Loading...
HomeMy WebLinkAboutDickerson_Infrastructure_Change_Order_2_-_PO_11463 Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 1 of 7 CHANGE ORDER FORM Change Order # 2 Project Name Taxiway G Construction Purchase Order # 11463 Project # A2551 Contractor: Dickerson Infrastructure, Inc. Contact Name Mike Bryant Address: 3122 North 25th Street Ft Pierce, FL 34946 Contract Date August 12, 2025 By the signature affixed below, the City and the Contractor agree to the changes stipulated herein. Upon proper execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are enjoined and in full force while executing the change(s) stipulated as follows: DESCRIPTION: This Change Order is being issued to accomplish the following: 1. Contract Amount Increase: Add $57,118.00 to address unsuitable subbase material encountered at the Phase 2 Taxiway G/B tie-in. Excavation revealed 8–12 inches of gray sand and an undetermined layer of decomposed organics (“muck”), creating unstable ground conditions. Work was halted pending the Engineer of Record's direction (see Exhibit A: RFI 0004 and Cost Breakdown). 2. Contract Time Extension: Extend the contract by fourteen (14) calendar days. Seven (7) days for City of Sebastian’s scheduled closures (Nov 2025–Jan 2026, Exhibit B) and seven (7) days for additional work required at the Taxiway G/B tie-in. 3. Liquidated Damages Revision: Revise the schedule to combine Phases 1 and 2 and reflect the added calendar days (Exhibit C). A. Contract price prior to this change 959,166.40 Net increase (decrease) resulting from this change 57,118.00 New contract price including this change order $1,016,284.40 B. Contract time prior to this change (number of days) 97 (2/1/2026) Net increase (decrease) resulting from this change (number of days) 14 days New completion date including this change 111 days (2/15/2026) AGREED: ENGINEER: DICKERSON INFRASTRUCTURE: ___________________________ ___________________________ Hamed Jafarian, PE, ICE Mike Bryant, President Date: ______________________ Date: ______________________ Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA ID: 2CD15BA7-298... Digitally signed by <hamed.jafarian@ice-eng.com> January 12, 2026 07:27 PM EST 01/12/2026 ID: A32B9191-4C5E... Digitally signed by <mbryant@dfifl.com> January 13, 2026 06:31 AM EST 01/13/2026 Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 2 of 7 CITY OF SEBASTIAN: ___________________________ ___________________________ Brian Benton, City Manager Catherine E. Testa, Acting City Clerk Date: ______________________ Date: ______________________ Approvals by City of Sebastian Staff: City Manager Authorization – a cumulative amount less than 15% of the contract price or $15,000. X City Council Authorization – a cumulative amount exceeds 15% of the contract price or $15,000. CITY COUNCIL MEETING: January 28, 2026 Project Manager ___________ as to Scope of Work Procurement Manager ___________ as to purchasing Finance ___________ as to budget City Attorney ___________ as to legal Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA ID: 4EE88524-F18A-... Digitally signed by <bbenton@cityofsebastian.org> February 05, 2026 10:44 AM EST 02/05/2026 ID: C1D9762D-EF4F-... Digitally signed by <ctesta@cityofsebastian.org> February 05, 2026 10:57 AM EST 02/05/2026 Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 3 of 7 Exhibit A RFI 0004 and Cost Estimate Unforeseen Condition Unsuitable Subbase Material Replacement Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA REQUEST FOR INFORMATION (RFI) RFI No: 0004 CONTRACT NO.: G3A50 CONTRACT TITLE: Sebastian Municipal Airport, Taxiway G (Golf) Construction Project PRIME CONTRACTOR: Dickerson Infrastructure, Inc. CONTRACTOR’S REQUEST FOR INFORMATION REQUESTED BY: Zephyr Zuccarelli DATE REQUESTED: 12/8/2025 POTENTIAL COST IMPACT: Yes POTENTIAL SCHEDULE IMPACT Yes SUBCONTRACTOR: RFI SUBJECT: Phase 2 Construction; Demolition of Phase 2; Taxiway G and Taxiway B (tie-in). Existing conditions (subbase) require assessment before proceeding. FEATURE OF WORK; Taxiway G (Golf) Construction SPECIFICATION SECTION: S-140; “Site Demolition”, section 140-2.5 “Compaction of Existing Base and Subgrade”, P-152; “Excavation, Subgrade and Embankment”, and P- 154; “Subbase Course”. INFORMATION REQUESTED: Requesting ICE-Engineer to address and advise how to proceed ASAP. Reference: Approved for Construction (AFC) Plans: Sheet C2.3. Specifications: S-140; “Site Demolition”, section 140-2.5 “Compaction of Existing Base and Subgrade”, P-152; “Excavation, Subgrade and Embankment”, and P-154; “Subbase Course”. Requesting the following Information: During Phase 2 construction (demolition activities, 12/8/25) base rock was removed, revealing subbase. (Location is the Northwest radius at the Taxiway G and Taxiway B tie-in area.) Contractor encountered existing conditions of subbase different than expected, causing a STOP in WORK (questioning attitude prompted by contractor). Existing conditions as follows: Subbase of 8-12 inches of gray sand with (undetermined amount; 1-3 feet possible) sub-layer of “muck” (decomposed organics/spongy peatmoss layer at water table). Ground unstable, “pumping and moving” under equipment load. RFI 0004 was prompted by ICE-Engineers to begin the process of determination regarding how to proceed with demolition and construction activities for Phase 2. We appreciate your prompt response/acknowledgement of this RFI, as this clarification/correction is essential for maintaining construction alignment with project specifications. CONTRACTOR’S RECOMMENDATION: RFI response. Additional time and or materials possible. Please advise. Thank you! Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA Engineering Firm RESPONSE ANSWERED:DATE RECEIVED: DATE ANSWERED: TITLE: Engineering Firm RESPONSE TO CONTRACTOR: CONTRACTING OFFICER’S SIGNATURE 12/8/2025 12/8/2025 Hamed Jafarian Sr. PM To re-establish the required pavement support section, proceed as follows: 1. Excavation of Unsuitable Materials; Excavate all unsuitable subbase and underlying muck to a depth of 2.75 feet below the proposed finished grade to remove all unstable, pumping material. 2. Placement of Replacement P-219 Material (Subbase Replacement); Backfill the excavation with P-219 crushed aggregate base material placed in two (2) compacted lifts of 12 inches each. Each lift shall be moisture-conditioned, compacted, and proofrolled in accordance with the specifications. Field density acceptance is required on each lift to achieve in place dry density at least 100% of the standard proctor ASTM D698) max. dry density. 3. Placement of Final 6-Inch Base Layer: After acceptance of the two 12-inch lifts, place the final 6-inch P-219 base course per project plans and specifications. Compact and test to meet all specified requirements. 4. Measurement of Repair Area; The RPR will measure and quantify the limits of excavation and replacement for documentation and payment purposes. 5. Time Considerations; As the unsuitable subbase prevented proofrolling and halted construction activities, the Contractor may request additional contract time as needed, in accordance with the procedures outlined in the contract documents. Any requested time extension shall include supporting justification and requires owner's approval. I.C.E. Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA Cost Estimate – Unforeseen Condition: Unsuitable Subbase Material Replacement (2-Foot Depth) P-152 Unclassified Excavation 430.0 CY $ 25.00 $ 10,750.00 P-219 24" Optional Base Course (4x 6" lifts for 644 sy) 2576 SY $ 18.00 $ 46,368.00 Total $ 57,118.00 Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 4 of 7 Exhibit B City of Sebastian Holiday Schedule Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 5 of 7 City of Sebastian Holiday Schedule (November 2025, December 2025 and January 2026) Date Holiday Tuesday, November 11, 2025 Veteran’s Day Thursday, November 27, 2025 Thanksgiving Day Friday, November 28, 2025 Friday after Thanksgiving Wednesday, December 24, 2025 Day before Christmas Day Thursday, December 25, 2025 Christmas Day Thursday, January 1, 2026 New Year’s Day Monday, January 19, 2026 Martin Luther King, Jr. Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 6 of 7 Exhibit C Revised Liquidated Damages Schedule Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA Procurement Division 1225 Main Street, Sebastian, FL 32958 Phone: 772-388-8231 Page 7 of 7 16.2 Liquidated Damages: Task Consecutive Calendar Days from Notice to Proceed Liquidated Damages Completion of Phases 1 & 2 80 $500 PER DAY Phases 1 & 2 SHALL be completed by January 15, 2026 Task Consecutive Calendar Days from the completion of Phases 1 & 2 Liquidated Damages Punch list and permanent markings 31 $500 PER DAY Punch list/permanent markings SHALL be completed by February 15, 2026 Document ID: B5EE778A8DC7DA9C4FFFD479A848DEAA