HomeMy WebLinkAbout11131990 City of Sebastian
POST OFFICE BOX 780127 [] SEBASTIAN, FLORIDA 32978
TELEPHONE (407) 589-5330 ri FAX (407) 589-5570
PUBLIC MEETING
CITY OF SEBASTIAN
1225 MAIN STREET
INDIAN RIVER COUNTY
FLORIDA
THE SEBASTIAN CONSTRUCTION BOARD OF THE CITY OF SEBASTIAN,
INDIAN RIVER COUNTY, FLORIDA, WILL HOLD THEIR REGULAR MEETING
ON TUESDAY, NOVEMBER 13, 1990 AT 7:30 P.M. IN THE CITY
COUNCIL CHAMBERS.
K. NAPPI,' ~E~RETARY
SEBASTIAN CONSTRUCTION BOARD
NOTE: IF ANY PERSON DECIDES TO APPEAL ANY DECISION MADE ON
THE ABOVE MATTERS, HE/SHE WILL NEED A RECORD OF THE
PROCEEDINGS, AND FOR SUCH PURPOSES, HE/SHE MAY NEED TO ENSURE
THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH
RECORD INCLUDES THE TESTIMONY IN EVIDENCE ON WHICH THE APPEAL
IS. BASED.
SEBASTIAN CONSTRUCTION BOARD
REGULAR MEETING
NOVEMBER 13, 1990 - 7:30 P.M.
CALL TO ORDER
ROLL CALL
A'PPROVAL OF MINUTES - REGULAR MEETING - 10/9/90
OLD BUSINESS:
VIOLATION HEARING CONTINUED
VON REISEN, ALAN
ATTORNEY MATTERS:
BUILDING OFFICIAL MATTERS:
NEW BUSINESS:
BLOCK EXAM - SEBASTIAN
SMITH, DAVID T./TILE & MARBLE
REAGAN, WILLIE C./RESIDENTIAL CONTRACTOR
MURPHY JR., JOHN F./DRYWALL
BLOCK EXAM - GAINESVILLE
AUTRY, DAVID K./GENERAL CONTRACTOR
ACTIVATE LICENSE
SILVA, SCOTT/ROOFING UNLIMITED
SEBASTIAN CONSTRUCTION BOARD
REGULAR MEETING
NOVEMBER ~ 1990 ' 7:30 P.M.
MEETING WAS CALLED TO ORDER BY ACTING CHAIRMAN DERNBACH AT
7:30 P.M.
ROLL CALL: PRESENT: MR. KELLEY
MR. NEUBERGER
MR. CAPP
ACTING CHAIRMAN DERNBACH
ABSENT: CHAIRMAN CAREY - EXCUSED
MR. HANEY - EXCUSED
VICE CHAIRMAN LAMAN - UNEXCUSED
ALSO PRESENT: GEORGE BONACCI - CHIEF BUILDING INSPECTOR
APPROVAL OF MINUTES
MOTION BY MR. CAPP, SECONDED BY MR. NEUBERGER TO ACCEPT THE
MINUTES OF THE OCTOBER 9, 1990 MEETING.
CARRIED.
OLD BUSINESS
VIOLATION HEARING CONTINUED - ALAN VON REISEN
MR. VON REISEN WAS PRESENT AT THE MEETING.
MR. DAVE PATTY WAS ALSO PRESENT AND ASKED TO APPROACH THE
MIC.
ACTING CHAIRMAN DERNBACH ASKED MR. PATTY IF HE STILL WAIVED
HIS RIGHTS AS TO THE NOTIFICATION OF HEARING AND HE SAID
THAT HE DID.
MR. PATTY WAS SWORN IN.
MR. CAPP NOTED THAT AT THE LAST MEETING MR. PATTY WAS ASKED
TO BRING IN SOME OF HIS WORK RECORDS.
MR. PATTY SAID THAT HE DiD NOT HAVE ANY PAPERWORK REGARDING
THE WORK DONE AT 1225 BEVAN.
MR. & MRS. BRADY OF 1225 BEVAN WERE PRESENT AT THE MEETING
AND WERE SWORN IN.
PAGE 2
SEBASTIAN CONSTRUCTION BOARD - 11/13/90
VON REISEN, ALAN cont
MR. BRADY SHOWED A COPY OF THE CONTRACT BETWEEN HE AND HIS
WIFE AND ABC POOLS. DPI, DAVE PATTY, INC., A SWIMMING POOL
PROPOSAL FOR MR. CHARLES BRADY SR., 1225 BEVAN, SEBASTIAN,
FLORIDA. IT WAS SIGNED BY DAVE PATTY. THERE WAS ALSO A
CANCELLED CHECK MADE PAYABLE TO DPI FOR $1620.00.
MR. BRADY TOLD THE BOARD THAT DIGGING THE HOLE WAS AS FAR AS
DPI HAD GOTTEN WHEN A STOP WORK ORDER WAS POSTED. ANOTHER
POOL CONTRACTOR COMPLETED THE POOL.
THE CHECK WAS FOR DPI TO START THE POOL.
THE MONEY WAS REFUNDED.
IT WAS NOTED THAT
FINDING OF FACTS:
MOTION BY MR. CAPP, SECONDED BY MR. KELLEY THAT WE FIND MR.
PATTY, HE DID VIOLATE CITY OF SEBASTIAN CODE 7-20, NO PERMIT,
7-99(A), NO LICENSE, 7-100(1), VIOLATION OF BUILDING CODE.
THE BOARD SECRETARY NOTED THAT IN THE FINDING OF FACT THAT
IT NEEDED TO BE MORE SPECIFIC.
MR. KELLEY WITHDREW HIS SECOND.
MR. CAPP WITHDREW HIS MOTION.
MOTION BY MR. CAPP, SECONDED BY MR. KELLEY THAT WE HAVE FOUND
THAT MR. PATTY HAS VIOLATED CITY OF SEBASTIAN CODES 7-20, NO
PERMIT, 7-99(A), NO LICENSE, 7-100(1), VIOLATION OF BUILDING
CODE, WHICH OCCURRED AT 1225 BEVAN IN THE CITY OF SEBASTIAN
ACTING AS AN UNLICENSED POOL CONTRACTOR.
ROLL CALL:
AYES: MR. KELLEY
MR. NEUBERGER
MR. CAPP
ACTING CHAIRMAN DERNBACH
NAYS: NONE
CARRIED.
MOTION BY MR. NEUBERGER, SECONDED BY MR. CAPP THAT THE
FINDING BY THE BOARD BE SENT TO DPR FOR ENTRY IN MR. PATTY'S
RECORD - IF HE iS DULY LICENSED HE MUST BE REGISTERED WITH
THE STATE..
CARRIED.
PAGE 3
SEBASTIAN CONSTRUCTION BOARD - 11/13/90
A RECESS WAS TAKEN AT 7:50 P.M. SO THAT THE BOARD SECRETARY
COULD MAKE COPIES OF THE CONTRACT BETWEEN MR. PATTY AND MR. &
MRS. BRADY.
MEETING REOPENED AT 8:00 P.M. WITH ALL PRESENT.
MOTION BY MR. CAPP SECONDED BY MR. NEUBERGER THAT NO ACTION
BE TAKEN AGAINST ALAN VON REISEN REGARDING THE POOL. AT 1225
BEVAN.
CARRIED.
MR. VON REISEN REQUESTED THAT A LETTER BE SENT TO CHET BUSH,
BUILDING OFFICIAL IN'BREVARD COUNTY SHOWING THE OUTCOME OF
THE MEETING.
NEW BUSINESS
BLOCK EXAM - SEBASTIAN
SMITH, DAVID T./TILE & MARBLE
REAGAN, WILLIE C./RESiDENTIAL CONTRACTOR
MURPHY JR., JOHN F./DRYWALL
MOTION BY MR. NEUBERGER SECONDED BY MR. KELLEY TO ACCEPT THE
APPLICATIONS OF DAVID SMITH, WILLIE REAGAN AND JOHN MURPHY
JR. FOR THE BLOCK EXAM IN SEBASTIAN.
CARRIED.
BLOCK EXAM - GAINESVILLE
AUTRY, DAVID K./GENERAL CONTRACTOR
MOTION BY MR. NEUBERGER SECONDED BY MR. CAPP THAT WE SPONSOR
DAVID AUTRY FOR THE GENERAL CONTRACTORS EXAM IN GAINESViLLE.
CARRIED.
ACTIVATE LICENSE
SILVA, SCOTT/ROOFING UNLIMITED
MOTION BY MR. CAPP, SECONDED BY MR. NEUBERGER THAT WE ACCEPT
THE APPLICATION TO ACTIVATE HIS LICENSE.
CARRIED.
PAGE 4
SEBASTIAN CONSTRUCTION BOARD - 11/13/90
VIOLATION HEARING - JAMES PURKHISER
ACTING CHAIRMAN DERNBACH REVIEWED THE MEMO FROM CARSON
COAKLEY, CODE ENFORCEMENT REGARDING 307 BAYHARBOR TERRACE.
MR. PURKHISER WAS SWORN IN.
IT WAS NOTED THAT MR. PURKHISER'S COMPANY WAS CALLED J & D
ROOFING.
A BRIEF DISCUSSION FOLLOWED.
FINDING OF FACTS:
MOTION BY MR. CAPP, SECONDED BY MR. KELLEY THAT JAMES
PURKHISER WAS FOUND IN VIOLATION IN THE CITY OF SEBASTIAN
CODES ON THE DATE OF 8/11/90 AT APPROXIMATELY 1:00 P.M., HE
WAS FOUND IN VIOLATION OF SEC. 7-99(A), NO LICENSE, SEC. 7-
100(1.), VIOLATION OF BUILDING CODE, SEC 7-20, NO PERMIT AT
307 BAYHARBOR, CiTY OF SEBASTIAN.
ROLL CALL: AYES: MR. KELLEY
MR. NEUBERGER
MR. CAPP
ACTING CHAIRMAN DERNBACH
NAYS: NONE
CARRIED.
MOTION BY MR. NEUBERGER, SECONDED BY MR. CAPP THAT THE
FINDINGS OF THE BOARD BE SENT TO DPR AS AN ENTRY INTO MR.
PURKHiSER'S RECORDS.
CARRIED.
MOTION BY MR. CAPP, SECONDED BY MR. NEUBERGER THAT NO FURTHER
ACTION BE TAKEN AGAINST JAMES PURKHISER AT THIS TIME
REGARDING A HOUSE AT 307 BAYHARBOR TERRACE, LOT 14, BLOCK
308, CITY OF SEBASTIAN.
CARRIED.
DISCUSSION: PRE-FAB SHEDS - NEED COMPETENCY CARD
A BRIEF DISCUSSION FOLLOWED.
PAGE 5
SEBASTIAN CONSTRUCTION BOARD - 11/13/90
PRE-FAB SHEDS, cont
MOTION BY MR. NEUBERGER, SECONDED BY MR. KELLEY THAT IN THE
CASE OF PRE-FAB FACTORY MADE THROUGH INDUSTRY STANDARD TYPE
UTILITY SHEDS, THE INSTALLER, IF HE IS A DISTRIBUTOR
INSTALLING THIS FACTORY PRODUCT SHOULD NOT NEED A COMP CARD
TO DO THE INSTALLATION BUT HE DOES HAVE TO PULL THE PERMITS
AND ABIDE BY THE LOCAL TIE DOWN REGULATIONS.
CARRIED.
IT WAS ALSO NOTED THAT A CERTIFICATE OF INSURANCE BE
SUBMITTED WITH THE PERMIT APPLICATION.
SCORES WERE REGISTERED IN THE SCORE BOOK BY MR. NEUBERGER AND
MR. KELLEY.
THERE BEING NO FURTHER DISCUSSION, MEETING ADJOURNED AT 8:30
P.M.
SEBASTIAN CONSTRUCTION BOARD
· 1990 NEETING.
BOARD SECRETARY