City Council Information Letter
February 15, 2002
Incorporation of "Bulb Outs" - United States Hi.qhway
Improvement Pro,qram
I am pleased to report to you, after numerous discussions with various State
of Florida officials, the Florida Department of Transportation is consenting to
incorporate installation of "bulb outs" into the United States Highway One
(US1) Improvement Program currently underway. Respective
enhancements will be implemented in approximately 16 locations within the
Sebastian Corporate Limits along US1 recently determined viable in this
regard, while concurrently, not to impede drainage flow dynamics. This
accomplishment was the result of a meeting I had with State Representative
Stan Mayfield several weeks ago, whereby the recommendations of the
Treasure Coast Regional Planning Council were discussed. From this
meeting, contact was made with Florida Deputy Commissioner of
Transportation Rick Chesser to discuss possibilities of bulb out
improvements. Direction was then provided to project managers based at
FDOT District IV headquarters to make necessary adjustments. As such,
respective contract amendments are currently being processed. Bulb outs
will feature both shrubbery landscaping and paving brick installation. Once
again, primary rationale for installing bulb outs along US 1 is to assist traffic
calming, as well as help to preserve (for as long as possible anyway)
positioning of the four lane highway arrangement currently enjoyed in the
community. Motivation for pursuing this possibility simply involved
employing the notion that it makes sense to address additional modifications
at this time, while construction activities are underway, as opposed to the
City actually implementing enhancements during a later time after
construction, preventing a "second inconvenience" for users of US1. Please
be advised however, that overall construction activities may be expanded a
few more weeks as a result of incorporating this program. I will therefore not
be recommending to City Council pursuit of the Highway Beautification
Council Grant Program, as originally intended for later this year.
City Council Information Letter
February 15, 2002
Page 2
Status of Filbert Street Property
As briefly mentioned during Wednesday evening's meeting, arrangements
are underway to remove water expansion construction infrastructure from
the city owned Filbert Street parcel. As such, the attached letter was
delivered earlier this week to Mr. James Chambers, President, Tri-Sure
Corporation, the contractor currently implementing the program on the
County's behalf in Sebastian. A final deadline of March 31st has been
established for the Tri-Sure Corporation to vacate the property once and for
all. This timeframe was deemed fair during a meeting that recently took
place with officials from the Indian River County Department of Utilities.
Residents in the area of the Filbert parcel can soon therefore feel rest
assured that the property will not be used again for storage purposes, as
arrangements will soon thereafter be initiated develop a passive park.
~tion/Auction of Former Davis Pro ert
Please be advised that the Laurel Corporation, a high-end residential
construction company based in Vero Beach, acquired the former 80-acre
Davis parcel recently annexed into the Sebastian Corporate Limits, via
auction late last week. Company vice president Debb Robinson (234-4106)
met with both Tracy Hass and I to discuss various issues relative to
development criteria. Agents from Laurel currently anticipate developing the
property at a lower density scale than originally addressed with the Davis
Brothers, including the possibility of constructing a deed restricted
subdivision containing approximately two single family units per acre, a
private curb and gutter drainage system, sidewalks and street lights. As
these proposals are still preliminary, both you and the Planning and Zoning
Commission will be updated as soon as more final details become available.
Just a reminder that City Hall will be closed Monday February 18TM in
observance of President's Day. I will be available here in the area (primarily
at home, as I am not in position to travel very far these days) during this
extended weekend. As such and as always, you may feel free to contact me
at anytime, should the need arise.
Enclosure(s):
Fax from Florida Department of Transportation - US1 "Bulb Outs"
Letter to James Chambers, Tri-Sure Corporation My Documents/InfoLe~er122
FDOT-D4 DESIGN
Fax: 954-777-4482
Feb 7 2002 18:04
P. O1
FAX COVER :SHEET'
~rom:
Phone No.: (954)77%
SC No.:,: 436-
Fax No. (954)77.7:4482
SC N 436-4482
i
FDDT-D4 DESIGN Fax:954-?7?-a482 Feb
7 2002 18:05 P. 02
~ian FM#228603-1-52-01
S~e Section 8g010-3507:SR-5 (US, I) from South of Harrison Stre~c to
the Indian P, iver-Bra~ard County Line 0VIP 18.740 to 3/IP 22.269)~
During!the initial eonaidexafion ofwheth~r "bulb-°~ts'' could be built as part. of the
ongoing ~onatruefion proje~ot basic mat~xial a labor construction costs were ~valuated.
The area wh~rc thc, "bulb-nuts" could he placed was. d~rmined based upon where thc
existing curb and gutt~ was proem. This area e:aende ~om I~an-ison Street to Central
Avenue (+/- 1.13 miles). Tkis is a little less than the city limits but since there ia aa
curbing along the outside edge of pavement beyond this area bulb-outs were not
aonsidereA feasible outside of this are~ Upon fuxthec investigation, and f~dbazk fi-om
the Maintenance and Drainage o~ces, issues regarding operational, maintenance and
liabiIity lave surfaced. There are 13 ~ide sweets (26 bulb-nuts), which are considered for
bulb-outs, however afthe 26 bulb-out loc~tlons I7 have draitu~ge inlets which ~onfli~t
with the bulb-out Ir~tment. A bulb-out island has b~en dasigned, with ~eedbaek fi-om
both Drainage arai Maintenance, to allow most of the stoma water to cominue to ~ollect
and drain along the e~isting curb and gutter to the exi~ing inlets (See attached
file/sketch). TI~ following are the disadvantages to tiffs d~iga.
Debris aneumulation be~een the curb of the bulb-out island and the existing
gatter along tho edge of the roadway ceuld significantly aff~x~t the perfomaance of
the existing inlets. The Maintenance office is concerned with this and
recommended maintaining the existing curb and gutter around the corner anti
down the side street to allow for stnrm water bypass in the even~: of blockage of
the inleL
P, oadway (SP, 5) runoff directly ia front of the proposed bulb-out islands and
existing inlets, wlfich pxeviousty was collected in the inlets would be directed
along tl~ edg~ of the bulb-outand down the Side street bypassing the ~nistlng
inlet and drainage system. The qu¢stien was raised by the Drainage office on
wh~ther w~ (FDOT) would be liable for any runoff related impacts down the side
:streets because of this? It was pointed out that based upon historical litigation
regarding ~noff and flooding down side streets it rc~y he necessary to ~
additionalin!ets down the side str~ to colleut this water, Since this project was
pexmi~ed under the blo ~qntiee General Permit the addition ~' many inlets and
pipe is not ~urreatly perraitt~d, The'FDOT would probably have to gat a
permit for tlxis proje~. Since the e~'Asting drainage system is a direct discharge to
~ Iaclian ?,iver Lagoon with little ff any watzr quality treatment this may
be a good thing. During the design of the projec~ the Coumy had reque.~d a~at
the department pur~ase and zonatruet drainage ponds for rcentment of the
roadway runoff since the existing drainage system wa~ direc~dy discharging 't~ the
environmentally sensitive Indian
lkiver Lagoon. We were able to say No to this request since we were NOT
significently upgrading the existing drainage system, and NOT adding a
significant amount of impervious areas, and lqOT purchasing any ~ for this
project. ~ don't ku~ow ifwz can still say fl-at i£w~ add this many Mdkional
F-DOT-D4 DESIGN Fax:954-?'??-4482 Feb ? 2002 J8:05 P. 03
If additional inlets are proposed u~U~ conflicts ara also a question, since nor~ of
these side street areas hsve been investigated.
llhth thee concerns in mind a brief analysis of the existing drainage alo~ these' I3 side
streou was perf'onned with tl~ bulb-out design in mind. Of the 26 poteatial bulb-out
sites only 1~ oftbe location~ were de,ermined to be viable with mo~t havin~ little impam
to sig. e ~r~:~i: clralne~c, The roi{or,ring lis~ o£the s)~tes where bulb-outs are propos~cl
dosc~b~s the t~vcl dircction, ~iclc of the side ~rcc~, whcU~.~ an inlct is present, and
whether there are any side street inlets.
Travel Curb SideSu~et Tre~
Side Street Direetian $id__e Inle.__/t B~'-Pass Inlet Allowed
Fellsmere Blvd. ~ South NO NO NO
Fellsmere Blvd. lib North NO NO NO
CR 512 EB SB North YES YES . NO
Coolidge Street l'~ Soulh YES YES NO
C~v~!~nd Strs~t N9 Soulh NO NO
)vi,sin Stree~ ~ Norbh N0 Iq0 N0
M~in Street SB North N0 YES
3'e~'erson St;e~ ~ S~ ~S N0 ~0
J~son S~e~ ~ ~ South ~0 ~S
Je~n S~ SB No~ ~S ~S N0
T~ S~ SB No~ ~S ~0 NO
T~ S~e~ ~ Gou~ ~0 NO
The tree~ bring referred to are skinny Alexander type palms or some other species with
very little diameter ~o avoid blocking dr/ver's vision when they are exiting sm~et~ or
drivev~ys.
F-DOT-D4 DESI6N Fax:954-777-4482 Feb 5 2002 17:23 P. 02
SIDESTR-~T
February 11, 2002
HO~. O~ P~.L~CAN ISLAND
1225 MAIN STREET · SEt3ASTIAN, FLORIDA 32958
TELEPHONE: (561) 589-5330 · FAX (561) 589-5570
Mr. James Chambers, President
Tri-Sure Corporation
Post Office Box 653
Auburndale, Florida 33823
Re: Filbert Street Property
Dear Mr. Chambers:
Last year, the City of Sebastian was gracious to permit your organization to use the city
owned Filbert Street parcel to help facilitate administration of the present phase of the
Indian River County Water Expansion Program. Although the initial timeframe for this
purpose was formally established to last until Summer 2001, Tri-Sure was able to enjoy
services far beyond the respective period. As the City of Sebastian is currently in the
process of initiating plans to implement construction of a neighborhood park on this
property, your organization is hereby required to vacate the Filbert Street parcel by
Sunday March 31,2002. Both myself and Director of Public Works Terry Hill have
spoken with Eric OIson and Mike Hotchkiss of the Indian River County Department of
Utilities relative to this matter earlier today, as they are currently positioning themselves
to assist you and your organization with this transition process accordingly.
Should you have questions and/or concerns regarding this matter, feel free to contact
me by calling (561) 388-8203. Otherwise, look forward in receiving your full
cooperation.
TRM/ ~'
Cc:
Honorable Mayor and City Council (Via February 15, 2002 information Letter)
Terry Hill, Director of Public Works
Burt Jones, Department of Engineering
My DocumentsNVaterExpansio n3