HomeMy WebLinkAbout04101990City of Sebastian
POST OFFICE BOX }'80127 m SEBASTIAN, FLORIDA 32978
TELEPHONE (407) 589-5330
FAX 407-589-5570
PUBLIC MEETING
CITY OF SEBASTIAN
1225 MAIN STREET
INDIAN RIVER COUNTY
FLORIDA
THE SEBASTIAN CONSTRUCTION BOARD OF THE CITY OF SEBASTIAN,
INDIAN RIVER COUNTY, FLORIDA, WILL HOLD THEIR REGULAR MEETING
ON TUESDAY, APRIL 10, 1990 AT 7:30 P.M. IN THE CITY COUNCIL
CHAMBERS.
K. NAPPI, SECRETARY
SEBASTIAN CONSTRUCTION BOARD
NOTE: IF ANY PERSON DECIDES TO APPEAL ANY DECISION MADE ON
THE ABOVE MATTERS, HE/SHE WILL NEED A RECORD OF THE
PROCEEDINGS, AND FOR SUCH PURPOSES, HE/SHE MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH
RECORD INCLUDES THE TESTIMONY IN EVIDENCE ON WHICH THE APPEAL
IS BASED.
SEBASTIAN CONSTRUCTION BOARD
REGULAR MEETING
APRIL 10, 1990 - 7:30 P.M.
CALL TO ORDER
ROLL CALL
APPROVAL OF MINUTES: REGULAR MEETING, 3\13\90
OLD BUSINESS:
ATTORNEY MATTERS:
BUILDING OFFICIAL MATTERS:
NEW BUSINESS:
FORMAL APPROVAL
LUECK, JR., ARTHUR M./COMMERCIAL SWIMMING POOL
LETTER OF RECIPROCITY
O'BRIEN, JOHN L./ALUMINUM UNLIMITED
HERMESi TIMOTHY A./GENERAL CONTRACTOR
BLOCK EXAM - SEBASTIAN - MAY
QUANT, BRIAN/CARPENTRY SUB-CONTRACTOR
REARDIN, CAROLE L./POOL MAINTENANCE & REPAIR
GARRIS, PAUL L./JOURNEYMAN ELECTRICIAN
ADAMS III, M. BOYT/GENERAL CONTRACTOR
GEHRKE, GARY/CARPENTRY SUB-CONTRACTOR
KOZDRA, DAVID A./FINISH CARPENTRY
BISHOP, FRANK J./PAINTING SUB-CONTRACTOR
HORTON, JURIEL D./CARPENTRY SUB-CONTRACTOR
WATSON, RODNEY R./CARPENTRY SUB-CONTRACTOR
VANGINHOVEN, DAVID C./CARPENTRY SUB-CONTRACTOR
MAIKRANZ, KEiTH/FINISH CARPENTRY
PAGE 2 - SEBASTIAN CONSTRUCTION BOARD - 4/10/90
NEW BUSINESS cont
STAUBACH, PAUL D./JOURNEYMAN ELECTRICIAN
HAMILTON, NORMAN A./JOURNEYMAN ELECTRICIAN
MCCULLY, WM. K./RESIDENTIAL CONTRACTOR
STONE, CHARLES W./PAINTING SUB-CONTRACTOR
BAXTER, SPENCER F./JOURNEYMAN ELECTRICIAN
KOMARNICKI, WALTER P./JOURNEYMAN ELECTRICIAN
BARRETT, KENNETH M./POOL MAINTENANCE & REPAIR
DAVIS, CRAIG G./TILE & MARBLE
FR'IESON, LEROY J./STRUCTURAL STEEL
BERRY, DONALD E./TILE & MARBLE
GEHRKE, RONALD M./CARPENTRY SUB-CONTRACTOR
GRIFFIN, MICHAEL C./WIDOW INSTALLATION
SPILMAN, LYNN E./RESIDENTIAL SWIMMING POOL CONTRACTOR
BLOCK EXAM - GAINESVILLE
WALKER, WM. H./TiLE & MARBLE
RIDGELY, ROBERT E./TILE & MARBLE
COSTIGAN, GREG A./TILE & MARBLE
MURPHY IV, JAMES R./PAINTING SUB-CONTRACTOR
HEATH, DONALD/CARPENTRY SUB-CONTRACTOR
HARRIS, KEVIN/TILE & MARBLE
COMPLAINT AGAINST USE OF UNLICENSED SUBS - ROBERT VETA
COMPLAINT AGAINST USE OF UNLICENSED SUBS - RICHARD VAETH
DISCUSSION: SHOWER ENCLOSURE VENTILATED SHELVING
ACOUSTICAL TILE SANDBLASTING
PRE-FABRICATED FIREPLACE INSTALLATION
PAGE 3 - SEBASTIAN CONSTRUCTION BOARD - 4/10/90
REGISTER SCORES IN SCOREBOOK
15 MINUTES TO PUBLIC
ADJOURN
NOTE: IF ANY PERSON DECIDES TO APPEAL ANY DECISION MADE ON
THE ABOVE MATTERS, HE/SHE WILL NEED A RECORD OF THE
PROCEEDINGS AND FOR SUCH PURPOSES, HE/SHE MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH
RECORD INCLUDES THE TESTIMONY IN EVIDENCE ON WHICH THE APPEAL
IS BASED.
SEBASTIAN CONSTRUCTION BOARD
REGULAR MEETING
APRIL 10, 1990 7:30 P.M.
MEETING WAS CALLED TO ORDER AT 7:30 P.M. BY CHAIRMAN CAREY.
ROLL CALL: PRESENT: MR. KELLEY
MR. NEUBERGER
MR. HANEY
MR. CAPP
CHAIRMAN CAREY
ABSENT: VICE CHAIRMAN LAMAN - EXCUSED
MR. DERNBACH - EXCUSED
ALSO PRESENT: MR. COOPER, BUILDING OFFICIAL; MR. BONACCI,
CHIEF BUILDING INSPECTOR.
RECESS WAS TAKEN AT 7:33 P.M. TO REVIEW THE APPLICATION
FILES.
MEETING REOPENED AT 8:17 P.M. WiTH ALL PRESENT.
NEW BUSINESS:
FORMAL APPROVAL
LUECK, JR., ARTHUR M./COMMERCIAL SWIMMING POOL
MOTION BY MR. NEUBERGER, SECONDED BY MR. CAPP TO ACCEPT
APPLICATION TO DO COMMERCIAL SWIMMING POOLS.
CARRIED.
LETTER OF RECIPROCITY
O'BRIEN, JOHN L./ALUMINUM UNLIMITED
HERMES, TIMOTHY A./GENERAL CONTRACTOR
MOTION BY MR. NEUBERGER, SECONDED BY MR. HANEY TO ACCEPT
APPLICATIONS.
CARRIED.
BLOCK EXAM - SEBASTIAN - MAY
QUANT, BRIAN/CARPENTRY SUB-CONTRACTOR
REARDIN, CAROLE L./POOL MAINTENANCE & REPAIR
GARRIS, PAUL L./JOURNEYMAN ELECTRICIAN
PAGE 2
SEBASTIAN CONSTRUCTION BOARD .- 4/10/90
ADAMS III, M. BOYT/GENERAL CONTRACTOR
GEHRKE, GARY/CARPENTRY SUB-CONTRACTOR
KOZDRA, DAVID A./FINISH CARPENTRY
BISHOP, FRANK J./PAINTING SUB-CONTRACTOR
HORTON, JURIEL D./CARPENTRY SUB-CONTRACTOR
WATSON, RODNEY R./CARPENTRY SUB-CONTRACTOR
VANGINHOVEN, DAVID C./CARPENTRY SUB-CONTRACTOR
MAIKRANZ, KEITH/FINISH CARPENTRY
STAUBACH, PAUL D./JOURNEYMAN ELECTRICIAN
HAMILTON, NORMAN A./JOURNEYMAN ELECTRICIAN
MCCULLY, WM. K./RESIDENTIAL CONTRACTOR
STONE, CHARLES W./PAINTING SUB-CONTRACTOR
BAXTER, SPENCER F./JOURNEYMAN ELECTRICIAN
KOMARNICKI, WALTER P./JOURNEYMAN ELECTRICIAN
BARRETT, KENNETH M./POOL MAINTENANCE & REPAIR
DAVIS, CRAIG G./TILE & MARBLE
FRIESON, LEROY J./STRUCTURAL STEEL
BERRY, DONALD E./TILE & MARBLE
GEHRKE, RONALD M./CARPENTRY SUB-CONTRACTOR
GRIFFIN, MICHAEL C./WINDOW INSTALLATION
SPILMAN, LYNN E./RESIDENTIAL SWIMMING POOL CONTRACTOR
MOTION BY MR. NEUBERGER, SECONDED BY MR. HANEY THAT ALL THE
NAMES LISTED UNDER THE BLOCK EXAM FOR SEBASTIAN FOR MAY AS
PREVIOUSLY READ BY THE CHAIRMAN BE ACCEPTED.
CARRIED.
PAGE 3
SEBASTIAN CONSTRUCTION BOARD - 4/10/90
BLOCK EXAM - GAINESVILLE
WALKER, WM. H./TILE & MARBLE
RIDGELY, ROBERT E./TILE & MARBLE
COSTIGAN, GREG A./TILE & MARBLE
MURPHY IV, JAMES R./PAINTING SUB-CONTRACTOR
HEATH, DONALD/CARPENTRY SUB-CONTRACTOR
HARRIS, KEVIN/TILE & MARBLE
MOTION BY MR. NEUBERGER, SECONDED BY MR. CAPP THAT ALL THE
ABOVE LISTED WITH THE EXCEPTION OF GREG A. COSTIGAN BE
RECOMMENDED FOR THE BLOCK EXAM IN GAINESVILLE.
CARRIED.
MR. NEUBERGER NOTED THAT THE ONLY PROOF OF EXPERIENCE IN MR.
COSTIGAN'S FOLDER WAS A LETTER FROM A SUPPLY HOUSE. HE FELT
THAT LETTER DID NOT VERIFY THAT MR. COSTIGAN WAS A TILE
SETTER.
MR. COSTIGAN SAID THAT HE HAD ALWAYS WORKED FOR HIMSELF. HE
SAID HE COULD GET LETTERS FROM SOME OF HIS CUSTOMERS.
MOTION BY MR. NEUBERGER, SECONDED BY MR. HANEY TO ACCEPT MR.
COSTIGAN'S APPLICATION CONTINGENT UPON RECEIPT OF LETTERS
BROUGHT IN TO THE BOARD SECRETARY.
CARRIED.
THE BOARD SECRETARY STATED THAT IN THE PAST THE BOARD HAD
ACCEPTED STATEMENTS FROM SUPPLIERS AS PROOF OF EXPERIENCE.
CHAIRMAN CAREY SAID THAT THIS MATTER WOULD BE DISCUSSED LATER
ON IN THE MEETING.
APPROVAL OF MINUTES:
MOTION BY MR. NEUBERGER, SECONDED BY MR. HANEY TO APPROVE THE
MINUTES OF MEETING HELD 3/13/90 AS WRITTEN.
CARRIED~
PAGE 4
SEBASTIAN CONSTRUCTION BOARD - 4/10/90
COMPLAINT AGAINST USE OF UNLICENSED SUBS - ROBERT VETA
CHAIRMAN CAREY SWORE IN MR. VETA.
MR. CAPP NOTED THAT MR. VETA WAS WORKING ON ONE OF MR.
MASLOW'S HOMES AND WAS UNLICENSED AT THE TIME. HE HAD
ALLOWED HIS LICENSE TO EXPIRE. AFTER A "STOP WORK" ORDER WAS
GIVEN, MR. VETA DID COME IN TO RENEW HIS LICENSE.
MR. HANEY ASKED IF HE HAD BROUGHT THE EMPLOYMENT RECORDS AS
REQUESTED CONCERNING THE TWO SUB-CONTRACTORS THAT WERE
WORKING ON THE JOB. MR. VETA SAID HE DID BRING HIS WORKMANS
COMPENSATION BUT NO EMPLOYMENT RECORDS.
MR. VETA STATED THAT THE TWO SUB-CONTRACTORS WERE NOT
EMPLOYEES, THAT THEY SUB-CONTRACTED FROM HIM.
MR. VETA TOLD THE BOARD THAT HE DID NOT NEED THE CITY OF
SEBASTIAN TO PUT FOOD ON HIS TABLE AND THAT IF THE BOARD
WANTED TO TAKE AWAY HIS LICENSE THAT IT WAS UP TO THEM.
MOTION BY MR. CAPP TO SUSPEND ROBERT VETA'S LICENSE
INDEFINITELY IN THE CITY OF SEBASTIAN.
MOTION WITHDRAWN BY MR. CAPP.
MOTION BY MR. CAPP, SECONDED BY MR. NEUBERGER THAT WE SUSPEND
ROBERT VETA'S SEBASTIAN LICENSE INDEFINITELY AND ALSO THAT
DPR BE NOTIFIED OF THIS CASE.
MR. COOPER ASKED IF IT WOULD PROPER IN STEAD OF SUSPENDING TO
REVOKE THE LICENSE.
MR. NEUBERGER WITHDREW HIS SECOND, MR. CAPP WITHDREW HIS
MOTION.
MOTION BY MR. CAPP, SECONDED BY MR. HANEY THAT WE REVOKE MR.
VETA'S SEBASTIAN COMPETENCY LICENSE AND ALSO DPR BE NOTIFIED
OF THIS CASE IMMEDIATELY.
MR. COOPER FELT THAT THE MOTION SHOULD ALSO INCLUDE THE CODE
SECTIONS THAT WERE IN VIOLATION.
MR. HANEY WITHDREW HIS SECOND, MR. CAPP WITHDREW HIS MOTION.
PAGE ~
SEBASTIAN CONSTRUCTION BOARD - 4/10/90
DISCUSSION: ROBERT VETA cont
MOTION BY MR. CAPP, SECONDED BY MR. HANEY THAT WE REVOKE
ROBERT VETA'S SEBASTIAN COMPETENCY CARD TO DO DRYWALL. THE
BOARD HAS FOUND HIM GUILTY OF VIOLATING SECTIONS 7-100, SUB-
PARAGRAPH B, (2) AND (3) AND THAT DPR BE NOTIFIED OF THIS
CASE IMMEDIATELY.
CARRIED.
MOTION BY MR. HANEY, SECONDED BY MR. CAPP TO PURSUE THIS CASE
AND BRING IN THE EMPLOYEES, JiM MACINTYRE AND TONY TANNER,
INCLUDING PAYROLL, WORKMANS COMP RECORDS THAT THEY ARE
SUPPOSE TO HAVE.
CARRIED.
MOTION BY MR. HANEY, SECONDED BY MR. KELLEY TO BRING MR.
MASLOW BACK IN FRONT OF THE BOARD AND HAVE HIM EXPLAIN THE
FOUR PERMITS THAT MR. KELLEY HAS CONCERNING USING DIFFERENT
LICENSED CONTRACTORS AND USING SOMEBODY ELSE.
CARRIED.
COMPLAINT AGAINST USE OF UNLICENSED SUBS - RICHARD VAETH
MR. VAETH WAS NOT PRESENT AT THE MEETING.
THE BOARD SECRETARY TOLD THE BOARD THAT MR. VAETH DID RECEIVE
THE LETTER TO APPEAR BEFORE THE BOARD BUT THAT HE DiD NOT
CONTACT HER.
IT WAS NOTED THAT MR. VAETH IS NOT LICENSED IN THE CITY OF
SEBASTIAN AND NEVER HAS BEEN.
MR. COOPER TOLD THE BOARD THAT PAST TESTIMONY CONCERNING
MERCEDES HOMES FOR HIRING MR. VAETH WAS GIVEN TO SHOW THE
FACT THAT HE DID DO THE CARPENTRY ON THREE SEPARATE OCCASIONS
AT HOMES LOCATED AT CARNIVAL TERRACE, CAPON TERRACE, (THE
HOUSE THAT COLLAPSED) AND ABBOT TERRACE.
MOTION BY MR. HANEY, SECONDED BY MR. KELLEY THAT THE BOARD
FINDS RICHARD VAETH GUILTY OF BEING AN UNLICENSED SUB-
CONTRACTOR IN THE CITY AND AT THIS TIME WE HAVE HIM FOR THREE
jOBS ON ABBOT TERRACE, CAPON TERRACE AND CARNIVAL TERRACE
VIOLATING SECTION 7-100, SUB-PARAGRAPH B, (1), (2) AND (3).
PAGE 6
SEBASTIAN CONSTRUCTION BOARD - 4/10/90
DISCUSSION: RICHARD VAETH cont
ROLL CALL: AYES:
MR. KELLEY
MR. NEUBERGER
MR. HANEY
MR. CAPP
CHAIRMAN CAREY
NAYS: NONE
CARRIED.
MOTION BY MR. HANEY, SECONDED BY MR. CAPP TO FINE MR. VAETH
THE MAXIMUM $500.00 FOR THESE VIOLATIONS ON EACH VIOLATION.
MR. COOPER SAID HE WOULD CHECK WITH THE CITY ATTORNEY ON THE
AMOUNT AND WHETHER OR NOT WE CAN CHARGE $500.00 ON EACH
VIOLATION.
MR. CAPP WITHDREW HIS SECOND, MR. HANEY WITHDREW HIS MOTION.
MOTION BY MR. HANEY, SECONDED BY MR. KELLEY THAT WE FIND MR.
RICHARD VAETH GUILTY OF UNLICENSED WORK IN VIOLATION OF
SECTION 7-99, SUB-PARAGRAPH A ON THE THREE HOUSES DONE AT
ABBOT TERRACE, CAPON TERRACE AND CARNIVAL TERRACE.
ROLL CALL: AYES:
MR. KELLEY
MR. NEUBERGER
MR. HANEY
MR. CAPP
CHAIRMAN CAREY
NAY: NONE
CARRIED.
MR. COOPER ADVISED THE BOARD THAT THE COUNTY, GENE MORRIS'S
OFFICE HAS SENT A LETTER TO THE CITY ASKING FOR ALL
OCCUPATIONAL LICENSES AND INFORMATION ON COMP CARDS BEING
ISSUED BY THE CITY. THEY ARE GOING TO REQUIRE A MANDATE THAT
THEY GET A COUNTY OCCUPATIONAL LICENSE. THE CITY DOES NOT
HAVE A CODE TO REQUIRE THAT AND WE DO NOT HAVE TO.
THE COUNTY REQUIRES EVERYONE TO TAKE THE BLOCK EXAM,
SEBASTIAN DOES NOT.
IF WE CONTINUE LICENSING UNDER THE CURRENT CODE, THE COUNTY
WILL TELL THESE PEOPLE THAT THEY MUST HAVE A COUNTY
OCCUPATIONAL LICENSE WHICH WOULD REQUIRE TAKING THE BLOCK
EXAM.
PAGE 7
SEBASTIAN CONSTRUCTION BOARD - 4/10/90
AT THIS POINT WE COULD GO ALONG WITH THE COUNTY AND TEST
EVERYONE.
MR. COOPER SAID HE WOULD ALSO ASK THE COUNTY TO GRANDFATHER
ALL EXISTING COMP CARDS TO OBTAIN A COUNTY OCCUPATIONAL
LICENSE.
HE ALSO RECOMMENDED THAT THE BOARD MAKE A RECOMMENDATION TO
CITY COUNCIL TO AMEND THE ORDINANCE TO REQUIRE A COUNTY
OCCUPATIONAL LICENSE AND HAVE THE SAME REQUIREMENTS AS THE
COUNTY TO TEST ALL TRADES.
DISCUSSION:
SHOWER ENCLOSURE VENTILATED SHELVING
ACOUSTICAL TILE SANDBLASTING
PRE-FABRICATED FIREPLACE INSTALLATION
THE BOARD SECRETARY CHECKED WITH SURROUNDING AREAS ON THE
LAST THREE TO FIND OUT HOW THEY WERE BEING HANDLED.
VERO BEACH
SANDBLASTING COMES UNDER PAINTING
ACOUSTICAL - UNDER INSULATION
BREVARD COUNTY - DOES NOT LICENSE SANDBLASTING OR ACOUSTICAL
BOTH VERO BEACH AND BREVARD COUNTY ONLY REQUIRE AN
OCCUPATIONAL LICENSE FOR PRE-FABRICATED FIREPLACE
INSTALLATION.
MR. COOPER FELT THAT SHOWER ENCLOSURE SHOULD BE UNDER
GLAZING.
PRE-FABRICATED FIREPLACE INSTALLATION WILL NOT BE REQUIRED TO
HAVE A COMP CARD.
SANDBLASTING WOULD COME UNDER PAINTING AND ACOUSTICAL TILE
WOULD COME UNDER DRYWALL. IT WAS NOTED THAT IF ACOUSTICAL
TILE WAS ALL THE CONTRACTOR WAS GOING TO DO, HE WOULD NOT
HAVE TO TAKE THE DRYWALL TEST.
MR. NEUBERGER FELT THAT VERIFICATION OF EMPLOYMENT ON THE
APPLICATIONS NEEDED TO BE CLEANED UP.
IN THE PAST, A LETTER WRITTEN ON ORIGINAL LETTER HEAD WAS
ACCEPTED BY THE BOARD. ONLY LETTERS THAT ARE NOTARIZED WILL
BE ACCEPTED.
W-2 FORMS WILL NO LONGER BE ACCEPTED DUE TO THE FACT THAT
THEY DO NOT VERIFY WHAT TYPE OF WORK WAS DONE.
PAGE 8
SEBASTIAN CONSTRUCTION BOARD - 4/10/90
DISCUSSION TOOK PLACE WITH NO ACTION FROM THE BOARD.
THE BOARD REQUESTED THAT THE PHOTOGRAPHS USED ON THE
APPLICATIONS BE A PASSPORT TYPE PICTURE.
MOTION BY MR. HANEY, SECONDED BY MR. CAPP THAT THE
PHOTOGRAPHS ON THE APPLICATIONS BE A PASSPORT TYPE PHOTOGRAPH
THAT CLEARLY SHOWS THE PERSONS FACIAL CHARACTERISTICS OTHER
THAN BACKGROUND FEATURES.
CARRIED.
MR. HANEY AND MR. CAPP REGISTERED THE TEST SCORES IN THE
SCORE BOOK.
THERE BEING NO FURTHER DISCUSSION, MEETING ADJOURNED AT 10:50
P.M.