HomeMy WebLinkAboutBevans Sidewalk Warranty Letter-R1
Commercial Diving | Marine Construction | Specialty Engineering | Nuclear Services
Underwater Engineering Services, Inc. 3306 Enterprise Road, Fort Pierce, Florida 34982 p (772)337-3116 ● f (772)337-0294
An Equal Opportunity Employer
September 24, 2025
Karen Miller
Director of Public Works/City Engineer
City of Sebastian
Subject: Bevan Drive Sidewalk Warranty Letter
Dear Karen Miller:
This letter serves as a formal warranty for the 5’ by 85’ sidewalk that UESI constructed on Bevan
Drive for the Stonecrop Drainage Project which was completed on September 15, 2025. The
sidewalk control joints were cut in the sidewalk 2” to 2.5” in depth, exceeding the 1-1/4” required
depth. Due to the City’s concern regarding the structural integrity of the sidewalk, UESI and the City
have agreed to UESI providing a one-year warranty. We hereby warrant that all materials and
workmanship provided in connection with the above referenced sidewalk construction for a warranty
period of one (1) year from the date of September 17, 2025.
During this warranty period, UESI agrees to repair or replace, at our own expense, any defects in
materials or workmanship discovered under normal use and service, provided such defects are not
the result of:
• Misuse, abuse, or neglect
• Vandalism or accidents
• Natural disasters or severe weather
• Improper maintenance or repairs performed by others
• Normal wear and tear due to usage or weather
All warranty repairs will be conducted in a timely manner upon written notification from the City of
Sebastian. If you should have any questions or require service under this warranty, please contact
us at our office main line at 772-337-3116.
Thank you,
Andrew Connelly
Vice President
Director of Project Development