HomeMy WebLinkAbout06171985Jim Gallagher
Mayor
Ci , of Sebastian
POST OFFICE BOX 127 [] SEBASTIAN, FLORIDA 32958-0127
TELEPHONE (305) 589-5330
SEBASTIAN CONSTRUCTION BOARD
WORKSHOi~ MEETING
JUNE 17, 1985 - 7:30 P.M.
CALL TO ORDER
ROLL CALL
APPROVE MINUTES OF REGULAR MEETING ON 5/14/85; WORKSHOP MEETINGS
OF 5/22/85, 5/30/85, 6/4/85..
OLD BUSINESS '-
BLOCK EXAMINATION - GAINESVILLE
MOORE, PATRICK C. /HARV CLASS "C"/FINAL APPROVAL
ROUGH DRAFT LETTER - BUILDING INSPECTORS HOURS
ROUGH DRAFT ORDINANCE - CONVENTIONAL HOMES AND MANUFACTURED BUILDINGS
MANDATORY GUIDELINES FOR UNLICENSED SUB-CONTRACTORS
DISCUSSION - TESTING AND LICENSING OF SUB AND SPECIALTY CONTRACTORS
DISCUSSION - ELECTRICAL CODE
CHAIRMAN' S MATTERS:
ATTORNEY'S MATTERS:
NEW BUSINESS:
1985-86 BUDGET
15 MINUTES TO PUBLIC:
ADJOURN
NOTE: IF ANY PERSON DECIDES TO APPEAL ANY DECISION MADE ON THE ABOVE
MATTERS, HE/SHE WILL NEED A RECORD OF THE PROCEEDINGS AND FOR SUCH
PURPOSES, HE/SHE WILL NEED TO ENSURE THAT A VERBATIM RECORD OF THE
PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY IN EVIDENCE
ON WHICH THE APPEAL IS MADE.
Deborah C. Kragas
City Clerk
SEBASTIAN CONSTRUCTION BOARD - WORKSHOP MEETING - JUNE 17, 1985
MEETING WAS CALLED TO ORDER BY ViCE CHAIRMAN CAREY AT 7:40 P.M.
PRESENT: MR. DOMINIX, MR. HOFFMAN, MR. BALLOUGH, VICE CHAIRMAN CAREY.
ABSENT: CHAIRMAN HARRIS, MR.. MOLER, EXCUSED; MR. TRIPP, MR. RIZIO,
MR. PALMER, UNEXCUSED.
ALSO PRESENT: MR. NEUBERGER, CITY ELECTRICAL AND MECHANICAL INSPECTOR.
MOTION BY MR. HOFFMAN, SECONDED BY MR. DOMINIX TO TABLE MINUTES OF
REGULAR MEETING ON 5/14/85; WORKSHOP MEETINGS ON 5/22/85, 5/30/85,
6/4/85. CARRIED.
BLOCK EXAMINATION ~ GAINESVILLE
MOORE, PATRICK C./HARV CLASS "C"/FINAL APPROVAL
MOTION BY MR. DOMINIX, SECONDED BY MR. HOFFMAN TO APPROVE
APPLICATION TO TAKE THE BLOCK EXAM FOR HARV CLASS "C"
IN GAINESVILLE. CARRIED.
MOTION BY MR. DOMINIX, SECONDED BY MR. HOFFMAN TO ACCEPT ROUGH DRAFT
LETTER - RE: BUILDING INSPECTORS HOURS, AS WRITTEN.
(SEE ATTACHED) CARRIED.
MOTIONBY MR. HOFFMAN, SECONDED BY MR. DOMINIX TO APPROVE AS WRITTEN
THE ROUGH DRAFT ORDINANCE -CONVENTIONAL HOMES AND MANUFACTURED
BUILDINGS AND GIVE TO ATTORNEY PALMER.
CARRIED.
A ROUGH DRAFT FOR GUIDELINES FOR UNLICENSED SUB CONTRACTORS WAS
GIVEN TO THE BOARD SECRETARY TO BE GIVEN TO ATTORNEY PALMER FOR
HIS OPINION AND BROUGHT BACK BEFORE THE BOARD.
(SEE ATTACHED) CARRIED.
A DISCUSSION FOLLOWED CONCERNING THE TESTING AND LICENSING OF SUB
AND SPECIALTY CONTRACTORS.
MR. NEUBERGER'S OPINION WAS THAT ALUMINUM SPECIALTY SUBS CAN NOT
PULL THEIR OWN PERMITS.
MOTION BY MR. BALLOUGH, SECONDED BY MR. DOMINIX TO INFORM THE
BUILDING DEPARTMENT THAT SPECIALTY CONTRACTORS CAN NOT BULL THEIR
OWN PERMITS.
CARRIED.
DISCUSSION - ELECTRICAL CODE - BEGINNING ON PAGE 16, PARAGRAPH "M"
MOTION BY MR. DONIMIX, SECONDED BY MR. BALLOUGH TO LEAVE PARAGRAPH
"M" AS WRITTEN.
CARRIED.
MOTION BY MR' DOMINIX, SECONDED BY MR. HOFFMAN TO LEAVE PARAGRAPH
"N" AS WRITTEN.
CARRIED.
SEBASTIAN CONSTRUCTION BOARD - WORKSHOP MEETING -.'JUNE 17, 1985
ELECTRICAL CODE DISCUSSION CONTINUED:
MOTION BY MR. BALLOUGH, SECONDED BY MR. DOMINIX TO STRIKE PARAGRAPH
"0" FROM THE CODE.
CARRIED.
MOTION BY MR. DOMINIX, SECONDED BY MR. BALLOUGH TO OMIT PARAGRAPH "P".
CARRIED.
THE BOARD DECIDED UNANIMOUSLY TO STOP THE ELECTRICAL CODE DISCUSSION
AT 9:30 P.M.
MOTION BY MR. DOMINIX, SECONDED BY MR. HOFFMAN TO LEAVE PARAGRAPH
"Q" AS WRITTEN.
CARRIED.
MOTION BY MR. DOMINIX, SECONDED BY MR. HOFFMAN TO ACCEPT PARAGRAPH
"R" WITH CHANGES DISCUSSED. (AS PER ATTACHED)
CARRIED.
MOTION BY MR. DOMINIX, SECONDED BY MR. HOFFMAN TO ADJOURN MEETING.
CARRIED.
MEETING ADJOURNED AT 9:30 P.M.
Construction Board
City of Sebastian
P.O. Box 127
Sebastian, FL 32958
13 June 1985
City of Sebastian
Mayor Gallagher
P.O. Box 127
Sebastian, FL 32958
Dear Mayor Gallagher=
It is become a large problem in the construction industry to
acquire the neccessary inspections that are required to cause
the uninterrupted progress of any building p~.~gCt within the
city. -, ..... .
The Construction Board has heard a number of'oompla'in~.s ~rom
Builders and Developers within our city, The mo.St heard
complaint is that the fees paid for the put' ~eg~
the Building. Department are not being
We are requesting that this years bu~
reviewed in l'ight of the tremendous incre~
over the same period last year, and adjus
upm~ard according~y~ The base fl
ope
January 1984 to June 1984
Value of'Construc~i0~
Fees Collected
~'37',026.00
January 1985 to June 1985
Value of Construction
Fees Collected
Reinspection f~es since
March
$.1'~,'500,315.00
".: ,5o0.oo'
I0
The current value of cons
We also would request that you'.conside.r"-put~
full time certified-inspectOr on'd~y at the
Please consider that iM our business'it ~s'impo=
public and the building industry have access 'to a fully'qualified
inspector during the normal course of a business week. Our
understanding of the current situation is that the building
J
Department has the Cheif Building.lB
that has no particular set hours
tO day busine~s ~hat:.'is cons$~tan~'
our only fully certified inspector
presently enjoy theknowledge'.of
by Dan Blair..in March, that'.the. City.~ee~e~' ~
inspector and'that Chuck was to fikl the pO
failed to forward the approRriate papeN wQr
It is important tO Sebastian that we'ik
we currently have. We cannot e~pect these men
basis of day to day knowlege of their employment status.
The Building Department is creating all the funds neccessary to
adequately run the department with the quality individuals that
are presently in place.
Please consider directing the Building Official to update the
current needs of the Buiding Department and putting in place the
needed changes to bring the department in line with the present
demand.
On behalf of the industry, the public and construction board,
I thank you.
Respectfully yours,
Jim Harris
Chairman
Sebastian Construction Board
JH~cb
cc:
Hector Franco - Building Official
Debbie Krages - City Clerk
(To be attached to Building Permit Application)
If found guilty of employing, subcontracting or hiring on a
temporary basis any non-licensed person or sub-contractor, then
that person who is responsible for obtaining the building permit
on that job will be fined in accordance with the following
schedule:
* A/C, ELECTRICAL, PLUMBING - a minimum of $500.00 or 1% of the
permit valuation, whichever is greater.
* FOR ANY SPECIALTY OR NON-PERMITTED TRADE, i.e. roofing, tile,
drywall, flooring, painting, masonry, land clearing, aluminum,
etc. a minimum fine of $250.00 or % of 1% of the permit valuation,
whichever is greater.
Payment will be made prior to issuing the C.O. or when the C.O.
has been issued then prior to the person obtaining any other
building permit in the City or in the case of a person who is
not likely to be obtaining any other building permits then
collection will be made in accordance with those procedures
the City deems appropriate.
Fines will be paid to and collected by the Sebastian Building
Department. It is recommended that the funds be used for the
purpose of paying the collection and attorneys fees to enforce
this ordinance and any surplus funds be set aside to establish
a reward pool for the purpose of offering rewards to assist
the Police Department regarding thefts and other crimes
associated within the building industry.
When a Building Permit is issued, a copy of this regulation must
be signed by the applicant and retained by the Building Department.
NOTE: To verify if contractor is licensed in the City of
Sebastian, call 589-5330.
SEBASTIAN CONSTRUCTION BOARD - WORKSHOP MEETING - JUNE 17, 198S
PROPOSED CHANGES TO CITY ORDINANCE NO. 0-83-14 .'
SEC. 7-46.6 GENERAL REQUIREMENTS
(R) IN THE WIRING OF COLD-STORAGE PLANTS AND ROOMS OR BUILDINGS
OF SIMILAR CHARACTER, ALL WIRES USED FOR LIGHT, HEAT OR POWER SHALL
BE INSTALLED IN RIGID GALVANIZED, SHERARDIZED METAL THREADED CONDUIT
OR ALUMINUM RIGID CONDUIT AND GALVANIZED METAL OR ALUMINUM OUTLET
BOXES, CUT-OUT AND DISTRIBUTION CABINETS AND FITTINGS INSTALLED.
RVC CONDUITS AND'FITTINGS AND OUTLET BOXES WOULD BE ACCEPTABLE
WITHIN THEIR TEMPERATURE LIMITATION AND APPROVED BY THE BUILDING
DEPARTMENT. CONDUITS SHALL BE INSTALLED IN SUCH MANNER THAT THEY
WILL DRAIN TO THE OUTLETS AND CABINETS; CONDUCTORS INSTALLED IN
CONDUIT MUST COMPLY WITH THE NATIONAL ELECTRICAL CODE STANDARD
FOR DAMP OR WET LOCATIONS. ALL CONDUITS ENTERING OR LEAVING
REFRIGERATION BOXES MUST BE SEALED OFF.