HomeMy WebLinkAboutF - 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services Bid Tabulation SheetAsphalt Paving Systems, Inc.
Zaphyrhills, FL
Yes
Yes
Yes
Yes
Yes
$ 33,085.03
$ 54,046.21
$ 38,650.42
$ 79,194.24
$ 29,324.00
$ 343,983.40
$ 4,186.00
$ 1,437,953.50
$ 120,000.00
2,140,422.80$
Notes:
Posting Date: September 5, 2025
Bid Bond
Required Forms
FDOT Prequalification (Drainage, flexible paving, grading, and hot plant–mixed
bituminous courses)
Bonding Capacity Certification
BID TABULATION
Bid #: 25-18-ITB
Bid Title: Citywide Pavement Maintenance and Rehabilitative Services
Bid Price Form
CHIP SEAL / FOG SEAL - SUBTOTAL
CAPE SEAL - SUBTOTAL
MICRO-SURFACING - SUBTOTAL
IN-PLACE RECYCLING - SUBTOTAL
Grand Total (Basis of Award)
ASPHALT - SUBTOTAL
ASPHALT REJUVENATION - SUBTOTAL
CRACK SEALING - SUBTOTAL
PAVEMENT MARKINGS - SUBTOTAL
MOT - SUBTOTAL
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Single Chip (Number 89 Stone) - 0-25,000 SY 1 SY 4.63$ 4.63$
2 Single Chip (Number 89 Stone) - 25,001-50,000 SY 1 SY 4.14$ 4.14$
3 Single Chip (Number 89 Stone) - 50,001-100,000 SY 1 SY 3.94$ 3.94$
4 Single Chip (Number 89 Stone) - Over 100,000 SY 1 SY 3.74$ 3.74$
5 Double Chip (Number 57 & 89 Stone) - 0-25,000 SY 1 SY 7.65$ 7.65$
6 Double Chip (Number 57 & 89 Stone) - 25,001-50,000 SY 1 SY 6.99$ 6.99$
7 Double Chip (Number 57 & 89 Stone) - 50,001-100,000 SY 1 SY 6.60$ 6.60$
8 Double Chip (Number 57 & 89 Stone) - Over 100,000 SY 1 SY 6.35$ 6.35$
9 Triple Chip Seal - 0-25,000 SY 1 SY 10.30$ 10.30$
10 Triple Chip Seal - 25,001-50,000 SY 1 SY 9.65$ 9.65$
11 Triple Chip Seal - 50,001-100,000 SY 1 SY 9.25$ 9.25$
12 Triple Chip Seal - Over 100,000 SY 1 SY 8.99$ 8.99$
13 Fog Seal - 0-25,000 SY 1 SY 0.70$ 0.70$
14 Fog Seal - 25,001-50,000 SY 1 SY 0.70$ 0.70$
15 Fog Seal - 50,001-100,000 SY 1 SY 0.70$ 0.70$
16 Fog Seal - Over 100,000 SY 1 SY 0.70$ 0.70$
17 Mobilization - Task Order Total - $0.00- $50,000 1 LS 7,500.00$ 7,500.00$
18 Mobilization - Task Order Total - $50,001-$100,000 1 LS 7,500.00$ 7,500.00$
19 Mobilization - Task Order Total - $100,001-$500,000 1 LS 9,000.00$ 9,000.00$
20 Mobilization - Task Order Total - Over $500,000 1 LS 9,000.00$ 9,000.00$
33,085.03$
CHIP SEAL / FOG SEAL
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
Mobilization
Subtotal - CHIP SEAL / FOG SEAL
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Cape Seal - 0-25,000 1 SY 12.89$ 12.89$
2 Cape Seal - 25,001-50,000 1 SY 11.80$ 11.80$
3 Cape Seal - 50,001-100,000 1 SY 10.84$ 10.84$
4 Cape Seal - Over 100,000 1 SY 10.68$ 10.68$
5 Mobilization - Task Order Total - $0.00- $50,000 1 LS 12,000.00$ 12,000.00$
6 Mobilization - Task Order Total - $50,001-$100,000 1 LS 12,000.00$ 12,000.00$
7 Mobilization - Task Order Total - $100,001-$500,000 1 LS 15,000.00$ 15,000.00$
8 Mobilization - Task Order Total - Over $500,000 1 LS 15,000.00$ 15,000.00$
54,046.21$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
CAPE SEAL
Mobilization
Subtotal - CAPE SEAL
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Double Micro - 0-25,000 SY 1 SY 8.16$ 8.16$
2 Double Micro - 25,001-50,000 SY 1 SY 7.60$ 7.60$
3 Double Micro - 50,001-100,000 SY 1 SY 6.90$ 6.90$
4 Double Micro - Over 100,000 SY 1 SY 6.84$ 6.84$
5 Single Micro - 0-25,000 SY 1 SY 6.00$ 6.00$
6 Single Micro - 25,001-50,000 SY 1 SY 5.43$ 5.43$
7 Single Micro - 50,001-100,000 SY 1 SY 5.14$ 5.14$
8 Single Micro - Over 100,000 SY 1 SY 4.35$ 4.35$
9 Rut Filling (Leveling) - 0-25,000 Tons 1 Tons 400.00$ 400.00$
10 Rut Filling (Leveling) - 25,001-50,000 Tons 1 Tons 400.00$ 400.00$
11 Rut Filling (Leveling) - 50,001-100,000 Tons 1 Tons 400.00$ 400.00$
12 Rut Filling (Leveling) - Over 100,000 Tons 1 Tons 400.00$ 400.00$
13 Mobilization - Task Order Total - $0.00- $50,000 1 LS 8,500.00$ 8,500.00$
14 Mobilization - Task Order Total - $50,001-$100,000 1 LS 8,500.00$ 8,500.00$
15 Mobilization - Task Order Total - $100,001-$500,000 1 LS 10,000.00$ 10,000.00$
16 Mobilization - Task Order Total - Over $500,000 1 LS 10,000.00$ 10,000.00$
38,650.42$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
MICRO-SURFACING
Mobilization
Subtotal - MICRO-SURFACING
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Pulverization - 0-25,000 SY 1 SY 13.60$ 13.60$
2 Pulverization - 25,001-50,000 SY 1 SY 10.15$ 10.15$
3 Pulverization - 50,001-100,000 SY 1 SY 9.55$ 9.55$
4 Pulverization - Over 100,000 SY 1 SY 9.05$ 9.05$
5 Cement - Cement Treated Base - 0-25,000 Tons 1 Tons 250.00$ 250.00$
6 Cement - Cement Treated Base - 25,001-50,000 Tons 1 Tons 250.00$ 250.00$
7 Cement - Cement Treated Base - 50,001-100,000 Tons 1 Tons 250.00$ 250.00$
8 Cement - Cement Treated Base - Over 100,000 Tons 1 Tons 250.00$ 250.00$
9 Asphaltic Cement - Foamed Asphalt Base - 0-25,000 Gallons 1 Gallons 4.85$ 4.85$
10 Asphaltic Cement - Foamed Asphalt Base - 25,001-50,000 Gallons 1 Gallons 4.85$ 4.85$
11 Asphaltic Cement - Foamed Asphalt Base - 50,001-100,000 Gallons 1 Gallons 4.85$ 4.85$
12 Asphaltic Cement - Foamed Asphalt Base - Over 100,000 Gallons 1 Gallons 4.85$ 4.85$
13 Asphaltic Emulsion - Emulsion Treated Base - 0-25,000 Gallons 1 Gallons 3.64$ 3.64$
14 Asphaltic Emulsion - Emulsion Treated Base - 25,001-50,000 Gallons 1 Gallons 3.64$ 3.64$
15 Asphaltic Emulsion - Emulsion Treated Base - 50,001-100,000 Gallons 1 Gallons 3.64$ 3.64$
16 Asphaltic Emulsion - Emulsion Treated Base - Over 100,000 Gallons 1 Gallons 3.64$ 3.64$
17 Added Rap or Aggregates - 0-25,000 Tons 1 Tons 50.00$ 50.00$
18 Added Rap or Aggregates - 25,001-50,000 Tons 1 Tons 50.00$ 50.00$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
IN-PLACE RECYCLING - RECONSTRUCTION (FULL DEPTH RECLAMATION)
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
IN-PLACE RECYCLING - RECONSTRUCTION (FULL DEPTH RECLAMATION)
19 Added Rap or Aggregates - 50,001-100,000 Tons 1 Tons 50.00$ 50.00$
20 Added Rap or Aggregates - Over 100,000 Tons 1 Tons 50.00$ 50.00$
21 Excavation for Widening/Unsuitable Materials - 0-25,000 CY 1 CY 45.00$ 45.00$
22 Excavation for Widening/Unsuitable Materials - 25,001-50,000 CY 1 CY 45.00$ 45.00$
23 Excavation for Widening/Unsuitable Materials - 50,001-100,000 CY 1 CY 45.00$ 45.00$
24 Excavation for Widening/Unsuitable Materials - Over 100,000 CY 1 CY 45.00$ 45.00$
25 General Use Optional Base Material - 0-25,000 CY 1 CY 47.50$ 47.50$
26 General Use Optional Base Material - 25,001-50,000 CY 1 CY 47.50$ 47.50$
27 General Use Optional Base Material - 50,001-100,000 CY 1 CY 47.50$ 47.50$
28 General Use Optional Base Material - Over 100,000 CY 1 CY 47.50$ 47.50$
29 Shoulder Rework - 0'-4' (width) LF 1 LF 2.35$ 2.35$
30 Shoulder Rework - <4' to 6' (width) LF 1 LF 2.75$ 2.75$
31 Shoulder Rework - <6' to 10' (width) LF 1 LF 3.35$ 3.35$
32 Shoulder Rework - <10' (width) LF 1 LF 3.85$ 3.85$
33 Milling 1-2” - 0-1,000 SY 1 SY 15.50$ 15.50$
34 Milling 1-2” - 1,001-5,000 SY 1 SY 7.50$ 7.50$
35 Milling 1-2” - 5,001-10,000 SY 1 SY 4.99$ 4.99$
36 Milling 1-2” - 10,001-25,000 SY 1 SY 3.99$ 3.99$
37 Milling 1-2” - Over 25,001 SY 1 SY 3.65$ 3.65$
38 Mobilization - Task Order Total - $0.00- $50,000 1 LS 17,500.00$ 17,500.00$
39 Mobilization - Task Order Total - $50,001-$100,000 1 LS 17,500.00$ 17,500.00$
40 Mobilization - Task Order Total - $100,001-$500,000 1 LS 20,000.00$ 20,000.00$
41 Mobilization - Task Order Total - Over $500,000 1 LS 22,500.00$ 22,500.00$
79,194.24$
Mobilization
Subtotal - IN-PLACE RECYCLING
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 9.5 S.P. Traffic Level C - 0-100 Ton 1 Ton 358.00$ 358.00$
2 9.5 S.P. Traffic Level C - 100-500 Ton 1 Ton 248.00$ 248.00$
3 9.5 S.P. Traffic Level C - 501-1,000 Ton 1 Ton 193.00$ 193.00$
4 9.5 S.P. Traffic Level C - 1,001-5,000 Ton 1 Ton 186.00$ 186.00$
5 9.5 S.P. Traffic Level C - Over 5,001 Ton 1 Ton 182.00$ 182.00$
6 12.5 S.P. Traffic Level C - 0-100 Ton 1 Ton 356.00$ 356.00$
7 12.5 S.P. Traffic Level C - 101-500 Ton 1 Ton 246.00$ 246.00$
8 12.5 S.P. Traffic Level C - 501-1,000 Ton 1 Ton 191.00$ 191.00$
9 12.5 S.P. Traffic Level C - 1,001-5,000 Ton 1 Ton 184.00$ 184.00$
10 12.5 S.P. Traffic Level C - Over 5,001 Ton 1 Ton 180.00$ 180.00$
11 Mobilization - Task Order Total - $0.00- $50,000 1 LS 5,500.00$ 5,500.00$
12 Mobilization - Task Order Total - $50,001-$100,000 1 LS 5,500.00$ 5,500.00$
13 Mobilization - Task Order Total - $100,001-$500,000 1 LS 7,500.00$ 7,500.00$
14 Mobilization - Task Order Total - Over $500,000 1 LS 8,500.00$ 8,500.00$
29,324.00$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
334 SUPERPAVE ASPHALT CONCRETE
Mobilization
Subtotal - ASPHALT
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Rejuvenation - 0-1,000 SY 10 SY 6.56$ 65.60$
2 Rejuvenation - 1,001-5,000 SY 10 SY 4.38$ 43.80$
3 Rejuvenation - 5,001-25,000 SY 10 SY 3.14$ 31.40$
4 Rejuvenation -25,001-50,000 SY 10 SY 1.61$ 16.10$
5 Rejuvenation - Over 50,000 SY 10 SY 1.47$ 14.70$
6 Test Core Removal - 0-1,000 EA 10 EA 450.00$ 4,500.00$
7 Test Core Removal - 1,001-5,000 EA 10 EA 450.00$ 4,500.00$
8 Test Core Removal - 5,001-25,000 EA 10 EA 450.00$ 4,500.00$
9 Test Core Removal - 25,001-50,000 EA 10 EA 450.00$ 4,500.00$
10 Test Core Removal - Over 50,000 EA 10 EA 450.00$ 4,500.00$
11 Test Core Laboratory Analysis - 0-1,000 EA 10 EA 562.50$ 5,625.00$
12 Test Core Laboratory Analysis - 1,001-5,000 EA 10 EA 562.50$ 5,625.00$
13 Test Core Laboratory Analysis - 5,001-25,000 EA 10 EA 562.50$ 5,625.00$
14 Test Core Laboratory Analysis - 25,001-50,000 EA 10 EA 562.50$ 5,625.00$
15 Test Core Laboratory Analysis - Over 50,000 EA 10 EA 562.50$ 5,625.00$
16 Rejuvenation (including Titanium Dioxide) - 0-1,000 SY 10 SY 11.37$ 113.70$
17 Rejuvenation (including Titanium Dioxide) - 1,001-5,000 SY 10 SY 8.33$ 83.30$
18 Rejuvenation (including Titanium Dioxide) - 5,001-25,000 SY 10 SY 4.97$ 49.70$
19 Rejuvenation (including Titanium Dioxide) - 25,001-50,000 SY 10 SY 3.42$ 34.20$
20 Rejuvenation (including Titanium Dioxide) - Over 50,000 SY 10 SY 3.09$ 30.90$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
ASPHALT REJUVENATION
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
ASPHALT REJUVENATION
21 Field Core Removal - 0-1,000 EA 10 EA 450.00$ 4,500.00$
22 Field Core Removal - 1,001-5,000 EA 10 EA 450.00$ 4,500.00$
23 Field Core Removal - 5,001-25,000 EA 10 EA 450.00$ 4,500.00$
24 Field Core Removal - 25,001-50,000 EA 10 EA 450.00$ 4,500.00$
25 Field Core Removal - Over 50,000 EA 10 EA 450.00$ 4,500.00$
26 Field Core Laboratory Analysis - Viscosity - 0-1,000 EA 10 EA 562.50$ 5,625.00$
27 Field Core Laboratory Analysis - Viscosity - 1,001-5,000 EA 10 EA 562.50$ 5,625.00$
28 Field Core Laboratory Analysis - Viscosity - 5,001-25,000 EA 10 EA 562.50$ 5,625.00$
29 Field Core Laboratory Analysis - Viscosity - 25,001-50,000 EA 10 EA 562.50$ 5,625.00$
30 Field Core Laboratory Analysis - Viscosity - Over 50,000 EA 10 EA 562.50$ 5,625.00$
31 Field Core Laboratory Analysis - Titanium Dioxide Penetration -
0-1,000 EA 10 EA 900.00$ 9,000.00$
32 Field Core Laboratory Analysis - Titanium Dioxide Penetration -
1,001-5,000 EA 10 EA 900.00$ 9,000.00$
33 Field Core Laboratory Analysis - Titanium Dioxide Penetration -
5,001-25,000 EA 10 EA 900.00$ 9,000.00$
34 Field Core Laboratory Analysis - Titanium Dioxide Penetration -
25,001-50,000 EA 10 EA 900.00$ 9,000.00$
35 Field Core Laboratory Analysis - Titanium Dioxide Penetration -
Over 50,000 EA 10 EA 900.00$ 9,000.00$
36 Field Core Laboratory Analysis - Titanium Dioxide NO2
Reduction - 0-1,000 EA 10 EA 1,012.50$ 10,125.00$
37 Field Core Laboratory Analysis - Titanium Dioxide NO2
Reduction - 1,001-5,000 EA 10 EA 1,012.50$ 10,125.00$
38 Field Core Laboratory Analysis - Titanium Dioxide NO2
Reduction - 5,001-25,000 EA 10 EA 1,012.50$ 10,125.00$
39 Field Core Laboratory Analysis - Titanium Dioxide NO2
Reduction - 25,001-50,000 EA 10 EA 1,012.50$ 10,125.00$
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
ASPHALT REJUVENATION
40 Field Core Laboratory Analysis - Titanium Dioxide NO2
Reduction - Over 50,000 EA 10 EA 1,012.50$ 10,125.00$
41 Field Core Laboratory Analysis - Titanium Dioxide Solar
Reflectance Index (SRI) - 0-1,000 EA 10 EA 2,812.50$ 28,125.00$
42 Field Core Laboratory Analysis - Titanium Dioxide Solar
Reflectance Index (SRI) - 1,001-5,000 EA 10 EA 2,812.50$ 28,125.00$
43 Field Core Laboratory Analysis - Titanium Dioxide Solar
Reflectance Index (SRI) - 5,001-25,000 EA 10 EA 2,812.50$ 28,125.00$
44 Field Core Laboratory Analysis - Titanium Dioxide Solar
Reflectance Index (SRI) - 25,001-50,000 EA 10 EA 2,812.50$ 28,125.00$
45 Field Core Laboratory Analysis - Titanium Dioxide Solar
Reflectance Index (SRI) - Over 50,000 EA 10 EA 2,812.50$ 28,125.00$
46 Mobilization - Task Order Total - $0.00- $50,000 1 LS 1,500.00$ 1,500.00$
47 Mobilization - Task Order Total - $50,001-$100,000 1 LS 1,500.00$ 1,500.00$
48 Mobilization - Task Order Total - $100,001-$500,000 1 LS 1,500.00$ 1,500.00$
49 Mobilization - Task Order Total - Over $500,000 1 LS 1,500.00$ 1,500.00$
343,983.40$
Mobilization
Subtotal - ASPHALT REJUVENATION
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Crack Sealant - 0-500 Gallon 1 Gallon 48.0000$ 48.0000$
2 Crack Sealant - 501-1,000 Gallon 1 Gallon 38.0000$ 38.0000$
3 Crack Sealant - 1,001-5,000 Gallon 1 Gallon 35.0000$ 35.0000$
4 Crack Sealant - 5,001-10,000 Gallon 1 Gallon 34.0000$ 34.0000$
5 Crack Sealant - Over 10,000 Gallon 1 Gallon 31.0000$ 31.0000$
6 Mobilization - Task Order Total - $0.00- $50,000 1 LS 1,000.00$ 1,000.00$
7 Mobilization - Task Order Total - $50,001-$100,000 1 LS 1,000.00$ 1,000.00$
8 Mobilization - Task Order Total - $100,001-$500,000 1 LS 1,000.00$ 1,000.00$
9 Mobilization - Task Order Total - Over $500,000 1 LS 1,000.00$ 1,000.00$
4,186.0000$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
CRACK SEALING
Mobilization
Subtotal - CRACK SEALING
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 4"10 GM 9,000.0000$ 90,000.0000$
2 6"10 GM 10,690.0000$ 106,900.0000$
3 8"10 LF 9.0000$ 90.0000$
4 12"10 LF 19.1500$ 191.5000$
5 18"10 LF 30.4000$ 304.0000$
6 24"10 LF 38.2500$ 382.5000$
6 4"10 GM 6,900.0000$ 69,000.0000$
7 6"10 GM 8,250.0000$ 82,500.0000$
8 4"10 GM 9,000.0000$ 90,000.0000$
9 6"10 GM 10,690.0000$ 106,900.0000$
10 8"10 LF 9.0000$ 90.0000$
11 12"10 LF 19.1500$ 191.5000$
12 18"10 LF 30.4000$ 304.0000$
13 4"10 GM 6,900.0000$ 69,000.0000$
14 6"10 GM 8,250.0000$ 82,500.0000$
PAVEMENT MARKINGS
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
YELLOW - SKIP
WHITE - SKIP
YELLOW - SOLID
WHITE - SOLID
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
PAVEMENT MARKINGS
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
15 4"10 GM 18,000.0000$ 180,000.0000$
16 6"10 GM 21,375.0000$ 213,750.0000$
17 Yellow - Skip 4"10 GM 6,190.0000$ 61,900.0000$
18 Yellow - Skip 6"10 GM 7,315.0000$ 73,150.0000$
19 White - Skip 4"10 GM 6,190.0000$ 61,900.0000$
20 White - Skip 6"10 GM 7,315.0000$ 73,150.0000$
21 "STOP"10 EA 475.0000$ 4,750.0000$
22 "R X R" (Includes 6" white)10 EA 732.0000$ 7,320.0000$
23 "ONLY"10 EA 475.0000$ 4,750.0000$
24 "LANE"10 EA 475.0000$ 4,750.0000$
25 "MERGE"10 EA 585.0000$ 5,850.0000$
26 "SCHOOL"10 EA 585.0000$ 5,850.0000$
YELLOW - DOUBLE
LEGENDS
AUDIBLE AND VIBRATORY PAVEMENT MARKINGS
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
PAVEMENT MARKINGS
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
27 "AHEAD"10 EA 585.0000$ 5,850.0000$
28 "Vistor"10 EA 835.0000$ 8,350.0000$
29 "Resident"10 EA 960.0000$ 9,600.0000$
30 "Path"10 EA 585.0000$ 5,850.0000$
31 TURN AND THROUGH LANE TURN ARROW 10 EA 315.0000$ 3,150.0000$
32 THROUGH LANE USE ARROW 10 EA 170.0000$ 1,700.0000$
33 TURN LANE USE ARROW 10 EA 170.0000$ 1,700.0000$
34 BIKE OR CART 10 EA 280.0000$ 2,800.0000$
35 BIKE ARROW 10 EA 225.0000$ 2,250.0000$
36 YIELD TRIANGLES 10 EA 69.0000$ 690.0000$
37 Bi-Directional, Amber 10 EA 18.0000$ 180.0000$
38 Mono-Directional Colorless 10 EA 18.0000$ 180.0000$
39 Bi-Directional, White/Red 10 EA 18.0000$ 180.0000$
1,437,953.5000$
REFLECTIVE PAVEMENT MARKERS
MARKINGS
Subtotal - PAVEMENT MARKINGS
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
1 Standard Index 600 Series MOT TWO- LANE AND
MULTILANE, WORK ON SHOULDER - 0-7 Days 1 Day 1,500.0000$ 1,500.0000$
2 Standard Index 600 Series MOT TWO- LANE AND
MULTILANE, WORK ON SHOULDER - 8-14 Days 1 Day 1,500.0000$ 1,500.0000$
3 Standard Index 600 Series MOT TWO- LANE AND
MULTILANE, WORK ON SHOULDER - 15-21 Days 1 Day 1,500.0000$ 1,500.0000$
4 Standard Index 600 Series MOT TWO- LANE AND
MULTILANE, WORK ON SHOULDER - 22-31 Days 1 Day 1,500.0000$ 1,500.0000$
5 Standard Index 600 Series MOT TWO- LANE AND
MULTILANE, WORK ON SHOULDER - Over 31 Days 1 Day 1,500.0000$ 1,500.0000$
6 Standard Index 600 Series MOT TWO- LANE, TWO-WAY
WORK WITHIN THE TRAVEL WAY - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$
7 Standard Index 600 Series MOT TWO- LANE, TWO-WAY
WORK WITHIN THE TRAVEL WAY - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$
8 Standard Index 600 Series MOT TWO- LANE, TWO-WAY
WORK WITHIN THE TRAVEL WAY - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$
9 Standard Index 600 Series MOT TWO- LANE, TWO-WAY
WORK WITHIN THE TRAVEL WAY - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$
10 Standard Index 600 Series MOT TWO- LANE, TWO-WAY
WORK WITHIN THE TRAVEL WAY - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
11 Standard Index 600 Series MOT TWO- LANE, TWO-WAY,
INTERSECTION WORK - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$
12 Standard Index 600 Series MOT TWO- LANE, TWO-WAY,
INTERSECTION WORK - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$
13 Standard Index 600 Series MOT TWO- LANE, TWO-WAY,
INTERSECTION WORK - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$
14 Standard Index 600 Series MOT TWO- LANE, TWO-WAY,
INTERSECTION WORK - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$
15 Standard Index 600 Series MOT TWO- LANE, TWO-WAY,
INTERSECTION WORK - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
SHOULDER
WITHIN THE TRAVEL WAY
INTERSECTION WORK
MAINTENANCE OF TRAFFIC (MOT)
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
MAINTENANCE OF TRAFFIC (MOT)
16 Standard Index 600 Series MOT Multilane Roadway, Lane
Closures - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$
17 Standard Index 600 Series MOT Multilane Roadway, Lane
Closures - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$
18 Standard Index 600 Series MOT Multilane Roadway, Lane
Closures - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$
19 Standard Index 600 Series MOT Multilane Roadway, Lane
Closures - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$
20 Standard Index 600 Series MOT Multilane Roadway, Lane
Closures - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
21 Standard Index 600 Series MOT Multilane Roadway,
Intersection Work - 0-7 Days 1 Day 3,000.0000$ 3,000.0000$
22 Standard Index 600 Series MOT Multilane Roadway,
Intersection Work - 8-14 Days 1 Day 3,000.0000$ 3,000.0000$
23 Standard Index 600 Series MOT Multilane Roadway,
Intersection Work - 15-21 Days 1 Day 3,000.0000$ 3,000.0000$
24 Standard Index 600 Series MOT Multilane Roadway,
Intersection Work - 22-31 Days 1 Day 3,000.0000$ 3,000.0000$
25 Standard Index 600 Series MOT Multilane Roadway,
Intersection Work - Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
26 Standard Index 600 Series MOT Temporary Road Closure - 0-
7 Days 1 Day 3,000.0000$ 3,000.0000$
27 Standard Index 600 Series MOT Temporary Road Closure - 8-
14 Days 1 Day 3,000.0000$ 3,000.0000$
28 Standard Index 600 Series MOT Temporary Road Closure -
15-21 Days 1 Day 3,000.0000$ 3,000.0000$
29 Standard Index 600 Series MOT Temporary Road Closure -
22-31 Days 1 Day 3,000.0000$ 3,000.0000$
30 Standard Index 600 Series MOT Temporary Road Closure -
Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
MULTILANE ROADWAY, LANE CLOSURE
MULTILANE ROADWAY, INTERSECTION WORK
TEMPORARY ROAD CLOSURE
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit Extended Price
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
MAINTENANCE OF TRAFFIC (MOT)
31 Standard Index 600 Series MOT Two- Way Left-Turn Lanes -
0-7 Days 1 Day 3,000.0000$ 3,000.0000$
32 Standard Index 600 Series MOT Two- Way Left-Turn Lanes -
8-14 Days 1 Day 3,000.0000$ 3,000.0000$
33 Standard Index 600 Series MOT Two- Way Left-Turn Lanes -
15-21 Days 1 Day 3,000.0000$ 3,000.0000$
34 Standard Index 600 Series MOT Two- Way Left-Turn Lanes -
22-31 Days 1 Day 3,000.0000$ 3,000.0000$
35 Standard Index 600 Series MOT Two- Way Left-Turn Lanes -
Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
36 Standard Index 600 Series MOT Sidewalk Closure - 0-7 Days 1 Day 1,500.0000$ 1,500.0000$
37 Standard Index 600 Series MOT Sidewalk Closure - 8-14
Days 1 Day 1,500.0000$ 1,500.0000$
38 Standard Index 600 Series MOT Sidewalk Closure - 15-21
Days 1 Day 1,500.0000$ 1,500.0000$
39 Standard Index 600 Series MOT Sidewalk Closure - 22-31
Days 1 Day 1,500.0000$ 1,500.0000$
40 Standard Index 600 Series MOT Sidewalk Closure - Over 31
Days 1 Day 1,500.0000$ 1,500.0000$
41 Standard Index 600 Series MOT Work Within the Roundabout
- 0-7 Days 1 Day 3,000.0000$ 3,000.0000$
42 Standard Index 600 Series MOT Work Within the Roundabout
- 8-14 Days 1 Day 3,000.0000$ 3,000.0000$
43 Standard Index 600 Series MOT Work Within the Roundabout
- 15-21 Days 1 Day 3,000.0000$ 3,000.0000$
44 Standard Index 600 Series MOT Work Within the Roundabout
- 22-31 Days 1 Day 3,000.0000$ 3,000.0000$
45 Standard Index 600 Series MOT Work Within the Roundabout
- Over 31 Days 1 Day 3,000.0000$ 3,000.0000$
120,000.0000$
ROUNDABOUT
Subtotal - MOT
TWO-WAY LEFT TURN LANES
SIDEWALK CLOSURE
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231
Item No.Description QTY Unit of
Measure Price Per Unit
1 Performance Turf Sod N/A SY 6.0000$
2 Variable Message Board N/A Per Board
Per Day 50.0000$
3 SINGLE POST SIGN, F&I GROUND MOUNT, UP TO 12 SF N/A AS 425.0000$
4 SINGLE POST SIGN, F&I GROUND MOUNT, 12-20 SF N/A AS 1,450.0000$
5 SINGLE POST SIGN, F&I GROUND MOUNT, 21-30 SF N/A AS 2,600.0000$
6 MAILBOX (REMOVE AND REPLACE)N/A EA 325.0000$
7 Silt Fence Type III N/A LF 3.2500$
8 Removal of Existing Marking N/A SF 3.6500$
9 Preform Thermoplastic 12”N/A LF 11.8500$
10 Preform Thermoplastic 24”N/A LF 25.0000$
11 Off Duty Law Enforcement Officer N/A HR 125.0000$
BID TABULATION
Bid #: 25-18-ITB
Bid Title: 25-18-ITB - Citywide Pavement Maintenance and Rehabilitative Services
Asphalt Paving Systems, Inc.
Zaphyrhills, FL
MISC
Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231