Loading...
HomeMy WebLinkAboutFiber Second Extension & Amendment ExecutedSECOND EXTENSION AND AMENDMENT TO AGREEMENT FOR ANNUAL FIBER OPTIC ENGINEERING, DESIGN, MATERIAL, SUPPLIES AND INSTALLATION SERVICES This Second Extension and Amendment to that certain Agreement to provide Annual Fiber Optic Engineering, Design, Material, Supplies and Installation Services is entered into effective as of September 12, 2025, by and between Indian River County, a political subdivision of the State of Florida ("County") and Gerelcom, Inc. ("Contractor"). BACKGROUND RECITALS WHEREAS, the County and the Contractor entered into an Agreement for Annual Fiber Optic Engineering, Design, Material, Supplies and Installation Services effective September 12, 2023; and WHEREAS, Paragraph 3 of the Agreement contains the term and renewal provisions; and WHEREAS, the first term commenced effective as of September 12, 2023 and ended on September 11, 2024; and WHEREAS, the first renewal tern commenced effective as of September 12, 2024 and will end on September 11, 2025; and WHEREAS, pursuant to the Agreement, the parties desire to extend the Agreement for an additional one year; and WHEREAS, the parties with to Amend the Agreement to include new Termination for Breach language; and WHEREAS, the parties desire to amend Exhibit 2 to the Agreement — Pricing; NOW, THEREFORE, in consideration of the foregoing, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the County and the Contractor agree as follows: The background recitals are true and correct and form a material part of this Second Extension and Amendment. 2. The second renewal term shall commence effective September 12, 2025, and shall end on September 11, 2026. There are two additional one-year renewals available on the contract. ARTICLE 1 I — TERMINATION OF CONTRACT is amended to include: D. (4) A vendor or service provider that breaches such contract during an emergency recovery period (I-yearperiod that beings on that date that the Governor initially declared a state of emergency for a natural emergency) is to pay a $5,000 penalty and damages, which may be either actual and consequential damages or liquidated damages. 4. Exhibit 2 to the Agreement is updated to reflect new pricing. 5. All other terms and provisions of the Agreement shall be unchanged and remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Second Extension and Amendment to be executed effective the day and year first set forth above. GERELCOM, INC. Bryan Lanham, Digitally signed by Bryan Lanham, RCDD By: RCDD Date: 2025,08.1408:52:51-04'00' -r rnted name: Bryan Lanham, RCDD Title: Vice President (.Corporlte Seal) INDIAN RIVER COUNTY, FLORIDA. BOARD OF COUNTY COMMISSIONERS,,,,,.,.,,,,, By: A 4, �OfilA Joseph E. Flescher Chairm ig'r yE �✓fR CO��' Dare: 8/14/2025 Attest: Ryan L. Butler, Clerk of Circuit Court And C mptroller Ile uty Clerk Approved: 4 ohn A. Titkanich, Jr. County Administrator Approved as to form and legal sufficiency: 66"" V � �" Po nifer . Shu er unty Attorney 6 R ( ma Addendum 1 Bid Form Bid Form — Addendum 1 Annual Bid for Fiber Optic Engineering, Design, Material, Supplies and Installation Bid #: Bid Opening Date and Time: Bid Opening Location: The following addenda are hereby acknowledged: Addendum Number I 2023056 July 25, 2023 Purchasing Division 1800 271h Street Vero Beach, FL 32960 Date 3"Y P. 2-oV-5 2:00 P.M. In accordance with all terms, conditions, specifications, and requirements, the bidder offers the following (Bidders are not required to bid on all groups, but are required to bid on all items within each erouo they choose to bid on): Item Code Group 1 Technical Labor Per Unit Price GR-1-1 _ Engineering Florida PE Services ........ . --- ........ __ HR $ 2 2S;_ GR 1-2 - BICSI Registered Communications Distribution Designer ... .... HR $ GR 1-3 CADD Operator _ - HR - $ Q�. Ob GR 1-4 Clerical Support Services _.._ HR GR-1-5 _ OSP GPS Survey .....................--..-.-.._....... . MILE $ a o� GR 1-6 OSPGISTechnician _. _.....-......-.....,............... ............................ MILE $ o� 8Q.......: GR-1 7 . ... OSP ROW Strand Mapping .........................- _ .... .t.. MILE- GR 1 8 OSP ROW Design and Permitting - MILE $ c GR 1-9 Commercial Cable -Electronics Technician (.Ons,ite) _ .. ..- _..... ........... HR _.... 7 $ �� p� GR 1 10 Commercial Cable Installer (Onsite) _ ....... .... HR _.... $ GR-1-11 Commercial Duct Installer (Onsite) HR - $l Bidder Name: Addendum 1 Bid Form Group 2 OSP Construction Conduit, Pull and Junction Boxes Per Unit Price GR-2-1 Conduit, 2" PVC @ 24", Machine Trench (F&I) ..-.. LF $ (. .4$� - -----------_--- GR-2-2 ------------ .__ ------• — - - - - _........ ........................_-_ Conduit, 2" PVC @ 36" Machine Trench (F&I) ---...........-----•-- LF -- _............._.._....................... !..GR--2--3 -............................_......._...._.................._.._..._.._...................._........._.............. Conduit, 2" PVC @ 24", Hand Trench (F&I) ............ ------------- GR 2 4 -.... - - _ ... _ . _-•-- _...._.._._.._._...�F......-_$- Conduit, 2" PVC @ 36", Hand Trench (F&I) ... _ __ .. ._ LF $ --..... -......... ............... (b,�� ._. GR-2-5 _... Conduit, 2" PVC, Extra Pipe (F&I) _. . .... . _ ... ............ LF $ _....... s_ ....... _ -- - GR-2-6 ......._..Innerduct,..1.1/` " Corrugated, Colored (F&I) ..........._....._............................LF... $...... �ea.•.. .2?...... ..... GR 2 7 Conduit Plowing 4W 11/4" HDPE, Colored F&I t._...._).... LF $ -........._....._.... GR-2-8 - - - MaxCell Placement in existing 2" Conduit - 2" - 3 Cell (F&I) .............-.......-........_ . - - ....__.. - _ ...._._._..._.....-.._.... _ .... LF _ .. ........ ......_......_.. 3.7 - - ............................ ... GR-2-9 MaxCell Placement in existing 3" Conduit - 3" - 3 Cell (F&I) LF $ ._....�l. �q�_... _._... — GR-2-10 -..................... MaxCell Placement in existing 4" Conduit - 4" - 3 Cell (F&I) •-- _.... _..................................----._._....--..._.....-_._._...._.._....__-..___...-..••-••••-- ............. LF ..... .._..._.._ $ .._.-.__.._.. - _.... - GR-2-11 Cable Direct Bury, Hand Dig @ 18" (1 Only) LF $ _...__......_...�.................... _...................... ............ ............. I GR-2_12 Cable Direct Bury, Plow @ 30" (1 Only) __.._....�-- .._..-._.._:._.__._....__LF $ _.._------._- . i GR 2 13Directional I ....._. l Bore, 2" HDPE (F&)_............._....................... LF $.1..... .. ...... Z,..ck2.._.__ Jr0.00 GR-2-14 Directional Bore, 2" HDPE, Special Conditions (F&I) LF $ ..�.e..S'. GR 2 15- Directional Bore, 8" Under Waterway<1,000 If (F&I)-_... _...____.__. _._..L. ........................... . 91-2-16------- Conduit, 2" GRS,.(F&I)-------------•--•-••-----•-----•--._..---••----.....-_... $ c� GR-2-17 - .IF Conduit 4" GR5, (F&I) _.. LF _............... $ .t.5.--- _........-_.._ ...... �t�, QS _GR-2-18.....-_.Conduit, 2" Fiberglass Bridge Mount (F&I) LF $ 14 2.� GR 2 19 ..._...._......... .................•..__.._........._..........._._. Conduit, 4" Fiberglass Bridge Mount (F&I) LF $....& . .................... ..... ... 3_-, GR-2-21 ............................_..._.... __._....,. _------ ....._........-....._...._. Detectable Tracer Wire (F&I) -.._.._........... -•-.._..................................---.............._.........- _-.........-- LF $ ......................... -- r._. - .... ...... _....... .. GR-2-22......_. Detectable Marking Tape (F&I).......__.-..... _....._...................._. LF �_ ..t!s..... ..._..._.... .... GR-2-23 F & I..........--:.........._......._........--.--- GR-2-24 - .................-_..._......_......_ . —.._._..._.............-.._..�..�1._...._.... ROW Delineator Marker Post Orange 6' (F&I) .............._..._.._....-- ......................... $ (?_ �'� GR-2-25 _....... __. _....... _ Cable Route Markers -Tubular, Type III HDPE _-_...EA EA $ ! d ......._.........__...---.- Pull Boxes and Junction Boxes ..................._..... -..U...'.��................ _...... GR-2-26 Man ... ...----------......-------.• ....--................._........_.........._..__._....._......_.................- ._.....__.._........_.... GR-2-27.___. Handhole, Composite 24"x36"x24" W/ Lid (F&I) - -. EA ....... . GR 2 28 Handhole, Composite 24"x36"x24" W/ Lid Traffic Rated (F&I)_ EA . GR-2-29 Pullboxes, Composite 17"x30"x12" W/ Lid (F&I) EA $ ............. GR 2 30 .... ....._........................... Pullboxes, Composite 17"x30"x12" W/ Lid Traffic Rated (F&I) ..... . ..............._......-----._........._._..._........_ EA . $ t7p �i.ZQ.......- ............ GR-2-31 Pull Box Apron — for a 24" x 36" pull box measuring 12"W x 6"D ........... ............_... ............. ...... .............. - EA- $,SQ..... Outside Plant Cabinets ---.._...._._..................... ........-- -- ... Communications Cabinet — Small's"H x 24"W x ""^ with Concrete Base (Furnished and Installed) EA $ .................................................................................................................. . Communications Cabinet — Large 5 .'-"u., 20"I_N x , 9"D with Concrete Base (Furnished and Installed) GR-2-34 Communications Cabinet— Medium ""H x 2g"`"' x ""^, with Concrete Base (Furnished and Installed) _.. _......................._. ......... .......................... GR-2-35 Device Cabinet Type 332 (66"H x 24"W x 30"D) (Furnished and Installed) .....--.............. ....................................... .................- - _..... ...._.._ GR-2-36 FO Closure -Re -Entry Kit, Cable Preparation, up to 144_ Fiber, Aerial or UG Installation (Furnished and Installed) EA $ EA $ EA $ (.... ' EA $ 1©0« 159.00 17AS-00 1 ( 2S•Ob 1599.00 Addendum 1 Bid Form Bidder Name: Group 3 Fiber Optic Cable Per Unit Price GR-3-1 Cable 12F, SM, LT, Aerial(F&1)............._............_-..................... ...... .............._....FO GR-3 2 ......... .........._......LF...-.... FO Cable 24F, SM LT, Aerial (F&I)............................... .---- •--..... .._.__..._...__L ... ...........1..-....... _.... _$._.. j... �.7 GR-3-3 FO Cable 48F, SM, LT, Aerial (F&I) __ ._......_._........ _...----..._...... _ - LF _ - $ 5� - �. R-4. Cable 96F, SM, LT, Aerial(F&I)_ LF -... . -----------------•---- GR-3-5 . -.............-............_.._...._..----•------.-__..-----. FO Cable 144F, SM, LT, Aerial (F&I) ....... ......... .--._. LF .... $ 1 GR-3 6 ........ ....... ...---------..................... FO Cable 12F, SM, ADSS, Aerial (F&I) :. ............. ............ ........ I............, ..... ... ....... .. .. ......_ .... .................... LF ..... . ............. $ GR-3-7 T FO Cable 24F, SM,-ADSS,_Aerial (F&I) LF $ - . ..... GR-3 ...--•..................----•--------...._......................�..�_�..?�!.......... �- ............................................................. GR-3-9 .-----....-.......----•-----•---...-----................... .------- -1- ............. FO Cable 96F, SM, ADSS, Aerial (F&I) . -... - ..... LF --....... $ .. 4. GR-3-10-..._..._.--_..._.: ................ ...._._. ......- -FO Cable 144F, SM, ADSS, Aerial (F&I) ........ L� ...... - $ �.2..r..�_-...__.. GR-3 1.... -.... .................FO ---- ..............................- -- Cable 12F SM- LT, UG (F&I) - -LF LF $. 4�....._..... GR-3712 ................................. .........__._..........-_-.... _ . -FO Cable 24F, SM, LT, UG (F&I)......W......... _....... ......�. . GR-3-13..... .. FO Cable 48F, SM, LT, UG (F&Q. ► ,1. GR-3-14 ........................ ...........:..........--...._...._.......... FO Cable 96F, SM, LT, UG (F&) -LF...........$....... LF $ GR 3-15 ............. - ......- - - FO Cable 144F, SM, LT, UG (F&I) LF -..� $ �...._. GR-3 16......_ ...._.... FO Cable 12F, SM, Drop Cable (F&I) LF . $ +._......... GR-3-17 ... _ •.. FO Cable 12F ............... -----...., MM, LT, UG (F&I) LF $ GR-3-18. _..._.....---•--.FO-Cable - -- ........................_.. 24F, MM, LT, UG(F&.)....................._...--- .---........ .--•-•- -- .............._�.....U..�a........ LF-....... $--.`-......... GR-3 19.........�_,.._...... FO Cable 48F MM, LT, UG(F&I) LF GR-3-20-.-..._.........._. .............. - ....................... I ...... ........... ....................... --... FO_Cable 96F, MM, LT, UG (F&I) -.........� LF....- -.... ..._ . $------v 3..'�iaa..._. GR-3-21 .........................._..FO ...... ....... _... ................_............................. Cable 144F, MM, LT, UG (M) LF $ -J-.( -. p----..._..................._..........------...--------....___.-.... -- Fiber Optic Cable - ISP Per ..... Unit Price GR-3-22 -..-.....-......__........ FO Cable 12F, SM, Riser (F&I) . .-.._-.....-....................................................................._..-•----.......•-............I-- LF $ GR-3-23 - --- -- -- -- - ••• FO Cable 24F, SM, Riser (F&I)................... ------...................._...._...................-._LF---.._ -- - - - --- .--_.----- ..-1_..., ................... $...�.r.3�r'..._-......_. GR-3-24 ........--- ................. ......._ FO Cable 48F, SM, Riser (F&I) -• --.... .-.. _ --- ------------- ---.......... LF $ ..... . - - GR-3-2S ....._ ............... FO Cable 96F, SM, Riser (F&I) --- . ---- -... ........ LF $ ` `��_ GR-3-26 - ........._...._,...._..................--- -- -•- -------...... - - FO Cable 144F, SM, Riser (F&I) ... --.._..__.... ...:...._....:__._._... -- _ LF ---- . $ GR-3-27 _.... ........ -.._.......__ f0 Cable 12F, SM, Plenum (F&I} - ...............Z�.-.. LF $� c- GR-3-28................_ _..�.._..._..._....: ................._......... f0 Cable 24F-- $M- Plenum (F&I ..... ...... /,.6_._.... GR_ 3-29 ---- - ....._.._ _......LF....-.._$...... - -FO Cable 48F, SM, Plenum (F&I).......... . ........... ..... ----...........................LF...... $....1. .� ........ GR-3 30 _:........ FO Cable 96F SM, Plenum (F&I) ........ ...r LF $ r GR-3-31 -----. ...._ _----•--- -•----- -------•----- -- •--•--•-------------....�� FO Cable 144F, SM Plenum (F&Ij LF _..... $ GR-3-32 .........................--------•-•-..._-------•--...-------- FO Cable 12F, MM, Riser (F&1) _.-..-.....---•----..----..-...--.-._....--_-_•----.:-...-.........._._.-....._---_•-•.------••-------_-- LF $ , -... GR-3-33 ......................................... FO Cable 24F, MM ............ ....-..---...------.....Riser (F&I)_ _.. ___........._..-----.............................----._LF------- --._.'"� 7.A........... { GR-3-34 FO Cable 48F, MM,. Riser (F&I) LF $ 1 "7 GR-3 35 I_... - - ------------------ - . _____...... FO Cable 96F, MM, Riser F&I - _ _--------------------------------- LF $ GR-3-36 FO Cable 144E MM Riser (F&l) ............... C�a���-- GR-3-37 _ - -FO Cable-12F, MM,Plenum(F&1)._ �.r?b...... GR-3 38 ------- -_ -- ................................................ ........ .-...._._...._LF........$............ FO Cable 24F, MM, Plenum (F&I) - .-_.-..-- _.._ LF $ r, GR-3-39 ... -_,. ..._ ... ............... ....._...__..., - .............................. ...... FO Cable 48F,.MM,..Plenum (F&I)....................._.. LF .. ....' $ /_!� �_ ._. GR-3 40 ................................._. FO Cable 96F, MM, Plenum (F&I) ...............-........-----.-_....-----...........,....................,...................• LF $ Z> GR-3-41 ---................-............---._.._......................... FO Cable 144F, MM, Plenum (F&I) LF - $ ��• Addendum 1 Bid Form Bidder Name: Group 3, continued Fiber Optic Cable - Preterm Drops Per Unit Price GR-3-42 FO Cable SM, Preterm ST,150' W/Housing (F&I) EA $ GR-3-43 _6F, FO Cable 12F, SM, Preterm ST, 150'W/Housing (F&I) ----------. ............... ------ ..-......_............ _................................-•-------.._......_._..._........_.............. EA - $ - - b� ���� ._. _._._ .... __..... GR-3-44 FO Cable 6F, SM, Preterm ST, 150' W/Coupler (M) $..... :7 i---..... ..... GR-3-45 . ...... .... _.._ .. ...__. ..................... __....:.__...EA........ FO Cable 12F, SM, Preterm ST,150' W/Coupler F&I) ..........................-.......................... •-•---............. • --- ----- _ ( EA $• .��.. .._:. � 1..1.3a......- - Fiber Optic Splicing Terminations - ISP Per Unit Price GR-3-46 Splice -Term. Cabinet, Wall/Rack (F&I) $.....11.:35• 3 ................. I-—....... GR-3-47 _ -FO _.. ................. FO Splice Term Cabinet, 12F, Wall/Rack (F only) .....EA.._.__. EA $ --- ��3,�, --................... .._._... - - — - -.. _ ._..... .. ,, ...... GR-3-48 FO Splice -Term. Cabinet, 24F Wall/Rack (F&I) 7: _ GR 3 49 -,.f FO Splice Term Cabinet, 24F Wall/Rack (F onlY..._..,._.,_....._..._.._......._.....EA _.....EA_.....__.. $... Z�0�20 ----_.......-. _ _... _ FO Splice Term Cabinet, 48F_Wall/Rack (F&I) _... EA $ �_. jra _GR-3-50 GR-3-51 FO Splice Term Cabinet, 48F Wall/Rack (F only) _.... EA_ -..._ $ .38.v . Zk t ............... .. - ...............----.----.. GR- ... . .. ��- ... _.._..._..._ GR-3-53 .................. FO Term. Housing, 96F Wall/Rack (Fonly) EA_ $. ��G,_ai_ .... GR-3 54.._..----...-..........FO ......... - - Splice Housing 48-144F (F&I) _ $ 6fe=- GR-3-55 .__...._._..................... FO Splice Housing 48-144F (Fonly) _---.............................................. -......._ _ ._EA..., EA...--$ -- - , GR-3-56 FO Ter. Housing, 96F Wall/Rack (F&I) $.....Z:. ..................... i GR-3-57 _..... .............................................. -- - _._-----_._ FO Ter. Housing, 96F Wall/Rack (F only) _...._EA......_. EA $ Z --- ----- GR-3-58 . ----- -- --------------- ................................... FO Cable Prep, Fanout Kit, Buffer 6F (F&I) EA $ e - 3, ---------------------------- GR-3-59 ................. GR-3 60 ----•••-•-........_.:..._._ ------------ •----•--- --......----........----..-•---•--_.-,........._........._...__.--.....__. - FO Cable Prep, Fanout Kit, -Buffer 6F (F only).........._.................._..........._.....EA._ FO Cable Prep Fanout Kit Buffer 12F (F&I) EA -$ $ .. ..E............ S�+-� � GR-3 61- - GR-3 62 - FO Cable Prep, Fanout Kit, Buffer 12F (F only) FO Cable Prep, Fanout Kit, Spider 1ZF SMJMM (F&) EA EA $ .. Z 3, ,� GR-3 63 FO Cable Prep, Fanout Kit, Spider 12F SM/MM (F only) EA $ _,......_... GR-3-64 . ..... ...... ..... Connector, ST, MM.. Unicam (F&I). ...........................FO GR-3 65 .... ........... .............................................._. .......... . .... .... FO Connector, ST, MM Un►cam (F only) __ ... _.. �.. ...._......... .....EA ....$. EA --- --- $ - -..Z :.. ........ GR-3-66 ..... FO Connector, SM, Unicam (&) ....-----•---_..._. ..-......-•-•----•-----... EA . .......$... .....v.�.r.�..... - GR-3 67 --._....--- FO Connector, ST, SM, Unicam (F only) -..---. -. _.. --. - - - - -- - - ----- .--...------------- EA ------__........_ $ 1� GR-3-68 cam (F&I FO Connector, S.. SM Uni ) .... _ ................................. .... EA ._...................���. $ 1 .. . GR-3-69 _. ................._.............._...._._............_.. FO Connector, SC, SM, Unicam (F only)_.._.EA:...._. -... --.----.-.-..,.................•-••-•-.-... $........�{._l........I GR-3-70 FO Jumper, Duplex ST-ST, SM,10' (F Only) EA $ .;; GR-3-71 --_. _-- -. ..---..:....-...._....... FO Jumper, Duplex ST SC, SM,10' (F Only) . EA $ ................... .... GR-3-Z2 .. . ... ..................... ........ .. . ........._... FO Jumper, Duplex ST-LC, SM. 10' (F Only)...... .... $ .... g GR-3-73 _._... -• ..............---.....,........_.....EA FO Jumper,_ Duplex ST FC, SM, 10' (F Only) ----- .,........ EA _........_.................-_ GR-3-74 -- -FO Jumper,..Dupiex SC -SC, SM, 10' (F_Oniy) ......3u..�'....... - - GR-3 75 - - _..................... _...._.._.....EA- FO Jumper, Duplex SC LC, SM,10' (F Only) ...._$._..._....,3.. EA $ .... GR-3 76 FO Jumper, Duplex ST ST, MM,10' (F OnIY....................._..._.__._..._..._.._._...EA $ - f GR-3-77 FO Jumper, Duplex SC -SC, MM,10' (F Only) EA Addendum 1 Bid Form Bidder Name: _ Group 3 - Continued ............ FiberOptic Spl................................................... -_..._........._...................._..........._....---............ ._ ....-........... GR-3-78 FO Splice Closure 12F, Aerial/UG (F&I) _.. ---------------- .......... EA $ -........... 1 .....-'......_ .... .... ..... GR-3-79 .._....... FO Splice Closure 12F, Aerial/UG (F only) _......................._.._.EA............_7145":oa-..... ............ .......... GR-3-80 FO Splice Closure 24F, Aerial/UG (F&I) _._.... _...............................................---- EA ........_........... $ q_� ' ° .. GR-3-81.............................FOSpliceClosure_24F,Aerial/UG(Fonly)........................_-..............-._.-..EA.......$..-.'..Zb_S ....... ._ .P. ......... GR-3 82 FO Splice Closure 48F, Aerial/UG (F&I) t- __ EA ! GR-3-83 FO Splice Closure 48F, Aerial/UG (.. only) EA $ �,/, ', ...-•-..---- GR-3-84 _ _ _... ............. FO Splice Closure 96F, Aerial/UG (F&I) _ _........... EA _ , ....... _........_.... GR-3-85 .. ...........................__...._.._.__.....__...._......_...._._...._.._...........__....__ FO Splice Closure 96F, Aerial/UG (F only) a.b" r _._ GR- GR-3 86 ---- _ __.,.....__.._..........-----•--....._..._...EP.......-$........ ...._ FO Closure Reentry Kit, Cable Prep (F&I) - - --___..._.._............-...'EA......._$.....� . GR-3 87 Splice Tray, Fusion Heatshrmk, 12F, 12" (F&I) EA.. _.$.._.. _..�g.,_ GR-3-88 Splice Tray, Fusion Heatshrink, 12F, 12" (F only) EA $ �j-,_Z+a ...---------------._..........-.._ GR-3-89 ... Splice Tray, Fusion Heatshrink, 24F,12' (F&I) Z. -----------------•--...------...... GR-3-90 . _.........__......._.........._...._EA.......$.......j Splice Tray, Fusion Heatshrink, 24F, 12" (F only) EA $ .. /': e' ..... Fusion Splice Heat Shrink <.1db OSP includes pigtail as EA...__.$........ GR-3-91 ._..__ ...................needed 61-3 92 (F&I) y --- - g.. --..........................:._`....._.Y) .... OTDR Test An Wavelen th Bare Fiber FOSC I onl EA $ ,s OSP Construction -Aerial Per Unit Price GR-3-93 Messenger Cable 1/4" (F&I) LF $ ..........................-.._..........---...._.......:-........._... GR-3-94 -...----------------------..._..........__........................................................._.........._.. Remove Messenger Cable 1/4". (1 Only) LF $ t r . .................................................................. GR 3-95 .....__ ..._..---- .Pole Attach Loose Tube W/J Hook Concrete (F&1) ---...._......... ..... - .... GR 3 96 Pole Attach Loose Tube W/J Hook Woad (F&1) EA $ Z vo GR-3-97 ......... ......_. ............. _ .... ..... --• Place Pole Riser 2" GRS (F&I) LF $ L , l� .. ..................._...._. GR-3-98 ..- . _ -....._._-.._.--..._.....-..._----------•--......_................. ._.................. _......._.._..---------• Place Riser U-Guard To 20' (F&I) ------ - LF -......_..._. $ f.- ................._..------..-._..--.....-----......-_....:-................_...........g-.............-----._.... GR-3-99 -_-._..........-•--...__.................. Place 2" Riser Sealing Bushing1-3 Hole F&I _--...-.................. EA $ .. '?� GR-3-100 ........ Place 2 Riser Heatshrink ... . EA $ ro.......................... ...... ._-----........._-------------. -----..-.. ---- ----....._.-.............-_--. ..... ^.... '7A� GM (F&I) CA E-A - Addendum 1 Bid Form Bidder Name:__ _ Group 4 Multi -Pair Cables Per Unit Price GR-4-1 Cat 6 Plenum Enhanced (avg 150) (F&I) _.._LF.-�..a............... a GR-4-2 .................... Cat 6 Plenum Enhanced (avg 150) (F only) _...._._._._..___ _.. ............-.-..__..... LF GR 4 3 Cat 6 PVC Enhanced (avg 150) (F&I) . .._...._._.._..............._.._..____.�F.:.._..._�.....(,S ........ GR 4 4 . Cat 6 PVC Enhanced (avg 150} (F on1Y)..............._...:........_ - - ._.......- --. _LF.. .. $._.... �._......... GR-4-5 Cat 5E 25 Pair PVC Plenum .(%l) .... ...... ' . i.. -- - GR-4-6 Cat 5E 25 Pair PVC Riser, (F&I) LF $ . Q . GR-4-7 Cat 5E 25 Pair PE 89 OSP (F&I) LF $ - ...-•-------•------•....._...--•................._....-----..__._....._...---...._....-------............... _�.. _ ............ GR-4-8 ........__....... Plate 1 Gang Surface or Flush (F&I)_........................._. . .�?�.-...._. GR 4 9 Face Plate 2 Gang Surface or Flush (F&1) EA $ i GR-4-10 _Cat 6 Jacks RJ45 568A/B 1 Port. Data (F&I} EA --.-. _�................•-•-- --..._ ............_.._......... GR-4-11 Cat 6 Jacks RJ45 568A/B 2 Port Data/Voice (F&1. ---..._.... _._._.._..z9`.a. GR 4 12 Cat 6 Patch Panel Wall Mount 24 Port (F&I) EA _....................._.--........,... ........ _ .. ._.......... _._._....__..._....._.. ......_.._... _ GR-4-13 Cat 6 Patch Panel Rack Mount 48 Port (F&1) --- .....--- ..............------....... ...... ._................ ............ .................... .................. ------ .......................... _._.._._...•• ....._.._...��'._...... - GR-4-14 Cat 6 Patch Panel Rack Mount 96 Port (F&i) EA . .....: GR-4-15 Wire Management Panel 19"x1.75" (F&I) _ ..................... .....-----•-. ..... ........._..--_............. .._.....---- GR-4-16 Wire - .................... -- Management Pane119x5-.25 (F&I) --..- ... EA $ C bd - -_................................... ..._.............-.. ,.... GR-4-17 Cat 6 Patch.Cords RJ451-6' Standard (F&I) EA _..... ..........._........._.. --....... - --- - - -...........__....._...-----..._._.............-............_......------....._............. _. �...... E. GR-4-18 Cat SE Punch Block 110 25 Pair (F&I) EA $ �c� b� .._.....--....-- --.........................-. _........._............,.-..-_-............._......,._.._...._..----- . .. . GR 4 19..........- --Cat 5E Punch Block 66 25 Pair (F&I) _ --_............._.....__..._........... .....$..._.....S?°(. GR-4-20..._................._Cat. n Test(F& EA $ CU Drop Certificatio1).._.........,..............._.....:. - ........ ...__...)-4 ...-_ GR 4 21 Cable Support Brackets, Bridle Rings (F&I) UNIT $ -�_ + --...--. _..._. _._........ . GR-4-22 Cable Raceway, Surface Mount Per Drop (F&I] DROP $^^ c+�a - - _......_ ................._..I..... __._. ...... _. GR-4-23.......... ...._.._.Conduit, EMT 2" W/All Fittings (F&Q...............-...................----..--•--.--._._LF ...._ $...........�. �c .... GR 4 24 Conduit, EMT Fire Sleeve 2" (F&I)._................................. ........... ... ---..__.. _EA_ _ . $.....)--(.2'�._..... GR-4-25 CondSle uit, EMT Fire eve 4" (F&I) EA $ GR-4-26 Cable Tray 12" Ladder Alum Black (F&I) _ _ LF - -$ --------.................. . .n. Cab GR-4-27 ........ --- - ...... ray,.12",-Misc. Hardware (F&1)._ ...... _..__....................................... �F.._..... $... _ .... ...•. ... GR-4-28_ -EIA Rack Wall Mt Hinged 19"x36" (F&I) (Bldg Entry) --_.._...._-- $._t�`�s�_'i._ " GR 4 29 EIA Rack Free Standing 19"x84" (F&I) EA �. .......... ........ ......... . ..._. . GR-4-30 Cable Management Kit Horizontal (F&I) EA $ �•bp; -------------------- ------ --- - •----............ --.. - GR-4-31 Cable Management Kit Vertical (F&I) EA $,, ...._ ........................-----------I---. -... ------ .... GR-4-32 EIA Cabinets 19 x84 x30„ Complete (F&I) EA $ 3�QQQ,�bA Item Code Group 5 NexusWorx Application - Fiber Documentation Per Unit Price _ GR-5-1 NexusWorx Fiber Optic Data Entry Support Services HR $ Will your company extend these prices to other governmental agencies Yes No ❑ within the State of Florida?