HomeMy WebLinkAboutCSA #4 Upper Stonecrop Drainage ImprovementsCITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
CARTER ASSOCIATES, INC.
1708 21 ST STREET
VERO BEACH, FL 32960
Work Authorization No: CSA - 4
Proiect Title: Upper Stonecrop Drainage Improvement Project
IT IS AGREED to undertake the following work in accordance with the provisions of the Carter Associates, Inc.,
Master Agreement entitled NON-EXCLUSIVE ENGINEERING CONSULTING SERVICES AGREEMENT — CITYWIDE
dated February 22, 2021.
Description of Assignment:
Carter Associates, Inc. will provide civil engineering services for the Stonecrop Project as describer in the
Scope of Work— Exhibit A.
1. Pricing
Description
TOTALS
Task 1 A — Site Survey
$25,095.00
Task 2—Preliminary Planning
$16,536.00
Task 3 — Drainage Design and Modeling
$27,924.00
Task 4 — Construction Plan Preparation
$25,272.00
Tasks — Permitting
$12.324.00
Task 6 — Grant Application Assistance
$7,800.00
Task 7 — Construction Services
$35,232.00
Reimbursable Expenses
$3,000.00
Option 1 —Additional Site Survey
$22,775.00
2. Deliverables Provided to the City (surveys, plans, etc.)
Description Quantity
See the detailed Scope of Work attached (Exhibit A) 1
3. Basis of Compensation/Period of Services:
The above referenced description for CSA #4 will be performed for a fee in the amount of
$172,958.00.
CSA#4
Page 1 of 3
Document ID: B1 3EA55DDF3782985E59982AE9026F8B
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
AGREED:
CARTER ASSOCIATES, INC.
r wvt / /. —81GC/7z
To 9163A9FE 54ED 4850 B942.OD68-
13IgIW lly signed by
<jblum@canerassoccom>
June 13, 2025 04:16 PM EDT
John Blum, President
Date: 06/13/2025
Attest:
ID: O88DE3F6-202F-4762-AC5B-8FEC5...
Digitally signed by
sjwllllams@cltyofsebasdan.org>
JuM 01. 202501:07 PM EDT
Jeanette Williams, MMC,
City Clerk
Approved by City Council on 6/25/2025.
CSA k 4
CITY OF SEBASTIAN:
ID: 72713CE87-C84C45E6-883M71B7...
Digitally signed by
4benton@cityofsebast1an.org>
July 01, 202512:41 PM EDT
Brian Benton, City Manager
Date: 07/01 /2025
Approved as to Form and Content for Reliance
by the City of Sebastian only:
��
ID: OBSD10C9 FB70-0 D-Al9E-05E98...
DlglWlly signed by
<c0ckcr0R@aity0fsebasVan.ar9>
lune 26.202511:54 AM EDT
Jennifer D. Cockcroft, Esq.,
City Attorney
Page 2 of 3
Document ID: B13EA55DDF3782985E59982AE9026F8B
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
ExhibitA
Scope of Work
CSA # 4
Page 3 of 3
Document ID: B13EA55DDF3782985ES9982AE9026FBB
m L�� ccmp ny
April 23, 2025
Ms. Karen Miller, P.E.
Director of Public Works / City Engineer
City of Sebastian
1225 Main Street
Sebastian, Florida 32958
RE: Civil Engineering Services Agreement
Upper Stonecrop Drainage Improvement Project
CAI Proposal No. 2543935 (Ref. Proj. No. 21349)
Dear Karen:
We are pleased to present this proposed agreement to provide civil engineering services for the
below described tasks at the Upper Stonecrop Project. We propose the following scope of services
and corresponding fees in accordance with the Professional Services Agreement (PSA) effective
April 23, 2025, between Carter Associates, Inc. (CAI) and City of Sebastian (CLIENT).
PROJECT LIMITS:
This proposal and the services detailed within pertain to the proposed drainage canal improvements
located in the canal right -of way between Brookedge Terrace / Tulip Drive and between Laconia
Street / Clearbrook Street in Sebastian, Florida 32958.
SCOPE OF SERVICES:
The following outline and scope of services is provided:
Task 1A — Site Survev
Perform and prepare Boundary/Control Survey:
o Recover and / or re-establish subject block, lot and centerline control for establishment of
block, lot lines and drainage right of ways. Prepare plan view drawings of block lot and
right of way geometry with recorded monumentation and control points. Survey to include
Block 239, Sebastian Highlands Unit 10
Establish Vertical Control (Benchmarks):
o Differential levels (approximately 12,000 linear feet) from a published record vertical
benchmark to establish near or on site temporary vertical benchmarks for survey, design,
construction, and as -built purposes.
Perform and prepare Topographic Survey:
1708 21st Street, Vero Beach, Florida 32960 • t 772.562.4191 • carterassoc.com
P:\21-349 City of Sebastian - Stonecrop\Proposals\StoneCropPhase3.docx
Page 1 of 5
Document ID: B13EA55DDF3782985E59982AE9026F8B
o Observe and record horizontal and vertical data of existing on -site conditions improvement
locations and ground elevations within 25 feet of the centerline of the 30 feet wide drainage
right of way, points of intersection (changes of direction) and adjacent road right of ways.
o Perform and prepare cross -sections of the 30 feet wide drainage right of way at lot line
intersections or approximately every 80 feet, drainage right of way points of intersection
(PI or changes of direction) and adjacent road right of ways
o Perform as -built survey and cross sections of four (4) ditch right of way intersections with
Laconia Street, Bayfront Terrace, Albatross Terrace and Rose Arbor (Tulip) Drive
o Prepare plan view drawings of topographic survey an provide PDF and CAD files for
engineering design.
Task 2 — Preliminary Planning
• Site visit to inspect site conditions such as topography and vegetation. Review potential
impacts to adjacent properties.
• Meet with design team and prepare conceptual plan alternatives for presentation to City of
Sebastian.
• Attend "kick-off' meeting with City Engineer and departments to review conceptual
improvements plan.
• Coordinate with utility providers to determine existing locations of water and sewer crossings.
Task 3 — Drainage Design and Modeling
Review and modify the ICPR model produced for the initial project between Laconia Street
and Stonecrop Drive to identify existing conditions and prepare alternatives for each crossing.
Review and produce report showing impacts throughout the watershed upon implementation
of the proposed improvements.
Prepare design for three new crossings and all proposed ditch inverts proposed in the design
of the system.
Task 4 — Construction Plan Preaaration
• Prepare construction plans that will incorporate improvements for the City of Sebastian SWMS
Capital Projects No. 15, 16 and 17.
• Prepare phasing plan to identify the scopes of each improvement for use in separation of
projects within the construction bidding.
• Define any proposed re -grading of the existing ditches to prepare for armoring of the re -graded
canal.
• Review and note any private property impediments for construction within the right-of-way.
• Prepare improvements plan for the southern ditch which may include armoring if specified by
the CLIENT.
• Coordinate with Geotechnical Engineer for soil boring locations, expected loads and criteria
needed for any crossings. Soil testing is not included with this proposal and will be provided
by the CLIENT.
Page 2 of 5
Document ID: B13EA55DDF3782985E59982AE9026F8B
• Preparation of traffic maintenance plans for the crossing installations.
• Provide follow through during permitting process to address Sebastian review comments.
• Prepare a tree removal plan to document any impacts on the existing vegetation.
Task 5 — Permitting
• Prepare and submit applications to the St Johns River Water Management District for
coordination on the modifications to the canal.
• Prepare exhibits and submit to the US Army Corps of Engineers for impacts to waters of the
United States.
Task 6 — Grant Aaalication Assistance
Assist the CLIENT with production of exhibits needed for grant applications.
Provide assistance in responding to any requests for additional information that may occur
during the review process.
Task 7 — Biddine and Construction Services
• Prepare quantities estimates for bid form and technical specifications.
• Attend Pre -Bid and Bid opening Meetings, respond to questions from Bidders.
• Review bids and provide recommendations.
• Attend council meeting to assist in questions regarding bids.
• Provide coordination between contractor, permitting agencies, and CLIENT.
• Provide "on -site" resident project representative for the duration of time required to meet
permit conditions and provide routine reporting of substantial construction activities to the
Engineer.
• Complete and submit certification forms along with contractor provided "as-builts" to all
permitting agencies.
Option 1 — Additional Site Survev for Ditches Between Bavfront and Tulin Drive
Perform and prepare Boundary/Control Survey:
o Recover and / or re-establish subject block, lot and centerline control for establishment of
block, lot lines and drainage right of ways. Prepare plan view drawings of block lot and
right of way geometry with recorded monumentation and control points. Survey to include
Part of Blocks 236 & 237 and all of Block 238, Sebastian Highlands Unit 10
Establish Vertical Control (Benchmarks):
o Differential levels (approximately 2,000 linear feet) from previously established record
vertical benchmark to establish near or on site temporary vertical benchmarks for survey,
design, construction, and as -built purposes.
Perform and prepare Topographic Survey:
Page 3 of 5
lq7rA
IT
Document ID: B13EA55DDF3782985E59982AE9026F8B
Observe and record horizontal and vertical data of existing on -site conditions improvement
locations and ground elevations within 25 feet of the centerline of the 30 feet wide drainage
right of way, points of intersection (changes of direction) and adjacent road right of ways.
Perform and prepare cross -sections of the 30 feet wide drainage right of way at lot line
intersections or approximately every 80 feet, drainage right of way points of intersection
(PI or changes of direction) and adjacent road right of ways
Prepare plan view drawings of topographic survey an provide PDF and CAD files for
engineering design.
COMPENSATION:
We recommend authorization of the following fees for this assignment.
TaskIA — Site Survey........................................................................................................ $25,095.00
Task2 — Preliminary Planning....................................................................................... $16,536.00
Task 3 — Drainage Design and Modeling,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, $27,924.00
Task 4 — Construction Plan Preparation,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, $25,272.00
Task5 — Permitting........................................................................................................... $12.324.00
Task 6 — Grant Application Assistance ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,............... $7,800.00
Task7 — Construction Services.........................................................................................$35,232.00
Reimbursable Expenses....................................................................................................... $3,000.00
TOTAL FEES. .................................................................................................................. $150,183.00
Option 1— Additional Site Survey................................................................................... $22,775.00
TOTAL FEES WITH OPTION 1................................................................................. $172,958.00
ASSUMPTIONS:
In developing this proposal, CAI represents to the CLIENT that the following assumptions have
been made and that deviation from these assumptions may require additional expenditures on
behalf of the CLIENT to CAI.
1. This proposal specifically excludes all application and/or impact fees, which shall be the
responsibility of the CLIENT.
12 is s siif inuL alIsa...As have been ,.btai....a ...:ah
r1:caJ all
sen'iees ill t;as ra aairaw. r= limitai srly % saastaust' n sr_c.
3. Architectural, landscape, electrical, mechanical, and structural services are not included with
this fee proposal.
4. Construction stakeout and as -built surveys are not included with this proposal. It is anticipated
that the contractor will be responsible for construction stakeout and as -built surveys. CAI can
provide these services for the contractor if he chooses.
Page 4 of 5
Document ID: B1 3EA55DDF3782985E59982AE9026F8B
Thank you for giving us the opportunity to submit a proposal for our services. We look forward to
working with you on this project. Our receipt of a signed copy of this agreement will serve as our
notice to proceed. Should you have any questions or need additional information, please do not
hesitate to contact me at our office.
Sincerely, Agreed to and Accepted:
INC. By:
Print Name:
Clinton JAahies, P.E. Address:
Date:
Page 5 of 5
Document ID: B13EA55DDF3782985E59982AE9026FBB
City of Sebastian SW MS Capital Project No. 15
saM4w oMn. rwc Idwn Mq.s,xx m
wgw5ld.rw Mw
/ arakz] do
O
! (mn
I
$npnrarrysv„yaMRyn
nmrM
3
WOdurbnbhep
fwvYu[tlan Wv
ModWtlpnaM pemWWallm
s
fmm,mwrs+w]
ROGnb. cmwM
1
AWn4nv<tal]nMi[
s
M��..Rrwawrx w..,Mm
9
RwwaSalWr.Sva Senbu
lO
44a5a%aMCxrne M[Jnn
11
bWryRWdvim
II
iMbM%�MoemM
SubY%�MrwMnr RrvdaOm
H
Wa,4 Hyaul.(cnpmMpbry
IS
[unruibn lmynkm
Ib SubuuI1L551
l] WLr%wavl]Oal
u ]cW 6PIH.1l1
i Na i uus4v i]WWu4i wme i or4 1
Aelmv
Mua
Sl9.ill
1
Su,]I]
ybmpuYlMMprµeun
IS
SfOpil
fUfO]
ADpnnnauunW
li
$zspm
I
HSAb
[mruvm Crnbp,p4a
r3
H.151
I
HFH
wmaElok S%NdMrmLL
$s
s5.wo
1
v,5m
$d5rwwl..wb,s..rnmw[m'oM.mabm.mt«n, r..wnwr.W �w.Me.
�
H
no
s]w
roorcawnnw%m.slm4w,rtd Mmw
Is
$n0
I
Hw
H
SM
SS
60%
Sl
$SpO
[xrWmlRwpmma4ry]P.NOI <bru'Srpr}WyemextaR5�4aP.
li
HS
tl
OOl
SSYS
fmnLLnaMimaLdmvwrM.56'MV N'renv rapr..w¢5/blfeMr
S]IS
ff
GOY
Sl
W.m
Mynaw rm V.[Wnmxmu. wnrYn.tr]f.M.cmu.Mverrm,prrnY.�aamgrm-a.
A
SW
H
OG%
Sl
S11W
WYa44mm�MWrMrerxLL WubWnbrt [orowrbn, y.eneq bYWrbM1MOroMnvmdSq
W
b
111
50
Ill
SSV
dY.30 ea4irwnartL lAtl Sr rva'
Y
Y
11C0
SO%
I.O'4
H.Cq
M.Stl.u.mmrava.lAtl SiuY.
rGx
SH
H
S1IH
Tanyen MCbp4IWn.4[wndeWdMrbmNWNuwnvtnm4nalr nlMlNM1nOMr[mny V.
IS
SS.EAS
I
Slpii
.SwmNb M1%MgMrmry
SfMpi)
335}p1
SID}fp
Document ID: B13EASSDDF3782985E59982AE9026F8B
City of Sebastian SWMS Capital Project No. 16
wanaop oiw'.m.vF. wn.n nmN[nn.n:
Prole[:LwIMM.P
Prol<[f Are.
IN.mN /���1�
1 WYI I IM16Y IlY.tl1nM1 V/tl.l LLWv 1
gNWI
IXHY
1bnvN(ul
f
fryineerryLrveY.M Pe,Yn
L$
$1.})x
1
SH.T]
.Y.nmemGxxNdpeµa:wl
x
v.mmw$
33
3w,aao
,wmee
W M[urmunro
L3
MAI,
Sx3,on
1
fuAT
Cmuwwb.wMp. w[a
(gmw.bn(gr,
s9oePu.uro..eoro.esmq,
u
v.lv
sx,xu
aw:wme. s:awgrou.
s
fssou[Inni.nY
p
sljm
i
sl$T
bWr,ebr:nlry[,Npganylw.M,M.rgNupnen[[IaJf.npilum.b.Wee
If
H
IA
sm
famn.�:n..,n3•.v.n,re.. u..a.I..nwrN.
u
slsx
sb,
rlNnlz.�ra..n$.-Wnau..0
N
H.mwmu.awl9„Plnn H.,..m
sm
v
sxao
w.qe,Pwaw�:.r,nxe.xva.mrn�.anP......m..nre.m•
mP,mwfavW
H�npes,mw
sr
In
m
nn
v.xso
wnNro.m mmgdd.aw.l H�noaen,+Pe,,,a,,,.nnxoq
um.lm. mc«r.nw.ue.n
s>rs
3o
aoN
w
s»,3so
e,aabn rrKw. F.nu.r�, m.H¢w[o-.PFnm.
11
M.Ew.YNgw"Ibn
$W
PAllf
H
H.xb
F.wew.[wIF[IvaE�mwr.v.mm YnrW.xbn.[omp[Ibn.prvemenl MYWrbn.,N wavry nuelFPr.
Ix
FearMW'9,nenrlon
SY
59
111
SDN
11)
$35p
L'.$tl..umen[.na. l.K05irq.L
v3
SWIIyHrnrvrn Mlw.lbn
Y
H
1.(N
SM
I.tlaO
HAI
%',Sangnmt.rt,]IXOssrgd.
1,
ryul.fumrrvnm RpM
xH
S.
93
H.HI
nnrpl.NbyrortlpMemxre:eWgMamrinbN[mm:ru:bnml.n.M.11M wun PMrfpuvylF.
1$
Cuvvmnnlnp,nma
Sl.�
1
$IW
NrumMmbiNddbmu..
Ib
9uua.11L14
313ax3s
Il
fmryway 11Y41
$q]b
u
iey6p13wIx1
HN!)3
Document ID:
City of Sebastian SW MS Capital Project No. 17
Slo-uvw GlN-erylrmfuFen MWmnm
I.,I—,.-tap
I�Ib../ryfy✓a 5�'II�W [m MIi�M f
1
[q+venNSurm,w Coup.
3
6tl4[vmenM1 •ry
r M1.swuM1�
w G,wMl.n6.l
s
fmYM1Yn S�u.ry
�
Iwmu.m[
e
sw^[u�1.M mm.•mlvWN•N wN.lm�
9
emme4MW%w5•asbru
Ip
mull•Nn)fl fauM•6mhMr1
m
u
wrvn uo.•uw�
m
4maII�WW Mlu'•16
Is
SNf�q-IdnlNl•NwNw
x6
•neWwW�lmvwlNC•bM
]I
[pvMgNupplW
u+v IIa
I9 Lang6en�U0f
m 1•gimvlwiq
IS
WA,
I
Y1.961
IS
S.
I
M.
IS
1.
1
M.
IS
S)),>»
USan
IS
St.
Sl.sm
$Il
1.
51..
IS
I
Sw
sr
no
IS
I
St.
IS
NS
111
0M
I.
IS".
V
Stn
S6
I,.
IS
St".
SY
Sm
5S
I,.
SI
$,.I.
V
S11
M1
OIM
m)
57111
Y
SIS
15.m3
OA
15.H1
$IM,Ls
SY
fl
111
SA
Iit
Slb
V
Y
I,M]
Sms
Lm0
Hlm
ilf
SI•
Il
uS
$5.105
59.Im
XI•,IM
SI9D.m1
Wlu
Document ID: B13EA55DDF3782985E59982AE9026F8B
IYY
4�gnMbSel]%dpµeavn
F9p punv,mmN
wml,.wllan-IIo.wM
1�.I.IwmS.sYdw.,wu.
WmvMl¢vtlirye Tpapnry lM •MtlYMlv��avru*. u-Wtlt.wreylrcNp•e
F�)6iM1T11fl,wdM1MuaImN�YNrt•M IxpVM•tlw���aeNy EarM
sw [q Na gn,wl•aq•un v'. xp' d wnpp Ipww.y vrv..mL,w r e•pN
mtlpn,M nlmma el oi%MS pu'm •p' [uMM14 •pptwlm,len H U n.M1
vuvr pNagaw.,m.o-na.,.a.yalpll. weag6..ingl..6M,4upn,ExYm,w[ww•nIM.
luumu..munaw[.vl,mw•eww.ro6nwll. <pmwglp.,wwl.,lll I.eaallw,.w wa.nquuv
M ):laaw Wryeb x5'. x. I6'aunMmMR 3x36Nev+.'vN, L•(Y/li.
95.Naumaava
m' • SP xvnxn� ,m. xPV 51 u W.
twnm� W eIpwldv,vemwne,MgMlpmoNwJ¢Mr�atbnnulvl6uJu IMun Mer(My V.
4mnNu4x%Mglu.mm
h
V
T
0
—r PEi
CITY OF SEBASTIAN
CITY COUNCIL STAFF REPORT
DATE June 25, 2025
TO Honorable Mayor and City Council
THRU Brian Benton, City Manager
Karen Miller, City Engineer & Special Projects
FROM Director
Consideration of CSA #4 for Carter and Associates,
Inc. to begin design of the Upper Stonecrop
SUBJECT Drainage Improvement Project in the amount of
$172,958.00, and authorize the City Manager or
designee to execute
EXECUTIVE SUMMARY
The City of Sebastian is currently midway to completion of the Stonecrop Drainage Project,
funded through the Hazard Mitigation Grant Program. As the downstream section that collects
stormwater drainage from much of the Sebastian Highlands will be completed by August of
2025, we are now looking to complete resiliency efforts on the upstream portions of the ditch.
The Upper Stonecrop Project is considered a conglomerate of previously listed Capital
Improvement Projects as well as the most recent Stormwater Master Plan (SWMP) update.
Attached you will find previous cost estimates and scope from the stormwater master plan from
Projects 15, 16, and 17, outlining the replacement and increased road crossing sizes at Tulip
Drive, Albatross Terrace, and Bayfront Terrace. Project 17 from the Stormwater Master Plan
update called for armoring of the ditch from the location of the current Stonecrop project to
Bayfront Terrace at the North.
The City plans to apply for Hazard Mitigation Grant Funding and other grants as they arise to
assist with funding for the construction portion of the project. Approving this design work does
not allow reimbursement for design work, but allows greater chances of grant funding having
design plans as well as reducing the contract wait and approval time between the design and
construction phase of the grant program.
We are seeking approval for this CSA including Option 1's additional survey which will allow for
a significant increase in the amount of ditch armoring from the original Stormwater Master Plan
recommendation. The CSA will be issued to the City's previously procured professional
engineering consultant, Carter and Associates, Inc., under an existing Professional Services
Agreement which was executed the City of Sebastian in 2021.
on
M
.R
..
M
M
M
P
A
224 7
eon
ems►
RECOMMENDATION
Staff recommends City Council accept and approve CSA #4 for Carter and Associates, Inc.,
`� including Option 1, for professional design services of the Upper Stonecrop Project.
ATTACHMENTS:
1. Carter and Associates CSA 4 - Vendor signed
FUNDING SOURCE:
r-�
Expenditure required Amount Budgeted: Funding source
$172,958.00 $305,000 Discretionary Sales Tax
Additional Funds Needed: $ 0.00
NO
n
M
M
R"
n 225
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
CARTER ASSOCIATES, INC.
1708 21 ST STREET
VERO BEACH, FL32960
Work Authorization No: CSA - 4
Proiect Title: Upper Stonecrop Drainage Improvement Project
IT IS AGREED to undertake the following work in accordance with the provisions of the Carter Associates, Inc.,
Master Agreement entitled NON-EXCLUSIVE ENGINEERING CONSULTING SERVICES AGREEMENT- CITYWIDE
dated February 22, 2021.
Description of Assignment:
Carter Associates, Inc. will provide civil engineering services for the Stonecrop Project as describer in the
Scope of Work- Exhibit A.
1. Pricing
Description
Task 1 A - Site Survey
Task 2 - Preliminary Planning
Task 3 - Drainage Design and Modeling
Task 4-Construction Plan Preparation
Task 5 -Permitting
Task 6 - Grant Application Assistance
Task 7 - Construction Services
Reimbursable Expenses
Option 1 - Additional Site Survey
2. Deliverables Provided to the City (surveys, plans, etc.)
Description
See the detailed Scope of Work attached (Exhibit A)
TOTALS
$25,095.00
$16,536.00
$27,924.00
$25,272.00
$12.324.00
$7,800.00
$35,232.00
$3,000.00
$22,775.00
Quantity
3. Basis of Compensation/Period of Services:
The above referenced description for CSA #4 will be performed for a fee in the amount of
$172,958.00.
CSA # 4
Page 1 of 3
226
Document ID: B13EA55DDF3782985E59982AE9026F8B
CITY OF SEBASTIAN, FLORIDA
_ WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
_ AGREED:
CARTER ASSOCIATES, INC.
ID: 9163AWE-54ED-085D-B942-OD68...
Digitally signed by
<jblum@canemssoc.com>
jwe 13, 2025 04:16 PM EDT
John Blum, President
Date: 06/13/2025
Attest:
— Jeanette Williams, MMC,
City Clerk
CSA # 4
_ocumentID: B13EA55DDF3782985E59982AE9026F8B
CITY OF SEBASTIAN:
Brian Benton, City Manager
Date:
Approved as to Form and Content for Reliance
by the City of Sebastian only:
Jennifer D. Cockcroft, Esq.,
City Attorney
Page 2 of 3
227
r
CITY OF SEBASTIAN, FLORIDA
WORK AUTHORIZATION FORM
CONSULTANT SERVICE AGREEMENT (CSA)
Exhibit A
Scope of Work
r
n
r
7
CSA # 4 Page 3 of 3
Document ID: B13EA55DDF3782985E59982AE9026F8B
NIP
' April 23, 2025
Ms. Karen Miller, P.E.
' Director of Public Works / City Engineer
City of Sebastian
1225 Main Street
' Sebastian, Florida 32958
RE: Civil Engineering Services Agreement
am Upper Stonecrop Drainage Improvement Project
CAI Proposal No. 2543935 (ReE Proj. No. 21349)
' Dear Karen:
We are pleased to present this proposed agreement to provide civil engineering services for the
below described tasks at the Upper Stonecrop Project. We propose the following scope of services
and corresponding fees in accordance with the Professional Services Agreement (PSA) effective
April 23, 2025, between Carter Associates, Inc. (CAI) and City of Sebastian (CLIENT).
PROJECT LEMTS:
This proposal and the services detailed within pertain to the proposed drainage canal improvements
located in the canal right -of way between Brookedge Terrace / Tulip Drive and between Laconia
Street / Clearbrook Street in Sebastian, Florida 32958.
AI
SCOPE OF SERVICES:
• The following outline and scope of services is provided:
Task 1A — Site Survev
• Perform and prepare Boundary/Control Survey:
o Recover and / or re-establish subject block, lot and centerline control for establishment of
�. block, lot lines and drainage right of ways. Prepare plan view drawings of block lot and
right of way geometry with recorded monumentation and control points. Survey to include
Block 239, Sebastian Highlands Unit 10
�. • Establish Vertical Control (Benchmarks):
o Differential levels (approximately 12,000 linear feet) from a published record vertical
benchmark to establish near or on site temporary vertical benchmarks for survey, design,
.. construction, and as -built purposes.
• Perform and prepare Topographic Survey:
1708 21st Street, Vero Beach, Florida 32960 • t 772.562.4191 • carterassoc.com
we P:\21-349 City of Sebastian - Stonecrop\Proposals\StoneCropPhase3.doa
Page 1 of 5
_ocumentlD:B13EA55DDF3782985E59982AE9026F8B
229
r
o Observe and record horizontal and vertical data of existing on -site conditions improvement
locations and ground elevations within 25 feet of the centerline of the 30 feet wide drainage r.
right of way, points of intersection (changes of direction) and adjacent road right of ways.
o Perform and prepare cross -sections of the 30 feet wide drainage right of way at lot line
intersections or approximately every 80 feet, drainage right of way points of intersection 0„
(PI or changes of direction) and adjacent road right of ways
o Perform as -built survey and cross sections of four (4) ditch right of way intersections with
Laconia Street, Bayfront Terrace, Albatross Terrace and Rose Arbor (Tulip) Drive on
o Prepare plan view drawings of topographic survey an provide PDF and CAD files for
engineering design.
on
Task 2 — Preliminary Planning
• Site visit to inspect site conditions such as topography and vegetation. Review potential ^,
impacts to adjacent properties.
• Meet with design team and prepare conceptual plan alternatives for presentation to City of
Sebastian.
r•
• Attend "kick-off' meeting with City Engineer and departments to review conceptual
improvements plan.
• Coordinate with utility providers to determine existing locations of water and sewer crossings. r•
Task 3 — Drainage Design and Modeling
Review and modify the ICPR model produced for the initial project between Laconia Street
and Stonecrop Drive to identify existing conditions and prepare alternatives for each crossing.
Review and produce report showing impacts throughout the watershed upon implementation .,
of the proposed improvements.
Prepare design for three new crossings and all proposed ditch inverts proposed in the design
of the system. .,
Task 4 — Construction Plan Preparation
OR
• Prepare construction plans that will incorporate improvements for the City of Sebastian SWMS
Capital Projects No. 15, 16 and 17.
• Prepare phasing plan to identify the scopes of each improvement for use in separation of
projects within the construction bidding.
• Define any proposed re -grading of the existing ditches to prepare for armoring of the re -graded
canal. ..
• Review and note any private property impediments for construction within the right-of-way.
• Prepare improvements plan for the southern ditch which may include armoring if specified by
the CLIENT.
• Coordinate with Geotechnical Engineer for soil boring locations, expected loads and criteria
needed for any crossings. Soil testing is not included with this proposal and will be provided
by the CLIENT.
Page 2 of 5 illkl
Document ID:
230 —,
M
• Preparation of traffic maintenance plans for the crossing installations.
^ • Provide follow through during permitting process to address Sebastian review comments.
• Prepare a tree removal plan to document any impacts on the existing vegetation.
^ Task 5 — Permitting
• Prepare and submit applications to the St Johns River Water Management District for
• coordination on the modifications to the canal.
• Prepare exhibits and submit to the US Army Corps of Engineers for impacts to waters of the
United States.
Task 6 — Grant Anolication Assistance
^ • Assist the CLIENT with production of exhibits needed for grant applications.
• Provide assistance in responding to any requests for additional information that may occur
during the review process.
Task 7 — Bidding and Construction Services
^ • Prepare quantities estimates for bid form and technical specifications.
• Attend Pre -Bid and Bid opening Meetings, respond to questions from Bidders.
• Review bids and provide recommendations.
'� • Attend council meeting to assist in questions regarding bids.
• Provide coordination between contractor, permitting agencies, and CLIENT.
• Provide "on -site" resident project representative for the duration of time required to meet
permit conditions and provide routine reporting of substantial construction activities to the
Engineer.
• Complete and submit certification forms along with contractor provided "as-builts" to all
^ permitting agencies.
^
Option 1— Additional Site Survev for Ditches Between Bavfront and Tulip Drive
• Perform and prepare Boundary/Control Survey:
o Recover and / or re-establish subject block, lot and centerline control for establishment of
^ block, lot lines and drainage right of ways. Prepare plan view drawings of block lot and
right of way geometry with recorded monumentation and control points. Survey to include
Part of Blocks 236 & 237 and all of Block 238, Sebastian Highlands Unit 10
^ • Establish Vertical Control (Benchmarks):
o Differential levels (approximately 2,000 linear feet) from previously established record
vertical benchmark to establish near or on site temporary vertical benchmarks for survey,
design, construction, and as -built purposes.
• Perform and prepare Topographic Survey:
no
Page 3 of 5
d
_ocument ID: B1
231
am
o Observe and record horizontal and vertical data of existing on -site conditions improvement
locations and ground elevations within 25 feet of the centerline of the 30 feet wide drainage i.
right of way, points of intersection (changes of direction) and adjacent road right of ways.
o Perform and prepare cross -sections of the 30 feet wide drainage right of way at lot line
intersections or approximately every 80 feet, drainage right of way points of intersection r.
(PI or changes of direction) and adjacent road right of ways
o Prepare plan view drawings of topographic survey an provide PDF and CAD files for
engineering design. ..
COMPENSATION:
We recommend authorization of the following fees for this assignment.
Task1A — Site Survey........................................................................................................
$25,095.00
Task 2 — Preliminary Planning.......................................................................................
$16,536.00 ..
Task 3 — Drainage Design and Modeling,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
$27,924.00
Task 4 — Construction Plan Preparation,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
$25,272.00
Task5 — Permitting...........................................................................................................
$12.324.00
Task 6 — Grant Application Assistance,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, $7,800.00
Task 7 — Construction Services.........................................................................................$35,232.00
Reimbursable Expenses
$3 000.00
TOTALFEES, .................................................................................................................. $150,183.00
Option 1— Additional Site Survey................................................................................... $22,775.00
TOTAL FEES WITH OPTION 1.................................................................................. $172,958.00
ASSUMPTIONS:
PM
In developing this proposal, CAI represents to the CLIENT that the following assumptions have
been made and that deviation from these assumptions may require additional expenditures on
behalf of the CLIENT to CAI.
1. This proposal specifically excludes all application and/or impact fees, which shall be the
responsibility of the CLIENT.
2. It k esr ander9tendifig that 81om is .:Baal . _,_ ha-v.. been _L _ a •
.,
t . �b _ _ _ C c..J..Jc J1 c b...cc....b �...� Y .....:i...e rY. .»l�.
Cin diis agNefflefA aFe lifBited 8fily f8 PARMNIAtiAn gaddwifli
stfatien sencisel.
3. Architectural, landscape, electrical, mechanical, and structural services are not included with
this fee proposal.
4. Construction stakeout and as -built surveys are not included with this proposal. It is anticipated ..
that the contractor will be responsible for construction stakeout and as -built surveys. CAI can
provide these services for the contractor if he chooses.
r.
Page 4 of 5
Document ID: 813EA55DDF3782985E59982AE9026FBB
232 .
Thank you for giving us the opportunity to submit a proposal for our services. We look forward to
.■ working with you on this project. Our receipt of a signed copy of this agreement will serve as our
notice to proceed. Should you have any questions or need additional information, please do not
hesitate to contact me at our office.
•
Sincerely, Agreed to and Accepted:
.. CARTE SSO TES, INC. By:
Print Name:
Clinton J ahjes, P.E. Address:
Proje anager
M
an
•
4"
n
-ocument ID: B1
Date:
Page 5 of 5
am
233
City of Sebastian SWMS Capital Project No. 15
stoleeop DRch �To, Cuhm. Replacement
Ptofect Laotron Map
Protect Area
O
it. Na rem Omlptba
AdmWs(m
Ive vM ro"meetlnp Cosh
1
Engineering Survey and Design
2
permitting
3
Bid Documents Prep
Can#m[Nvn Costs
4
Mobilization and Demobilization
5
Combustion Survey
6
Pollution Control
T
Maintenance of TerfOc
8
Saw cat and mill domain, asphalt wv¢ment
9
Remove Existing plan SeNom
10
Install Oft x T% Cvmete Box Culvert
11
Rose"Restoatian
12
Tine Gating-R¢stwation
0
Soccer,- Gsesrcnt Reparatbn
14
Woo Depool-Cmworse on Debra,
1S
Cmst ruction lmpe tbm
16
Suatand 11-I51
IT
Coffls,d y(30%)
18
ToblTmelle.l>)
I Unit
I Unit Cost ITakeof Otyl taboo I Duamf I
Total Cal
Illoln
IS
$19,732
1
$19,727
Associated to be 12 apmkst cost
IS
SSO,oOO
1
5501000
ERP permtt assumed
IS
S25,00D
1
S25AM
Cpnatruesian drawings, specs
IS
$4,253
1
$4,253
Assumed to be, 5%of other costs.
ES
$1,500
1
$1,500
Esllmatetl fee saging each property line and alignment cbec0.s, as -built survey Included.
IF
$3
120
$240
FOOT 6month avg tort for sediment barrier
LS
59W
1
S950
SY
S20
53
O.M
53
S1.060
Saw M antlmill approximately 24'x 20' of exbtin, roadway Davemenp av, 2-depth
IF
S45
81
0.0%
81
S3.645
Faavation and mramol ofexbtin, Min 36- RCP culverts, appmxlmatelf 301E each
IT
sm
81
0.0%
81
$62,775
Installation cost Mandes marshals. excmicen. bell structure installation. bacKil, and compassion.
SY
S60
53
DO%
53
531180
Irobilalien cont includes materials, base MNillation, compattbn. pavement lnsalladon, and raadvray marlln85.
SY
S3
ill
Sm
117
5350
21Y a 50'easemem, area, 1,000 SF I.I.I.
SF
$4
1.000
S.M
1,050
54.200
20 x SO'eate 1 area, 1.11005E tool.
T011
S34
%
$3.259
Tanspat and dspasal of warte.. and other denwlhlophdraructlon customs at the Indian Winner County LF.
IS
531895
1
$3,895
Assumed to be 5%of other costs.
$184,023
555,2W
$n9=
234
L.,.Inent—A3EA___IF37t__..)E595__.3902E. -- 1 1 1 1 1 1 1 1 I 1 1 1 1 1
I 1 I 1 I 1 1 I
I I I 1 1 1 I 1 I I I
City of Sebastian SW MS Capital Project No. 16
Sometimes, Ditch - Nbatmss CNaeN Replarement
Prokct location Map
/ Profett Area
O
Illem Ne.
IIhm Oexdptlm
I Unit
Unh Cost ITekeoN Ill,I Waste
Dusimill
Total Cart
Notes
Adminlsamtiveano Enipeedpg Costs
1
Engineering Surprise and Design
IS
$14,371
1
$14.372
Assumed to be 12%of project cost
2
Permon,
IS
$S01000
1
$ 0,000
ERP permR assumed
3
Bid documents Prep
IS
525,=
1
$2.S,00o
Canstrvctbn condogs, spec
CanstrvRNn Casts
4
MobR4atbn and donmbilleation
IS
52,132
1
$;132
ASUmedmhe s%aratM1ertaslx.
5
Cmsirvctron Survey
ES
51.500
1
511500
EsOmatedfee making such property lbe and olmobMa6gnment checb. as-bulR survey locluaed.
6
Pnnupbn Control
IF
$3
120
530T
MT 12 mnnM average- Market Area ll sediment barter
T
MaLrtenaaseof Traffic
IS
$61)R
1
$609
F00T 12month average -Market Area ll
a
SawM aad mill eAlsli, asphalt pavement
ST
$20
S3
0.0%
53
$1.=
Sew cut and mill appmximatelY 24'x20' of exisliag modincYPaverreal, avg 2-depth
9
Roamed � Usual, 54-Pipe Sections
6
$45
TO
0.0%
TO
$3.150
Exception and removal M boiling 54- RCP parent. approximately TO IF
10
Install all x Tit Concrete Box Culvest
lF
$AS
30
0.0%
30
$23,250
Installation cost Includes materials,excavation,bedding. Structure Installation, Iack0il, and tampaction.
II
Raman, Restoration
SY
ISO
53
0.01%
53
OAR()
Installation cost Includes materials, base Installation, casnWttlons pavement Installation, and rmdwq marNnga.
12
Fine Bonds, - Restoration
SY
53
111
S.0%
112
Wit
2o' x W easement area, I," SF total.
13
Sodding- Easement Respiration
a
$4
1,000
S.Ox
1,050
$a,lo0
2P x S0 easement area, 1,M IF tool.
14
used. Obpuas. Canrtrucumr dobds
TON
S34
93
$3,147
Transport antl disposal of to .. aM other demnBtbn/osairs ctbn materials at the Indian River Coumy U.
IS
Taiuvucdpn lnspecOons
IS
S3.=
1
$1AB0
Assumed to be s%of other rears.
16
Spousal (1-15)
5134.135
12
corrosion, (301a)
$40.210
18
Tpral Curt11H1T)
$174,375
235
Document ID: 1313EA55DDF3782985E59982AE9026F8B
City of Sebastian SWMS Capital Project No. 17
smnecmp "a-gayfmnt Uhn," Reclacemeel
Prot. lOutbn Map
^/ Project Area
Iran Me. Item Oewl5/m
Adminbtmtke
and Englaering Cosos
I
Engineering Survey and Design
2
Permltting
3
Bid pocumeres Prep
Camtvcllon Casio
e
MAIN...redaad 0emobllildion
5
Cenarualen Survey
6
Pollution Gontml
7
Mximenanceef TnfBc
a
Saw cut and mill erdsting asphalt pamnent
9
Remwe Earaft,M eSettWm
10
renal 41t a 7H Umdde Burl Cuhert
11
Roadway associate.
12
(riannal Eatarnion
13
Install Mannel Armoring
14
Fine Belpre -R.I..tlen
15
Sedding- Easement Reapntcon
16
Waste tedesal-Constrveticn Debris
17
ConsWttbn lnspealom
18
Subto al (1.17)
19
GOatlnBerlc-y 13M)
20
lead Coen(Will
I Unit
Uldtrm I TaapeHOty l wale
1luanea
6
$67,967
1
IS
$".M
I
15
Sss,0o0
I
IS
$23,399
1
ES
$1,500
1
LF
Sn
120
IS
SM
1
SY
$20
53
Ow
53
LF
S45
116
0.0%
136
tF
$ns
56
0.0%
56
SY
$60
53
0.0%
S3
a
Su
657
0.01K
657
Se
525
25,623
0.01,
25,623
SY
S3
111
5.0%
117
SF
$4
I'M
SA%
1,050
TOM
$34
106
IS
$9,105
1
Total Goa IMOees
$67,967 Assumed to be 12% a pmlert coot
$50,000 ERPpermlt.o.ned
$25,= Conitheabn dnwiags, specs
523,399 4ssumetlto be SX of othermsa.
$1150) Estimated lee staking eaal pmperer line and all6nment chests, as -bulk survey Included.
$1,982 FOOT 6-ndelh I, cost for sedidem banerand 110 LF Heady turbidity bass.
S608
$1,050 U. cut aM m111 appmaimaMy24'. 20'ol enstln8 roadway pavement, ad, 2-depth
$5,220 Famvat" and removal of eahtlry than 40- culverts, approximately 581F eatll
$4a,9% Installation cast includes mahadeh, ea ten, barred, rtrvcture Installation. badfill, anal camlped...
$3,180 Installation cost includes materials, bassInstallation, compabn, Wseraent Installation, she roadway maM1inBc
57.873 Assemed3:1s1ope change to 1.5:1,36'thannel width, 37.5 CFM esrm1ed, 3.4 CY7LF.
5384,3as Assumed39Sf/LFchiprrelene
$30 20' a 50' easement area. 1.000 SF total.
$4,200 20' a 50' eesemeal area, 1,0c05F total.
WIG Transport and disposal of waste Macrcte and other demollllon/constmabn materials at the Indian River (:aunty EF
$9.105 Assumed to be 2%of other costs.
$634.356
$190,307
$834lm
236
L.,,.,.,i3ent.—. .)13EA.,--JF37E.---JE59S--., bO26..._ 1 1 1 1 1