Loading...
HomeMy WebLinkAboutCSA#17 Apron Project Taxiway GDocument ID: F3C3E0BEEF4CD26B431CD04D6F075098Approved by City Council on February 25, 2026. ID: B606CD94-71A5-... Digitally signed by <jstokes@cityofsebastian.org> February 27, 2026 11:14 AM EST ID: 91C104A6-CF53-... Digitally signed by <bbenton@cityofsebastian.org> March 02, 2026 08:06 AM EST 03/02/2026 ID: 1B1A7B78-0638-... Digitally signed by <ctesta@cityofsebastian.org> March 02, 2026 08:45 AM EST DESIGN “GOLF APRON” PHASE 1 DESIGN, BIDDING, AND PERMITTING SERVICES SCOPE & FEE 5550 W. IDLEWILD AVENUE, SUITE 115, TAMPA, FL 33634 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 1 of 7 EXHIBIT “A” SCOPE OF WORK DESIGN GOLF APRON PHASE 1 SEBASTIAN MUNICIPAL AIRPORT PROJECT DESCRIPTION The City of Sebastian and the Sebastian Municipal Airport (CITY) intend to construct a new Apron known as “Golf Apron” on the north side of the Taxiway “G” to increase airport capacity and provide additional aircraft parking. The proposed apron will support future hangar development on the northwest side of the airport. The new Golf Apron will be 115 feet wide and 705 feet long, constructed as a flexible pavement apron. The Apron will encompass the decommissioned Runway 13-31, which is 150 feet wide. The existing runway pavement exhibits significant distress, including potholes, longitudinal cracks with raveling, fatigue cracking, depressed areas, localized rutting, and oil deposits. The surface is oxidized and heavily raveled, resulting in a rough and unsafe condition with foreign object debris (FOD) from loose aggregates. The new pavement will correct deficiencies in the apron grade and provide a durable surface free of rutting and loose aggregate, creating designated aircraft parking positions for future hangar development on the north side of Taxiway “G.” This project will extend the useful life of the existing pavement while providing a surface that meets or exceeds FAA grading requirements. The apron/ramp grade will be sloped at a minimum of 1% for 50 feet toward Taxiway “G,” in compliance with NFPA 415. The estimated construction cost is $1,300,000. This scope and fee for services provided by Infrastructure Consulting & Engineering (ICE) will be for Design efforts, Permitting, and Bidding Services for said project. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 2 of 7 Phase 1 – 30% Plans: ICE proposes to perform a structural and functional evaluation of the old runway pavement to assess the condition of the pavement and determine if it requires additional structural overlay. ICE proposes to perform a combination of nondestructive testing (NDT) and coring for a cost-effective and comprehensive evaluation of the pavement. This preliminary engineering phase is intended to identify the cause of the pavement structure deficiencies and provide different engineering & construction alternatives for the Taxiway construction and includes various studies which generally will include Existing Pavement Structure strength evaluation, evaluation of pavement failures, determination of rehabilitation alternatives and cost analysis for the rehabilitation alternatives. Preliminary Engineering activities include: 1. Perform Site Visits in order to assess existing pavement and subgrade conditions including the identification of all surface and subsurface deficiencies contributing to the pavement’s poor performance. a. Ground Penetrating Radar (GPR). GPR provides continuous measurement of pavement thickness at highway speed (ASTM D6087). The thickness of the surface course and also be determined from the GPR data to select an appropriate milling depth. GPR testing is proposed to perform at 6’ offset lines along the old runway to obtain a full coverage of the pavement thickness. b. Coring. Core samples are proposed to be extracted from the pavement at selected areas to examine the condition of the pavement layers as well as debonding between the layers. Core results will also be used to verify the GPR data. c. Borings shall be to approximately 10-20’ depth. Cores shall be only to the bottom of pavement in order to define existing pavement section, with a frequency of one bore per 10,000 sf per FAA’s “AC 15/5320-6G, Airport Pavement Design and Evaluation”. A report will be generated in order to analyze and describe all materials encountered, with identification of pavement failures and pavement recommendations. d. Survey elevation grid will be maximum of 50’x50’, except pavement areas and at all grade breaks and elevation changes, including top of bank and toe of slope of both sides of all ditches and swales to be 20’x20’ or as necessary. 2. Develop an AutoCAD drawing from DTM survey for use in modeling the old Runway (New Golf Apron) Reconstruction. 3. Obtain and review any available historical documents: construction documents, as-builts from previous projects to determine existing pavement structure. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 3 of 7 4. Analyze the existing pavement section. 5. Evaluation of the old runway 13-31 pavement based on geotechnical investigation above. 6. Incorporate results into the Preliminary Engineering Report. 7. Complete Preliminary Engineering Report including the various study elements: a. Project Narrative b. Topographical survey c. Geotechnical investigation. d. Existing Pavement Strength Evaluation: e. Engineering judgment for probable cause of pavement failures f. Design alternatives for pavement rehabilitation. g. Conduct a construction cost estimates for each rehabilitation alternative. h. Provide recommendation for preferred rehabilitation method. 8. Conduct in-house Quality Review for acceptable design practices and constructability. 9. Attend Pre-design Conference and review findings and discuss recommendations with airport personnel and FDOT/FAA as required. 10. Coordinate with the Airport Staff to optimize available construction monies and minimize the impacts in day-to-day operations of the airport. 11. Develop Projected Project Budgets Phase 1 services will involve preliminary design and the production of 30% Plans. The design considerations shall include: • Geotechnical Investigation, • Field Survey, • General Coordination with Airport Staff, • Pavement Design/Analysis, • Horizontal and Vertical Geometrics, • Preliminary Cost Estimates, • Engineer’s Report, The Consultant will prepare a revised Construction Cost Estimate, a 30% Engineer’s Report, and the Preliminary Plans, which will include: Cover Sheet Project Layout Plan Typical Sections Demolition Plan Profile Sheets Deliverables: Three (3) copies of the Preliminary Plans in 11”x17” format and 30% Engineer’s Report will be submitted to the CITY for distribution to airport staff. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 4 of 7 Phase 2 – 60% Plans The Consultant shall address any changes requested by the airport at the 30% Review Meeting in this Phase. Upon issuance of the Notice to Proceed, the Consultant will proceed with the 60% Plans to include the following: • General Coordination, • Grading, • OE/AAA submittal (including CSPP) • Construction Safety and Phasing Plan, • Coordination with SJRWMD. • Updated Cost Estimates, • Engineer’s Report • Marking • Signing The Consultant will prepare a revised Construction Cost Estimate, a 60% Engineer’s Report, and the 60% Plans, which will include: Cover Sheet Project Layout Plan Typical Sections Demolition Plan Safety Plan Staking Plan Preliminary Grading Plans General Notes Preliminary Cross-Sections Marking Plan Preliminary SWPP plans The Consultant will meet with the City to review the Plans, Specifications, and the Engineer’s Report to verify that all concerns, issues, and potential conflicts are addressed prior to proceeding with 90% of the Construction Documents. Deliverables: Three (3) copies of the 60% Plans in 11”x17” format and 60% Engineer’s Report will be submitted to the CITY for distribution to airport staff. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 5 of 7 Phase 3 – 90% Plans The Consultant shall address any changes requested by the airport at the 60% Review Meeting in this Phase. Upon issuance of the Notice to Proceed, the Consultant will proceed with the 90% Plans to include the following: • Preliminary Front-End Documents, • Preliminary Technical Specifications, • Final Grading Design, • Cost Estimates, • Engineer’s Report, • Submittal to SJRWMD The Consultant will prepare a revised Construction Cost Estimate, a 90% Engineer’s Report, and the 90% Plans, which will include: Cover Sheet Project Layout Plan Typical Sections Demolition Plan SWPP plans Staking Plan Safety Plan General Notes Final Grading and Drainage Plans Final Cross Sections Signing and Marking Plans Construction Safety and Phasing Plan Miscellaneous Details Marking and Signage Plans The Consultant will meet with the CITY to review the Plans, Specifications, and the Engineer’s report to verify that all concerns, issues, and potential conflicts are addressed prior to proceeding with Final Construction Documents. Deliverables: Three (3) copies of the 90% Plans in 11”x17” format, a draft set of specifications and front end documents, and 90% Engineer’s Report will be submitted to the CITY for distribution to airport staff. A copy will also be sent to the FAA, and FDOT for review and comment. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 6 of 7 Phase 4 – Final Contract Documents The Consultant shall address minor changes to the plans and any comments from City Procurement for the bidding documents, and then proceed with the 100% Plans to include the following: • Incorporate City Comments, • Final Plans, • Final Technical Specifications, • Final Quantities. • Final Front End Bidding Documents The Consultant will prepare a Final Construction Cost Estimate, a 100% Engineer’s Report, Bidding Documents and the Final Plans. Deliverables): Three (3) copies of the 100% Plans in 11”x17”format, the final Engineer’s Report and Contract Documents will be submitted to the CITY for distribution to airport staff, A copy will also be sent to the FAA, and FDOT for their files. Two full sized sets (22”x34”) of signed and sealed plans will be submitted for CITY records. Grant Services The consultant will coordinate during the project to provide and submit design and bidding status reports to the FDOT and perform necessary coordination with the FDOT district office. Upon design and bidding completion, ICE will submit all required project documentation to agencies. Phase 5 - Bidding Services The Consultant shall perform general coordination with the City and Bidders and will: • Prepare for and attend the Pre-Bid Conference. • Prepare and distribute addenda as necessary. • Attend the bid opening. • Assist the City in tabulating and evaluating bids; and • Assist the City with the re-bid of the project if the City rejects the bids for any reason. This work will be performed as an additional service requiring a negotiated contract, and • Assist in the contract. Other Provisions a) The CITY will pay all costs associated with any permit application and/or impact fees. b) Any mitigation of wetlands, impacts to threatened and endangered species, or other environmental efforts beyond the scope of the Focused EA will be performed under a separate agreement. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Scope of Services Sebastian Airport, Design Golf Apron Phase 1 Page 7 of 7 OUT OF SCOPE ITEMS a) Environmental design and services. b) FAA Categorical Exclusion. c) Dewatering Permit. d) Construction Administration and Inspection Services. PROJECTED PROJECT SCHEDULE DESIGN PHASE SERVICES Task Duration Phase 1 – 30% Plans 60 Days Phase 2 – 60% Plans 30 Days Phase 3 – 90% Plans 30 Days Permitting 30 Days Phase 4 – Final Contract Documents 30 Days TOTAL PROJECT DESIGN DURATION 180 days * * Contingent on owner’s review time) FEE Exhibit B: Please see the attached detailed fee proposal. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5 TOTAL 30% Plans 60% Plans 90% Plans Final Contract Documents Bidding Services CLASSIFICATION RATES HOURS HOURS HOURS HOURS HOURS HOURS Principal $255.00 5 4 6 4 0 19Sr. Project Manager $220.00 28 35 29 18 13 123Project Manager $200.00 18 6 6 16 12 58Senior Engineer $200.00 57 39 36 28 12 172Engineer$170.00 41 50 66 42 6 205Sr. Designer $140.00 57 50 49 18 4 178Designer$105.00 50 82 76 30 2 240Technician$90.00 48 56 64 54 2 224Administrative Assist.$70.00 44 41 49 24 36 194 TOTAL HOURS 348 363 381 234 87 1413 TASK COST $38,455.00 $41,540.00 $43,500.00 $27,410.00 $9,750.00 $160,655.00 DIRECT EXPENSES Reproduction $250.00 $250.00 $250.00 $250.00 $250.00 $1,250.00Postage$50.00 $55.00 $75.00 $75.00 $75.00 $330.00 TOTAL EXPENSES $300.00 $305.00 $325.00 $325.00 $325.00 $1,580.00 Survey $6,700.00 $6,700.00Geotechnical Investigation $16,200.00 $16,200.00Ground Penetrating Radar (GPR) $2,400.00 $2,400.00Environmental Review Estimate $2,000.00 $2,000.00 TOTAL SUBCONSULTANTS $27,300.00 $0.00 $0.00 $0.00 $0.00 $27,300.00 TOTAL COSTS $66,055.00 $41,845.00 $43,825.00 $27,735.00 $10,075.00 $189,535.00Method of Payment Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum Lump Sum SUBCONSULTANTS EXHIBIT "B"Manhour and Fee Estimate Design Golf Apron Phase 1 Sebastian Municipal Airport Summary Page B-1 of B-6 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Sr. Project Project Sr.Sr Administrative TotalItem/Task Description Principal Manager Manager Engineer Engineer Designer Designer Technician Assistant Hours Project Management 2 4 6Coordination with Airport 1 2 8 11Project Kick-Off Meeting 1 2 4 7Meeting with FDOT, FAA 2 4 6Coordination with Subconsultants 2 4 4 8 18Review Past stormwater permits 4 4 8Review available as-built info 2 4 4 10Preliminary Pavement Design/ Analysis 2 4 8 14Preliminary Drainage Evaluation, Review permits 8 8Evaluation of Existing Conditions 4 4Process Survey DTM 2 2 8 8 20Preliminary Fillet Design 0Horizontal Design 4 8 16 8 36Generate Profiles 4 8 8 4 24SJRWMD Pre-Application Meeting 4 8 4 2 18Update the Construction Cost Estimate 2 2 2 6Preliminary Construction Schedule 2 4 2 8 Cover Sheet 1 1 1 3Project Layout Plan 1 2 2 2 7Construction Safety and Phasing Notes 1 4 2 2 9General Notes 1 1 1 1 4Boring and Coring Plan 1 1 1 1 4Boring and Coring Logs 1 2 2 2 7Project Key Map 1 1 1 1 4Typical Sections 1 2 4 8 8 23Exist. Condition Plans 4 4 8 8 24Profile Sheets 4 4 8 8 2430% Engineer's report 2 4 8 14Quality Control Review 1 4 4 9Plot 30% 11"x17 plans (1 Copy)4 8 12 Total Hours:5 28 18 57 41 57 50 48 44 348 Prepare 30% Plans MANHOUR AND FEE ESTIMATE Phase 1 - 30% Design Plans EXHIBIT "B" Design Golf Apron Phase 1Sebastian Municipal Airport Page B-2 of B-6 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Sr. Project Project Sr.Sr Administrative TotalItem/Task Description Principal Manager Manager Engineer Engineer Designer Designer Technician Assistant Hours Project Management 1 8 8 17Coordination with Airport 1 8 8 17Coordination with Subconsultants 1 2 4 7Prepare for Review Meeting, Attendance, Minutes 4 4 2 10 Pavement Design/ Analysis 2 4 8 14Drainage Evaluation, and Design 8 8Fillet Design 0Horizontal Design 8 8 16 16 48Generate 3D Profiles 8 8 8 8 32Coordination with SJRWMD 4 8 8 2 22Update the Construction Cost Estimate 2 2 2 6Preliminary Schedule 1 1 1 3 Construction Safety and Phasing Plans 1 4 2 2 9Staking and Demolition Plan 4 4 16 16 40Preliminary Grading Plan 4 4 8 8 24Preliminary SWPP Plans 1 2 4 8 8 23Drainage Details 4 4 8 8 24Preliminary Cross Sections 4 4 8 8 2460% Engineer's report 2 4 8 14Quality Control Review 1 4 4 9Plot 60% 11"x17 plans (1 Copy)4 8 12 Total Hours:4 35 6 39 50 50 82 56 41 363 Prepare 60% Plans 60% Design MANHOUR AND FEE ESTIMATE EXHIBIT "B" Design Golf Apron Phase 1Sebastian Municipal Airport Phase 2 - 60% Design Plans Page B-3 of B-6 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Sr. Project Project Sr.Sr Administrative TotalItem/Task Description Principal Manager Manager Engineer Engineer Designer Designer Technician Assistant Hours Project Management 1 8 8 17Coordination with Airport 1 8 8 17Coordination with FDOT, and FAA 1 2 4 7Prepare for Review Meeting, Attendance, Minutes 2 4 2 8Preliminary Front End Documents 1 4 8 4 17Preliminary Technical Specifications 1 8 8 4 21 Finalize Pavement Design/ Analysis 2 4 4 10Finalize Drainage Evaluation, and Design 4 4Finalize Fillet Design 2 2 4Finalize Horizontal Design 4 4 8 8 24Generate 3D Cross Sections 4 4 8 4 20Prepare and Submit SJRWMD Permit Application 2 8 8 2 20Update the Construction Cost Estimate 2 2 4Final Schedule 1 1 1 3 Leveling Plans 4 4 8 8 24Grading and Drainage Plan 4 4 8 8 24SWPP Plans, Details and Notes 1 2 4 4 4 15Profile Sheets 4 4 8 8 24Drainage Details 4 4 8 8 24Marking Plans and Details 4 4 8 8 24Guide Sign Layout and Details 2 2 4 4 12Cross Sections 1 1 4 4 10Construction Details 1 4 4 4 1390% Engineer's report 2 4 8 14Quality Control Review 1 4 4 9Plot 90% 11"x17 plans (1 Copy)4 8 12 Total Hours:6 29 6 36 66 49 76 64 49 381 MANHOUR AND FEE ESTIMATE Prepare 90% Plans 90% Design EXHIBIT "B" Design Golf Apron Phase 1Sebastian Municipal Airport Phase 2 - 90% Design Plans Page B-4 of B-6 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Sr. Project Project Senior Administrative TotalItem/Task Description Principal Manager Manager Engineer Engineer Sr. Designer Designer Technician Assistant Hours Project Management 1 1Coordination with Airport 1 1Prepare for Review Meeting, Attendance, Minutes 1 4 2 7Finalize Plans 8 12 12 24 40 96Calculate Final Quantities & Eng. Est. of Probable Cost 2 2 2 2 8Prepare and Submit OE/AAA 2 4 4 4 14Address comments 0Finalize Technical Specifications 8 10 4 22Finalize Front End Docs 4 4 4 12 24Assemble Bid Schedule 2 2 4Plot full size and 11"x17" Plans 4 4 8 16Prepare Final Engineer's Report 8 8 2 4 22Quality Review and Control 1 4 4 8 2 19 Total Hours:4 18 16 28 42 18 30 54 24 234 Phase 4 - Final Contract Documents MANHOUR AND FEE ESTIMATE EXHIBIT "B" Design Golf Apron Phase 1Sebastian Municipal Airport Page B-5 of B-6 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Sr. Project Project Senior Administrative Item/Task Description Principal Manager Manager Engineer Engineer Sr. Designer Designer Technician Assistant Totals General Coordination with City 2 2 2 2 4 12Prepare Pre-Bid Agenda 2 2 2 6Attend Pre-Bid Conference 2 2 4Prepare Minutes to Pre-Bid 1 2 4 7Answers to Bidders/Issue Addenda 2 2 2 2 2 2 2 8 22Review Bids for Responsiveness 2 2 2 2 8 16Certified Bid Tabs 2 2 2 8 14General Coordination with Low Bidder 2 2 2 6 Total hours:0 13 12 12 6 4 2 2 36 87 MANHOUR AND FEE ESTIMATE Design Golf Apron Phase 1 Phase 5 - Bidding Services EXHIBIT "B" Sebastian Municipal Airport Page B-6 of B-6 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Do c u s i g n E n v e l o p e I D : 5 9 A B 5 3 4 0 - B C A F - 4 7 3 3 - B C 7 D - A 3 7 A 4 5 0 C 7 5 A A Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 ℄ EXIST. RW 13-31 NEW T/W GOLF NEW TW 'G' 35' 1.0% FUTURE APRON 'G' 115' MIN. 0.5% TW 'G' OFA 62' TAXIWAY "G" TYPICAL SECTION 53' TRANSIENT AIRCRAFT PARKING 17.5' FUTURE BOX HANGARS FUTURE APRON RECONSTRUCTION 17.5' Sebastian Municipal Airport TAXIWAY 'G' RECONSTRUCT Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Item No.Spec. No.Item Description Quantity Unit Unit Price Amount 1 1530 Barricades 1 LS $25,000.00 $25,000.00 2 1720 Project Record Documents 1 LS $5,000.00 $5,000.00 3 2000 Construction Layout and As-built Survey 2 LS $20,000.00 $40,000.00 4 C-100 Contractor Quality Control Program (CQCP)1 LS $35,000.00 $35,000.00 5 C-102-1 Installation and removal of silt fence 750 LF $10.00 $7,500.00 6 C-102-2 Temp. Check Dam 3 EA $800.00 $2,400.00 7 C-105 Mobilization (10% Max.)1 LS $104,000.00 $104,000.00 8 1720 Project Record Documents 1 LS $8,000.00 $8,000.00 9 S-140-1 Bituminous Surface Removal (Up to 2") 9,010 SY $4.00 $36,040.00 10 S-140-1 Exist. Base Removal (Up to 19")9,010 SY $7.00 $63,070.00 10 P-152-1 Unclassified Excavation 1 LS $25,000.00 $25,000.00 11 P-152-2 Embankment 5,000 CY $15.00 $75,000.00 12 P-152-3 Clearing and Grubbing 1 LS $6,000.00 $6,000.00 13 P-160 12" Stabilized Subgrade 9,060 SY $15.00 $135,900.00 14 P-219 Recycled Concrete Aggregate Base Course 9,060 SY $18.00 $163,080.00 15 FDOT-334 Superpave Asphalt Concrete SP-12.5, 3" 1,550 TON $150.00 $232,500.00 16 FDOT-300 Bituminous Prime Coat 1,360 GAL $6.00 $8,160.00 17 FDOT-301 Emulsified Asphalt Tack Coat 1,360 GAL $6.00 $8,160.00 18 P-620-1 Reflective Pavement Marking 1 LS $8,000.00 $8,000.00 19 P-620-2 Non Reflective Pavement Marking 1 LS $4,000.00 $4,000.00 20 Aircraft Tie Down (Including Galvanized STEEL Anchor and Concrete Collar 1 LS $8,000.00 $8,000.00 21 D-701 Drainage 1 LS $30,000.00 $30,000.00 22 Apron Guidance Signs 1 LS $8,000.00 $8,000.00 23 FDOT-570 Performance Turf 1.00 AC $5,000.00 $5,000.00 24 T-904 Sodding 1.00 AC $6,000.00 $6,000.00 25 T-905 Topsoil Placement 200 CY $20.00 $4,000.00 $1,052,810.00 10% Construction Preliminary Estimate Uncertainty $105,281.00 ENG CONSTUCTION ADMIN. & INSPECTION (13%)$136,865.30 ADMIN. FEE $3,500.00 IFE $0.00 Total CONSTRUCTION FEE=$1,298,456.30 ENGINEERING DESIGN FEE Total DESIGN FEE=$240,000.00 Total PROJECT COST FEE=$1,538,456.30 Golf Apron for FY 2027 Sitework Engineer's Opinion of Probable Construction Cost DATE: February 3, 2026 Pavement Reconstruction Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Oakhurst Professional Park + 1309 S.E. 25th Loop + Suite 103 + Ocala, Florida 34471 PHONE (352) 622-3133 + FAX (352) 369-3771 + rmbarrineau.com January 26, 2026 Hamed Jafarian, PE Infrastructure Consulting & Engineering 5550 W. Idlewild Ave., Suite 115 Tampa, FL 33634 RE: Proposal for Topographic Surveying Services at Sebastian Municipal Airport, Golf Apron Phase 1, City of Sebastian, FL Dear Hamed: Thank you for the Request for Proposal. R.M. Barrineau and Associates, Inc has prepared the following Scope of Surveying Services and timeline for the referenced project. Scope of Services: Fee: $ 6,700.00 Topographic Surveying Services: The services will be completed in accordance with the Standards of Practice for Professional Surveyors and Mappers, as set forth in the Florida Administrative Code and City of Sebastian Land Development Code Standards. 1. Elevation grid maximum of 50’x50’, except pavement areas and at all grade breaks and elevation changes, including top of bank and toe of slope of both sides of all ditches and swales to be 20’x20’ or as necessary. 2. All above-ground site features with descriptions including but not limited to pavement edges (PC, PT, and approx. midpoint on curves), driveways, sidewalks, walls, fences, signs (include sign message), buildings, pavement markings, and any other visible physical improvement. 3. All underground site features and utilities with descriptions including but not limited to water, sewer, storm sewer, power, communications/cable, and gas. Obtain utility locate from Sunshine State One Call and survey painted locate lines. Obtain data from any valve, clean out, manhole, junction box, meter, etc. encountered on site. Include pipe inverts /conduit size and type for all underground utilities or drainage. Include upstream and downstream locations and inverts of storm or sanitary sewer pipes coming into or out of the site, Reginald M. Barrineau, P.S.M., Founded 1988 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Page 2, Sebastion Golf Apron Ph 1 regardless of location. 4. Sufficient Control points. (Min. 3) within the Site Limits. 5. NAD 83 State Plane, Florida East Zone (1990 adjustment) for Horizontal control datum. 6. NAVD 88 for vertical control datum. 7. Provide deliverables: a. In AutoCAD 2020 format complete with contours, breaklines, features, callouts, spot elevations, symbols, and control points. b. Signed and sealed hard copy matching the provided cad file. c. ASCII point file in .txt or .csv format including Northing, Easting, Elevation, and Description. Include a text or pdf file with a list of the meaning of all abbreviations used. Schedule for Surveying Services: Estimated timeline for Survey to is four weeks from notice to proceed. Terms of this proposal are valid for 30 days from date of proposal. If you have any questions regarding the proposal, please do not hesitate to contact our office. If the terms are acceptable, please email authorization to proceed and we will schedule the project. An invoice will be submitted upon completion of the project, with payment due in 30 days. Thank you for the opportunity to submit a proposal for this project. Sincerely, Diane Barrineau Diane Barrineau, CFO R.M. Barrineau and Associates, Inc. Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098 Document ID: F3C3E0BEEF4CD26B431CD04D6F075098