HomeMy WebLinkAboutR-09-28RESOLUTION NO. R-09-28
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA ADOPTING A
SIX-YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL
YEARS ENDING 2010-2015; PROVIDING REPEAL OF
RESOLUTIONS OR PARTS OF RESOLUTIONS IN CONFLICT
HEREWITH; PROVIDING FOR SEVERABILITY AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Sebastian, Indian River County, Florida finds that it is in the
best interest of its citizens and taxpayers to provide for financial planning; and
WHEREAS, a detailed capital budget is necessary for the proper annual operation of
the City and its desired capital program;
WHEREAS, the Six-Year Capital Improvement Program has been reviewed by both
the City Council and the City Planning Zoning Commission;
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA as follows:
Section 1. The Six-Year Capital Improvement Program for Fiscal Year 2010-2015
for the City of Sebastian is attached hereto.
Section 2. All Resolutions or parts of Resolutions in conflict herewith are hereby
repealed.
Section 3. This Resolution shall take effect immediately upon its adoption.
The foregoing Resolution was moved for adoption by Councilmember c i 11 m o r
The motion was seconded by Councilmember coy and, upon being put
into a vote, the vote was as follows:
Mayor Richard H. Gilmor
Vice-Mayor Jim Hill
Councilmember Andrea B. Coy
Councilmember Dale I. Simchick
Councilmember Eugene Wolff
aye
aye
aye
aye
aye
The Mayor thereupon declared this Resolution duly passed and adopted this 12th day of
August, 2009
CITY O SE ~ STIAN, FLORIDA
By:
ichard H. Gilmor, Mayor
ATT T:
i '/ ~-
Sally A. Ma' , MMC City Clerk
Approved as to form and legality for the
relian a by the City of Sebastian only:
Robert Ginsburg, City rney
CITY OF SEBASTIAN, FLORIDA
CtiY OF
CITY MANAGER'S RECOMMENDED
CAPITAL IMPROVEMENT PROGRAM
FY 2009/10 THROUGH FY 2014/15
CITY MANAGER - AL MINNER
August 5, 2009
HOME OF PELICAN ISLAND
CITY OF SEBASTIAN, FLORIDA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEAR 2010-15
TABLE OF CONTENTS
CAPITAL IMPROVEMENT PROGRAM (CIP)
CAPITAL IMPROVEMENT PROGRAM SUMMARY
Introduction
Summary -List of Projects
Summary Grouped by Department
Summary Grouped by Function
Summary Grouped by Funding Source
FY 2009/2010 Project by Funding Source
FY 2010/2011 Project by Funding Source
FY 2011/2012 Project by Funding Source
FY 2012/2013 Project by Funding Source
FY 2013/2014 Project by Funding Source
FY 2014/2015 Project by Funding Source
Page Number
POLICE DEPARTMENT -Summary 10
Police Department -Detail 11
PUBLIC WORKS DEPARTMENT -Summary 12
Public Works -Detail 13
MUNICIPAL GOLF COURSE -Summary 18
Golf Course -Detail 19
MUNICPAL AIRPORT -Summary 20
Airport -Detail 21
RIVERFRONT COMMUNITY REDEVELOPMENT AGENCY -Summary ~ 24
Riverfront CRA -Detail
APPENDIX:
Schedule of Available Funding from Various Sources 26
CITY OF SEBASTIAN, FLORIDA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEAR 2010-15
CAPITAL IMPROVEMENT PROGRAM
City of Sebastian's adopted financial policies requires the City to coordinate the development of the Capital
Improvement Program with the development of the strategic plan and operating budget, as well as ensuring
compliance with the Comprehensive Plan Capital Improvement Element. Operating expenditures and
revenues associated with new capital improvements will be projected and included in the Capital
Improvement Program Five-Year Forecast. The Capital Improvement Program is updated and approved by
the City Council annually and encompasses a period of six years.
What are Capital Improvements?
Capital improvements include streets, buildings, building .improvements, new parks, park
expansions/improvements, airport runways, infrastructure improvements, and major, one-time acquisitions of
equipment. Projects in the Capital Improvement Program generally cost more than $50,000 and last at least
five years.
Policies Used in Developing the Capital Improvement Program
All capital projects submitted for approval must be justified in terms of how the project supports the
achievement of the City's Strategic Priorities. Projects are prioritized and approved based on the relevancy
of the project to the City's Strategic Plan and the impact on the end stakeholder(s).
1. The City shall adopt an annual Capital Budget based on the Capital Improvement Program. Future
capital improvement expenditures necessitated by changes in population, real estate development, or
in economic base will be calculated and included in the capital improvement budget projections.
2. The originating department of the capital improvement project will identify the estimated costs and
funding sources for each capital project proposal before it is submitted to the City Council for
approval.
3. The City shall make all capital improvements in accordance with an adopted Capital Improvement
Program budget.
4. The City will determine and use the most prudent financial methods for acquisition of capital
improvement projects based upon market conditions at the time of acquisition.
Following is a six-year Capital Improvement Program (C1P) Project Schedule for each requesting
department/division. In addition to the projects funded by various revenue sources such as the Local Option
Gas Tax, Discretionary Sales Tax, Recreation Impact Fees and Airport Fund, projects to be funded by
anticipated grants or though bank notes are also shown. The CIP is intended to be a complete listing of
projects needed for replacement or improvement of the City's major equipment, facilities,. roadways, and
structures. Although, potential funding has been identified, changes may be made in conjunction with
alternative sources as they become available or adjustments become necessary due to reductions in projected
revenues. The timing of projects identified may also be altered from year to year to meet changing
circumstances.
1
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
n~
List of Projects FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 Total
Police Department
Police Vehicle Replacement $ 385,000 $ 385,000 $ 385,000 $ 385,000 $ 385,000 $ 385,000 $ 2,310,000
Police Boat and Trailer - - - - 55,000 - 55,000
Parking Lot Expansion - 45,000 - - - - 45,000
Roads and Special Projects
Street Repaving 50,000 25,000 50,000 50,000 150,000 150,000 475,000
PowerlineRoadNorth 1,146,250 - - - - - 1,146,250
Schumann & Barber Intersection - - - - 1,500,000 - 1,500,000
Sidewalk/Bike Paths Construction - - 150,000 150,000 150,000 150,000 600,000
Sidewalk Repairs - - - - 50,000 50,000 100,000
512 Median Landscaping - 500,000 - - - - 500,000
Public Works Garage Relocation - - 1,150,000 - - - 1,150,000
Parks & Recreation
Barber Street Field Lighting - 275,000 - - - - 275,000
Splash Park Canopy 50,000 - - - - - 50,000
Skate Park Office 50,000 - - - - - 50,000
New Park -Barber/Acorn Terrace - - 50,000 - - - 50,000
New Park -Celtic & Crown - - - 50,000 - - 50,000
Lift Station -Riverview Park - 100,000 - - - - 100,000
Stormwater
1/4 Round Swale Rehab 975,000 350,000 350,000 350,000 350,000 350,000 2,725,000
Road Crossings/Side Yard Pipes - - - 250,000 250,000 250,000 750,000
Dredging Bulkhead Renovations - - - - 100,000 100,000 200,000
Cemetery
Sissor Lift Building 50,000 - - - - - 50,000
Relocate South Paved Roadway - 50,000 - - - - 50,000
Golf Course
New Clubhouse/Tee Box Improvements - - 2,195,000 - - - 2,195,000
Airport
Medium-size "Box Hangers" - - - - - 1,875,000 1,875,000
Master Plan Update - - 300,000 - - - 300,000
Prof.Services R/W 4/22 157,894 - - - - - 157,894
Pro£Services Taxiway C - - - 157,894 - - 157,894
Construct Taxiway C - - - 2,325,000 - - 2,325,000
Install Runway Lighting - - - - 937,500 - 937,500
Rehabilitate Apron - - - - - 500,000 500,000
Riverfront CRA
Cavcor Project 750,000 - - - - - 750,000
Underground Utilities - - - - - 3,500,000 3,500,000
Total ~ ~ ~ ~ ~ t ~ '
2
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
Grouped by Department
Police Department
Public Works Department
Roads and Special Projects
Parks & Recreation
Stormwater
Cemetery
Golf Course
Riverfront CRA
Airport
Total by Departments
Groused by Function
General Government
Public Safety
Transportation
Parks & Recreation
Physical Environment
Total by Functions
FY 2009-10 FY 2010-1 l FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 Total
$ 385,000 $ 430,000 $ 385,000 $ 385,000 $ 440,000 $ 385,000 $ 2,410,000
1,196,250 525,000 1,350,000 200,000 1,850,000 350,000 5,471,250
100,000 375,000 50,000 50,000 - - 575,000
975,000 350,000 350,000 600,000 700,000 700,000 3,675,000
50,000 50,000 - - - - 100,000
- - 2,195,000 - - - 2,195,000
750,000 - - - - 3,500,000 4,250,000
157,894 - 300,000 2,482,894 937,500 2,375,000 6,253,288
$ 750,000 $ - $ - $ - $ - $ 3,500,000 $ 4,250,000
385,000 430,000 385,000 385,000 440,000 385,000 2,410,000
1,354,144 525,000 1,650,000 2,682,894 2,787,500 2,725,000 11,724,538
100,000 375,000 2,245,000 50,000 - - 2,770,000
1,025,000 400,000 350,000 600,000 700,000 700,000 3,775,000
Grouped by FundinE Source
DST $ 1,827,498 $ 1,SSS,000 $ 2,035,000 $ 1,135,000 $ 2,790,000 $ 1,235,000 $ 10,577,498
LOGT 50,000 25,000 50,000 50,000 200,000 200,000 575,000
Recreation Impact Fees 200,000 100,000 50,000 50,000 - - 400,000
Available Construction Funds 928,752 - - - - - 928,752
Airport Operating Revenues 3,946 - 60,000 62,072 23,437 387,500 536,955
Grants 153,948 - 240,000 2,420,822 914,063 1,987,500 5,716,333
Riverfront CRA 400,000 - - - - - 400,000
Cemetery 50,000 50,000 - - - - 100,000
Bank Notes - - 2,195,000 - - 3,500,000 5,695,000
Total Funding Sources
3
CITY OF SEBASTIAN, FLORIDA
CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation Available
Option Impact Construction Riverfront Cemetery Bank
Gas Tax DST Fees Funds Airport Grants CRA Trust Fund Notes Total
FISCAL YEAR 2009/2010
Police Department
Police Vehicle Replacement ~ sss,ooo S sss,ooo
Roads and Special Projects
Street Repaving $ 50,000 $ so,ooo
Powerline Road North $ 2t~,a9a S 9za,~sz $ t,ta6,zso
Parks & Recreation
Splash Park Canopy $ so,ooo $ so,ooo
Skate Park Office $ so,ooo ~ so,ooo
Stormwater
1/4 Round Swale Rehab S 9~s,ooo S 9~s,ooo
Cemetery
Sissor Lift Building ~ so,ooo ~ so,ooo
Airport
Rehabilitate R/W 4/22 ~ s,9a6 $ ts3,9as $ ts~s9a
Riverfront CRA
Cavcor Parking Area $ zso,ooo $ too,ooo $ aoo,ooo ~ ~so,ooo
Total FY 2009/2010 ~ ~
4
CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation Available
Option Impact Construction Riverfront Cemetery Bank
Gas Tax DST Fees Funds Airport Grants CRA Trust Fund Notes Total
FISCAL YEAR 20]0/2011
Police Department
Police Vehicle Replacement $ 385,000 $ 385,000
Parking Lot Expansion $ as,ooo $ as,ooo
Roads and Special Projects
Street Repaving $ 25,000 $ 25,000
512 Median Improvements $ 500,000 $ 500,000
Parks & Recreation
Barber Street Field Lighting $ 2~s,ooo $ 2~s,ooo
Lift Station -Riverview Park $ ]00,000 $ ]00,000
Stormwater
I/4 Round Swale Rehab $ 350,000 $ 3s0,ooo
Cemetery
Relocate South Paved Roadway $ 50,000 $ 50,000
Total FY 2010/2011 t t t
5
CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation Available
Option Impact Construction Riverfront Cemetery Bank
Gas Tax DST Fees Funds Air ort Grants CRA Trust Fund Notes Total
FISCAL YEAR 2011/2012
Police Department
Parl Police Vehicle Replacement ~ 3ss,ooo S 3ss,ooo
Roads and Special Projects
Street Repaving S so,ooo $ so,ooo
Sidewalk Construction ~ tso,ooo $ tso,ooo
Public Works Facility ~ t,iso,ooo $ i,iso,ooo
Parks & Recreation
Barber/Acorn Terrace S 50,000 S so,ooo
Stormwater
Eng 1/4 Round Swale Rehab S 350,000 ~ sso,ooo
Airport
Master Plan Update $ 60,000 ~ 2ao,ooo S 300,000
Golf Course
Clubhouse/Irrigation/Tee Boxes $ 2,t95,oo0 $ z,t95,oo0
To[al FY 2011/2012 ~ ~
6
CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation Available
Option Impact Construction Riverfront Cemetery Bank
Gas Tax DST Fees Funds Airport Grants CRA Trust Fund Notes Total
F[SCAL YEAR 2012/2013
Police Department
Police Vehicle Replacement $ 385,000 $ 385,000
Roads and Special Projects
Street Repaving $ so,ooo $ so,ooo
Sidewalk Construction $ 1so,ooo $ 150,000
Parks & Recreation
Celtic & Crown $ so,ooo $ 50,000
Stormwater
Eng 1/4 Round Swale Rehab $ 350,000 $ 3so,ooo
Road Crossing/Side Yard Piping $ 250,000 $ 250,000
Airport
ProfeSSlOnal SBrViceS T/W C $ 3,947 $ 153,947 $ 157,894
COtl StI"UCt Taxiway C $ 58,125 $ 2,266,875 $ 2,325,000
Total FY 2012/2013 ~ ~ ~
7
CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation Available
Option Impact Construction Riverfront Cemetery Bank
Gas Tax DST Fees Funds Airport Grants CRA Trust Fund Notes Total
F[SCAL YEAR 2013/20]4
Police Department
Parl POhee Vehicle Replacement $ 385,000 $ 385,000
Police Boat/Trailer E ss,ooo $ ss,ooo
Roads and Special Projects
Street Repaving S 150,000 $ tso,ooo
Schumann & barber Intersection $ tsoo,ooo S tsoo,ooo
Sidewalk Construction ~ tso,ooo S 150,000
Sidewalk Repairs ~ so,ooo ~ so,ooo
Stormwater
1/4 Round Swale Rehab $ 350,000 S 350,000
Road Crossing/Side Yard Piping S zso,ooo ~ zso,ooo
Dredging/Bulkhead Renovation $ too,ooo $ too,ooo
Airport
Install Runway Lighting $ 23,437 $ 914,063 $ 937,500
l FY 2013/2014
T
t ~
o
a
8
CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
FISCAL YEAR 2014/2015
Police Department
Police Vehicle Replacement
Roads and Special Projects
Street Repaving
Sidewalk Construction
Sidewalk Repairs
Stormwater
Eng 1/4 Round Swale Rehab
Road Crossing/Side Yard Piping
Dredging/Bulkhead Renovation
Airport
Medium-size "Box Hangers"
Rehabilitate Apron
Riverfront CRA
Underground Utilities
Total FY 2014/2015
Grand Total
Local Recreation Available
Option Impact Construction Riverfront Cemetery Bank
Gas Tax DST Fees Funds Airport Grants CRA Trust Fund Notes
$ 385,000
$ 150,000
$ t so,ooo
$ so,ooo
$ 350,000
$ zso,ooo
$ too,ooo
$ 375,000 $ Is00,000
$ tzsoo ~ as~soo
Total
$ 385,000
$ 150,000
$ t so,ooo
$ so,ooo
$ 350,000
$ 250,000
$ too,ooo
$ t,8~s,ooo
$ soo,ooo
$ 3,500,000 $ 3,500,000
9
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
POLICE DEPARTMENT
Project Name FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 Total
Police Vehicle Replacement $ 385,000 $ 385,000 $ 385,000 $ 385,000 $ 385,000 $ 385,000 $2,310,000
Police Boat and Trailer - - - - 55,000 - 55,000
Parking Lot Expansion - 45,000 - - - - 45,000
Department Total
10
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
POLICE DEPARTMENT
Project Name:
Funding Source•
Justification:
Police Patrol Vehicles Project Descri tion:
Discretionary Sales Taxes 5 year vehicle replacement plan and additional°new vehicles for
added positions.
09/10 replace 10 high mileage, high maintenance vehicles from'2005.
10/11 replace 10 high mileage, high maintenance vehicles from 2006.
11!1.2 replace 10 high mileage, high maintenance vehicles from2007 & 2008.
12/13 replace 10 high mileage, high maintenance vehicles from 2008 &2009.
13/14 replace IO high mileage,liigh maintenance vehicles from ?009 & 2010.
14/15 replace 10 high mileage, high maintenance vehicles from 2010 & 2011.
Project Costs:
FY 09-10
$385,000
Operating Impact:
$0
FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15
$385,000 $385,000 $385',000. $38'.5,000. $385,000
$0 $0
$0 $0
$0
Project
Total
$2,310,000
$0
Project Name:
Funding Source:
Police Boat and Trailer '' ''" Project Descri tion:
Discretionary Sales Taxes Police boat and trailer replacement
Justification: FY 13/14 -replace 10 year old police patrol boat, high hours and high maintenance from 2003:
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $55,000 $0 $55,000
Operating Impact:
$0 $0 $0 $0 -$5,000. $0 -$5,000
Project Name:
Funding Source:
Parkin Lot Ex ansion Project Descri tion:
Discretiona Sales Taxes Provide-Parkin Behind the Police Station.-
Justification: This wi1iadd about elevens aces and extend out from the current arkin~ area b about thi feet.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $45,000 $0 $0-- $0 $0 $45,000
Operating Impact:
$0 $0 $0 $0
$0 $0' $0
11
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
PUBLIC WORKS DEPARTMENT
Project Name
Street Repaving
Powerline Road North
Schumann & Barber Intersection
SidewalkBike Paths Construction
Sidewalk Repairs
512 Median Landscaping
Public Works Garage Relocation
Division Total
FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-1? FY 2013-14 FY 2014-15 Total
$ 50,000 $ 25,000 $ 50,000 $ 50,000 $ 150,000 $ 150,000 $ 475,000
1,146,250 - - - - - 1,146,250
1,500,000 1,500,000
- - 150,000 150,000 150,000 150,000 600,000
- - - - 50,000 50,000 100,000
- 500,000 500,000
- - 1,150,000 - - - 1,150,000
•. 1 111 1 111 '~ 11 111 ~ ~ 1 111 1 111 ~ ~ 1
Barber Street Field Lighting $ - $275,000 $ - $ - $ - $ - $ 275,000
Splash Park Canopy 50,000 - - - - - 50,000
Skate Park Office 50,000 - - - - - 50,000
New Park -Barber/Acorn Terrace - - 50,000 - - - 50,000
New Park -Celtic & Crown - - - 50,000 - - 50,000
Lift Station -Riverview Park - 100,000 - - - - 100,000
Division Total
1/4 Round Swale Rehab $ 975,000 $350,000 $ 350,000 $350,000 $ 350,000 $ 350,000 $ 2,725,000
Road Crossings/Side Yard Pipes - - - 250,000 250,000 250,000 750,000
Dredging Bulkhead Renovations - - - - 100,000 100,000 200,000
Division Total ' 111 1 111 1 111 '~ • 11 111 '~ 11 111 11 111 • 111
Scissor Lift Building $ 50,000 $ - $ - $ - $ - $ - $ 50,000
Relocate South Paved Roadway - 50,000 - - - - 50,000
Division Total
12
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
PUBLIC WORKS DEPARTMENT
Project Name:
Funding Source:
Justification:
Street Re avin Project Descri tion:
Local Option Gas Tax Rehabilitation and repaving of failing road base and roads
This project is necessary to keep the streets in good condition and safe to the residents. There are several
which should be done right away due to failing road base, ie: Periwinkle Drive, Laconia Street, Main
Street, also all the side streets between Indian River Drive and US #1 should be taken care of as soon as
possible.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$50,000 $25,000 $50,000 $50,000 $150,000 $150,000 $475,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name: Powerline Road North Project Descri tion:
Funding Source: $166,014 Developer Escrow Design and construction of the extension of Powerline Road from
$330,022 CIP Fund 320 Main Street to Sebastian Blvd.
$432,716 CIP Fund 330
$217,498 Discretionary Sales
Justification: This ~a~ill allow another nortlL~south access road through the city.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$1,146,250 $0 $0 $0 $0 $0 $1,146,250
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification: These funds were budgeted in FY 08-09 but are being reallocated to FY 13-14.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $1,500,000 $0 $1,500,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification: This ro'ect focuses on allowin residents to walk offroad to avoid accidents.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $150,000 $150,000 $150,000 $150,000 $600,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Schumann & Barber Intersection Project Descri tion:
Discretiona Sales Taxes Im rovements to Intersection.
Sidewalk bike aths construction Project Descri tion:
Discretiona Sales Taxes Installation of new sidewalks throu hout the ci
13
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
PUBLIC WORKS DEPARTMENT
Project Name:
Funding Source:
Sidewalk Re airs Project Descri tion:
Normally LOGT, these repairs Removal/repair of broken or cracked sidewalks throughout City.
will need to charged to the Public
Works Operating Budget, until
the Paving Note is paid off.
Justification: Tlus ~ro~ect is necessary for the safety and ~~~ell being of the residents to a~~oid tri sand falls on broken
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $50,000 $50,000 $100,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
512 Median Landsca in Project Descri tion:
Discretionary Sales Taxes Improvements to improve the appearance of this major entryway to
the Ci Irri ation and landsca in will be added.
Justification: This ~ro'ect is desirable to enhance the view of those entering the City.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $500,000 $0 $0 $0 $500,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification: This is necessaryin order to enhance the view of those entering the City.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $1,150,000 $0 $0 $0 $1,150,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification:
Public Works Facili Project Descri tion:
Discretiona Sales Taxes Relocate the Public Works ara e and vehicle stora e area.
Barber Street Field Li htin Project Descri tion:
Discretiona Sales Taxes Remove and re lace out li hts with new
These are the oldest lights in the city and need to be replaced «~ith new to alliviate some of the
maintenance costs.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $275,000 $0 $0 $0 $0 $275,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
14
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
Project Name:
Funding Source:
S lash Park Cano Project Descri tion:
Recreation Impact Fees Install a canopy at the Splash Park.
Justification: This covering will provide shade for the customers.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$50,000 $0 $0 $0 $0 $0 $50,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Skate Park Office Project Descri tion:
Recreation Impact Fees Construct on office facility at the Skate Park.
Justification: This will improve operations at this facility and provide better working conditions.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$50,000 $0 $0 $0 $0 $0 $50,000
Operating Impact:
$0
$0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification:
New Parks Project Descri tion:
Recreation Impact Fees Installation of new neighborhood parks: Barber/Acorn, Zone D and
Celtic/Crown, Zone D.
This project continues allowing neighborhood parks in areas throughout the City. 11-12 Barber/Acorn is
ro osed 12-13 -Celtic and Crown is ro osed
Project Costs:
FY 09-10
$0
Operating Impact:
$0
FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15
$0 $50,000 $50,000 $0 $0
Project
Total
$100,000
$0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification
Project Costs:
FY 09-10
$0
Operating Impact:
$0
Lift Station Riverview Park Project Descri tion:
Eliminate the se tic tank b installin a lift station for the bathrooms
To a r~rade the system and eliminate the need to um the se tic e~~erv tune there is an e~°ent.
Project
FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$100,000 $0 $0 $0 $0 $100,000
$0 $0 $0 $0 $0 $0
15
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
PUBLIC WORKS DEPARTMENT
Project Name:
Funding Source:
1/4 Round Project Descri tion:
Discretionary Sales Taxes Installation of 1/4 Round throughout the City.
Justification: To continue the program of updating the drainage throughout the City.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$975,000 $350,000 $350,000 $350,000 $350,000 $350,000 $2,725,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name:
Funding Source:
Justification:
Road Crossin s/Side Yard Pi es Project Descri tion:
Discretionary Sales Taxes Installing new pipes in side yard ditches as quarter round is installed
and replacing failing road crossing pipes all through the City.
This project will help major flooding throghout the City by replacing failing pipes under the roads and
also save on maintenance by the mowing contractor by eliminating the side ditches to be maintained.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $250,000 $250,000 $250,000 $750,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name: Dred in /Bulkhead Renovation Project Descri tion:
Funding Source: Discretionary Sales Taxes This is for necessary dredging and bulkhead renovations to
approximately 8 miles of canals that are located south of County
Road 512.
Justification: This work will need to be done sometime in the future.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $100,000 $100,000 $200,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
16
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
PUBLIC WORKS DEPARTMENT
Project Name:
Funding Source:
Justification:
Scissor Lift Buildin Project Descri tion:
Cemete Trust Fund This will rovide a buildin to store the scissor lift unit.
This is necessary to protect and store the scissor lift and keep its electrical components dry and out o
the weather.
Project Costs:
FY 09-10 FY 10-11 FY 11-12
$50,000 $0 $0
Operating Impact:
$0 $0 $0
Project
FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $50,000
$0 $0 $0 $0
Project Name:
Funding Source:
Justification: This is necessa because the existin roadwa oes over raves aces.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $50,000 $0 $0 $0 $0 $50,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Redo South Paved Roadwa Project Descri tion:
Cemete Trust Fund The roadwa will be relocated.
17
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
GOLF COURSE
Project Name FY 2009-10 FY 2010-ll FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 Total
New Clubhouse $ - $ - $ 2,195,000 $ - $ - $ - $ 2,195,000
Department Total ' 111 ' 111
18
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
GOLF COURSE
Project Name:
Funding Source:
Justification:
New Club House Project Description:
This will be funded with a 12 year The estimated amount of $2,195,000 includes engineering plans,
debt issue at an expected rate o removal of existing building, the temporary facility, and all aspects o
3.5%. new construction. Construction estimate includes $470,000 for
irrigation improvements and $200,000 for work on tee boxes.
$100,000 will be used to relocate Green #9 and #18. $175,000 for
design is also included in the total estimated project costs.
The cost of renovating existing golf shop, offices and restrooms and adding additional 1600 square
to the existing building is not cost effective due to several reasons including plumbing and elect
issues, frame construction and evidence of termites and air conditioning issues.
Project Costs:
FY 09-10
$0
Operating Impact:
$0
FY 10-11 FY 11-12 FY 12-13
$0 $2,195,000 $0
$0 $0 $0
Project
FY 13-14 FY 14-15 Total
$0 $0 $2,195,000
$0 $0 $0
19
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015!
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
AIRPORT
Project Name FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 Total
Medium-size "Box Hangers" $ - $ - $ - $ - $ - $1,875,000 $1,875,000
Master Plan Update - - 300,000 - - - 300,000
Pro£Services R/W 4/22 157,894 - - - - - 157,894
Prof.Services Taxiway C - - - 157,894 - - 157,894
Construct Taxiway C - - - 2,325,000 - - 2,325,000
Install Runway Lighting - - - - 937,500 - 937,500
Rehabilitate Apron - - - - - 500,000 500,000
I~ - ~ . .. $ 157,894 $ - $ 300,000 $2,482,894 $ 937,500 $2,375,000 $6
20
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
AIRPORT
Project Name:
Funding Source:
Justification:
Project Costs:
FY 09-10
$0
Operating Impact:
$0
Box Han ers Project Descri tion:
FDOT $1,500,000
City $375,000 Build ""box"" hangers
Medium-size ""Box"" needed for anticipated. growth
Project
FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $1,875,000 $1,875,000
$0 $0 $0 $0 $375,000 $375,000
Project Name:
Funding Source:
Justification:
Master Plan U date Project Descri tion:
FDOT $240,000
City $60,000 Conduct Airport Master Plan Study
dumerous economic development and infrastructure requirements need future planning fc
.~stification
Project Costs: Project
FY 09-10 FY 10-1 I FY 11-12 FY 12-13 FY 13-14 FY 14-IS Total
$0 $0 $300,000 $0 $0 $0 $300,000
Operating Impact:
$0 $0 $60,000 $0 $0 $0 $60,000
Project Name: R/W 4/22 Im rovements Project Descri tion:
Funding Source: FDOT $3,947 Runway 4/22 rehabilitation of lights and markings.
City $3,946
FAA $150,000
Justification: Runwa 4/22 has non-standard li htin and markin s.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-IS Total
$157,894 $0 $0 $0 $0 $0 $157,894
Operating Impact:
$3,946 $0 $0 $0 $0 $0 $3,946
21
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
AIRPORT
Project Name:
Funding Source:
Justification:
Taxiwa C Desi n Project Descri tion:
FDOT $3,947 Perform feasibility, design, and engineering services for the
City $3,947 construction of Taxiway C.
FAA $150,000
At present, there is no parallel taxiway to Primary Runway 4-22. Aircraft taxing to the Terminal and
fuel facility currently have to cross the intersection of RWYS 8-26 and 4-22, then cross the threshold
of 8 again, in order to taxi to Primary Runway 4. Not only is this the Primary Runway, it also has the
most favored winds at over 97%. The act of crossing 3 active runways just to get to the primary can
be a significant safety hazard, promoting unnecessary runway incursions. The addition of a full-
length parallel taxiway to Primary Runway 4-22 will eliminate this safety concern and improve
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $157,894 $0 $0 $157,894
Operating Impact:
$0 $0 $0 $3,947 $0 $0 $3,946
Project Name:
Funding Source:
Justification:
Taxiwa C Construction Project Descri tion:
FDOT $58,125 Construct arallel Taxiwa C to rima RWY 4-22
Primary Runway 4-22 needs to have afull-length parallel taxiway in order to eliminate the need to
""back taxi"" on any portion of the runway. Additionally, Taxiway C will aid in obtaining an
instrument approach procedure for Runway 4-22.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $2,325,000 $0 $0 $2,235,000
Operating Impact:
$0 $0 $0 $58,125 $0 $0 $58,125
Project Name:
Funding Source:
Justification:
Install Runwa Li htin [not Project Descri tion:
FDOT $23,438 Install u dated runwa li htin and REIL for RW 4/22. Install
REILs installation will bring the runway into compliance and enhance safety. REIL installation on
RW 8/26 will enhance safety during marginal visibility conditions. Taxiway/taxilane lighting is
necessary for safety improvement.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $937,500 $0 $937,500
Operating Impact:
$0 $0 $0 $0 $23,437 $0 $23,437
22
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT DETAIL
AIRPORT
Project Name:
Funding Source:
Justification
Rehabilitate A ron Project Descri tion:
FDOT $12,500 Apron F rehabilitation
City $12,500
FAA $475,000
Apron F is the former southeast section of closed runway 13/31. Its surface is the original 1943
asphalt when the airport was constructed. Its surface is loose, thin, uneven, and unsafe to aircraft.
Project Costs:
FY 09-10 FY 10-11
$0 $0
Operating Impact:
$0 $0
Project
FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $500,000 $500,000
$0 $0 $0 $12,500 $12,500
23
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
RIVERFRONT COMMUNITY REDEVELOPMENT AGENCY
Project Name FY 2009-10 FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14 FY 2014-15 Total
Cavcor Project $ 750,000 $ - $ - $ - $ - $ - $ 750,000
Underground Utilities - - - - - 3,500,000 3,500,000
~ - ~ . ~ . $ 750,000 $ - $ - $ - $ - $3,500,000 $ 4,250,000
24
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2010-2015
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
RIVERFRONT COMMUNITY REDEVELOPMENT AGENCY
Project Name:
Funding Source:
Justification:
Cav Co Parkin renovation Project Descri tion:
CRA Funds $400,000 Surface the parking lot (i.e. asphalt or permeable surface),
Discretionary Sales Tax $250,000 landscaping, more defined drive aisles and ingress/egress, etc.
Recreation Impact Fees $100,000
Public parking is identified in the CRA Master Plan as part of critical infrastructure improvements within
the Riverfront district. This project would encompass a complete renovation of the parking area knows
as Cav Corp, just east of the Hess gas station. This lot is currently undezuntilized by haphazard
boatitrailer parking and could be. better utilized. By surfacing the lot, defining parking spaces, adding
landscaping, this lot Mould become an amenity to Ri~~erfront visitors as ~~°ell as local businesses.
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$750,000 $0 $0 $0 $0 $0 $750,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
Project Name: Under round Utilities Project Descri tion:
Funding Source: This project will be funded with a Within the Riverfront District, bury utilities (electric, phone, cable)
bank note. The bank note is underground.
anticipated to be issued for 15
years at a rate of about 3.9%.
Justification:
In the CRA Master Plan, urban design recommendations for the Riverfront district include placing all
utilities underground. This would greatly increase the aesthetics of the Riverfront district and would be
the first phase of a streetscaping program. Once the utilities are underground, the City can place
hardscape amenties including benches and landscaping (i.e. street trees, planters, etc).
Project Costs: Project
FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Total
$0 $0 $0 $0 $0 $3,500,000 $3,500,000
Operating Impact:
$0 $0 $0 $0 $0 $0 $0
25
LOCAL OPTION GAS REVENUE
FISCAL YEARS 2010-2015
Local Option Gas Taxes
FDOT Lighting Agreement
Investment Income
Local Option Gas Tax Fund Revenues
Debt Payment
Operating Costs (Street Lights,etc.)
Transfer to General Fund
Barber Street R/R Crossing
TOTAL
Debt Payment
Operating Costs (Street Lights,etc.)
Transfer to General Fund
Reduction to General Fund Transfer
Addition for Go-Line Grant Match
Street Repaving
TOTAL
Debt Payment
Operating Costs (Street Lights,etc.)
Transfer to General Fund
Reduction to General Fund Transfer
Addition for Go-Line Grant Match
Street Repaving
TOTAL
Debt Payment
Operating Costs (Street Lights,etc.)
Transfer to General Fund
Reduction to General Fund Transfer
Street Repaving
TOTAL
Debt Payment
Operating Costs (Street Lights etc.)
Transfer to General Fund
Reduction to General Fund Transfer
Street Repaving
TOTAL
Operating Costs (Street Lights)
Transfer to General Fund
Street Repaving
Sidewalk Repairs
TOTAL
Operating Costs (Street Lights)
Transfer to General Fund
Street Repaving
Sidewalk Repairs
TOTAL
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15
$ 660,000 $ 676,500 $ 693,413 $ 710,748 $ 728,517 $ 746,729 $ 765,398 $ 4,981,304
19,047 19,523 20,011 20,512 21,024 21,550 22,089 143,756
7,000 7,135 5,420 4,728 5,094 5,307 8,371 43,056
$ 686,047 $ 703,158 $ 718,844 $ 735,987 $ 754,635 $ 773,587 $ 795,858 $ 5,168,116
300,000
207,434
215,784
34,216
757,434
300,000
205,000
250,000
(75,000)
50,000
50,000
780,000
300,000
205,000
250,000
(75,000)
50,000
25,000
755,000
300,000
205,000
250,000
(75,000)
50,000
730,000
300,000 (Final)
205,000
250,000
(50,000)
50,000
755,000
210,125
250,000
150,000
50,000
660,125
215,378
250,000
150,000
50,000
665,378
BEGINNING FUND BALANCE $ 226,792 $ 155,405 $ 78,563 $ 42,407 $ 48,395 $ 48,030 $ 161,491 $ 226,792
BUDGET REQUIREMENT - 15% OF EXPENSES 36,248 45,750 42,000 38,250 38,250 61,519 62,307 62,307
UNRESTRICTED RESERVE BALANCE $ 190,545 $ 109,655 $ 36,563 $ 4,157 $ 10,145 $ (13,489) $ 99,184 $ 164,485
TOTAL REVENUES 686,047 703,158 718,844 735,987 754,635 773,587 795,858 5,168,116
TOTAL EXPENDITURES+DEBT+TRANSFERS 757,434 780,000 755,000 730,000 755,000 660,125 665,378 5,102,937
ENDING FUND BALANCE $ 119,158 $ 32,813 $ 407 $ 10,145 $ 9,780 $ 99,972 $ 229,664 $ 229,664
26
DISCRETIONARY SALES TAX FUND (DST)
FISC AL YEARS 2010-2015
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Totals
DST Revenue $ 2,400,000 $ 2,460,000 $ 2,521,500 $ 2,584,538 $ 2,649,151 $ 2,715,380 $ 2,783,264 $ 18,113,832
Interest from Airport Advance 8,550 8,550 8,550 8,550 8,550 11,400 11,376 65,526
Principal from Airport Advance 0 0 0 0 0 600 .624 1,224
Investment Income 34,000 79,395 72,852 73,969 64,709 79,307 55,000 459,232
DST PROJECT REVENUE $ 2,442,550 $ 2,547,945 $ 2,602,902 $ 2,667,057 $ 2,722,410 $ 2,806,686 $ 2,850,264 $ 18,639,814
City Hall Debt (Retires 2018) 1,032,957
Police Cars (10 Change-Outs) 385,000
Potomac Road Crossing 125,000
Barber/Schumann Intersection Improvements 0
1/4 Round Swale Improvement 350,000
TOTAL FY 09 1,892,957
City Hall Debt (Retires 2018) 1,034,894
Police Cars (10 Change-Outs) 385,000
Powerline Road -North ' 217,498
Cavcor Parking Area 250,000
Barber/Schumann Intersection Improvements 0
Public Works Garage Relocation 0
1/4 Round Swale Improvement 975,000
TOTAL FY 10 2,862,392
City Hall Debt (Retires 2018) 1,030,681
Police Cars (10 Change-Outs) 385,000
Police Parking Lot Expansion 45,000
512 Median Landscaping 500,000
Barber Street Sports Complex -Lights 275,000
1/4 Round Swale Improvement 350,000
TOTAL FY 11 2,585,681
City Hall Debt (Retires 2018) 1,034,526
Police Cars (10 Change-Outs) 385,000
Public Works Garage Relocation 1,150,000
1/4 Round Swale Improvement 350,000
Sidewalk Construction 150,000
TOTAL FY 12 3,069,526
City Hall Debt (Retires 2018) 1,031,192
Police Cars (10 Change-Outs) 385,000
1/4 Round Swale Improvement 350,000
Sidewalk Construction 150,000
Road Crossing and Side Yard Piping 250,000
TOTAL FY 13 2,166,192
City Hall Debt (Retires 2018) 1,031,106
Police Cars (10 Change-Outs) 385,000
Police Boat 55,000
Barber Schumann Intersection 1,500,000
Dredging/Bulkhead Renovations 100,000
1/4 Round Swale Improvement 350,000
Sidewalk Construction 150,000
Road Crossing and Side Yard Piping 250,000
TOTAL FY 14 3,821,106
City Hall Debt (Retires 2018) 1,033,831
Police Cars (10 Change-Outs) 385,000
Dredging/Bulkhead Renovations 100,000
1/4 Round Swale Improvement 350,000
Sidewalk Construction 150,000
Road Crossing and Side Yard Piping 250,000
TOTAL FY 15 2,268,831
BEGINNING FUND BALANCE $ 1,404,945 $ 1,954,538 $ 1,640,091 $ 1,657,312 $ 1,254,842 $ 1,811,061 $ 796,641 $ 1,404,945
BUDGET RESERVE - 10% OF EXPENSES 189,296 286,239 258,568 306,953 216,619 382,111 226,883 226,883
RESERVE FOR ADVANCE TO AIRPORT 285,000 285,000 285,000 285,000 285,000 284,400 283,776 283,776
UNRESTRICTED RESERVE BALANCE $ 930,649 $ 1,383,299 $ 1,096,523 $ 1,065,359 $ 753,223 $ 1,144,550 $ 285,982 $ 1,178,062
TOTAL REVENUES 2,442,550 2,547,945 2,602,902 2,667,057 2,722,410 2,806,686 2,850,264 18,639,814
TOTAL EXPENDITURES+DEBT+TRANSFERS 1,892,957 2,862,392 2,585,681 3,069,526 2,166,192 3,821,106 2,268,831 18,666,685
ENDING FUND BALANCE $ 1,480,242 $ 1,068,852 $ 1,113,744 $ 662,890 $ 1,309,441 $ 130,130 $ 867,415 $ 1,151,191
* Powerline Road Total = $1,146,250 ($166,014 Developer Escrow, $330,022 CIP Fund 320, $432,717 CIP Fund 330 and above $217,498 DST Transfer.)
27
STORMWATER UTILITY FUND
FISCAL YEARS 2010-2015
Stormwater Fees
Investment Income
SW PROJECTED REVENUE
Professional Services
NPDES 5 Year Permit
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
Collier Creek Project
TOTAL STORMWATER FY09
Profesional Services
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
TOTAL STORMWATER FY10
Profesional Services
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
TOTAL STORMWATER FY11
Profesional Services
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
TOTAL STORMWATER FY12
Profesional Services
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
TOTAL STORMWATER FY13
Profesional Services
NPDES 5 Year Permit
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
TOTAL STORMWATER FY14
Profesional Services
Series 2003 Issue (Retires 2022)
Transfer to General Fund for Swale Maintenance
TOTAL STORMWATER FY15
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 TOTALS
$ 850,000 $ 850,000 $ 850,000 $ 850,000 $ 850,000 $ 850,000 $ 850,000 $ 5,950,000
25,000 27,344 25,868 25,517 25,167 24,838 24,217 177,951
875,000 877,344 875,868 875,517 875,167 874,838 874,217 6,127,951
100
7,998
440,135
512,500
590,000
1, 550,733
100
437,485
500,000
937,585
100
439,035
450,000
889,135
100
439,248
450,000
889,348
100
438,048
450,000
888,148
100
7,998
441,448
450,000
899,546
100
440,010
450,000
890,110
BEGINNING FUND BALANCE $ 1,012,003 $ 336,270 $ 276,029 $ 262,762 $ 248,931 $ 235,950 $ 211,243 $ 1,012,003
BUDGET RESERVE - 15% OF EXPENSES 232,610 140,638 133,370 133,402 133,222 134,932 133,517 133,517
UNRESTRICTED RESERVE BALANCE 779,393 195,632 142,659 129,360 115,709 101,019 77,726 878,487
ANNUAL REVENUES 875,000 877,344 875,868 875,517 875,167 874,838 874,217 6,127,951
ANNUAL EXPENDITURES 1,550,733 937,585 889,135 889,348 888,148 899,546 890,110 6,944,605
ENDING FUND BALANCE $ 103,660 $ 135,392 $ 129,392 $ 115,529 $ 102,728 $ 76,311 $ 61,833 $ 61,833
28
RECREATION IMPACT FEE FUNDS
FISCAL YEARS 2010-2015
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Totals
Recreation Impact Fees $ 33,000 $ 33,000 $ 33,000 $ 33,000 $ 33,000 $ 33,000 $ 33,000 $ 231,000
Return from Main Street Project Transfer 233,821 - - - - - - 233,821
Investment Income 38,000 28,143 24,671 23,613 25,029 25,229 25,435 190,120
PROJECTED REVENUE $ 304,821 $ 61,143 $ 57,671 $ 56,613 $ 58,029 $ 58,229 $ 58,435 $ 654,941
Dog Park (Additional)
Stormwater Park
Schumann Park
TOTAL FY 09
Cavcor Parking Area
Riverview Park Pavillion
Riverview Park Splash Park Canopy
TOTAL FY 10
Lift Station -Riverview Park
TOTAL FY 11
TOTAL FY 12
Barber/Acorn Park
TOTAL FY 13
Celtic/Crown Park
TOTAL FY 14
TOTAL FY 15
SEVEN YEAR PROJECTION
Beginning FY08-09 Fund Balance
Total Revenue (FY09 - FY15)
Total Expenses (FY09 - FY15)
PROJECTED FUND BALANCE FY 15
BEGINNING FUND BALANCE
TOTAL REVENUES
EXPENDITURES+DEBT+TRANSFERS
ENDING FUND BALANCE
38,000
16,000
175,000
229,000
100,000
50,000
50,000
200,000
100,000
100,000
0
50,000
50,000
50,000
50,000
0
FIVE YEAR PROJECTION
1,033,393 Beginning FY10-11 Fund Balance 970,357
654,941 Total Revenue (FY11 - FY15) 288,977
629,000 Total Expenses (FY11 - FY15) 200,000
1,059,334 PROJECTED FUND BALANCE FY 15 1,059,334
$1,033,393 $1,109,214 $ 970,357 $ 928,028 $ 984,641 $ 992,670 $ 1,000,899 $ 1,033,393
304,821 61,143 57,671 56,613 58,029 58,229 58,435 654,941
229,000 200,000 100,000 0 50,000 50,000 0 629,000
$1,109,214 $ 970,357 $ 928,028 $ 984,641 $ 992,670 $ 1,000,899 $ 1,059,334 $ 1,059,334
29
RIVERFRONT CRA FUND
FISCAL YEARS 2010-2015
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 TOTALS
Tax Increment from City $ 273,888 $ 228,326 $ 236,317 $ 244,589 $ 253,149 $ 262,009 $ 271,180 $ 1,769,458
Tax Increment from County 251,236 209,442 216,772 224,360 232,212 240,340 248,751 1,623,113
Bank Note - - - - - - 3,500,000 3,500,000
Return from Main Street Project Transfer 670,435 - - - - - - 670,435
Investment Income 2,200 2,767 5,790 4,335 6,083 7,933 9,889 38,997
SW PROJECTED REVENUE 1,197,759 440,535 458,880 473,283 491,444 510,282 4,029,820 7,602,003
Operating Expenditures 94,421
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Match on Waterfront Grant 351,500
TOTAL RIVERFRONT CRA FY09 575,921
Operating Expenditures 75,402
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Cavcor Parking Area 400,000
TOTAL RIVERFRONT CRA FY10 605,402
Operating Expenditures 77,664
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Cavcor Parking Area 500,000
Undergrounding Utilities -
TOTAL RIVERFRONT CRA FY11 707,664
Operating Expenditures 79,994
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Bank Note Payment -
TOTAL RIVERFRONT CRA FY12 209,994
Operating Expenditures 82,394
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Bank Note Payment -
TOTAL RIVERFRONT CRA FY13 212,394
Operating Expenditures 84,866
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Bank Note Payment -
TOTAL RIVERFRONT CRA FY14 214,866
Operating Expenditures 87,412
Fagade/Sign Improvement Program 30,000
Bill Board Advertising 40,000
Transfer to General Fund for Quality Maintenance 60,000
Undergrounding Utilities 3,000,000
Bank Note Payment 308,568
TOTAL RIVERFRONT CRA FY15 3,525,980
BEGINNING FUND BALANCE $ 16,404 $ 638,242 $ 473,375 $ 224,591 $ 487,880 $ 766,930 $ 1,062,346 $ 16,404
ANNUAL REVENUES 1,197,759 440,535 458,880 473,283 491,444 510,282 4,029,820 7,602,003
ANNUAL EXPENDITURES 575,921 605,402 707,664 209,994 212,394 214,866 3,525,980 6,052,221
ENDING FUND BALANCE $ 638,242 $ 473,375 $ 224,591 $ 487,880 $ 766,930 $ 1,062,346 $ 1,566,186 $ 1,566,186
30
GOLF COURSE FUND
FISCAL YEARS 2010-2015
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Totals
Charges for Services $1,422,290 $1,483,200 $1,522,200 $1,522,200 $1,522,200 $1,522,200 $1,522,200 $10,516,490
Rents 31,500 32,000 32,800 33,620 34,461 35,322 36,205 235,908
Other Revenue 5,960 6,660 6,660 6,660 6,660 6,660 6,660 45,920
Note Proceeds - - - 2,550,000 - - - 2,550,000
Investment Income 5,243 4,200 21,937 58,934 35,913 35,537 36,174 197,937
PROJECTED REVENUE $1,464,993 $1,526,060 $1,583,597 $4,171,414 $1,599,233 $1,599,719 $1,601,239 $13,546,255
Operating Costs 1,355,482
Debt Service 314,990
Capital 90,670
TOTAL FY 09 1,761,142
Operating Costs 1,314,141
Debt Service 313,100
Financing Cost 49,000
Capital -
TOTAL FY 10 1,676,241
Operating Costs 1,314,141
Debt Service -
Capital 65,000
TOTAL FY 11 1,379,141
Operating Costs 1,314,141
Debt Service 260,545
Capital 2,243,000
TOTAL FY 12 3,817,686
Operating Costs 1,314,141
Debt Service 260,545
Capital 40,000
TOTAL FY 13 1,614,686
Operating Costs 1,314,141
Debt Service 260,545
Capital -
TOTAL FY 14 1,574,686
Operating Costs 1,314,141
Debt Service 260,545
Capital 0
TOTAL FY 15 1,574,686
SEVEN YEAR PROJECTION FIVE YEAR P ROJECTION
Beginning FY08-09 Fund Balance 542,988 Beginning FY 10-11 Fund Balance 96,658
Total Revenue (FY09 - FY15) 13,546,255 Total Revenu e (FY11 - FY15) 10,555,202
Total Expenses (FY09 - FY15) 13,398,268 Total Expenses (FY11 - FY1 5) 9,960,885
PROJECTED FUND BALANCE FY 15 690,975 PROJECTED FUND BALANCE FY 15 690,975
BEGINNING FUND BALANCE $ 542,988 $ 246,839 $ 96,658 $ 301,114 $ 654,842 $ 639,389 $ 664,422 $ 542,988
TOTAL REVENUES 1,464,993 1,526,060 1,583,597 4,171,414 1,599,233 1,599,719 1,601,239 13,546,255
EXPENDITURES+DEBT+TRANSFERS 1,761,142 1,676,241 1,379,141 3,817,686 1,614,686 1,574,686 1,574,686 13,398,268
ENDING FUND BALANCE $ 246,839 $ 96,658 $ 301,114 $ 654,842 $ 639,389 $ 664,422 $ 690,975 $ 690,975
31
AIRPORT FUND
FISCAL YEARS 2010-2015
FY 08-09 FY 09-10 FY 10-11 FY 11-12 FY 12-13 FY 13-14 FY 14-15 Totals
Net Fuel Sales $ 17,820 $ 17,000 $ 17,680 $ 18,387 $ 19,123 $ 19,888 $ 20,683 $ 130,581
Non-taxable Rents 2,000 2,000 2,000 2,000 2,000 2,000 2,000 14,000
Golf Course Rents 175,000 175,000 175,000 175,000 175,000 175,000 175,000 1,225,000
Taxable Rents 115,000 157,000 163,280 169,811 176,604 183,668 191,015 1,156,377
Other Revenue 69,200 69,250 69,250 69,250 69,250 69,250 69,250 484,700
Note Proceeds - - - - - - 375,000 375,000
Investment Income 2,000 3,000 5,796 7,379 7,686 8,141 14,374 48,375
PROJECTED REVENUE $ 381,020 $ 423,250 $ 433,006 $ 441,827 $ 449,662 $ 457,946 $ 847,321 $ 3,434,033
Operating Costs 390,565
Repayment of DST Fund Advance 8,550
Transfer to Construction Fund 20,000
TOTAL FY 09 419,115
Operating Costs 364,764
Repayment of DST Fund Advance 8,550
Transfer to Construction Fund 3,946
TOTAL FY 10 377,260
Operating Costs 364,764
Repayment of DST Fund Advance 8,550
Transfer to Construction Fund -
TOTAL FY 11 373,314
Operating Costs 364,764
Repayment of DST Fund Advance 8,550
Transfer to Construction Fund 60,000
TOTAL FY 12 433,314
Operating Costs 364,764
Repayment of DST Fund Advance 8,550
Transfer to Construction Fund 62,072
TOTAL FY 13 435,386
Operating Costs 364,764
Repayment of DST Fund Advance 12,000
Transfer to Construction Fund 23,437
TOTAL FY 14 400,201
Operating Costs 364,764
Repayment of DST Fund Advance 12,000
Transfer to Construction Fund 387,500
TOTAL FY 15 764,264
SEVEN YEAR PROJECTION FIVE YEAR PROJECTION
Beginning FY08-09 Fund Balance 542,988 Beginning FY 10-11 Fund Balance 18,241
Total Revenue (FY09 - FY15) 3,434,033 Total Revenue (FY11 - FY15) 2,629,763
Total Expenses (FY09 - FY15) 3,202,854 Total Expenses (FY11 - FY15) 2,406,479
PROJECTED FUND BALANCE FY 15 774,167 PROJECTED FUND BALANCE FY 15 241,525
BEGINNING FUND BALANCE $ 10,346 $ (27,749) $ 18,241 $ 77,933 $ 86,446 $ 100,723 $ 158,468 $ 10,346
TOTAL REVENUES 381,020 423,250 433,006 441,827 449,662 457,946 847,321 3,434,033
EXPENDITURES+DEBT+TRANSFERS 419,115 377,260 373,314 433,314 435,386 400,201 764,264 3,202,854
ENDING FUND BALANCE $ (27,749) $ 18,241 $ 77,933 $ 86,446 $ 100,723 $ 158,468 $ 241,525 $ 241,525
32