Loading...
HomeMy WebLinkAbout04011984Jim Gallagher Mayor City of Sebastian POST OFFICF BOX 127 [] SEBASTIAN, FLORIDA 32958-0127 TELEPHONE (305) 589-5330 SEBASTIAN CONSTRUCTION BOARD WORKSHOPMEETING APRIL 1, 1984 -7:30 P.M. Deborah C. Krages City Clerk CALL TO ORDER ROLL CALL DISCUSSION: BUILDING CODES ADJOURN NOTE: IF ANY PERSON DECIDES TO APPEAL ANY DECISION MADE ON THE ABOVE MATTERS, HE/SHE WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH~'~ PURPOSES, HE/SHE WILL NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY IN EVIDENCE ON WHICH THE APPEAL IS BASED. SEBASTIAN CONSTRUCTION BOARD WORKSHOP - APR~I~L 1~ MEETING WAS CALLED TO ORDER BY CHARIMAN HARRIS AT 7:30 PRESENT: MR. LEWIS, MR. BALLOUGH, VICE CHAIRMAN CAREY, MR. TRIPP, MR. PALMER, CHAIRMAN HARRIS. ABSENT: MR. MOLER, EXCUSED. MR. RIZIO CAME IN AFTER THE START OF THE MEETING. ALSO PRESENT:. DAN BLAIR, BUILDING OFFICIAL, CHUCK NEUBERGER, ELECTRICAL AND MECHANICAL INSPECTOR, RAY THOMPSON, PLUMBING INSPECTOR, BOB SAMMONS, COUNTY ELECTRICAL INSPECTOR. CHAIRMAN HARRIS AND DAN BLAIR BOTH NOTED THAT THE PURPOSE OF THE WORKSHOP WAS TO DISCUSS BUILDING CODES AND CERTAIN ASPECTS OF CODE INTERPRETATIONS.' ELECTRICAL CODE: CHAIRMAN HARRIS STATED THE 1984 NATIONAL ELECTRIC CODE IS PRESENTLY IS BEING FOLLOWED. THE ONLY ALTERATIONS IS THE SEBASTIAN ELECTRICAL CODE. WHEN IT APPLIES IT IS USED ALONG WITH THE NATIONAL CODE. MR. CHUCK NEUBERGER, CITY ELECTRICAL INSPECTOR NOTED THE FOLLOWING ITEMS ON THE SEBASTIAN ELECTRICAL CODE NEEDED TO BE DISCUSSED: i) 2) 3) PAGE 10, SECTION 7-47-4 4) PAGE 11, PARAGRAPH J 5.)'~ PAGE 12 , PARAGRAPH PAGE 8, SECTION 7-47-1 - INSPECTIONS - PARAGRAGH 2 PAGk 9, PARAGRAGH 4 SERVICE ENTRANCE STANDARDS - PARAGRAGH D 6) PAGE 13, SECTION 7-47-5 7) PAGE 14, SECTION 7-47-6 8) PAGE 15~ PARAGRAPH H 9) PAGE 16, PARAGRAPH K COMMERCIAL CONSTRUCTION, PARAGRAPH A GENERAL CONSTRUCTION, PARAGRAPH A,C,D PLUMBING CODE: MR. RAY THOMPSON, ~I~Y-BLUMBINGiINSPECTOR, BROUGHT UP THE FOLLOWING ITEMS FOR DISCUSSION: WATER SUPPLY COMING IN: 1) TOO MANY LINES OFF THE 1/2 INCH LINE INSTEAD OF GOING OUT TO 3/4 INCH BEFORE BRANCHING OFF. 2) ALL PIPES COMING THROUGH WALL AND SLABS MUST BE SLEEVED. 3 ) ICE WATER MAKE-UP LINES CANNOT USE dADIUM OR GALVANIZED STAPLES AGAINST COPPER - IT WILL START EATING THE LINES AND CAUSE PROBLEMS IN THE FUTURE. SEBASTIAN CONSTRUCTION BOARD WORKSHOP - APRIL 1, 1985 iT W~S--N~D THAT THERE IS NO PLUMBING CODE IN SEBASTIAN - THE 1984 STANDARD PLUMBING CODE IS USED. MECHANICAL CODE: 1984 STANDARD MECHANICAL CODE IS USED. MR. CHUCK NEUBERGER DISCUSSED THE FOLLOWING ITEMS: 1 ) ARTICLE 403 EQUIPMENT LOCATION 2) ARTICLE 404 INSTALLATION REQUIREMENTS 3) ARTICLE 308.8 - RANGE DUCT CLEARANCE RECOMMENDATION - MINIMUM OF 24 INCHES 4 ) ARTICLE 603 CONDENSATE DRAIN PIPING BACK UP DRAIN SHOULD BE IN CONSPICUOUS PLACE. CHAIRMAN HARRIS REQUESTED A COPY OF A LETTER DATED JUNE 30, 1983 BE GIVEN TO THE BOARD- RE: PLAN REVIEW CHECK LIST. A DISCUSSION FOLLOWED CONCERNING SOIL COMPACTORS. DAN BLAIR, BUILDING OFFICIAL, STATED THAT A LOT OF AREAS ARE NOT EVEN USING 24 INCHES FILL, ESPECIALLY IN THE GDC AREA. A LOT OF WHITE SAND IS BEING USED CAUSING PROBLEMS WITH CRACKED FOOTERS AND FLOORS. ANY SOIL NOT "VIRGIN" SOIL SHOULD HAVE A COMPACTOR RUN OVER IT. CHAIRMAN HARRIS SUGGESTED A COMPACTION SHOULD BE REQUIRED~ A LETTER FROM FLORIDA ROOFING, SHEET META~ AND AIR CONDITIONING CONTRACTORS ASSOCIATION, INC. CONCERNING THE VIOLATION OF FLORIDA STATUTE 489 WAS READ INTO THE MINUTES BY ViCE CHAIRMAN CAREY. MOTION BY VICE CHAIRMAN CAREY, SECONDED BY MR. TRIPP TO ADJOURN MEE TING. CARRIED. MEETING ADJOURNED AT 11:00 P.M.