60% Engineer's Report, and the 60% Plans, which will include: Cover Sheet Typical Sections General Notes Preliminary Grading Plans Marking Plan Project Layout Plan Safety Plan Staking and Demolition Plan Profile Sheets Electrical Plans The Consultant will meet with the City to review the Plans, Specifications, and the Engineer's Report to verify that all concerns, issues, and potential conflicts are addressed prior to proceeding with 90% Construction Documents. Deliverables: Three (3) copies of the 60% Plans in 11 "X17 "format and 60% Engineer's Report will be submitted to the CITYfor distribution to airport staff. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 4 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 1E INFRASTRUCTURE CONSULTING & ENGINEERING Phase 3 — 90% Plans CITY OF S EB�'STI�N HOME OF PELICAN ISLAND The Consultant shall address any changes requested by the airport at the 60% Review Meeting in this Phase. Upon issuance of the Notice to Proceed, the Consultant will proceed with the 90% Plans to include the following: • Preliminary Front End Documents, • Preliminary Technical Specifications, • Final Grading & Drainage Design, • Submittal of SJRWMD Permit Application, • Construction Notes, • Cost Estimates, • Engineer's Report. The Consultant will prepare a revised Construction Cost Estimate, a 90% Engineer's Report, and the 90% Plans, which will include: Cover Sheet Typical Sections Construction Notes General Notes Signing and Marking Plans Erosion Control Plans Project Layout Plan Safety Plan Staking and Demolition Plan Grading and Drainage Plans Electrical Plans Miscellaneous Details The Consultant will meet with the CITY to review the Plans, Specifications, and the Engineer's report to verify that all concerns, issues, and potential conflicts are addressed prior to proceeding with Final Construction Documents. Deliverables: Three (3) copies of the 90% Plans in 11 "x17 "format, a draft set of specifications and front end documents, and 90% Engineer's Report will be submitted to the CITYfor distribution to airport staff. A copy will also be sent to the FAA, and FDOT for review and comment. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 5 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 1E INFRASTRUCTURE CONSULTING & ENGINEERING Phase 4 — Final Contract Documents CITY OF S EB�'STI�N HOME OF PELICAN ISLAND The Consultant shall address minor changes to the plans and any comments from City Procurement for the bidding documents, and then proceed with the 100% Plans to include the following: • Incorporate City Comments, • Incorporate Permitting Comments, • Final Plans, • Final Technical Specifications, • General Provisions/Supplementary Conditions, • Final Quantities and • Final Front End Bidding Documents. The Consultant will prepare a Final Construction Cost Estimate, a 100% Engineer's Report, Bidding Documents and the Final Plans. Deliverables): Three (3) copies of the 100% Plans in 11 ' x17' format, the final Engineer's Report and Contract Documents will be submitted to the CITYfor distribution to airport staff, A copy will also be sent to the FAA, and FDOT for their files. Two full sized sets (22' x34') of signed and sealed plans will be submitted for CITY records. Other Provisions a) The CITY will pay all costs associated with any permit application and/or impact fees. b) Any mitigation of wetlands, impacts to threatened and endangered species, or other environmental efforts beyond the scope of the Focused EA will be performed under separate agreement. c) One complete signed and sealed set of plans shall be delivered. This complete design shall be modified to create one set of "Phase 1" bid documents for bidding purposes. Future phased construction sets and bidding phase services shall be packaged under a separate scope and fee. d) No bidding and construction phase services are included in this proposal. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 6 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 CITY OF 1E Sf]3ASTI�N INFRAMUCTURE - CONSULTING & ENGINEERING HOME OF PELICAN ISLAND PROJECTED PROJECT SCHEDULE DESIGN PHASE SER VICES Task Duration Phase 1 — 30% Plans 60 Days Phase 2 — 60% Plans 30 Days Phase 3 — 90% Plans 30 Days Phase 4 — Final Contract Documents 30 Days TOTAL PROJECT DESIGN DURATION 150 days * * Contingent on owners review time) Phase Major Activities 2025 2026 ork 1 1 I A 5 1 O N D J F M Noticeto Proceed Survey/ Geotech 1 ' . Design -��------- 90% Design Obtain Permit Design PROJECT SCHEDULE SEBASTIAN MUNICIPAL AIRPORT (X26) TERMINAL APRON EXPANSION- DESIGN FEE Please see the associated detailed fee proposal. Scope of Services and Fee Proposal Sebastian Airport Terminal Apron Expansion Page 7 of 7 Document ID: 97DO24F27577898AA5A7B976890196B4 EXHIBIT "B" CITY OF Manhour and Fee Estimate SF$AsTI-AN 1E Terminal Apron Expansion _ Sebastian Municipal Airport HOME OF PELICAN ISLAND INFRAMUCTURE Summary CONSULTING & FNGINEERING PHASE 1 PHASE 2 PHASE 3 PHASE 4 TOTAL Final 30% Plans 60% Plans 90% Plans Contract Documents CLASSIFICATION RATES HOURS HOURS HOURS HOURS HOURS Principal $255.00 4 1 2 4 11 Sr. Project Manager $220.00 28 22 40 28 118 Senior Engineer $200.00 18 12 38 28 96 Engineer $170.00 33 39 53 46 171 Sr. Designer $140.00 16 98 44 16 174 Technician $90.00 79 104 86 56 325 Administrative $70.00 16 9 16 16 57 TOTAL HOURS 194 285 279 194 952 TASK COST $26,860.00 $37,835.00 $40,940.00 $29,000.00 $134,635.00 DIRECT EXPENSES Reproduction $500.00 $600.00 $750.00 $750.00 $2,600.00 Postage $75.00 $75.00 $75.00 $75.00 $300.00 TOTAL EXPENSES $575.00 $675.00 $825.00 $825.00 $2,900.00 SUBCONSULTANTS Survey $11750.00 $11, 750.00 Geotechnica/ Investigation $10, 750.00 $10, 750.00 Ground Penetration Radar (GPR) $2,500.00 $2,500.00 Drainage Design Services $2, 875.00 $2, 875.00 $2, 875.00 $2, 875.00 $11, 500.00 Electrical Services $2,461.28 $10, 054.25 $10, 594.37 $7, 680.87 $30, 790.77 TOTAL SUBCONSULTANTS $30,336.28 $12,929.25 $13,469.37 $10,555.87 $67,290.77 ITOTAL COSTS $57,771.28 $51,439.25 $55,234.37 $40,380.87 $204,825.77 Method of Payment Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Page B-1 of B-5 Document ID: 97DO24F27577898AA5A7B976890196B4 EXHIBIT "B" Sebastian Municipal Airport Terminal Apron Expansion Phase 1 - 30% Design Plans MANHOUR AND FEE ESTIMATE Sr. Project Senior Administrative Total Item/Task Description Principal Manager Engineer Engineer Sr. Designer Technician Assistant Hours Coordination with Airport Staff 2 8 4 14 Project Kick -Off Meeting 4 4 Meeting with FAA 6 6 Coordination with Subconsultants 8 4 2 8 22 Review available as -built info 1 2 4 7 Pavement Design & Drainage Analysis 2 4 6 Evaluation of Existing Conditions 4 4 Generate Sections 2 2 8 8 20 Update the Construction Cost Estimate 1 2 2 5 Prepare 30% Plans Cover Sheet 1 1 2 Project Layout Plan 1 8 9 Typical Sections 1 2 16 19 Staking and Demolition Plan 4 4 4 24 36 Section Sheets 2 2 2 16 22 30% Engineer's report 2 4 4 10 Quality Control Review 2 4 6 Plot 30% 11"07 plans (6 Copies) 2 2 Total Hours: 4 28 18 33 16 79 16 194 Page B-2 of B-5 Document ID: 97D024F27577898AA5A7B976890196B4 EXHIBIT "B" Sebastian Municipal Airport Item/Task Description Coordination with Airport Subconsultant Coordination Prepare for Review Meeting, Attendance, Minutes Preliminary Design Process Survey DTM Profile Pavement Geometry Preliminary Grading & Drainage Design Review Preliminary Lighting Cost Estimate Prepare 60% Plans General Notes Staking and Demolition Plan Profile Sheets Preliminary Grading Plans Preliminary SWPP plans Preliminary Cross Sections 60% Engineer's Report Quality Review Plot 60% 11"07" Plans Total Hours: Terminal Apron Expansion Phase 2 - 60% Design Plans MANHOUR AND FEE ESTIMATE Sr. Project Senior Technical Total Principal MapaoRr Engineer Engineer Sr. Designer Technician Assistant Hours 4 1 5 4 4 2 10 4 4 2 10 4 4 4 4 16 16 16 5 4 16 25 2 2 8 4 16 3 3 2 4 8 8 22 1 4 6 11 8 8 16 16 16 32 16 16 32 2 2 16 20 6 16 8 30 2 4 4 10 1 4 4 9 2 2 1 22 12 39 98 104 9 285 Document ID: 97D024F27577898AA5A7B976890196B4 Page B-3 of B-5 EXHIBIT "B" Sebastian Municipal Airport Item/Task Description Coordination with Airport Subconsultant Coordination Coordination with FAA and FDOT Prepare for Review Meeting, Attendance, Minutes Preliminary Technical Specifications Final Design Preliminary Front End Documents Preliminary Technical Specs Final Grading & Drainage Design Construction Notes Review Electrical Plans Quantities/ Cost Estimate Prepare 90% Plans Construction Safety and Phasing Plan Grading & Drainage Plans Erosion Control Plans Final Sections Marking & Signing Plans Miscellaneous Details 90% Engineer's Report Quality Review Plot 90% 11"07" Plans Total Hours: Terminal Apron Expansion Phase 3 - 90% Design Plans MANHOUR AND FEE ESTIMATE Sr. Project Senior Technical Total Principal Manager Engineer Engineer Sr. Designer Technician Assistant Hours 1 4 5 4 4 4 12 4 4 2 10 4 4 2 10 4 8 8 8 28 4 8 8 20 4 8 12 2 2 5 8 8 25 2 2 8 12 2 2 2 2 6 10 2 8 8 18 2 8 16 26 2 4 8 14 4 4 8 16 2 2 4 16 24 4 4 4 12 2 4 4 10 1 6 4 11 2 2 2 40 38 53 44 86 16 279 Document ID: 97D024F27577898AA5A7B976890196B4 Page B-4 of B-5 EXHIBIT "B" Sebastian Municipal Airport Item/Task Description Coordination with Airport Coordination with sub -consultants Prepare for Review Meeting, Attendance, Minutes Finalize Plans Calculate Final Quantities Prepare and submit OE/AAA Address comments Finalize Technical Specifications Finalize Front End Docs Plot full size and 11 "x17" plans Prepare Final Engineer's report Terminal Apron Expansion Phase 4 - Final Contract Documents MANHOUR AND FEE ESTIMATE Sr. Project Senior Technical Principal Manager Engineer Engineer Sr. Designer Technician Assistant 4 4 4 4 4 2 Quality Review 4 Total Hours: 4 8 8 16 4 2 4 8 8 4 8 6 8 2 8 8 2 8 8 2 8 8 8 8 28 28 46 16 56 4 2 2 4 2 W Tota I Hours 4 8 10 32 6 20 30 20 20 10 20 14 194 Page B-5 of B-5 Document ID: 97DO24F27577898AA5A7B976890196B4