Loading...
HomeMy WebLinkAbout10142009CRY OF HOME OF PELICAN ISLAND SEBASTIAN CITY COUNCIL AGENDA REGULAR MEETING WEDNESDAY, OCTOBER 14, 2009 6:30 P.M. CITY COUNCIL CHAMBERS 1225 MAIN STREET, SEBASTIAN, FLORIDA ALL AGENDA ITEMS MAY BE INSPECTED IN THE OFFICE OF THE CITY CLERK 1225 MAIN STREET, SEBASTIAN, FLORIDA OR ON THE CITY WEBSITE Procedures for Public Input are Attached to the Back of the Agenda 1. CALL TO ORDER 2. INVOCATION Reverend Mark Patterson, Alliance Community Church 3. PLEDGE OF ALLEGIANCE 4. ROLL CALL 5. AGENDA MODIFICATIONS Modifications and additions require unanimous vote of City Council members 6. PROCLAMATIONS, AWARDS, BRIEF ANNOUNCEMENTS Presentations of proclamations, certificates and awards, and brief timely announcements by Council and Staff. No public input or action under this heading. 09.048 A. Presentation by Indian River Commissioner Peter O'Bryan Relating to the City of Sebastian Tax Abatement Referendum (PowerPoint Presentation) 09.128 B. Certificate of Appreciation to Frank Garland Nine Years of Construction Board Service 09.145 C. Proclamation Honoring the 2009 World Canopy Relative Work Gold Medal Team 1 That Trained at Skydive Sebastian 09.146 D. Proclamation Honoring the Friends of St. Sebastian River 20 Anniversary 3 09.087 E. Federal 2010 Census Representative Ann St. Pierre Request for City Committee Brief Announcements 7. CONSENT AGENDA All items on the consent agenda are considered routine and will be enacted by one motion. There will be no separate discussion of consent agenda items unless a member City Council so requests; in which event, the item will be removed and acted upon separately. If a member of the public wishes to provide input on a consent agenda item, he /she should request a Council Member to remove the item for discussion prior to start of the meeting or by raising his/her hand to be recognized. 5-8 A. Approval of Minutes 9/23/09 Special Meeting Minutes 9 -17 B. Approval of Minutes 9/23/09 Regular Meeting Minutes 09.059 C. Approve Change Order #8 to S.E. Cline in the Amount of $27,805.00 for 19 -23 Additional Materials for the Collier Canal Project (Administrative Services Transmittal, Change Order, E -Mail, Summary) 09.147 D. Approve Alcoholic Beverage Use Yacht Club for Ford Wedding Reception on 25-29 October 24, 2009 from 1:00 5:00 p.m. (Parks Transmittal, Application, Receipt) 09.148 E. Authorize the Mayor to Execute Addendum to Law Enforcement Agencies 31 -47 Interlocal Crime Lab Agreement (City Clerk Transmittal, Agreement, Addendum) 09.149 F. Approve Applied Aquatic Management, Inc. Weed Control Contract Based on 49 -68 Piggyback Rates from DEP Contract for Time and Materials (PW Transmittal, Cost Estimate, DEP Contract) 8. COMMITTEE REPORTS APPOINTMENTS City committee reports and Council Member regional committee reports. No public input or action except for City committee member nominations and appointments under this heading. 9. PUBLIC HEARINGS Procedures for public hearings: Mayor opens hearing Attomey reads ordinance or resolution Staff presentation Public Input Staff summation Mayor closes hearing Council action Anyone wishing to speak is asked to sign up before the meeting, when called, go to the podium and state his/her name for the record. 09.134 A. Second Reading, Adoption Hearing of Revised Ordinance No. 0 -09 -13 Local 69 -75 Vendor Preference (City Attorney Transmittal, 0- 09 -13) AN ORDINANCE OF THE CITY OF SEBASTIAN, FLORIDA, RELATING TO PURCHASING, AMENDING SECTION 2 -11 OF THE CODE OF ORDINANCES, ENTITLED LOCAL VENDOR PREFERENCE, WHICH PROVIDES FOR A LOCAL VENDOR PREFERENCE POLICY; PROVIDING FOR REPEAL OF ORDINANCES OR PARTS OF ORDINANCE IN CONFLICT HEREWITH, PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. (1 Reading 9/23/09 Revised, Advertised 9/30/09 PJ Legal Ads) 10. UNFINISHED BUSINESS 11. PUBLIC INPUT (Procedures on Back of Agenda) 2 12. NEW BUSINESS 09.132 A. Resolution No. R -09 -40 Sebastian Municipal Airport Runway 4/22 77 -138 Rehabilitation and Improvements (Airport Director Transmittal, R- 09 -40, JPA, Bid Tab, Contracts) A RESOLUTION OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE A PUBLIC TRANSPORTATION SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT WITH THE FDOT TO PROVIDE FUNDING FOR RUNWAY 4/22 DESIGN AND CONSTRUCTION, RUNWAY REHAB, LIGHTING AND MARKING; PROVIDING FOR CONFLICT; PROVIDING FOR EFFECTIVE DATE. 09.041 B. Resolution No. R -09 -41 Stan Mayfield Working Waterfronts Grant Program 139 -161 Proposed Modification (GMD Transmittal, R- 09 -41, Grant Application Form) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEBASTIAN, FLORIDA, REQUESTING A BOUNDARY MODIFICATION AND INCREASING FUNDING ALLOCATION FOR THE APPROVED STAN MAYFIELD WORKING WATERFRONT GRANT; PROVIDING FOR CONFLICTS AND PROVIDING FOR AN EFFECTIVE DATE. 13. CITY ATTORNEY MATTERS 14. CITY MANAGER MATTERS 09.150 A. Sebastian Municipal Airport/Roseland Road Buffer Update (City Manager 163 -187 Transmittal, March 2002 Master Plan Excerpt, Feb. 2002 Master Plan Excerpt, Minutes, 2001 Layout, 2002 Layout, 2008 Layout, Previous CM Newsletter Excerpt, LPA Group Letter) 15. CITY CLERK MATTERS 16. CITY COUNCIL MATTERS A. Vice Mayor Hill B. Council Member Coy C. Council Member Simchick D. Council Member Wolff E. Mayor Gilimor 17. ADJOURN (All meetings shall adjourn at 10:00 p.m. unless extended for up to one half hour by a majority vote of City Council) HEARING ASSISTANCE HEADPHONES ARE AVAILABLE IN THE COUNCIL CHAMBERS FOR ALL GOVERNMENT MEETINGS. All City Council Meetings are Aired Live on Comcast Channel 25. ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE WITH RESPECT TO ANY MATTER CONSIDERED AT THIS MEETING WILL NEED A RECORD OF THE PROCEEDINGS AND MAY NEED TO ENSURE THAT A VERBATIM RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND EVIDENSE UPON WHICH THE APPEAL IS TO BE HEARS. (F.S.286.0105) IN COMPLIANCE WITH THE AMERICAN WITH DISABILITIES ACT (ADA), ANYONE WHO NEEDS A SPECIAL ACCOMODATION FOR THIS MEETING SHOULD CONTACT THE CITY'S ADA COORDINATOR AT 589 -5330 AT LEAST 48 HOURS IN ADVANCE OF THIS MEETING. 3 Upcoming meetings: October 28, 2009 Board of Adjustment Meeting 6 pm October 28, 2009 Regular Meeting 6:30 pm November 9, 2009 Special Meeting 6:30 pm November 18, 2009 Regular Meeting 6:30 pm December 9, 2009 Regular Meeting 6:30 pm December 16, 2009 Regular Meeting 6:30 pm 4 PROCEDURES FOR PUBLIC INPUT IN ACCORDANCE WITH RESOLUTION R -09 -05 Regular City Council Meetings Public input is ALLOWED under the headings: Consent Agenda Public Hearings Unfinished Business New Business Public Input Public input is NOT ALLOWED under the headings: Proclamations, Awards, Brief Announcements (except for individuals giving or accepting proclamations or awards); Committee Reports and Appointments (except for committee members giving reports and applicants being interviewed for committee appointments); City Council Matters Charter Officer Matters Council may, by majority vote, call upon an individual to provide input if desired. Workshops and Special Meetings. Public input is limited to the item on the agenda Time Limit Input on agenda items where public input is permitted on agendas is FIVE MINUTES, however, City Council may extend or terminate an individual's time by majority vote of Council members present. Input Directed to Chair Speakers shall address the City Council IMMEDIATELY PRIOR TO CITY COUNCIL DELIBERATION of the agenda item and ALL INPUT SHALL BE DIRECTED TO THE CHAIR, unless answering a question of a member of City Council or City staff. Individuals shall not address City Council after commencement of City Council deliberation on an agenda item after public input has concluded, provided, however, the Mayor and members of City Council may recall an individual to provide additional information or to answer questions. Certain Remarks Prohibited Personal, impertinent, and slanderous remarks, political campaigning and applauding are not permitted and may result in expulsion from the meeting. The Chair shall make determinations on such remarks, subject to the repeal provisions below. Chair to Control Meeting In controlling the meeting during public input, the Chair will take the following actions: First Offense verbal warning to move on. Second Offense offender is directed to be seated. Third Offense (refusal to be seated or other disruptive acts offender will be asked to leave the premises) Appealing Decisions of Chair Any member of Council may appeal the decision of the Chair to the entire Council. A majority vote of City Council shall overrule any decision of the Chair. Public Input Heading on Agenda The heading on Regular Meeting agendas "Public Input" provides an opportunity for individuals to bring NEW INFORMATION OR REQUESTS TO CITY COUNCIL NOT OTHERWISE ON THE PREPARED AGENDA. Individuals are asked to attempt to resolve matters with staff prior to meetings. Individuals are asked to provide copies of material for Council one week prior to the meeting if they intend to refer to specific material. City Council will not debate an issue during Public Input but may by consensus direct a Charter Officer in regard to the item if necessary or place a requested item on a future agenda. 5 HOME OF PELICAN ISLAND Whereas, on July 20 2009, members from the United States Parachute Association (USPA) two -way canopy formation team celebrated a surprise ending to a week of competition, beating out the favored Russian team and crushing their previous world record at this year's World Games, held in Kaohsiung, Taiwan from July 16 July 26, 2009; and Whereas, the World Games, held every four years in the year following the summer Olympic Games, are conducted under the auspices of the International Olympic Committee (IOC) and feature those sports that are recognized by the IOC but not included in the field of play in the Olympics; and Whereas, Air Sports (parachuting) is a relatively new category for the World Games, debuting at the 2005 World Games in Duisburg, Germany and marking 2009 as the first time canopy formation was introduced at the Games, which made the stakes higher for the winner of this category; and Whereas, for teammates Chris Gay, Liz Godwin and Mark Gregory who are no strangers to competition, having competed and coached in skydiving events for years, winning a gold medal was made remarkably sweeter when the team broke the world record in their event, giving the U.S.A. bragging rights for the best in the world in two way canopy formation; and Whereas, the team credits their gold -medal performance largely to the help of Skydive Sebastian, who provided support to the team to practice and refine the skills they needed to take the gold in the international arena; Now, THEREFORE, be it proclaimed by the City of Sebastian City Council that sincere and enthusiastic congratulations are extended to the 2009 World Game Canopy Relative Work Gold Medal Team! ADOPTED this 14 day of October, 2009. ATTEST: Sally A. I'aio, MMC City Clerk Richard H. Gillmor, Mayor PR plV of HOME OF PELICAN ISLAND FRIENDS OF ST. SEBASTIAN RIVER TWENTIETH ANNIVERSARY ON BEHALF OF THE COUNCIL OF THE ATTEST: CITY OF SEBASTIAN, FLORIDA WHEREAS, the Friends of St. Sebastian River was established twenty years ago to maintain and improve the health and beauty of the ST. SEBASTIAN RIVER and its watershed, and WHEREAS, the CITY OF SEBASTIAN drainage system represents a significant portion of the watershed to the river, and WHEREAS, the CITY OF SEBASTIAN takes its name from the name of this river, and WHEREAS, the people of the CITY OF SEBASTIAN benefit greatly from the recreational use of this river, its watershed, and surrounding parks, and WHEREAS, the FRIENDS OF ST, SEBASTIAN RIVER assisted the SEBASTIAN AREA HISTORICAL SOCIETY in having the UNITED STATES GEODETIC SURVEY correct, properly identify, and officially record the historical name of the St. Sebastian River and its Prongs, and WHEREAS, the FRIENDS OF ST. SEBASTIAN RIVER has regularly conducted educational programs about the river for the public over the last twenty years; researched and makes available on its website extensive information explaining water quality issues affecting the river and its watershed; and participates actively in community festivals and celebrations with information for the public, and WHEREAS, the FRIENDS OF ST. SEBASTIAN RIVER actively cooperates with other local and regional organizations involved in water resource conservation, including support for the development of the ST. SEBASTIAN RIVER BUFFER PRESERVE STATE PARK, and WHEREAS, the FRIENDS OF ST. SEBASTIAN RIVER volunteers have diligently monitored the health of the river in various testing and data collecting efforts by various agencies, and WHEREAS, the FRIENDS OF ST. SEBASTIAN RIVER annually recognizes outstanding volunteer service to our local community and environment by granting a Sebastian River High School student with the George V. Schum Memorial Award and Scholarship, NOW THEREFORE, BE IT PROCLAIMED BY THE COUNCIL OF THE CITY OF SEBASTIAN, FLORIDA on this 14 day of October, in the year 2009, on behalf of the good citizens of the CITY OF SEBASTIAN, congratulations to the FRIENDS OF ST. SEBASTIAN RIVER on their twenty years of dedicated, faithful service to its mission, and our appreciation for the efforts of it members to maintain the health and beauty of our beloved namesake, the ST. SEBASTIAN RIVER. Sally A. Maio, MMC City Clerk Richard Gillmor, Mayor L I 3. ROLL CALL City Council Present: Mayor Richard H. Gillmor Vice -Mayor Jim Hill Council Member Andrea Coy Council Member Dale Simchick Council Member Eugene Wolff HOME OF PELICAN ISLAND SEBASTIAN CITY COUNCIL MINUTES SPECIAL MEETING FY 2009/2010 MILLAGE AND BUDGET WEDNESDAY, SEPTEMBER 23, 2009 6:00 P.M. CITY COUNCIL CHAMBERS 1225 MAIN STREET, SEBASTIAN, FLORIDA 1. Mayor Gillmor called the special meeting to order at 6:12 p.m. 2. The Pledge of Allegiance was recited. Staff Present: City Manager, Al Minner City Attorney, Robert Ginsburg City Clerk, Sally Maio Deputy City Clerk, Jeanette Williams Airport Director, Joseph Griffin Administrative Services Director, Debra Krueger Finance Director, Ken Killgore Growth Management Director, Rebecca Grohall Police Chief, Michelle Morris Police Captain, Mike Beyers MIS Senior Systems Analyst, Barbara Brooke -Reese 4. FINAL PUBLIC HEARING ON MILLAGE AND FY 2009/2010 BUDGET The City Manager Announced the Proposed Millage Rate of 3.3456 Mills which is 12.1% Less than Rolled -Back Rate of 3.8038 Mills. The City Attorney read Resolution Nos. R -09 -36 millage, R -09 -37 budget, R -09 -38 financial policies and R -09 -39 Golf Course to Airport lease amendment by title only. The City Manager gave a brief update on the proposed millage and budget, demonstrating how Sebastian taxes on average have decreased approximately 10% based on decreased assessed values and comparing percentages of all agency ad valorem taxes, and noted Sebastian taxes represent only 19% of all taxes paid by City residents to various Indian River County agencies. Special City Council Meeting Final Millage and Budget Hearing September 23, 2009 Page Two Mayor Gillmor called for public input at 6:19 p.m. Damien Gilliams, 1623 US Highway One, Sebastian, said there is a lot of fat in the budget and further cuts need to be made, that there is an excess in reserves which means the City is overtaxing and stashing it away. He recommended waiving business licenses, stopping buy -outs, waiving impact fees and drainage fees, cutting Council salaries, citing the expense account, and suggested a Citizens Academy. Joe Scozzari, Sebastian, noted not one Council member told staff to sharpen its pencil, said a lot of grants don't have to be spent for seven years, and asked what we have to offer people traveling on 1 -95 who see the billboards. Barbara Salmon, Sebastian, said this is a public forum and there should be decorum. Al Paternoster, Sebastian inquired whether the furloughs will be required of exempt as well as hourly employees and whether the Police Department will be furloughed. The City Manager responded that police officers will be furloughed but their time will be staggered, and that all City employees will be furloughed. Mr. Paternoster cautioned that by reducing the PD we are jeopardizing the community and if there is a reduction in response time based on the furlough we are opening ourselves up to liability. Ms. Simchick asked the amount of savings from the PD furlough and the City Manager responded it was approximately $150,000. Ms. Simchick noted we are taking $84,000 from reserves and maintaining the millage rate. She asked the City Attorney if the option to draw more from reserves can be exercised at any time, and the City Attorney responded yes as long as the budget is balanced. Mr. Hill thanked staff, noted they had come down from a $400,000 deficit to an $84,000 deficit, and said it is the responsibility of the Chief to assure the level of service of the Police Department is maintained. Ms. Simchick said Council did not have to decide on Police furloughs tonight. Mr. Hill suggested Chief Morris appear before Council at a future meeting to explain how she will maintain levels of service. 2 Special City Council Meeting Final Millage and Budget Hearing September 23, 2009 Page Three 09.056 i. RESOLUTION NO. R -09 -36 Millage Rate for Calendar Year 2009 (Finance Transmittal, R- 09 -36) A RESOLUTION OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, ADOPTING A MILLAGE RATE OF 3.3456 MILLS FOR THE CALENDAR YEAR 2009 AND ALLOCATING SAME TO THE FISCAL YEAR BEGINNING OCTOBER 1, 2009 AND ENDING SEPTEMBER 30, 2010; PROVIDING FOR CONFLICTS; AND PROVIDING FOR EFFECTIVE DATE. MOTION by Mr. Hill and SECOND by Ms. Coy to adopt Resolution R- 09 -36. The City Attorney stated for the record that the taxing authority is the City of Sebastian, a municipal corporation under the laws of the State of Florida, the rolled back rate is 3.8038 mills, there is no percentage increase over the rolled back rate, rather there is a 12.1% decrease, and the millage rate is 3.3456 mills. Result of the Roll Call: Ayes: All Nays: None Passed 5 -0 09.056 ii. RESOLUTION NO. R -09 -37 Fiscal Year 2009/2010 Budget (Finance Transmittal, R- 09 -37, Schedule A, Proposed Budget Previously Provided) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA ADOPTING THE BUDGET FOR THE FISCAL YEAR BEGINNING OCTOBER 1, 2009 AND ENDING SEPTEMBER 30, 2010; MAKING APPROPRIATIONS FOR THE PAYMENT OF OPERATING EXPENSES, CAPITAL EXPENSES, AND FOR THE PRINCIPAL AND INTEREST PAYMENTS ON THE BOND AND OTHER INDEBTEDNESS OF THE CITY IN THE CITY'S GENERAL FUND, SPECIAL REVENUE FUNDS, DEBT SERVICE FUND, CAPITAL IMPROVEMENT FUNDS, GOLF COURSE FUND, AIRPORT FUND, AND BUILDING DEPARTMENT FUND AS PROVIDED FOR IN SCHEDULE "A ATTACHED HERETO, ESTABLISHING AUTHORITY OF THE CITY MANAGER TO IMPLEMENT THE BUDGET; PROVIDING FOR SEVERABILITY; PROVIDING FOR CONFLICTS; AND PROVIDING FOR EFFECTIVE DATE. MOTION by Mr. Hill and SECOND by Mayor Gillmor to adopt Resolution R- 09 -37. Result of the Roll Call: Ayes: All Nays: None Passed 5 -0 3 Special City Council Meeting Final Millage and Budget Hearing September 23, 2009 Page Four 5. OTHER MATTERS RELATING TO THE BUDGET 09.056 A. Richard H. Gillmor, Mayor ATTEST: Sally A. Maio, MMC City Clerk RESOLUTION NO. R -09 -38 City Financial Policies (Finance Transmittal, R- 09 -38, Attachment A) A RESOLUTION OF THE CITY OF SEBASTIAN, FLORIDA, READOPTING AMENDED FINANCIAL POLICIES GOVERNING VARIOUS AREAS OF BUDGET AND FINANCE AS PROVIDED FOR IN ATTACHMENT "A PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. MOTION by Ms. Coy and SECOND by Mr. Hill to adopt Resolution R- 09 -38. Result of the Roll Call: Ayes: All Nays: None Passed 5 -0 09.056 B. RESOLUTION NO. R -09 -39 Airport Lease to the Golf Course (Finance Transmittal, R- 09 -38, Exhibit A, R- 00 -48, Exhibit A) A RESOLUTION OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, AMENDING RESOLUTION NO. R- 00-48, AUTHORIZING THE CITY MANAGER TO EXECUTE A NEW LEASE AGREEMENT BY AND BETWEEN THE CITY OF SEBASTIAN FOR USE OF LAND FROM THE SEBASTIAN MUNICIPAL AIRPORT IN THE OPERATION OF THE SEBASTIAN MUNICIPAL GOLF COURSE; PROVIDING FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE. MOTION by Mr. Hill and SECOND by Ms. Coy to adopt Resolution R- 09 -39. Result of the Roll Call: Ayes: All Nays: None Passed 5 -0 6. Being no further business, Mayor Gillmor adjourned the special meeting at 6:35 p.m. Approved at the October 14 2009 Regular City Council meeting. 4 City Council Present: Mayor Richard H. Gillmor Vice -Mayor Jim Hill Council Member Andrea Coy Council Member Dale Simchick Council Member Eugene Wolff None. OW CAF HOME OF PELICAN ISLAND SEBASTIAN CITY COUNCIL MINUTES REGULAR MEETING WEDNESDAY, SEPTEMBER 23, 2009 6:30 P.M. CITY COUNCIL CHAMBERS 1225 MAIN STREET, SEBASTIAN, FLORIDA 1. Mayor Gillmor called the regular meeting to order at 6:45 p.m. 2. Rabbi Goldring, Congregation Beth El gave the invocation. 3. The Pledge of Allegiance was recited. 4. ROLL CALL Staff Present: City Manager, Al Minner City Attorney, Robert Ginsburg City Clerk, Sally Maio Deputy City Clerk, Jeanette Williams Airport Director, Joseph Griffin Administrative Services Director, Deb Krueger Finance Director, Ken Killgore Growth Management Director, Rebecca Grohall Police Chief, Michelle Morris Police Captain, Mike Beyer Parks Supervisor, Chris McCarthy MIS Senior Systems Analyst, Barbara Brooke -Reese 5. AGENDA MODIFICATIONS Modifications and additions require unanimous vote of City Council members Regular City Council Meeting September 23, 2009 Page Two Mr. Garland was not present. C. Brief Announcements 6. PROCLAMATIONS, AWARDS, BRIEF ANNOUNCEMENTS Presentations of proclamations, certificates and awards, and brief timely announcements by Council and Staff. No public input or action under this heading. 09.128 A. Presentation of Certificate of Appreciation to Frank Garland Former Construction Board Member 09.138 B. Presentation of Plaque Employee of the Second Quarter Barbara 1 Brooke -Reese MIS Senior Systems Analyst Mayor Gillmor read Ms. Brooke Reese's accomplishments and presented her with a plaque and savings bond. Ms. Coy invited the public to the free McKee Botanical Garden Open House on October 3 from 10:00 a.m. to 5:00 p.m. Mr. Wolff welcomed the Sebastian River High students who were in attendance for a class assignment. 7. CONSENT AGENDA All items on the consent agenda are considered routine and will be enacted by one motion. There will be no separate discussion of consent agenda items unless a member City Council so requests; in which event, the item will be removed and acted upon separately. If a member of the public wishes to provide input on a consent agenda item, he/she should request a Council Member to remove the item for discussion prior to start of the meeting or by raising his/her hand to be recognized. 3 -13 A. Approval of Minutes 9/9/09 Regular Meeting 15-18 B. Approval of Minutes 9/14/09 Special Meeting 09.139 C. Approve Road Closure for Substance Awareness Council 5K Run Fundraiser 19 -22 Saturday, January 2, 2010 7:30 am to 9:30 am Indian River Drive from Harrison Street North to Jackson Street (Parks Transmittal, Application, Info) 09.140 D. Approve Road Closure for Sebastian River Middle School IB Program 5K Run 23 -28 Fundraiser Saturday, November 14, 2009 6:45 am to 9:30 am Indian River Drive from Harrison Street North to Jackson Street (Parks Transmittal, Application, SRMS Letter) MOTION by Mr. Hill and SECOND by Ms. Coy to approve consent agenda items A -D passed with a voice vote of 5 -0. 8. COMMITTEE REPORTS APPOINTMENTS City committee reports and Council Member regional committee reports. No public input or action except for City committee member nominations and appointments under this heading. 2 Regular City Council Meeting September 23, 2009 Page Three 09.141 A. Police Pension Board of Trustees 29 -58 i. Appoint Two Resident Positions for Two Year Terms (City Clerk Transmittal, FS 185.05, 5 Applications, Board List, Press Release) Ms. Bastian described her background and said she would like to stay challenged in the investment arena. Mr. Tanner said he was retired from the New York City Police Dept., and has diverse risk experience. Mr. Taracka said he has been a board member for the last four years and he would like to continue. Mr. Thibodeau said he was retired from the Springfield Massachusetts Police Dept. and was looking for a volunteer opportunity. Mr. Zomok was not in attendance. The following nominations were made: Mr. Hill nominated Mr. Taracka Mr. Wolff nominated Mr. Tanner Ms. Simchick nominated Mr. Thibodeau Mayor Gillmor nominated Ms. Bastian The result of the roll call on the first position was: Mr. Hill Taracka Ms. Coy Taracka Ms. Simchick Tanner Mr. Wolff Taracka Mayor Gillmor Taracka Mr. Taracka was appointed to the first position. Using the same nominees, the result of the roll call on the second position was: Ms. Coy Bastian Ms. Simchick Tanner Mr. Wolff Tanner Mayor Gillmor Bastian Mr. Hill Tanner Mr. Tanner was appointed to the second position. Mayor Gillmor thanked everyone who applied and encouraged them to apply for another board vacancy. 3 Regular City Council Meeting September 23, 2009 Page Four 9. PUBLIC HEARINGS 09.129 A. Second Reading and Final Adoption of Ordinance 0 -09 -12 Noise (City Attorney 59 -64 Transmittal, Memo, 0- 09 -12) AN ORDINANCE OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, REPEALING SECTION 66 -3 (4) AND ENACTING CHAPTER 67; OF THE CODE OF ORDINANCES OF THE CITY OF SEBASTIAN, FLORIDA, RELATING TO UNNECESSARY AND EXCESSIVE NOISE; PROVIDING ENFORCEMENT PROCEDURES AND EXEMPTIONS; REPEALING CONFLICTING PROVISIONS; PROVIDING FOR SEVERABILITY AND AN EFFECTIVE DATE. The City Attorney read Ordinance No. 0 -09 -12 by title and the Mayor opened the public hearing 7:09 p.m. Mayor Gillmor explained in the past there was a noise ordinance but it was lost in code reshuffling, there has always been City involvement with loud noises and this will now give the Police Department an enforcement measure. Damien Gilliams, 1623 US Highway 1, asked if the ordinance included the City when they have concerts at Riverview Park. Mayor Gillmor replied all businesses are exempt. The City Attorney confirmed any activity authorized by City Council or the City Manager is exempt from this ordinance. Mr. Gilliams continued by saying he was planning on acquiring a decibel reader as the City breaks the law constantly. Ms. Coy called for a point of order, stating certain remarks that are slanderous are prohibited; and she took some of his remarks as slanderous. Mayor Gillmor concurred, and Mr. Gilliams said, "To the honorable Mrs. Coy. Mayor Gillmor gave him a second warning. Tom Collins, Capt. Hiram's, said this issue came to his attention three or four months ago and said when a neighbor isn't courteous to a neighbor there needs to be some "teeth." He said he has talked with Mrs. Ferrell who has come to him with loud music complaints and they have done everything they can do. He urged Council to be cautious when talking about curtailing business interests; they are open to any suggestions; and he would appreciate a call on any issues. Joe Scozzari, Sebastian, said he thought the ordinance was five decibels over a 60 decibel reading. The City Attorney said it would be five over what you hear without the noise. Mr. Scozzari said he hears nothing in his neighborhood at 6:30 in the evening, and five decibels above would be his speaking voice. He suggested looking into decibel levels. Mr. Hill clarified it is five decibels or more at the nearest property line. If 4 Regular City Council Meeting September 23, 2009 Page Five MOTION by Ms. Coy and SECOND by Mr. Hill to approve Ordinance No. 0- 09 -12. Result of the roll call vote: Ayes: All Nays: None Passed 5 -0 10. UNFINISHED BUSINESS none. 11. PUBLIC INPUT Damien Gilliams, 1623 US Highway 1, said Council must have a vote when a point of order is called. He said up to this month the City has been spending approximately $1.5 to $1.8 M without going to bid which concerns him as the City is going to take $84,000 out of the reserves. Ms. Simchick cited F.S.287 which outlines requirements for purchasing. The City Manager said she was correct and additionally the City has a purchasing ordinance. Ms. Simchick asked Mr. Gilliams for certain instances of the City's overspending. Mr. Gilliams said Council should request an audit as the City is spending without due diligence. Joe Scozzari, Sebastian, said he provided the spending documents that Mr. Gilliams referenced and said "you can nickel and dime yourself to wealth" as well. Mr. Wolff asked him to name the top three overspent items from his recollection. Mr. Scozzari said the dog park fence, and some Police Department items that donations paid for. He said there are retirees that can help department heads shop. He asked how much department heads are allowed to spend before coming to the City Manager. Ms. Simchick said the department heads spend within their budget, with the comptroller reviewing it. The City Manager briefly explained the operating expenses on page 48 of the budget which show a declining trend for the City. He said anything over $750 requires a bid, then up to $15,000 he can approve, and after that Council must approve. Mr. Scozzari asked if the City stayed within budget or went over. The Mayor said the City went a little over. Ms. Coy asked Mr. Wolff if he heard three items for which the City overspent from Mr. Scozzari. Mr. Wolff said he heard fencing for the dog park and police items. Regular City Council Meeting September 23, 2009 Page Six 12. NEW BUSINESS Mr. Scozzari shouted from the audience it was a dog muzzle for $38.00 and the Mayor gave him a warning. 09.015 A. George Street Ditch Rehabilitation Project (City Manager Transmittal, 65-105 Agreement, Recommendation) The City Manager described the bid responses, noting staffs recommendation of Sunshine Land Design is within the proposed local vendor guidelines. MOTION by Mr. Hill and SECOND by Mr. Wolff to approve recommendations 1, 2, and 3 from staff. Damien Gilliams, 1623 US Highway 1, said it is good to see things going out to bid, suggested cutting out the drainage tax (stormwater assessment) when the drainage is all straightened out. He said he paid for a site plan which included drainage and has to pay the drainage tax which is double taxation. Mr. Wolff asked if it would be too difficult to ask Sunshine Land Design to accept the low bid of $76,093. The City Manager explained it was a line item bid, it would upset the bidding process, and the numbers are pretty much there. In response to Ms. Coy, the City Manager said we have had a good working relationship with Sunshine Land Design. Result of the roll call vote: Ayes: All Nays: None Passed 5 -0 09.142 B. NationAir Insurance Group Airport Lease Agreement (Airport Transmittal, 107 -128 Lease, Schedules) The Airport Director said NationAir Insurance Group has made an application to rent a wing at the Airport Administration Building for $8.50 a square foot which has been approved by FDOT. He noted the lease package includes an airport tie down. MOTION by Mr. Hill and SECOND by Mr. Wolff to approve. Damien Gilliams, 1623 US Highway 1, said the last lease he did was for $15.00 a square foot and asked if there was an appraisal in the file. He suggested taking this off the agenda and have two appraisals done so the taxpayer knows what the property is worth. In response to Ms. Simchick, the City Attorney advised that an appraisal was not required by FDOT or FAA. 6 Regular City Council Meeting September 23, 2009 Page Seven Mr. Hill said it was wonderful to see business coming to the community and thanked the Airport Director. Mayor Gillmor reminded everyone what we are not receiving anything for the property now. Mr. Wolff said the building has been unoccupied for four years, by getting people in the building, they will bring more people and in five years we can re- negotiate the price of the lease. Ms. Coy also thanked the Airport Director. The Airport Director said a lot of the credit must also be given to the City Manager and City Attorney. Result of the roll call vote: Ayes: All Nays: None Passed 5 -0 13. CITY ATTORNEY MATTERS none. 14. CITY MANAGER MATTERS 09.143 A. KB Homes Settlement Update (City Manager Transmittal, Minutes, Previous 129 -136 Transmittal, Offers) The City Manager reported that he has accepted KB Homes settlement in the amount of $10,000 which was approved by Council in 2008. 09.144 B. Furlough Day Report (City Manager Transmittal) 137 The City Manager said he is beginning to plan for the furlough days which is asking the all of the employees to take a 5% pay cut except for the PBA who will be receiving a raise through their contract but end up breaking even with the furlough days. He said the days were listed in the agenda packet but they have been nullified and rescheduled as stated in his Sept. 21 e-mail to Council. (copy attached) He said staff will do their very best to keep four police officers on the streets at all times. He noted the police dispatchers are short staffed and will probably not be furloughed; and the Golf Course employees have offered to work without pay to stay open. Purchasing The City Manager said he understood the season (of questioning purchasing) and with Council's guidance he has tried to bring down taxes. He recalled his first budget in which Council wanted to reach rolled -back which was done by 8 go Regular City Council Meeting September 23, 2009 Page Eight eliminating the two procurement employees and placing the procurement responsibilities onto the department heads which has saved $750,000 in personnel costs to date. He said the success was measured by decreasing personnel, operating and capital costs. He said at that time he instituted a procurement program with the department heads and displayed the regulations on the overhead screen (attached). In response to Council's renewed directive to spend money locally he cited how much money has been spent since 10/1/08 to date: The City Manager noted part of the outside the region amount is the S.E. Cline Collier Creek project which is out of Palm Coast. He said the out of state amount includes the wall material from a Georgia company and computer supplies from AT &T. He said we are doing our best to use the vendors in town and spending our money wisely. 15. CITY CLERK MATTERS none. 16. CITY COUNCIL MATTERS A. Mayor Gillmor Mayor Gillmor said one of his friends had recently come down with H1N1 virus and urged people to check with their doctor to see if they need a flu shot. B. Vice Mayor Hill Mr. Hill asked the City Manager to look at some solutions to the hodge podge of signs at the entrance of Main Street to the Airport. He said it is silly season tonight and commended the Mayor for the way he handled the meetings tonight. C. Council Member Coy 932,256 in Sebastian 534,895 in Indian River County 1.26 M in the region 3.2 M outside the region 3 M out of state Ms. Coy asked how many high school students were still in attendance and asked one young lady to come to the podium. Lindsey Wexler, student, said they were assigned a government project and had to write a paper giving their opinion on what they observed tonight. 8 Regular City Council Meeting September 23, 2009 Page Nine Richard H. Gillmor, Mayor ATTEST: Sally A. Maio, MMC City Cleric D. Council Member Simchick Ms. Simchick said it was a great night for the kids to see diversity. She said the Boy Scouts will be in front of Publix on Roseland Road and Sebastian Blvd. this weekend selling popcorn and encouraged everyone to support their local boy scouts. E. Council Member Wolff none. 17. Being no further business, Mayor Gillmor adjourned the regular meeting at 8:07 p.m. Approved at the October 14, 2009 Regular City Council Meeting. I HOME OF PELICAN ISIAND AGENDA TRANSMITTAL Subject: Funding Authorization for Additional Work Related to Collier Canal Project: Ap rove for Submittal by: Al inner, City Manager Agenda No. Oq. d 5q De.artment Origin: Administrative Services Finance Director City Clerk: City Attorney: Date Submitted: September 30, 2009 For Agenda of: October 14, 2009 Exhibits: S.E. Cline Change Order #8 S.E. Cline email dated September 25, 2009, 12:25pm Summary of S.E. Cline Change Orders to Date EXPENDITURE REQUIRED: $27,805.00 AMOUNT BUDGETED: $5,504,417.00 APPROPRIATION REQUIRED: $0.00 SUMMARY S.E. Cline Construction, Inc. original proposal for Collier Canal bulkhead design was based on soil borings furnished by CDM Engineering, which indicated that the wall design and construction could be accomplished using MR -2 Manta Ray anchors located on 12' centers. Unfortunately, near the canal bulkhead wall, in the Wimbrow and Main Street area, the soil is much less stable than anticipated and the tiebacks were not setting in a proper and safe manner. To date, S.E. Cline has installed more than 6,000 linear feet of bulkhead with approximately 350 linear feet requiring a different anchorage arrangement due to loose soil. The problem areas were north of the Barber Street Bridge on the east side of the Collier Canal (Segment 5). All other areas have had no problems and have performed exactly as the design permitted. This issue was initially reported to you in the City Manager Current Topics Update of June 5, 2009. RECOMMENDED ACTION Move to approve S.E. Cline Construction, Inc., Change Order #8 in the amount of $27,805.00 for construction of additions to Collier Canal Project resulting from Wimbrow Soft Soil Conditions. 0_0 CHANGE ORDER #8 PURCHASE ORDER 5863 CONTRACTOR: S.E. Cline Construction Co. ADDRESS: 18 Utility Drive Palm Coast, Florida 32137 HOME OF PELICAN ISLAND CITY OF SEBASTIAN CHANGE ORDER PROJECT NAME: Collier Canal Stormwater Retrofit Project Design -Build Services PROJECT C4606 PHONE 386- 931 -0016 CONTRACT NAME: Collier Canal Stormwater CONTACT DATE: September 26, 2008 By the signature affixed below, both the City and the Contractor agree to the changes as stipulated herein. Upon proper execution of this document, the Contractor is hereby notified to commence work. All changes stated below are hereby incorporated and made a part of the Contract identified above, and all the terms and conditions of said Contract are enjoined and in full force while executing the change(s) stipulated as follows: 1. Wimbrow Soft Soil Conditions Station 10 +00. Required change from 8' 14' Vinyl Sheets. Redesign and additional materials to include I -Beams Segment 5. A) Contract Price Prior to this Change Order Net Increase (Decrease) Resulting from this Change Order New Contract Price Including this Change Order B) Contract Time Prior to the Change Order (Number of Days) Net Increase (Decrease) Resulting from the Change Order (Number of Days) New Completion Date Including this Change Order AGREED: COMPAJ,YY G. 4 Authorized Signature CITY OF SEBASTIAN: City Manager Project Manager Date: Date: Approvals by City of Sebastian in accordance with Code Sec. 2 -10 (check one): City Manager Authorization cumulative amount less than 15% of contract price or $15,000 single change order X City Council Authorization cumulative amount exceeds 15% of contract price or $15,000 single change order City Attorney as to legal ATTEST: $3,316,470.42 27,805.00 3,344,275.42 days days Finance Director as to budget Sally A. Maio, MMC, City Clerk Debbie Krueger From: Hap Cameron [hap @clineconstruction.net] Sent: Friday, September 25, 2009 12:25 PM To: Debbie Krueger Cc: 'Marine Operations S.E. Cline Construction, Inc.' Subject: Change order explanations Zebra, er our conversation regarding C.O. 5 6 please see the following explanations: Wimbrow soft soil conditions stations 10 +00 to station 19 +66 Our proposal for Collier Canal bulkhead design as based on soil borings furnished by CDM, which indicated that the wall design and construction could be complished using MR -2 Manta Ray anchors located on 12' centers. o date we have installed more than 6000 1.f. of bulkhead with approximately 350 1.f. requiring a different anchorage rangement due to loose soils. some cases we had to put in more Manta Ray anchors with a closer spacing to meet the required design loading. other locations the soils were so loose that we had to install 14' long sheetpile instead of 8' and drive 8" x 20' long H- le to act as deadmen instead of Manta Rays to meet the required design loading. ie area we encountered these problems was North of The Barber St. brige on the East side of the Collier Canal, while all the other areas we have worked, performed exactly as our design predicted. Lou�l4 you have any other questions feel free to call at anytime. :''Dredging Load Haul Disposal Additional 959 C.Y. The Collier Canal Project was bid per CDM's design th the Finish grade of the cap to be 8 "above the existing cap and with swales graded behind the cap, which required an :imated 3,400 C.Y. of material. le soil borings indicated that the material from the canal would be suitable for this purpose with only 9% fines. 'ring the design stage it was determined that this design was not desirable and would disrupt the existing drainage of the tire neighborhood. e bulkhead cap was lowered to the original grade and the rear yard swales were deleted, eliminating the need for the aerial. also found that the material coming from the canal had much higher fines content and was not suitable for any other except disposal. these reasons we are disposing of 100% of all the dredged material. could you have any other questions feel free to call at anytime. �t Regards, VI. "Hap" Cameron Jr. nonng Zc Page 1 of 1 r co 0 O d L 0 a) V R O O L N CL c o M C d d 2 j2 re E To 2 C cr. C d `m O d co o V Q. O. a) 0) Q v m U5 M Nr E) 0 a) V. c) e- N C C N p) 0 C C 0) 6) O a a) a) E EVwv) c c a) a) c en O worn +a p 1 U O EOEn y 0 to to O s l0 f6 C o y N O O m 2 C o O )3 T a m �0 -0 'o m v c A a) a) 1 cA m a) o) a -o '5 •QV mmo c y 63 0 a) a) U T m 5 N 2 2 Q O m UU 0 0)0 ow 0) T T T m c c c 6) a) N o c E E J v N N N C N LL LL C t C L L .0 LL LL 0 0 y T 0. 0. 0. 2 c Z o o n .o O p 3 T m 4, m Y T T E E V U C 'C 'C 0 m m 7 N y m m m w E E E.- c c c ce m e _8' V 8 w g N N (1) O0)c a)•a)dm3orno C 2 2 2 6) m U C N N N N G C .0 t_ L .Q fT 0-3 •p •p 0 0C (CUUUU o\ 0 0\ o o o\ o\ o\ o\\ o\ o\ o 0 0 0 0 0 0 0 0 0 0 0 0 OD CD V•dDc) vf 0) 0 M c, 0? 0? OTt M 7 ON 00 OD OD EA r- h r- EO EG E0 ui ON 001V O O O cDOM 4:6 V•(0 0 0) E0 0) (0 M <n M 'e O (4) Md•Or r- W O(0 N d' N' co r'0 n O 0) (0 M V 00)0) EA n 43 M M r- r'- r- h E0 E0 E0 E0 m E E0 EH EA EA 69 EH EA EA EH Efl ER 69 EA O O O D 0 0 0 0 0 0 0 0 0 co ONE0 O Sri EE) EA EO CO 0) EU 0) u a0 c0 OOED NNN r- Nr∎00M T- V) cv C D T r EO T f 03 O Tf T r cvr:<6 as EO N O M N r- EA EA Efl ER EA EH 44 fO, 9 E9 EA EH 40 a) C1 lT) 0 Q o a)a)a)ma) Zr) a)a) a) 12 12 12 12 1? 12 12 12 12 'e12 12 V 000000000000 a a) a) a) a) 000 0 a) m 0)0)0)0)0)0))0)0) L L L L L L L t L •C L t 0. 000000000000 D Subject: Alcoholic Beverage Approval for Ford Wedding Reception at Yacht Club Approved or Submittal by: City Manager 1 t Agenda No. Department Origin: Finance Director: City Attorney: City Clerk: C 4 j- _�,/�'y. Date Submitted: September 29, 2009 For Agenda of: October 14, 2009 A r t I er Exhibits: Receipt and Copy of Rental Permit Application EXPENDITURE REQUIRED: None AMOUNT BUDGETED: N/A APPROPRIATION REQUIRED: None Off 01 HOME OF PELICAN ISLAND CITY OF SEBASTIAN AGENDA TRANSMITTAL SUMMARY James Ford is seeking Council approval to serve alcoholic beverages for a wedding reception at the Yacht Club on October 24, 2009 from 1:00 until 5:OOPM. Staff has verified applicant's date of birth. They are expecting 30 people to attend the party. RECOMMENDED ACTION Move to approve alcoholic beverages at the Yacht Club for the Ford wedding reception on October 24, 2009 from 1:00 until 5:00PM. CI YOF 5tgAITI 4 HOME OF PELICAN ISLAND NAME OF PERMTI 1 CITY OF SEBASTIAN RENTAL PERMIT APPLICATION DATE: T 24- 0' COMMUNITY CENTER f F 2 ADDRESS OF PERMITTEE: q 7 2_ F'g IIS c4-A/ 574 s p� No. Street City PHONE Y MAILING ADDRESS: -C4 NAME OF GROUP OR ORGANIZATION �R1 j REASON FOR RENTAL: W EAL) 1 K C %/ew ANTICIPATED NUMBER OF PERSONS ATTENDING EVENT: 30 If more than 75 attendees, extra duty police officer services are required (R- 02 -47 REQUESTED DATE: j0 2-1-2409 TIME: From: (%UO P/M To: 5,10d Ph't PLEASE ANSWER YES OR NO: 1_ Are You a Resident of Sebastian? 2. Will There Be An Admission or Door Charge? 3. Will Alcoholic Beverages Be Served? (a) If answer to #3 is Yes, Permittee's proof of age: )1.4– Make checks payable to City of Sebastian (A service fee of 5% or $10.00, whichever is greater, may be charged for a dishonored check per City Resolution No. R- 96-41) YACHT CLUB Office Use Only Rent Non Resident.. Total Tax. P. 0. Services Total SECURITY DEPOSIT $250.00 RENT 7% TAX POLICE OFFICER SERVICES OFFICE USE ONLY DATE PAID RECEIPT NO. INITIALS Alcohol Beverage Request APPROVED Police Department Agreement Confirmed (if applicable) Key Pickup Date: Key Returned Date: DISAPPROVED Date.. Security Deposit Returned By City Check# For On- TO RENTERS OF SFRASTTAN COMMUNITY CENTER OR YACHT CLUB_ A deposit of two hundred fifty dollars ($250.00) for cleanup must be made with the application_ This deposit is refundable if the building is left clean and undamaged by permittee. If cleaning or repair is necessary by City employees, this deposit or a portion of the deposit shall be forfeited, based on information supplied by the superintendent of buildings. T e E g e_1 permittee for said premises, have read the rental rules and regulations and agree to all the conditions listed. Furthermore, I understand that neglecting to clean the premises immediately afterward will result in forfeiture, in part or full, of the security deposit. CITY OF SEBASTIAN FINANCE DEPARTMENT RECEIPT 6123 Name f� -3 E 0 p f, Cash Date q T S 0 c laeheck Uls 3 l Amount Paid 001001 208001 Sales Tax 001001 220000 Security Deposit -Com. Center 001001 220000 Security Deposit -Yacht Club 001501 322900 Garage Sale Permit 001501 329500 Alarm Citation 001501 341920 Copies 001501 351140 Parking Citation 001501 354100 Code Enforcement Fines 001501 342100 Police Security Services 001501 359000 Other Fines /Forfeitures 001501 362100 Rent Royalties/ Com. Center 001501 362100 Rent/Royalties/Yacht Club 001501 362150 Park Rent/Pavilion Iect 001501 369900 Other Miscellaneous Revenue Initials IS `00 Total Paidtt 331 •)-S White Dept. of Origin Yellow Finance Pink Applicant I r cma SL�T HOME OF PELICAN ISLAND City of Sebastian 1225 Main Street Sebastian, Florida 32958 Execution of 1 Addendum to Interlocal Agreement Law Enforcement Agencies St. Lucie Crime Laboratory City Manager City Attorney Agenda No: Department Origin: City Clerld Date Submitted: 10/8/09 For Agenda of: 10/14/09 Exhibits: Original 2003 Interlocal Agreement, Addendum to Remove Paragraph 6 SUMMARY STATEMENT In 2003, the City of Sebastian entered into an interlocal agreement under FS 163.01 with various County and City law enforcement agencies for all agencies to utilize the St. Lucie County Crime Laboratory, and the agreement was signed by former Mayor Walter Barnes. The agreement was amended in 2005 to remove paragraph 6, and Council authorized former Mayor McCollum to execute that addendum. The St. Lucie County Attorney is now requesting new signatures on the addendum. RECOMMENDED ACTION Authorize the Mayor to execute the addendum to interlocal agreement on behalf of the City Council. THIS INTERLOCAL AGREEMENT made thisdia day of hiltAbt) 2001 between the INDIAN RIVER COUNTY SHERIFF; the MARTIN COUNTY SHERIFF; the OKEECHOBEE COUNTY SHERIFF; the ST. LUCIE COUNTY SHERIFF; the CITY OF FELLSMERE, a Florida municipal corporation, the CITY OF FORT PIERCE, a Florida municipal corporation; the TOWN OF INDIAN RIVER SHORES, a Florida municipal corporation; the CITY OF OKEECHOBEE, a Florida municipal corporation; the CITY OF PORT ST. LUCIE, a Florida municipal corporation; the CITY OF SEBASTIAN, a Florida municipal corporation; the TOWN OF SEWALL'S POINT, a Florida municipal corporation; the CITY OF STUART, a Florida municipal corporation; and the CITY OF VERO BEACH, a Florida municipal corporation. WHEREAS, Section 163.01, Florida Statutes, provides that local government units and independent constitutional officers may cooperate by agreement to provide necessary and essential public services, and WHEREAS, the Indian River Crime Laboratory, hereinafter called "Crime Lab" provides assistance to law enforcement agencies operating within the circuit; and, WHEREAS, for a number of years the parties have coordinated the funding, administration and management of the Crime Lab; and, g: \atty \agreemnt \interlaa \sheriff -Crime lab L INTERLOCAL AGREEMENT JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE 3318092 03/0512009 at 01:18 PM OR BOOK 3066 PAGE 674 684 Doc Type: AGR RECORDING: $95.00 F St. Lucie County Sheriff's Office Indian River County Sheriff's Office Martin County Sheriff's Office Okeechobee County Sheriff's Office Vero Beach Police Department Fort Pierce Police Department Sebastian Police Department Sewall's Point Police Department WHEREAS, the parties desire to formally create the Indian River Crime Laboratory Advisory Council (the "Crime Lab Council and establish its responsibilities with regard to the Crime Lab; WHEREAS, the parties further desire to transfer the responsibility for administration and management of the Crime Lab to the St. Lucie County Sheriff, who agrees to assume those responsibilities. NOW, THEREFORE, IN CONSIDERATION of their mutual covenants and promises, the parties agree as follows: 1. GENERAL This Agreement is entered into pursuant to Section 163.01, Florida Statutes, Florida Interlocal Cooperation Act. 2. CREATION OF COUNCIL Pursuant to Section 163.01, Florida Statutes, the parties hereby create and establish the Indian River Crime Laboratory Advisory Council (the "Crime Lab Council composed of the following agencies authorized to vote on matters relating to the operation of the Crime Lab: g \atty \agreemnt \interloc \sheriff crime lob 2 Port St. Lucie Police Department Indian River Shores Public Safety Department Okeechobee Police Department. Stuart Police Department Fellsmere Police Department It is the parties' express intent that the Crime Lab Council shall have sovereign immunity pursuant to the provisions of Section 768.28, Florida Statutes. 3. COUNCIL RESPONSIBILITIES The Crime Lab Council and contributions from the State of Florida shall fund the Crime Lab. The Council members will make contributions to the Crime Lab based on the population of the member agency's jurisdiction and number of submissions. The formula used will be determined by a simple majority vote of the contributing Council members. The Crime Lab Council will meet semi annually. The first meeting will be to review and approve the proposed budget. A second meeting will be held to review the activities of the Crime Lab and receive a briefing by the St. Lucie County Sheriff about the budget status and other pertinent issues facing the Crime Lab and /or its personnel. The Crime Lab Council will have total discretion over expenditures. Upon approval of these budget expenditures, it will be the responsibility of the St. Lucie County Sheriff to manage these funds and make them available to the Crime Lab for operational and capital expenses. g: \atty \agreemnt \interloc \sheriff -crime lab 3 4. ST. LUCIE COUNTY SHERIFF RESPONSIBILITIES The parties acknowledge that the St. Lucie County Sheriff shall administer and manage the day to day operations of the Crime Lab. The St. Lucie County Sheriff shall also manage the finances of the Crime Lab which shall include the preparation of a draft budget for submission to the funding agencies each fiscal year. The St. Lucie County Sheriff shall arrange for an independent audit of the Crime Lab. During the term of this Agreement, all employees of the Crime Lab shall be deemed to be employees of the St. Lucie County Sheriff. 5. TERM The term of this agreement shall begin on the date first above written and shall continue until terminated as set forth in Paragraph 7. 6. INDEMNITY Subject to the provisions of Section 768.28, Florida Statutes, each of the parties individually agrees to indemnify and hold the St. Lucie County Sheriff harmless from and against any actions at law to recover damages in tort for money damages for injury or loss of property, personal injury, or death arising out of this Agreement and caused by the negligent or wrongful act or omission of any of their respective employees while acting within the scope of his office or employment under circumstances in which the party, if a private person, would be liable to the claimant, in accordance with the general laws of the State of Florida. g: \atty \agreemnt \interloc \sheriff -crime Inb 4 Subject to the provisions of Section 768.28, Florida Statutes, the St. Lucie County Sheriff agrees to indemnify and hold the other parties harmless from and against any actions at law to recover damages in tort for money damages for injury or loss of property, personal injury, or death arising out of this Agreement and caused by the negligent or wrongful act or omission of the 5t. Lucie County Sheriff or any employee of the St. Lucie County Sheriff while acting within the scope of his office or employment under circumstances in which the St. Lucie County Sheriff, if a private person, would be liable to the claimant, in accordance with the general laws of the State of Florida. 7. TERMINATION Any of the parties may terminate its participation in the Council and responsibilities under this Agreement upon written notice to the other parties on or before June 1 Such termination shall be effective on October 1s of the year in which the notice is given. All responsibilities and obligations of the party under this Agreement shall terminate at that time. 8. WHOLE AGREEMENT This Agreement embodies the whole understanding of the parties. There are no promises, terms, conditions or obligations other than those contained herein; and this Agreement shall supersede all previous communications, representations, or agreements, either verbal or written, between the parties hereto. g: \atty\agreemnt \interloc\sheriff -crime lab 5 9. AMENDMENTS The Agreement may only be amended by a written document signed by all parties and filed with the Clerks of the Circuit Court of Indian River, Martin, Okeechobee, and St. Lucie Counties, Florida. 10. NOTICES All notices or other communications hereunder shall be in writing and shall be deemed duly given if delivered in person or sent by certified mail, return receipt requested, and addressed as follows: If to St. Lucie County Sheriff: If to Indian River County Sheriff: St. Lucie County Sheriff 4700 West Midway Road Fort Pierce, Florida 34950 -5652 If to Martin County Sheriff: Martin County Sheriff 800 SE Monterey Road Stuart, Florida 34994 If to City of Fellsmere: City Manager 21 5. Cypress Street Fellsmere, Florida 32948 If to Town of Indian River Shores: Town Manager 6001 N. A -1 -A Indian River Shores, Florida 32963 g• \atty \agreemnt \interloc \sheriff -crime lab 6 Indian River County Sheriff 4055 41' Avenue Vero Beach, Florida 32960 -1808 If to Okeechobee County Sheriff: Okeechobee County Sheriff 504 NW Fourth Street Okeechobee, Florida 34972 If to City of Fort Pierce: City Manager P.O. Box 1480 Fort Pierce, Florida 34954 If to City of Okeechobee: City Manager 55 SE 3r Avenue Okeechobee, Florida 34974 If to City of Port St. Lucie: City Manager 121 SW Port St. Lucie Blvd. Port St. Lucie, Florida 34984 If to City of Sebastian: City Manager P.O. Box 780127 1225 Main St. Sebastian, Florida X2970 32958 If to City of Vero Beach: City Manager P.O. Box 1389 Vero Beach, Florida 32961 9 \atty \agreemnt \interloc \sheriff -crime lab 7 If to Town of Sewall's Point: Town Manager 1 5. Sewall's Point Road Sewall's Point, Florida 34996 If to City of Stuart: City Manager 121 SW Flagler Avenue Stuart, Florida 34994 11. FILING This Agreement shall be filed with the Clerks of the Circuit Court of Indian River, Martin, Okeechobee, and St. Lucie Counties, Florida, prior to its effectiveness. IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the dates below written. ST. LUCIE COUNTY ERIFF By: Date: r7-17e3 WITNESSES: WITNESSES: Loi g: \atty \agreemnt \interloc \sheriff -crime lab 8 INDIAN RIVER COUNTY SHERIFF Date: MAR C! NTY s By Date: C 2' 3 OKEECHOBEE COUN SHE By: Date: 6-g 03 TOWN OF FELLSMERE Approved as to Form and Correctness: T W A ATTEST: Clerk g: \atty \agreemnt \interloc \sheriff -crime lab 9 CITY OF FO ERCE By: Date: App By: TOWN OF INDIAN RIVER SHORES ay V Date: e57G -3 Approved as to Form and Correctness: By: CITY OF By: Date: Form and Correctness: City Attorney EECHOBBEE Approved as to Form and d Correctness: By: V� City Attorney Approved with the deletirn of Paragraph 6. ATTEST: ATTEST: Clerk g: \atty \agreemnt \interloc \sheriff -crime lob 10 Mayor Date: Ai 1/Afres7e. .=74 2007 rm and Co rectness: Appro to By: i2 r wig ity Attorney By: Date: App By: TOWN 'S POI A f or own Attorney CITY OF SEBASTIAN By: Wei-1 W Yj a••NW) Mayor Date: g- 2 -D=s City Atto and Correctness: Approve o Fo m and Correctness: B ��L l ATTEST: ii Uo� g: \atty \agreemnt \interloc \sheriff -crime lab 11 By: Date: Approv By: CITY OF VERO BEAC By: Mayor Date: /1(11°3 Approved as to Form and Correctness: By: to Form and C ectness: City Attorney City Attorney IN WITNESS WHEREOF, I have executed this agreement, specifically, Interlocal Agreement and First Addendum Indian River Crime Laboratory, on this 2 -f," day of July, 2009. DERYL LOAR a' SHERIFF INDIAN RIVER COUNTY SHERIFF'S OFFICE DATE: 7/,1441 WITNESSES: THIS FIRST ADDENDUM made this 30 day of %7`i./ 2001, between the INDIAN RIVER COUNTY SHERIFF; the MARTIN COUNTY SHERIFF; the OKEECHOBEE COUNTY SHERIFF; the ST. LUCIE COUNTY SHERIFF; the CITY OF FELLSMERE, a Florida municipal corporation; the CITY OF FORT PIERCE, a Florida municipal corporation; the TOWN OF INDIAN RIVER SHORES, a Florida municipal corporation; the CITY OF OKEECHOBEE, a Florida municipal corporation; the CITY OF PORT ST. LUCIE, a Florida municipal corporation; the CITY OF SEBASTIAN, a Florida municipal corporation; the TOWN OF SEWALL'S POINT, a Florida municipal corporation; the CITY OF STUART, a Florida municipal corporation; and the CITY OF VERO BEACH, a Florida municipal corporation. WHEREAS, Section 163.01, Florida Statutes, provides that local government units and independent constitutional officers may cooperate by agreement to provide necessary and essential public services; and, WHEREAS, the parties have or anticipate entering into an interlocal agreement regarding the operation of the Indian River Crime Laboratory, hereinafter called "Agreement and, WHEREAS, the parties have agreed to delete the indemnification provisions set forth in the Agreement. FIRST ADDENDUM TO INTERLOCAL AGREEMENT g: \atty \agreemnt \interloc\sheriff -crime lab 1 JOSEPH E. SMITH, CLERK OF THE CIRCUIT COURT SAINT LUCIE COUNTY FILE t 3318093 03/06/2009 at 01:18 PM OR BOOK 3066 PAGE 685 699 Doc Type: AGR RECORDING: $129.00 NOW, THEREFORE, IN CONSIDERATION of their mutual covenants and promises, the parties agree as follows 1_ Paragraph '14. Indemnification, of the Agreement is hereby deleted in its entirety. 2. This Addendum shall be filed with the Clerks of the Circuit Court of Indian River, Martin, Okeechobee, and 5t. Lucie Counties, Florida, prior to its effectiveness. IN WITNESS WHEREOF, the parties hereto have executed this Addendum on the dates below written. WI SES: WITNESSES: WITNESSES: g: \atty \agreemnt \interloc\sheriff -crime lab 2 ST. LUCIE COUNTY SH F By: Date: INDIAN RIVER COUNTY SHERIFF By: Date: MARTIN COUNTY SHERIFF By: bete: F® -23 -2005 10:37 FROM:INDIAN RIVER CRIME L 772- 462 -3642 ATTEST: ATTEST: Clerk Clerk g: \atty \interloc \sherif f- crime. inb.addendum.wpd g:\ atty\ agreemnt\interioc \sherlff•crfrne lab 5 By TO:817723001072 P.6'6 CITY OF 5EBA Mayor Date: 3/10/05 Approved as to Form and Correctness: By: L N. t City Attorn CITY OF STUART By: Mayor bate: Approved as to Form and Correctness: By: City Attorney CITY OF VERO BEACH By: Mayor Date: Approved as to Form and Correctness: BY: City Attorney I Subject: Aquatic Weed Control Annual Contract Approved for Submittal by: Agenda No. Department Origin: Public Works Department Head :i•2.2ne-e-‘ Finance Director: City Attorney: /ir City Clerk: 1' A n•r Date Submitted: 10 -06 -09 For Agenda of: 10 -14 -09 Exhibits: Cost estimate from Contractor, copy of contact from DEP EXPENDITURE REQUIRED: As Budgeted AMOUNT BUDGETED: 50,000 APPROPRIATION REQUIRED: As budgeted FUNDING SOURCE: General Fund HOME OF PELICAN ISLAND CITY OF SEBASTIAN AGENDA TRANSMITTAL SUMMARY The Annual Aquatic Weed Control contract expires November 0. In the interest of keeping the canals with a 95% or better vegetation control, we talked to the contractor about the possibility of piggy backing another contract. We are therefore, asking that we be allowed to piggy back the time and materials contract from the Florida Department of Environmental Protection. Although their contract requires considerably more acreage, their requirements for keeping the canals weed free are much more stringent than ours. As you can see from the letter from Applied Aquatics the costs for our areas of concern are close to what we pay now. I have attached a spread sheet of our current costs verses our proposed new costs. We have done business with Applied Aquatics for a number of years and have found them to be exceptionally cooperative when we have complaints from residents or need an occasional ditch sprayed that is not part of the contract. RECOMMENDED ACTION Move to approve a contract with Applied Aquatics based on the piggyback rates from the DEP contract for time and materials Location Frequency current cost proposed cost difference Canals Monthly 2,000.00 1,950.00 (50.00) 65.00 Stonecrop Basin Quarterly 1,350.00 1,415.00 Periwinkle Pond Quarterly 180.00 100.00 (80.00) (550.00) Balboa Ditch Quarterly 1,300.00 750.00 4,830.00 4,215.00 (615.00) Yearly Yearly Decrease $35,320.00 32,525.00 $2,795.00 From: applied aquatic 10/07/2009 08:31 8009 P.001/001 863-533-8882 To: Linda City of Sebastian Fax: 772.228.7077 Date: 10.7.09 From: Jennifer Myers Fax (863) 534 -3322 Office #(863) 533 -8882 or 1- 800 -408 -8882 Subject: Estimate Rate Sheet Comments: Based on you last year of service the rates for the St. John's contract, I came up with the following estimates Monthly Service: $1,950.00 per month Stone Crop Basin: $1,415.00 per treatment Periwinkle Pond: $100.00 per treatment Balboa Ditch: $750.00 per treatment I have also attached the rate sheet for the contract. This contract does have an escalation clause that allows AAM to request a 5% increase annually. This increase is applied for and may or may not be approved. Number of pages including cover: 3 If you have any problems receiving the telecopy, or do not receive the indicated number of pages, please call (863) 533- 8882 or 1- 800 408 -8882. Thank You 11U 14 O f rtsuri— T -801 P002/003 F -044 DEP CONTRACT NO. PL085 AMENDMENT NO. 1 THIS CONTRACT as entered into on the 5 day of May, 2005, between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter referred to as the "Department"), and APPLIED AQUATIC MANAGEMENT, INC. (hereinafter referred to as the "Contractor is hereby amended as follows: In accordance with Paragraph 7.E., which provides for an increase in rates of up to 5% for each year after the initial year of the Contract the Contractor's request to increase rates is approved and effective May 5, 2007, or the execution date of this Amendment, whichever date is later, Attachment D, Fee Schedule, is hereby deleted in its entirety and replaced with Attachment D -1, Revised Fee Schedule, attached hereto and made a part of the Contract. All references in the Contract to Attachment D shall hereinafter refer to Attachment D -1, Revised Fee Schedule. In all other respects, the Contract of which this is an Amendment and attachments relative thereto, shall remain in frill force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment to be duly executed the day and year last written below. APPLIED AQU r C MANAGEMENT, INC. FLORIDA DEPARTMENT OF By; Title: Date: ENVIRONMENTAL PROTECTION Date: DEP4ttomey List of attachment/exhibits included as part of this Contract: Specify Tvpe Letter/Number Description (include number of pages) Attachment D-1 Revised Fee Schedule (1 Page) I(at Ethrid ,DEP Contract Manager �.c 1-1-. �i DEP Contracts A s for Approved as to form and legality: DEP Contract No. PL085, Amendment No. 1, Page 1 of 1 Division of fate Lands or designee #"2 Notes: ATTACHMENT D -1 REVISED FEE SCHEDULE ST. JOHNS RIVER WATER MANAGEMENT DISTRICT SOUTH AREA Unit Price A. Chemical Control (Contractor furnished airboat, spray system and crew) 54.60/Hour B. Snagging 47.25/Hour C. Pushing 47.25/Hour *Adjuvants (drift control, spreading, penetrating agents, etc.) shall be used to optimize herbicide effectiveness and should be figured in the respondent's unit price for herbicide. The DEP reserves the right, at its option, to famish any or all of the herbicides and spray additives in lieu of payment to the Contractor. REMAINDER OF PAGE INTENTIONALLY LEFT BLANK DEP Contract No. PL085, Attachment D -1, Page 1 of 1 1 rozwvies r -oLi4 VolloOrailimassavaMeasftwaspolurOmr wormaftwAftplamoormorvaneftriOerlowsveroir IsMarftwilarogrolarliftrftwollsor September 11, 2008 Mr. P.J. Myers Applied Aquatic Management, Inc. P. 0. Box 1469 Eagle Lake, Florida 33839 -1469 Dear Mr. Myers: Florida Department of Environmental Protection Marjory Stoneman Douglas Building 3900 Commonwealth Boulevard Michael W. Sole Tallahassee, Florida 32399 -3000 Secretary Chapter 2008 -150 Laws of Florida, amended Chapter 369, F.S. to transfer the authority to direct the control, eradication and regulation of aquatic plants and to achieve eradication or maintenance control of invasive plants on public lands in the State of Florida from the Department of Environmental Protection (DEP) to the Horida Fish and Wildlife Conservation Commission (FWCC). Your agreement with DEP (DEP Contract No. PL085) is included in this transfer. Enclosed is a copy of the Assignment Agreement which transfers your agreement to FWCC. Day to day operation of your contract should not be affected. However, if you have any questions, please contact the contract /grant manager identified in your agreement. Sincerely, Ruth Heggen Procurement Administrator RH /db Enclosure "More Protection, Less Process" www.dep.state Jl. us Charlie Crist Governor Jeff Kottkamp Lt. Governor 'FWC Contract No. 08113 ti DEP Agreement No. ADM599 ASSIGNMENT AGREEMENT OF CONTRACT RIGHTS AND RESPONSIBILITIES This Agreement is entered into between the FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION, which is hereinafter referred to as "DEP", and the FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION, which is hereinafter referred to as "FWC and both are hereinafter collectively referred to as the "Agencies WHEREAS, Chapter 2008 -150 Laws of Florida amended Chapter 369, F.S. to transfer to FWC from DEP the authority to direct the control, eradication and regulation of aquatic plants and to achieve eradication or maintenance control of invasive plants on public lands in the State of Florida; and, WHEREAS, the budget, positions, and rate of the Bureau of Invasive Plant Management have been transferred from the Division of State Lands in DEP to the Section of Invasive Plant Management in FWC's Division of Habitat and Species Conservation by the Legislative Budget Commission on June 18, 2008; and, WHEREAS, the rules governing aquatic plant management and control have been transferred from DEP to FWC effective June 27, 2008; and, WHEREAS, DEP is a party to certain contracts that DEP entered into in fulfillment of its responsibilities which have been reassigned to FWC. NOW, THEREFORE, DEP assigns all rights and responsibilities it has under the contracts listed in Exhibit A "the Contracts and any amendments thereto. FWC assumes and agrees to perform all the remaining and executory obligations of DEP under the Contracts and any amendments thereto. The Agencies agree that FWC shall be the primary custodian of all the Contracts, any amendments, and any associated records upon execution of this assignment. DEP agrees to transfer certified copies of all the Contracts and amendments, and copies of associated records to FWC as soon as practicable. IN THE WITNESS WHEREOF, the parties hereto have executed this Assignment Agreement thru their duly authorized signatories on the day and year last written below. FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Date Approved as to form and Legality: DEP ATTORNEY FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION Kenneth D. Haddad Executive Director fik/ o g Date Approved as to form and Legality: 1 Task Assignment Number: Task Assignment Term: Contractor Name: Contractor's Contract Manager: Fundlna Information: 9 Q9dp 13J10 -2800 -000 Q7 13 1 jObject Code 1 1399Q4 Approv s: Applle atic Management, Inc. r •'tract *agar Print name cc: Qwenn Godfrey, Contracts Office (MS93) Contracts Disbursements Section (MS78) TASK ASSIGNMENT NOTIFICATION FORM DEP CONTRACT NO. PLOW 4 Upon Execution to June 30, 2008 Applied Aquatic Management, Inc. Paul Myers (863) 533 -8882 DEP Contract Manager: Kat Ethridge (850) 245 -2819 DEP Site Manager: Ed Harris (407) 275.4004 Task Description: Aquatic plant management within the St. Johns River Water Management District South Area Work shall be conducted pursuant to details stated on the attached work plan pages. All work shall be coordinated with DEP Site Managers. Deliverables: Form 454(s) completed monthly with invoices. Invoicing. Frequency: Monthly, Invoices due by the 20 of each month. With the exception of June's invoice which will be due within a time period set by the Contract Manager. Cost Reimbursement Task Assignment Amount: $568,225.00. JSpec. Cat. ICS+ I Year Amount I 1 030001 1 102334 Iwo 1 2007/20081 5568.225.00 1 1 1 1 1 s i ate Florida Department of Environmental Protection Ce ct Contract M ager ‘610 ij '4iJIL Coat Con er ator Date w, ii .1 of (or designee) r o r of Invasive Plant Management (r designee) Date f State Lands DEP Contract No. PL085, Task Assignment Notification Form, Page 1 of 1 aT St Johns River South!AAM, Buiow Creek Flagler Estimated Cost $800.00 Plants to be Controlled Hydrilla Water hyacinth Water lettuce Hyacinth/Lettuce &her Pius B.Pepper Chinese Tallow Acres to be Controlled 5 30 4 1 $4,500.00 $600.00 $150.00 Control Method(s) Aquathol Super K Reward /2,4 -D Gyphosate/ Reward! 2,4-D, triclopyr Gyphosatel Reward/ 2,4-D, triclopyr Estimated Cost Is based on application only Other Plant Explanation: below. Add locations of boat ramps, other plants, and hydrilla Insert ma of water bod 1 V o2441Ta fh.ti NA: o ;yooarDRka../.40Mtet r Page 1 glen Beach Public Notification Procedures (check those that apply) _Jf Sign posted at access points ,_,Notices in newspapers Public meetings Notices distributed to residents Signal or marker system Other Plants to be Controlled Acres to be Controlled Estimated Cost Control Method(s) Hydrilla 100 $16,000.00 Aquathol K, Aquathol Super K Water hyacinth Water lettuce Hyacinth/Lettuce Other plants Estimated Cost is based on application only Other Plant Explanation: Hydrills control for Boat Trails and Access COti' Water Body: County (les): Public Notification Procedures (check those that apply) X Signs posted at access points Notices b newspapers Public meetings Notices distributed to residents Signal or marker system Other Chi St Johns River South/AAM, Inc. WBC: 2326/ Lake Dexter Volusial Lake Insert ma of•water bod below. Add locations of boat ram s other !ants and h drilla Page 2 acrt intralt(Int C oulity7: 1902 Inter County Johns River South/AAM, Inc. Lake Jessup Seminole Insert map of water body below. wEIC: 23081 ACOkidtg, Intr.-MO*4r Coynty?: Plants to be Controlled Hydrilla Wet& hyacinth Water lettuce Hyacinth/Lettuce 0.14 PIat. Torpedo grass Acres to be Controlled 50 20 Estimated Cost $8,000.00 Add control Method(s) Aquathol K, Aquathol Super K Glyphosate, lmazapyr $2,900.00 Estimated Cost is based on application only Other Plant Explanation: Control! of torpedo grass is attempting to eradicate this species from this part of the river. These are Isolated stands. 1•1111111111••■•••••• locations of boat ramps, other plants, and hydrilla aim Public Notification Procedures (check those that apply) Mips posted at access points __Notices in newspapers Public meetings _Notices distributed to reddents Signal or marker system Other Page 3 10110 inter County Plants to be Controlled Acres to be Controlled Estimated Cost Control Method(s) Hydrilla 400 $60,000.00 Aquathol K Aquathol Super K Water hyadnth Water lettuce Hyacinth/Lettuce citlier Plants Exotic water illy 5 $750.00 2,4-D granular, Glyphosate or Reward Estimated Cost Is based on application only Other Plant Explanation: eradication of invasive exotic water lily 0 Water Bad COUn es St Johns River South/AAM Lake Monroe Seminole Volusia .0:040111g 41 n;rar.giim lmfuniz1.411, W,, ,913i I r 1.....tPato 0111111 4 1:di l iF i Nti -41111L119-1740111"1. VIIIIilViiii II ....imr4:11 mob'glIVAL "I 1111. irdigq11 itkillrIWRIIIRg6 AIHI-71111 112.1.0-47 1 IVIIIIPAIIIIIP Inn 1 ticttli7ir1-,,,,cp_91.}, e:ii f .11111111111gx..i.+ 41 0 *IMII I Public Notification Procedures (check those that apply) _k_Signs posted at access points Noncom in newspapers Public meetings _Notices distributed to residents Signal or marker system Other Page 4 C:n adtr. Water•Ra dy:. Couittg (I s): Plants to be Controlled Hydrllla Water hyacinth Water lettuce Hyacinth/Lettuce ()`Iher Piarits WIId Taro Scirpus cubensis Cattails Acres to be Controlled 50 .200 5 Estimated Cost $10,000.00 $40,000.00 $1,000.00 Control Methodjs) Glyphosate 2,4 -0 Glyphosate 2,4 -0 Glyphosate 2,4 -0 Other Plant Explanation: Wild Taro and Sclrpus cubensis are expanding along the edge of the river. Cattails are establishing around the SR 19 Boat ramp area plus new Infestations Insert map of water body below. Add locations of boat ramps, other plants, and hhydrllia St Johns River Sout AAM, Inc. Palatlakaha River Lake County WBC: 20868 AciFea� s: Infra/tntt3tCQunty Public Notification Procedures (cheek those that apply) X_Slgos posted at access points in newspapers Pubitc meetings Notices distributed to residents Signal or marker system Other Page 5 750 Inter County $65,250.00 $2,200.00 $3,000.00 450 15 20 Reward/2,4-D Glyphosate Glyphosate Plants to be Controlled Hydrilla Water hyacinth Water lettuce Hyadnth/Lettuce Wei-Plante Torpedo grass .Para grass Acres to be Controlled 100 Estimated Cost $16,000.00 Control Method(s) A uathol Super K E Cost Is based an application °nit Other Mart Explanation: Controll of torpedo grass is attempting to eradicate this species from this part of the river. These are Isolated stands. Para grass In Inhibiting navigation in parts of the lake. Ad Insert map of water body below. d locations of boat ramps, other plants, and hyddlia **•-•;i4•1' .1 Page QiC Public Notification Procedures (cheek those that apply) _X Signs posted at access points _plotless in newspapers Public meetings Notices distributed to residents Signal or marker system Other Estimated Cost Plants to be Controlled Hydrilla Water hyacinth Water lettuce Hyacinth/Lettuce Oitig Plint Tussocks Tussocks/Snaggir Pennywort Parrot feather Acres to be Controlled 50 80 20 20 $9,000.00 $0.00 $2,900.00 $2,900.00 Other Plant Explanation: Keep the creeks open. Tussocks and vegetation impact navigation and recreation of these valued creeks. Control Method(s) Reward/2,4-D/Glyphosate Mechanical/shredder Reward/2,4-D/Gyphosate Reward/2,4-D/Glyphosate Ad Insert map of water body elow. d locations of boat ramps, other plants, and hydrIlla 0644,,Rd.owoo Public Notification Procedures (check those that apply) X Signs posted at access points Notices in newspapers Public meetings Notices distributed to residents Signal or marker system Other Page 7 Plants to be Controlled HydriIIa Water hyacinth Water tettuce Hxadnth/Lettuce Oiler Plain's B. Pepper Tallow Taro Paragrass Acres to be Controlled 15 1200 15 5 15 20 Estimated Cost $2,200.00 Control Method(s Aquathol Super K $175,000.00 'Reward /2,4-D amine $2.260.00 $750.00 $2,250.00 $3,000.00 Glyphosate/HabitatJRenavate Gtyphosate/HabitatVRenovate Glyphosate/ 2,4 -D amlrie/ Imazapyr Glyphosate/ 2,4-D amine/ Imazapyr Estimated Cost is based on application only Other Plant Explanation: Isolated stands of Invasive plants accessible from the river that could be eradicated. Hyacinth/lettuce Is for the barrow it Tosohatchee State Preserve ad scent to the river and to back u the USACOE in the river between H Insert ma Isolated stands of inish/a plods, "ape s Itte 1P Trenton elephant ear, Canotwood, .1 's {L><f tYallin pine us accefillir Bronson r Bent the St. Johns River B axdconldbeeradicated. Boas n omoxr •.5 dek! oust a Ocala Sot t Lie'spb to iuo Ustand Bolls o s s ?Bailin IA B r e area Bushntlll praoksvllte Ldu Bade ail x• o New Part tilehoy Union Springs l aketand 4 H ;van Llet liter Tampa (J IA j: s •¢p Detonm. *ifAtksmA e 2000 Obi, Iu.,1Id. mf100) Orlando NCO $t Retinae dttaaknmee Um Page 1 Public Notification Procedures (check those that apply) X Sipes posted at access points Notices in newspapers Public meetings Notices distributed to residents Signal or marker system Other 46 -520. 4Qtitrsttdr. Wr cod St Johns River ouch/ Inc. Tr! let Chain of Lakes Plants to be Controlled H ddlla Water hyacinth Water lettuce Hyacinth/Lettuce Other Plants Acres to be Controlled $4,500,00 30 30 Other Plant Explanation: Estimated Cost is based on application only fa Estimated Cost $4,500.00 Control Methods) Fluridone AS& PR, A uathol Su er K Reward /2,4 -D Insert map of w a r body below. Add locations of boat ramps, other plant$, and hydrilla Public Notification Procedures (check those that apply) X Sign posted at access'polnta Notices in newspapers Public meetings Notices distributed to residents Signal or marker system Other Page 9 ektwa, Ltie Wekiva, Rook S Run Blkwater 5 $3,500 $5,000 5 10,875.00 drilla Water hyacinth Water Lettuce Snagging Qttler Pants Cattails Paragrass Parrot feather Wild Taro Torpedo grass Oth er Plant Ex Catta[ts p aragr rt 5 7 75 35 15 5 15 5 g $10,875.00 $15,000.00 $5,075.00 $2,175.00 $725.00 $2,175.00 $725.00 piing Public Notification Procedures (chuck those that apply) X posted at access points Notices In newspapers Public meetings Notices distributed to residents Signal or marker system Other Glyphosate Glyphosate Glyphosate, 2,4 -D Glyphosate, 2,4-D Glyphosate torpedo grass. Prevent wild taro from spreading Inset map of water body below. Add locations of boat ramps, other plants, and hydriila Page 10 Control Method s) A. uathol K, uathol Su r K Reward/2,4 -D Reward /2,4 -D Mechanical Removal, Hand Removal Attachment A -1 Page f o[ yor deasiktment use only antsto be Controlled Hydrilla Water hyacinth Water lettuce Hya r Plante Torpedo grass p Acres to be Controlled 75 350 10 Taro t 15 ti p Brevard Osceola g Lake Win er Estimated Cost $12,000.00 $51,000.00 $1,500.00 $2,200.00 DeLonry Insert ma of water bod DPIR5035(16) (Revised 2/99) USA; 9000'0DW WBC: 20227 Control Method(s) Aquathoi Super K Reward /2,4 -D Olyphosate Reward /2,4- D /Giyphosate Public Notification Procedures (check those that apply) X_Stgns posted at access points Notices In newspapers Public meetings Notices distributed to residents Signal or marker system Other 1496 Inter Coun Estimated Cost Is based on application only attempting to eradicate these species from thls part of the river. These are below. Add locations of boat ram other !ants and h drilla Tl tC �1 Acres to be Controlled Estimated Cost 365 $5,000.00 Plants to be Controlled Hydrilla Water hyacinth Control Method(s) Aquathol K Aquathol Super K Water lettuce Hyacinth/Lettuce OtherPlant Ex lanation: HydrIlla control for Boat Trails and Access Estimated Cost is based on application Only Insert ma of water bo below. Add °cations of boat ram s other ants and h drilla Public Nottfication Procedures (cheek those that apply) X Signs posted at acme plats _Notices ln newspapers Public meetings °does distrib.uted te residents Signal or lather sygtem Other Page 12 area HOME OF PELICAN ISLAND Subject: 0 -09 -13 Local Vendor Preference A /At, ro d or Submittal by: Agenda No: Oci,t31 Department Origin: City Attorney's Office City Attorney: City Clerk: Date Submitted: 10/7/09 For Agenda of: 10/14/09 Sahti `'.`ager Exhibits: 0 -09 -13 Expenditure Required: Amount Budgeted: Appropriation Required: This agenda item incorporates September 9, 2009: 1. Expanding the Local County, Martin County, Brevard County. 2. Providing a uniform 3. Providing a dispute appealable to the Hold public hearing. At Council's SUMMARY STATEMENT the City Council on County, St. Lucie County and decision determination. 0- 09 -13. the amendments made by Area to include Indian River Okeechobee County, Osceola 5% Local Area preference resolution procedure: City Manager's City Council fora final and binding RECOMMENDED ACTION discretion, move to enact 9� ORDINANCE NO 0 -09 -13 AMENDED AN ORDINANCE OF THE CITY OF SEBASTIAN, FLORIDA, RELATING TO PURCHASING, AMENDING SECTION 2 -11 OF THE CODE OF ORDINANCES, ENTITLED LOCAL VENDOR PREFERENCE, WHICH PROVIDES FOR A LOCAL VENDOR PREFERENCE POLICY; PROVIDING FOR REPEAL OF ORDINANCES OR PARTS OF ORDINANCE IN CONFLICT HEREWITH. PROVIDING FOR SEVERABILITY; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Sebastian City Council finds that it is in the public's interest to provide an incentive for maximizing the successful solicitation of goods from vendors that are located in Indian River County, St. Lucie County, Martin County, Okeechobee County, Osceola County, and Brevard County, Florida (hereinafter referred to as the "Local Area and WHEREAS, the Sebastian City Council finds that City funds spent locally, with local businesses, provide an enhanced economic benefit to the City as a whole since recirculation of those tax dollars in the local economy generates taxable transactions, retains and creates local jobs, increases local profits, and increases procurement of local goods and services; and WHEREAS, this ordinance amends Section 2 -11 of the City Code by providing additional criteria for a local vendor preference policy. NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, AS FOLLOWS: SECTION 1. AMENDING SECTION 2 -11. The City Code of Sebastian, Florida is hereby amended by deleting Section 2 -11 as follows: three percent. SECTION 2. CREATING NEW SECTION 2 -11. The City Code of Sebastian, Florida hereby creates a new Section 2 -11 entitled Local Vendor Preference Policy, which reads as follows: 1 Section 2 -11. Local Vendor Preference Policy. (a) Definitions. (1) Local business means the vendor has: a. A valid business tax receipt issued by the City of Sebastian, Indian River County, St. Lucie County, Martin County, Okeechobee County, Osceola County, or Brevard County at the time a bid or proposal is submitted, and b. A physical address located within the Local Area, in an area zoned for the conduct of such business, from which the vendor is operating a significant portion of its business, and at which it maintains full -time employees. (2) Non -local business means any vendor that does not meet the definition of a business within the Local Area. (b) Establishment as Local Area business. To establish that a vendor is a Local Area business a vendor shall provide written documentation of compliance with the definitions for each such local business as defined in subsection (1) herein, at the time of submitting a bid or proposal. Post office boxes are not verifiable and shall not be used for the purpose of establishing the required physical business address. A vendor that misrepresents the Local Area status of its firm in a proposal or bid submittal to the City will lose the privilege to claim local preference status for a period two (2) years. (c) Local preference in purchasing and contracting. The City of Sebastian shall give preference to Local Area businesses in the purchase of commodities, personal property, general services, personal property, general services, professional services, and the purchase of or contract for construction or renovation of public works or other public improvements by means of competitive bid. The City shall give such preference to Local Area businesses in the following manner: (1) Competitive bid. Each formal competitive bid solicitation shall clearly identify how the price order of the bids received will be evaluated and determined. When a qualified and responsive non -local business submits the lowest price bid, and the lowest bid submitted by a qualified and responsive Local Area business is within five percent (5 of the lowest bid, then the lowest bidding Local Area business shall have the opportunity to submit an offer to match the price submitted by the lowest non -Local Area business bidder. 2 Within five (5) working days after the posting of the qualified and responsive bids, any Local Area business that has submitted a bid within five percent (5 of the lowest bid by a non -Local Area business, and that wants the opportunity to match the lowest bid, shall submit a written offer to match the lowest bid. If the lowest Local Area business bidder submits an offer that matches the lowest bid submitted, then the award shall be made to such Local Area business. If the lowest Local Area business bidder declines or is unable to match the lowest bids, then the option to do so moves to the next Local Area business if its bid is within five percent (5 of the lowest bids, and it is a qualified and responsive bidder. If the lowest bid is submitted by a qualified and responsive Local Area business, there is no local vendor preference. If a Local Area business accepts the opportunity to match the lowest bid of a non -Local Area business and that bid is based on unit -price bid items and estimated quantities, then the unit prices for all bid items shall be reduced in proportion to the reduction in the Local Area business's total bid amount required to match the lowest total bid. (2) Ties. In the event of any tie in the final bid price between a Local Area business, and a non -Local Area business, a contract award, or the first opportunity to negotiate, as applicable, shall be made to the Local Area business. In the event of any tie between a business located within the City of Sebastian and a business within the greater Local Area, the business located within the City of Sebastian shall be awarded the contract or receive the first opportunity to negotiate, as applicable. In the event of any two businesses located within the City of Sebastian, or two businesses located within the greater Local Area, the local vendor with the greatest number of full -time employees working in the City of Sebastian or the greater Local Area respectively, shall be awarded the contract or receive the first opportunity to negotiate as applicable. (d) Exception to local vendor preference policy. The local preference policy set forth herein shall not apply to any of the following purchases or contracts: (1) Goods or services provided under a cooperative purchasing agreement or piggyback agreement; or (2) Purchases or contract which are funded, in whole or pa°t, by a governmental entity and the laws, regulations, or policies governing such funding prohibit application of that preference; or 3 (3) Purchases made or contracts let under emergency or noncompetitive situations, or for litigation related legal services, as described in the City's purchasing policies; or (4) Purchases or contracts with an estimated cost of $5,000 or less; or (5) Purchases or contracts where the difference between the amount of the low bid submitted by a qualified and responsive non -Local Area business and the lowest bid submitted by a qualified and responsive Local Area business is greater than $25,000; or (6) Where all bids are rejected. (e) Waiver of the application for local vendor preference policy. Any request for the waiver of local preference to any particular purchase or contract must be heard by the City Council prior to advertising the bid. The City Council, as the awarding authority, may approve the waiver of local preference upon review and at its discretion. (f) Comparison and review of qualifications. The preferences established herein no way prohibit the right of the City of Sebastian to compare and review the quality of materials proposed for purchase, and to compare and review the qualifications, character, responsibility and fitness of all persons, firms or corporations submitting bids or proposals. Furthermore, the local preference established herein shall not prohibit the City from giving any other preference permitted by law in addition to the local preference contained herein. (g) Administration of local preference policy. This policy shall apply to all departments, functions and funds under the governance of the City of Sebastian, unless subsection (d) applies. (h) Dispute Resolution. Any dispute arising under the provision of this section shall first be presented to the City Manager for determination. The decision of the City Manager shall be appealable to the City Council, and the decision of the City Council shall be final and binding on all parties. SECTION 3. SEVERABILITY. In the event a court of competent jurisdiction shall determine that any part of this Ordinance is invalid or unconstitutional, the remainder of the Ordinance shall not be affected and it shall be presumed that the City Council of the City of Sebastian did not intend to enact such invalid provisions. It shall further be assumed that the City Council would have enacted the remainder of this Ordinance without said invalid or unconstitutional provision, thereby causing said remainder to remain in full force and effect. SECTION 4. EFFECTIVE DATE. This Ordinance shall take effect immediately upon its adoption. 4 The foregoing Ordinance was moved for adoption by Council Member The motion was seconded by Council Member and upon being put to a vote, the vote was as follows: Mayor Richard Gillmor Vice Mayor Jim Hill Council Member Andrea Coy Council Member Dale Simchick Council Member Eugene Wolff The Mayor thereupon declared this Ordinance duly passed and adopted this 14 day of October, 2009. ATTEST: CITY OF SEBASTIAN, FLORIDA By: Sally A. Maio, MMC Richard Gillmor, Mayor City Clerk 5 Approved as to form and legality for reliance by the City of Sebastian: Robert A. Ginsburg, City Attorney Subject: Airport Runway 4/22 Rehabilitation Improvements. Ap rov fo Submittal by: Agenda No. 0 g 132 Department Origi Municipal Airport J. Griffin Finance Dire or: City Clerk: Sally City Attorney: Date Submitted: For Agenda of: K n Kil re Maio Robert Ginsbur_,/� October 7, 2009 October 14, 2009 Al 17 1 n r, City Manager Exhibits: A. FDOT Supplemental C. West Construction Contract; JPA; B. Bid Tabulation/award D. LPA Design/Construction AMOUNT BUDGETED: $403,954 recommendation; Services Contract. APPROPRIATION REQUIRED: $6,152 EXPENDITURE REQUIRED: $6,152 HOME OF PELICAN ISLAND ITTAL SUMMARY On April 1, 2009, Council approved the execution of a FDOT Joint Participating Agreement for the design of Runway 4/22 improvements. The City /Airport match was /is $3,947, the total of which (AP &FDOT) represented 5% of the design project amount. The project was bid and closed on September 7, 2009. The bid amounts were far below original estimates. Low bidder was West Construction of Lake Worth, FL. Because of the anticipated low bid amounts, airport staff, the FAA, and the FDOT decided to combine the project to a design and construction. After Council approval on August 26, 2009, a FAA Airport Improvement Project (AIP) grant agreement for $383,756 was signed on September 14, 2009 that would represent 95% of the total project amount. FDOT and the City's match are still required at 2.5% each. Therefore, 2.5% of the total project amount ($403,954) is $10,099. The City has committed to the April 1 JPA of $3,947, therefore and additional $6,152 is needed to match the FDOT contribution of $6,152 as represented in the Supplemental JPA (Exhibit A). Airport match funding will be drawn from Airport Contingency. The award recommendation and bid tabulation for the project is attached as Exhibit B. The contract engaging West Construction for the project is attached as Exhibit C. Exhibit D is a Design and Construction Services Agreement with LPA Group. The LPA agreement is for $87,289 and represents design/engineering, construction services, agency (FAA FDOT) deliverables, and project closeout. Since we are modifying an airport runway, it is imperative that the controlling agencies have proper documentation relating to survey, construction, and compliance. RECOMMENDED ACTION 1. Move to approve Resolution R -09 -40 authorizing a Supplemental Joint Participation Agreement between the FDOT and the City of Sebastian for Airport Runway 4/22 Improvements. 2. Move to fund, from Airport Contingency, the increase in the `match' participation for the project by $6,152. 3. Move to award West Construction the construction services contract (Exhibit C) for the Runway 4/22 Improvements Project at the Sebastian Municipal Airport, not to exceed $306,956. 4. Move to award the LPA Group the Work Authorization (Exhibit D) for professional services for the Runway 4/22 Improvement Project at the Sebastian Municipal Airport, not to exceed $87,289. RESOLUTION NO. R -09-40 A RESOLUTION OF THE CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE A PUBLIC TRANSPORTATION SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT WITH THE FDOT TO PROVIDE FUNDING FOR RUNWAY 4/22 DESIGN AND CONSTRUCTION, RUNWAY REHAB, LIGHTING AND MARKING; PROVIDING FOR CONFLICT; PROVIDING FOR EFFECTIVE DATE. THIS DOCUMENT CONTAINS TWO (2) PAGES. WHEREAS, the Florida Department of Transportation has agreed to provide funding for Runway 4/22 Design and Construction, Runway Rehab, Lighting Marking at the Sebastian Municipal Airport; and WHEREAS, the City of Sebastian agrees to certain conditions to such funding; NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF SEBASTIAN, as follows: Section 1. AUTHORIZATION. The City Manager is hereby authorized to execute the attached PUBLIC TRANSPORTATION SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT for Project No. 42617219401 on behalf of the City, and is attached hereto. Section 2. CONFLICTS. All resolutions or parts of resolutions in conflict herewith are hereby repealed. Section 3. EFFECTIVE DATE. This resolution shall take effect immediately upon its adoption. The foregoing Resolution was moved for adoption by Council member The motion was seconded by Council member and, upon being put into a vote, the vote was as follows: Mayor Richard H. Gillmor Vice Mayor Jim Hill Council Member Andrea B. Coy Council Member Dale I. Simchick Council Member Eugene Wolff day of October, 2009. ATTEST: Sally A. Maio, MMC City Clerk 2 The Mayor thereupon declared this Resolution duly passed and adopted this 14th CITY OF SEBASTIAN, FLORIDA By: Mayor Richard H. Gillmor Approved as to form and legality for reliance by the City of Sebastian only: Robert A. Ginsburg, City Attorney STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT Number 1 Financial Project No.: 42617219401 (item-segment-phase-sequence) Contract No.: APG81 Catalog of Federal Domestic Assistan Fund: DS Function: 637 Federal No.: DUNS No.: ce Number Catalog of State Fin FLAIR Category: 088719 Object Code: 750004 Org. Code: 55042010428 Vendor No.: VF596000427008 ancial Assistance Number: THIS AGREEMENT, made and entered into this day of by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida, hereinafter referred to as the Department, and City of Sebastian hereinafter referred to as Agency. WITNESSETH: WHEREAS, the Department and the Agency heretofore on the 15th day of April ,2009 entered into a Joint Participation Agreement; and WHEREAS, the Agency desires to accomplish certain project items as outlined in the Attachment "A" appended hereto; and WHEREAS, the Department desires to participate in all eligible items for this project as outlined in Attachment "A" for a total Department Share of $10,099.00 NOW, THEREFORE THIS INDENTURE WITNESSETH: that for and in consideration of the mutual benefits to flow from each to the other, the parties hereto agree that the above described Joint Participation Agreement is to be amended and supplemented as follows: 1.00 Project Description: The project description is amended to include Construction. 725-030-07 PUBLIC TRANSPORTATION 04/07 Page 1 of 4 2.00 Project Cost: Paragraph 3.00 of said Agreement is increased by bringing the revised total cost of the project to 403,954.00 Paragraph 4.00 of said Agreement is increased by $6,152.00 bringing the Department's revised total cost of the project to 10,099.00 3.00 Amended Exhibits: Exhibit(s) B,D of said Agreement is amended by Attachment "A 4.00 Contract Time: Paragraph 18.00 of said Agreement N/A $246,074.00 725 -030-07 PUBLIC TRANSPORTATION 04/07 Page 2 0f 4 Except as hereby modified, amended or changed, all other terms of said Agreement dated April 15th 2009 and any subsequent supplements above written. AGENCY IN WITNESS WHEREOF, City of Sebastian AGENCY NAME SIGNATORY (PRINTED OR TYPED) SIGNATURE TITLE shall remain in full force and effect. the parties hereto have caused these presents to be executed, the day and year first FDOT Financial Project No. 42617219401 Contract No. APG81 Agreement Date See attached Encumbrance Form for date of Funding Approval by Comptroller LEGAL REVIEW DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION Director of Transportation Development TITLE 725-030-07 PUBLIC TRANSPORTATION 04/07 Page 3 of 4 This Attachment forms an integral part of that certain Supplemental Joint Participation Agreement between the State of Florida, Department of Transportation and City of Sebastian dated DESCRIPTION OF SUPPLEMENT (Include justification for cost change): State funding is increased to match the additional FAA funds awarded for the construction phase of the project. 1. Project Cost: As Approved As Amended Net $157,880.00 $403,954.00 $246,074.00 Total Project Cost $157,880.00 $403,954.00 $246,074.00 Comments: Financial Project No. 42617219401 Contract No. APG81 Agreement Date ATTACHMENT "A" SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT 725-030 -07 PUBLIC TRANSPORTATION 04/07 Page 4 of 4 Fund As Approved As Amended Net Department: $3,947.00 $10,099.00 $6,152.00 Agency: $3,947.00 $10,099.00 $6,152.00 FAA $149,986.00 $383,756.00 $233,770.00 Total Project Cost $157,880.00 $403,954.00 $246,074.00 III. MULTI -YEAR OR DEFERRED REIMBURSEMENT PROJECT FUNDING 725-030-07 PUBLIC TRANSPORTATION 04/07 Additional Page If a project is a multi -year or prequalified project subject to paragraphs 4.10 and 17.20 of this agreement, funds are programmed in the Department's Work program in the following fiscal year(s): FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 FY $0.00 Project years may be advanced or deferred subject to Legislative appropriation or availabity of funds. LPA THE LPA GROUP INCORPORATED Transportation Consultants 615 CRESCENT EXECUTIVE COURT, SUITE 200 LAKE MARY, FL 32746 -2146 407 306 -0200 FAX 407 306-0460 September 7, 2009 Mr. Joe Griffin Airport Manager City of Sebastian 202 Airport Drive East Sebastian, Florida 32958 Subject: Sebastian Municipal Airport Runway 4 -22 Improvements Bid Tabulation, Review and Recommendation Dear Mr. Griffin: As requested, THE LPA GROUP INCORPORATED has reviewed the unit prices for the Eight (8) bid packages submitted September 7, 2009 for the referenced project. The bid prices and totals are listed in the attached bid tab. The bid prices are determined to be appropriate for the work. Enclosed, please fmd one (1) signed and sealed originals of the Bid Tabulation. The bids were evaluated by our office for responsiveness to the advertisement. The bid schedule forms submitted by each were evaluated in the attached bid tabulation. West Construction, Inc. provided the lowest base bid at $291,812.00 for the base bid and $15,144.00 for additive bid 1 for a total bid of $306,956.00. Listed below are additional details: West Construction, Inc. operates out of Lake Worth, Florida and has been in business for 32 years. They have a $25 M single project bonding capacity. H.L. Pruitt Corporation is the subcontractor for the electrical services A signed bid, acknowledged addenda, and fully completed forms all accompanied the bid at the time of submittal. It is therefore the opinion of the Engineer that this bid is responsive. The price for additive bid 1 is reasonable, therefore if funding is available, and if the scope meets the intent of the grant, LPA recommends awarding additive bid. Based on the aforementioned evaluation, THE LPA GROUP INCORPORATED recommends a construction contract be awarded to the low bidder, West Construction, Inc. Based on the availability of funds, information provided by the Federal Aviation Administration (FAA) and the City of Sebastian, we recommend the award of the Base Bid contract to West Construction, Inc. for $291,812.00, contingent upon City of Sebastian Contracts, Legal and Minority Affairs review. ATLANTA BATON ROUGE CHARLOTTE COLUMBIA GREENSBORO JACKSONVILLE KENNESAW KNOXVILLE LITTLE ROCK McLEAN MOBILE NASHVILLE OCEAN SPRINGS ORLANDO RALEIGH SARASOTA TALLAHASSEE TAMPA WEST PALM BEACH 1 1 8 8 8 a t ime 111 8 8 1 1 1 1. 8 If 5 a 9 1 8 8 9 8 6 8 Fr 1 1 5 8 8 8 8 8 0 8 8 8 5 s 8 8 8 r a r 8 8 8 2 5 5 A 8 8 8 t 8 x 8 x 8 8 5 8 5 8 8 8 1 8 8 8 8 8 E 8 8 8 8 8 8 8 8 8 0 8 8 8 L. G 8 G 8 1 8 8 8 8 8 Q 8 8 8 5 G 8 G 8 9 5 u 8 r 8 s 5 8 8 8 8 8 a 8 s 8 8 8 1 8 8 8 8 8 a A 8 8 8 8 8 8 8 5 8 8 5 A 8 8 8 s A 8 8 8 s 8 a 8 1 8 1 8 8 5 8 8 8 5 8 1 8 8 5 8 8 8 8 8 8 a 8 g 8 a 8 8 8 5 8 8 8 Y 8 8 F 8 8 8 8 8 u 8 5 8 s s A 8 8 8 8 8 8 8 8 8 8 5 8 8 a 8 n 8 S 5 8 x a 8 5 8 8 8 a 8 8 8 2 8 a 8 �i 8 i �f 11 �i It li 1 1 1 1 1 1 1 1 E- 5, 5 s M 8 8 3 Ef F 3w se a 8 qUllf WWI I IF 11 1 1 7 8 8 2 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 Y 8 8 8 8 A 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 a§ of F! B� 11 8 1 i a a VII fil I II r \k 1" k I; 1 8 |A t 6i i i �R evil; Re 1! I Ii v R V 1 :fi b/ iilh {ijU i' 2 i 8 i i M WE! p, i t 08412x42 W 098b 01amm4 g Flnuet pW FM 8Redtxwm I n0.41 1 4124.0 ..noel. AlMnr4Yn, 1 .9., Mbar. fl*, sld L8 1 eb.IwlnpMM tit p1ex. Remonl W •8140np tax can Mleblbd In earth, eampW. Intllbf efranw0, Iwpoul of bus EA b 1- 1284.7 ntl Meuwn el edge bit 044 8.8, e4$ 12 0284.242, bwr and We. fpd904M. ply l9repl.8 I 000 I. 5.8.1� 1 5208008.0. 8 k,/ 8888 g88 q 31,120.0 $112.00 8i k k $1,120.0 11.344.0 8888 2 0 $2,n$.0M0 $90.7300 P k :l? 8 12,17800 11.019.00 traders Inc. hrl...au 014.1r..c.8o) 1314073 f 88 2 7 8 k G 32,710.0 li kk 4 k k $2,11000 $1.332.00 albs Co. Me. 7.41.r.rt 0.bnc.lq 1 5322.31600 ttttl snag b 8 1113.50 k!/ 2|| 8 8\ $2.00300 81.00200 Vi Merida. Inc. 1404.72423 LIT �■8 s8 j 32,45500 1144.89 1 88 Bryant 1 01.8.2.0.40 ttEt k 8 .8 8 $0,455.00 11,735.92 AexdWee. $0100.x1 Mmes 'I *219,413.0 sant 7 kf t§ 1 8 8 x„ 8110.00 7 ;2 2 ƒ 8 8 11.320.0 7.W Am* lowr.C.. 0000 0000. 3380.415.0 :2 8 31 00.00 810000 }f 8 r_:. 11000.00 11,200.00 Op Calumny b. 7.4.0.84. ate.) I 5404.259 .90 8888 4 i88 g 8 $1, 119.10 F 7| 8 8 8 8 $1.200.00 1949.20 Abn 4.2489080, Me. M Ca 01.4.0.80) CONSTRUCTION SERVICES AGREEMENT THIS AGREEMENT made this day of 2009, by and between the CITY OF SEBASTIAN, a municipal corporation of the State of Florida, 1225 Main Street, Sebastian, Florida, 32958, "City and West Construction, Inc. "Contractor. 318 S. Dixie, Suite 4 -5, Lake Worth, FL 33460, as authorized to do business in the State of Florida. This document contains 37 pages. WHEREAS, the City desires to engage a Florida licensed contractor who has special and unique competence and experience in providing construction services necessary to complete the Project hereunder; and, WHEREAS, the Contractor represents that it has such competence and experience in providing these services; and, WHEREAS, the City in reliance on such representation has selected the Contractor in accordance with its procedure for selection of Contractor; and, WHEREAS, the City and the Contractor desire to reduce to writing their understanding and agreements on such professional services. IT IS, THEREFORE, AGREED as follows: ARTICLE I The Contractual Relationship 1.0 EMPLOYMENT OF CONTRACTOR The City hereby agrees that it may engage the Contractor and the Contractor hereby agrees to perform professional services for the City in accordance with this Agreement. Contractor, as an independent contractor, and not as an employee shall furnish and complete all of the necessary labor, material, and equipment to perform the work as specified or indicated in the agreement documents. The work is generally described in the Bid Documents Project Manual (August 2009), Engineers' Report (August 2009) and Addendum 1 (September 2009) for the Runway 4- 22 Improvements Project at the Sebastian Municipal Airport. This Agreement is not an exclusive agreement and the City may employ other contractors, professional or technical personnel to furnish services for the City as the City in its sole discretion finds is in the public interest. 1 The Agreement shall not be construed to create a contractual relationship of any kind between the City and the Subcontractor(s), or, between any person or firm other than the City and Contractor. The Contractor shall not sell, transfer, assign or otherwise dispose of the Contract or any portion thereof, or of his right, title of interest therein or his obligations thereunder, or moneys due or to become due under this Contract. 2.0 AGREEMENT DOCUMENTS The Agreement Documents (also called CONTRACT DOCUMENTS) consist of this Agreement, Supplemental Agreement(s), Notice of Invitation to Bid, Instructions for Bidders., Bid Proposal, Bond Forms, Specifications and Scope of Work, Work Orders, Change Orders., Addenda if any, any other documents listed in the Agreement Documents, and written modifications issued after execution of this Agreement, if any. 2.1 INTENT The Specifications are an integrated part of the Contract Documents and as such will not stand alone if used independently. The Specifications establish minimum standards of quality for this Project. They do not purport to cover all details entering into the design and construction of materials or equipment. The intent of the Agreement Documents is to set forth requirements of performance, type of equipment and structures, and standards of materials and construction. It is also intended to include all labor and materials, equipment, and transportation necessary for the proper execution of the Work, to require new material and equipment unless otherwise indicated, and to require complete performance of the Work in spite of omission of specific reference to any minor component part and to include all items necessary for the proper execution and completion of the Work by the Contractor. Performance by the Contractor shall be required only to the extent consistent with the Agreement Documents and reasonably inferable from them as being necessary to produce the intended results. 2.2 ENTIRE AND SOLE AGREEMENT Except as specifically stated herein, the Agreement Documents constitute the entire agreement between the parties and supersede all other agreements, representations, warranties, statements, promises, and understandings not specifically set forth in the Agreement Documents. Neither party has in any way relied, nor shall in any way rely, upon any oral or written agreements, representations, warranties, statements, promises or understandings not specifically set forth in the Agreement Documents. 2.3 AMENDMENTS The parties may modify this Agreement at any time by written agreement. Neither the Agreement Documents nor any term thereof may be changed, waived, discharged or terminated orally, except by an instrument in writing signed by the party against which enforcement of the change, waiver, discharge or termination is sought. 2 2.4 CONSTRUING TERMS This Agreement shall not be construed against the party who drafted the same, as both parties have obtained experts of their choosing to review the legal and business adequacy of the same. 2.5 GOVERNING LAW AND WAIVER OF TRIAL BY JURY This Agreement shall be governed by the laws of the State of Florida, and any venue for any action pursuant to the Agreement Documents shall be in Indian River County, Florida. The parties hereto expressly waive trial by jury in any action to enforce or otherwise resolve any dispute arising hereunder. 2.6 CONTRACT TIME: (1) The CONTRACTOR shall be substantially completed with the following timeframe (a) Within 30 calendar days from effective date of Notice to Proceed, Contractor shall complete the following tasks: 1. Obtain all necessary permits. 2. Receive approved shop drawings for all materials and equipment to be utilized in the job. 3. Perform all photographic recording and documentation of conditions prior to construction. 4. Locate all existing utilities in the area of work. 5. Submit and secure approval of shop drawings. 6. Mobilize all labor, equipment, and materials. 7. Deliver and store all equipment and materials to the job site. 8. Notify all utilities and other affected parties prior to initiating construction. From 31 calendar days to 90 calendar days from the effective date of Notice to Proceed, the CONTRACTOR shall complete the following tasks: 1. Install all roadway, paving, grading, utility, drainage, landscape, and other improvements. 2. Perform all testing. 3. Restore all disturbed areas to their pre construction condition. 4. Correct all deficiencies noted by Engineer. Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial Completion. (c) From 91 calendar days to 130 calendar days from the effective date of Notice to Proceed, the CONTRACTOR shall complete the following tasks: 1. Clean up project area. 2. Remove all equipment and material from project site. 3. Perform contract closeout procedures. Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final Completion. (2) Liquidated Damages. OWNER and CONTRACTOR recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the work is not completed (b) 3 within the times specified in Paragraph (1) above, plus any extensions thereof Approved by the engineer and city in accordance with paragraphs 7.9 and 7.10 of this agreement. They also recognize the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by OWNER if the work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER two- hundred dollars ($200.00) for each day that expires after the time specified in Paragraph 2.6 for Final Completion. If CONTRACTOR shall neglect, refuse or fail to complete the remaining work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER two- hundred dollars ($200.00) for each day that expires after the time specified in Paragraph 2.6 for Final Completion and readiness for final payment. 2.7 CONTRACT PRICE OWNER shall pay CONTRACTOR for completion of the work in accordance with the Contract Documents in current funds in the amount of $306,956, based on the Unit Price Work bid in the Bid Form. This amount includes Additives 1, 2, 3, and 4. 2.8 UNIT PRICE WORK (A) Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. (B) The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by Engineer. Subject to the following provisions: Engineer will determine the actual quantities and classifications of Unit Price Work performed by Contractor. Engineer will review with Contractor the Engineer's preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). Engineer's written decision thereon will be final and binding (except as modified by Engineer to reflect changed factual conditions or more accurate data) upon Owner and Contractor (C) Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. (D) Owner or contractor may make a Claim for an adjustment in the Contract Price in accordance with paragraph 7.9, if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement and; 2. there is no corresponding adjustment with respect any other item of Work; and 4 3. Contractor believes that Contractor is entitled to an increase in Contract Price as a result of having incurred additional expense or Owner believes that Owner is entitled to decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease. 3.0 DEFINITION OF TERMS 3.1 GENERAL Whenever the following terms appear in these Agreement Documents, their intent and meaning shall, unless specifically stated otherwise, be interpreted as shown. 3.2 ACT OF GOD The words "Act of God" mean an earthquake, flood, hurricane (or other named tropical event), tornado or other cataclysmic phenomenon of nature. Rain, Wind or other natural phenomenon (including tropical waves and depressions) of normal intensity for the locality shall not be construed as an Act of God 3.3 ADDENDUM (re: bid documents) A modification of the plans or other contract documents issued by the Owner and distributed to prospective bidders prior to the opening of bids. All Addenda shall be considered as part of the Contract Documents. 3.4 AGREEMENT A written agreement between the Contractor and Owner defining in detail the work to be performed. The words Agreement and Contract, are one and the same. 3.5 A.S.T.M. DESIGNATION Wherever the letters A.S.T.M." are used in the Specifications, it shall be understood as referring to the American Society for Testing Materials. When reference is made to a certain Designated Number of a specification or test as set out or given by the American Society for Testing Materials, it shall be understood to mean the current, up -to -date standard specification or tentative specification for that particular process, material or test as currently published by that group. 3.6 BID The bid or proposal is the written offer of a Bidder to perform work described by the contract documents when made out and submitted on the prescribed proposal form properly sealed and guaranteed. The bid or proposal shall be considered as part of the Contract Documents. 3.7 BID BOND or PROPOSAL GUARANTEE: Bidder shall submit a Bid Bond or Proposal Guarantee in the amount of 5% of the total amount of the Bid, in the form of a Cashier's Check, Unconditional Irrevocable Letter of Credit drawn in favor of the City of Sebastian on a National Bank, or a bond from a surety company daly licensed in the State of Florida. 5 3.8 BIDDER An individual, partnership, or corporation submitting a proposal for the work contemplated; acting directly or through a duly authorized representative. 3.9 CHANGE ORDER A written order issued to the Contractor by the City and covering changes in the plans, specifications, or scope of work when the amount of work changed is not deemed sufficient to require a supplemental agreement, or adjustments in the Contract Price or Contract Time. 3.10 CONTRACT ADDENDUM A special written provision modifying or clarifying the terms and conditions of the Contract. The Contract Addendum shall be considered as part of the contract documents. 3.11 CONTRACTOR The word "Contractor" shall mean an individual, partnership, or corporation, and his, their or its heirs, executors, administrators, successors and assigns, or the lawful agent of any such individual, firm, partnership, covenant or corporation, or his, their or its surety under any contract bond, constituting one of the principals to the Contract and undertaking to perform the work herein. 3.12 DIRECTED, ORDERED, APPROVED ETC. Wherever in the Agreement Document the words "directed "ordered "approved "permitted "acceptable or words of similar import are used, it shall be understood that the direction, order, approval or acceptance of the Owner is intended unless otherwise stated. 3.13 ENGINEER A Professional Engineer duly licensed and registered in the State of Florida and designated by the City as Engineer. The City may designate a staff member as Engineer who is not licensed. 3.14 GENERAL CONDITIONS The directions, provisions and requirements contained within the Agreement Documents, all describing the general manner of performing the Work including detailed technical requirements relative to labor, material equipment, and methods by which the Work is to be performed and prescribing the relationship between the City and the Contractor. 3.15 INSPECTOR A duly authorized representative of the City assigned to make official inspections of the materials furnished and of the work performed by the Contractor. The Engineer and its designated employee(s) shall serve in the capacity as the inspector. 6 3.16 LABORATORY Any licensed and qualified laboratory designated by or acceptable to the Owner to perform necessary testing of materials. 3.17 OWNER City of Sebastian 3.18 PERFORMANCE AND PAYMENT BONDS Contractor shall submit bonds in the form prescribed by State Law, and generally as shown on sample forms herein, for Performance and Payment, each in the amount of 100% of the Contract Amount. 3.19 PLANS The official, approved plans, including reproduction thereof, showing the location, character, dimensions and details of the work to be done. All shop drawings submitted by the Contractor shall be considered as part of the contract documents. 3.20 PROPOSAL The proposal or bid is the written offer of a Bidder to perform the work described by the Contract Documents when made out and submitted on the prescribed proposal form (the "Bid proposal form properly signed and guaranteed. The proposal or bid shall be considered as part of the contract documents. 3.21 SPECIAL CONDITIONS Special clauses or provisions, supplemental to the Plans, Standard Specifications and other contract documents, setting forth conditions varying from or additional to the Standard Specifications for a specific project. 3.22 SPECIFICATIONS The directions, provisions, and requirements together with all written agreements made or to be made, setting forth or relating to the method and manner of performing the Work, or to the quantities and qualities of materials, labor and equipment to be furnished under the Agreement. 3.23 SUBCONTRACTOR An individual, partnership or corporation supplying labor, equipment or materials under a direct contract with the contractor for work on the project site. Included is the one who supplies materials fabricated or formulated to a special design according to the plans and specifications for the particular project. 3.24 SUPPLEMENTAL AGREEMENT A written understanding, or proposal and acceptance, executed between the City and the Contractor subsequent to execution of the Agreement herein with the written consent of the Contractor's Surety, relating to the work covered by the Agreement and clarifying or furthering the terms thereof. A modification to the Agreement shall be made by Contract Addendum. 7 3.25 SURETY Surety is a corporation qualified to act as surety under the laws of Florida, who executes the Contractor's Performance and Payment Bonds and is bound with the Contractor for the acceptable performance of the contracted work and for the payment of all debts pertaining thereto. 3.26 WORK, (The) or PROJECT, (The) The public improvement contemplated in the Plans and Specifications, and all actions necessary to construct the same. 3.27 WORK ORDER Work orders are work instructions including specification and plans that show the location, character, dimensions and details to the work to be done. Work orders are specific instructions, of limited scope, that will be a part of this contract. Work orders shall be considered as part of the contract documents. ARTICLE II Performance 4.0 PLANS, SPECIFICATIONS AND RELATED DATA 4.1 INTENT OF PLANS AND SPECIFICATIONS The intent of the Plans, Specifications, Work Orders and other Contract Documents is that the Contractor furnishes all labor and materials, equipment, supervision and transportation necessary for the proper execution of the Work unless specifically noted otherwise. The Contractor shall do all the work shown on the Plans and described in the Specifications and other Contract Documents and all incidental work considered necessary to substantially complete the Work ready for use, occupancy, or operation in a manner acceptable to the City. 4.2 CONFLICT In the event of any inconsistency, discrepancy or conflict between the Agreement, the Plans, Specifications, and other Contract Documents, the Agreement shall prevail and govern over all except a subsequently executed Contract Addendum; in the event of an inconsistency, discrepancy or conflict between the Plans and Specifications, the Specifications shall prevail and govern. 4.3 DISCREPANCIES IN PLANS Any discrepancies found between the Plans and Specifications and site conditions, or any errors or omissions in the Plans or Specifications, shall be immediately reported to the Engineer and City. The Engineer shall promptly determine the validity and seriousnes of the claimed condition and correct any such error or omission in writing, or otherwise direct Contractor. Any work done by the Contractor after his discovery of such discrepancies, errors or omissions shall be done at the Contractor's risk. 8 Any correction or errors or omissions in Plans and Specifications may be made by the Engineer when such correction is necessary for the proper fulfillment of their intention as construed by him. Where said correction of errors or omissions, except as provided in the next two (2) paragraphs below, adds to the amount of work to be done by the Contractor, compensation for said additional work shall be made under the Paragraph 10.7 CHANGES IN THE WORK below, except where the additional work may be classed under some item of work for which a unit price is included in the proposal. The fact that specific mention of any part of work is omitted in the Specifications, whether intentionally or otherwise, when the same is clearly shown or indicated on the Plans, or is usually and customarily required to complete fully such work as is specified herein, will not entitle the Contractor to consideration in the matter of any claim for extra compensation, but the said work must be installed or done the same as if called for by both the Plans and Specifications. All work indicated on the Plans and not mentioned in the Specifications or vice versa, and all work and material usual and necessary to make the Work complete in all its parts, whether or not they are indicated on the Plans or mentioned in the Specifications, shall be furnished and executed the same as if they were called for by both the Plans and Specifications. The Contractor will not be allowed to take advantage of any errors or omissions in the Plans and Specifications. The Engineer will provide full information when errors or omissions are discovered. 4.4 DRAWINGS AND SPECIFICATIONS AT JOB SITE One (1) complete set of all Plans, Specifications, Work Orders, Addenda, Change Orders, Shop Drawings and samples shall be maintained at the job site, in good order and annotated to show all changes made during the construction process, and shall be available to the Engineer and City at all times. A final copy thereof, along with "as- built" record drawings, operations and maintenance manuals, and data sheets, shall be delivered to the Engineer upon the completion of the Work. 4.5 DIMENSIONS Dimensions shown on the Plans will be used. Where the work of the Contractor is affected by finished dimensions, these shall be verified by the Contractor at site, and he shall assume the responsibility for their use. 4.6 SAMPLING AND TESTING Except as otherwise provided, sampling and testing of all materials, and the laboratory methods and testing equipment, required under the Specifications shall be in accordance with the latest standards or tenets of the American Society for Testing Materials. The testing of samples and materials shall be made at the expense of the Contractor, except where indicated otherwise. The Contractor shall furnish any required samples without charge. The Contractor shall be given sufficient notification of the placing of orders for materials to permit testing. 9 It is expected that all inspections and testing of materials and equipment will be done locally. If the Contractor desires that inspections for tests be made outside of the local area, all additional expenses, including per diem for the Engineer or Inspectors, shall be borne by the Contractor. 4.7 SHOP DRAWINGS The Contractor shall provide shop drawings, setting schedules and other drawings as may be necessary for the prosecution of the Work in the shop and in the field as required by the Plans and Specifications or Engineer's instructions. Deviations from the Plans and Specifications shall be called to the attention of the Engineer at the time of the first submission of shop drawings and other drawings. The Engineer's approval of any shop drawings shall not release the Contractor from responsibility for errors, corrections of details, or conformance with the Contract. Shop drawings shall be submitted according to the following schedule: (a) Seven (7) copies shall be submitted to the Engineer at least thirty (30) days before the materials indicated thereon are to be needed or earlier if required to prevent delay of work or to comply with subparagraph (b). (b) The Engineer shall, within fourteen (14) days of the submittal of any shop drawings, return three (3) copies to the Contractor marked with any corrections and changes required and noting if the drawings are acceptable as noted, or if resubmittal is required. (c) The Contractor shall then correct the shop drawings to conform to the corrections and changes requested by the Engineer and resubmit six (6) copies to the Engineer. (d) Three (3) copies of Approved Shop Drawings shall be returned to the Contractor by the Engineer. 4.8 QUALITY OF EQUIPMENT AND MATERIALS In order to establish standards of quality, the Specifications may refer to certain products by name and catalog number. This procedure is not to be construed as eliminating from competition other products of equal or better quality by other manufacturers where fully suitable in design. The Contractor shall furnish to the Engineer a complete list of his proposed desired substitutions prior to the signing of the Contract, together with such engineering and catalog data as the Engineer may require. Further substitutions may be submitted during the course of work in accordance with Paragraph 4.10 SUBSTITUTION OF EQUIPMENT AND /OR MATERIAL below. The Contractor shall abide by the Engineer's judgment when proposed substitution of materials or items or equipment are judged to be unacceptable and shall furnish the specified material or item of equipment in such case. All proposals for substitutions shall be submitted to the Engineer in writing by the Contractor and not by individual trades or material suppliers. The Engineer will advise of approval or disapproval of proposed substitutions in writing within a reasonable time. No substitute materials shall be used unless approved by Engineer in writing 10 4.9 EQUIPMENT APPROVAL DATA The Contractor shall furnish one (1) copy of complete catalog data for every manufactured item of equipment and all components to be used in the Work, including specific performance data, material description, rating, capacity, material gauge or thickness, brand name, catalog number and general type. This submission shall be compiled by the Contractor and submitted to the Engineer for review and written approval by the Engineer and City before any of the equipment is ordered. Each data sheet or catalog in the submission shall be indexed according to specification section and paragraph for easy reference. After written approval is received by the Contractor, submission shall become a part of the Contract and may not be deviated from except upon written approval of the Engineer and City. Catalog data for equipment approved by the Engineer and City does not in any case supersede the Contract Documents. The acceptance by the Engineer and City shall not relieve the Contractor from responsibility for deviations from Plans or Specifications, unless he has called the Engineer's attention, in writing, to such deviations at the time of submission, nor shall it relieve him from responsibility for errors of any sort in the items submitted. The Contractor shall check the work described by the catalog data with the Contract Documents for deviations and errors. It shall be the responsibility of the Contractor to insure that items to be furnished fit the space available. He shall make necessary field measurements to ascertain space requirements, including those for connections, and shall order such sizes and shapes of equipment that the field installation shall suit the true intent and meaning of the Plans and Specifications. Where equipment requiring different arrangement of connections from those shown is approved, it shall be the responsibility of the Contractor to install the equipment to operate properly, and in harmony with the intent of the Plans and Specifications, and to make all changes in the Work required by the different arrangement of connections at his own expense. 4.10 SUBSTITUTION OF EQUIPMENT AND /OR MATERIAL After the execution of the Contract Agreement, the substitution of equipment and/or material for that specified will be considered if: (a) The equipment and/or materials proposed for substitution is determined by the Engineer to be equal or superior to that specified in the Contract; (b) Unless determined to be of superior quality, the equipment and/or material proposed for substitution is less expensive than that specified and that such savings to the City, as proposed by the Contractor, are submitted with the request for substitution. If the substitution is approved, the Contract price shall be reduced accordingly; and (c) The equipment and/or material proposed for substitution is readily available and its delivery and use, if approved as a substitution, will not delay the scheduled start and completion of the specified work for which it is intended or the scheduled completion of the entire work to be completed under the contract. 11 No request will be considered unless submitted in writing to the Engineer and approval by the Engineer and City must also be in writing. To receive consideration, requests for substitutions must be accompanied by documentary proof of the actual difference in cost to the Contractor in the form of quotations to the contractor covering the original equipment and/or material, and also equipment and/or material proposed for substitution or other proof satisfactory to the Engineer. It is the intention that the City shall receive the full benefit of the saving in cost involved in any substitution unless the item is substituted for one designated in the Specifications by specific manufacturer's name and type, in which case one -third of the savings shall accrue to the benefit of the Contractor. In all cases, the burden of proving adequate proof that the equipment and/or material offered for substitution is equal or superior in construction and/or efficiency to that named in the Contract shall rest on the Contractor and the proof will be submitted to the Engineer. Request for substitution of equipment and/or material which the Contractor cannot prove to the satisfaction of the Engineer, at its sole discretion and judgment, to be equal or superior in construction and/or efficiency to that named in the Contract will not be approved. 5.0 MATERIALS AND WORKMANSHIP 5.1 MATERIALS FURNISHED BY THE CONTRACTOR All materials and equipment used in the Work shall meet the requirements of the respective Specifications, and shall not be used until it has been approved in writing by the Engineer. Wherever the specifications call for an item of material or equipment by a manufacturer's name and type, and additional features of the item are specifically required by the specifications, the additional features specified shall be provided whether or not they are normally included in the standard manufacturer's item listed. Wherever the specifications call for an item of material or equipment by a manufacturer's name and type, and the specified item becomes obsolete and is no longer available, the Contractor shall provide a substitute item of equal quality and performance which is acceptable to the Engineer and City and is currently available, at no increase in Contract price. 5.2 STORAGE OF MATERIALS Materials and equipment shall be stored so as to incur the preservation of their quality and fitness for the Work. When considered necessary, they shall be placed on wooden platforms or other hard clean surfaces, and not on the ground, and/or they shall be placed under cover. Stored materials and equipment shall be located so as to facilitate prompt inspection. Private property zoned for, or adjacent to land zoned for, residential uses shall not be utilized for storage purposes. 12 5.3 REJECTED WORK AND MATERIAL Any materials, equipment or work which do not satisfactorily meet the Specifications may be condemned by the Engineer or City by giving a written notice to the Contractor. All condemned materials, equipment or work shall be promptly taken out and replaced. All materials and equipment which do not conform to the requirements of the Contract Documents, are not equal to samples approved by the Engineer and City, or are in any way unsatisfactory or unsuited to the purpose for which they are intended, shall be rejected. Any defective work whether the result of poor workmanship, use of defective materials, damaged through carelessness or from other cause shall be removed within ten (10) days after written notice is given by the City, and the work shall be re- executed by the Contractor. The fact that the Engineer or the City may have previously overlooked such defective work shall not constitute an acceptance of any part of it. Should the Contractor fail to remove rejected work or materials within ten (10) days after written notice to do so, the City may remove them and may store the materials and equipment. Satisfaction of warranty work after final payment shall be in accordance with Paragraph 10.15. 5.4 MANUFACTURER'S DIRECTION Manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned as directed by the manufacturer unless herein specified to the contrary. 5.5 SKILL AND CHARACTER OF WORKMEN All workmen must have sufficient knowledge, skill and experience to perform properly the work assigned to them. Any foreman or workman employed by the Contractor or subcontractors who, in the opinion of the Engineer or the City does not perform his work in a skillful manner, or appears to be incompetent or to act in a disorderly or intemperate manner shall, at the written request of the City, be discharged immediately and shall not be employed again in any portion of the Work without the approval of the City. The Contractor shall at all times be responsible for the conduct and discipline of his employees and/or any subcontractor or persons employed by subcontractors. 5.6 CUTTING AND PATCHING The Contractor shall do all necessary cutting and patching of the Work that may be required to properly receive the work of the various trades or as required by the Plans and Specifications to complete the Work. He shall restore all such cut or patched work as directed by the Engineer or the City. Cutting of existing structures that could endanger the Work, adjacent property, workmen or the public shall not be done unless approved by the Engineer and under his surveillance. 5.7 CLEANING UP The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by his employees or work. At the completion of the Work, he shall remove all his rubbish, tools, scaffolding and surplus materials and shall leave his work "broom clean" or its equivalent, unless more exactly specified, and shall insure that all debris and other unsightly 13 3) objects are removed and disposed of in a satisfactory manner. At no additional expense to the City, the Contractor will restore to their original conditions or better, as nearly as practicable, those portions of the site not designated for alteration and all such property, structure, utilities, landscaping, etc., disturbed or damaged during the prosecution of the Work. Final payment will be withheld until such clean up and repairs are completed The Work will be considered complete only after all debris and unused material due to or connected with the Work have been removed and the surrounding area left in a condition satisfactory to the City. In the event the City finds that the Contractor has not complied in keeping the job site clean, the City may, after twenty -four (24) hours written notice to the Contractor to correct the situation, elect to have the job site cleaned by an independent labor force. The cost of cleaning by said independent labor force shall be deducted from moneys due the Contractor. 5.8 CITY'S OWNERSHIP OF MATERIALS Any and all materials, whether structural or natural, found within the limits of the project remain the property of the City unless City ownership is specifically conveyed to the Contractor. All material, equipment and work become the sole property of the City as installed. These provisions shall not be construed as relieving the Contractor from the sole responsibility for all materials and work for which payments have been made, for the restoration of damaged work, or as a waiver of right of the City to require the fulfillment of all the terms of the Contract. 5.9 GUARANTEE The Contractor shall warrant all equipment furnished and work performed by him for a period of one (1) year from the date of final written acceptance of the Work by City. Satisfaction of warranty work after final payment shall be as per Paragraph 10.15. All equipment and material warranties or guarantees shall be drawn in favor of the City and the originals thereof furnished to the Engineer for review and acceptance prior to final payment. Such guarantee shall in no way limit or relieve the Contractor of liability from subsequent claims of breach of contract due to substandard materials or workmanship, nor shall such warranty period shorten the statute of limitations for bringing a breach of contract or other action based upon any such deficiencies. 6.0 CONSTRUCTION STAKING TO BE PERFORMED BY CONTRACTOR 6.1 PERSONNEL, EQUIPMENT AND RECORD REQUIREMENTS Adequate field notes and records shall be available for review by the City and Engineer as the Work progresses and copies shall be available if necessary. Any inspection or checking of the Contractor's field notes or layout work by the Engineer and City and the acceptance of all or any part thereof, shall not relieve the Contractor of his responsibility to achieve the lines, grades and dimensions shown in the Plans and Specifications. 14 Prior to final acceptance of the project, the Contractor shall mark in a permanent manner on the surface of the completed Work all control points shown on the Plans. 6.2 CONTROL POINTS FURNISHED BY THE CITY The City will provide boundary or other control points and bench marks as shown on the Plans as "Contractor's Survey Control Point if any is provided. The Contractor shall be responsible for all survey control of his work during construction. The Contractor shall preserve all reference points and benchmarks furnished by the City. 6.3 FURNISHING OF STAKE MATERIALS The Contractor shall furnish all stakes, templates and other materials necessary for establishing and maintaining the lines and grades necessary for control and construction of the Work. 6.4 LAYOUT OF WORK Utilizing the control points furnished by the City in accordance with Paragraph 6.2, the Contractor shall establish all horizontal and vertical controls necessary to construct the Work in conformance with the Plans and Specifications. The Work shall include performing all calculations required and setting all stakes needed such as grade stakes, offset stakes, reference point stakes, slope stakes, and other reference marks or points necessary to provide lines and grades for all construction. Survey notes indicating the information and measurements used in establishing locations and grades shall be kept in notebooks and furnished to the Engineer with the record drawings for the Project. 6.5 RECORD DRAWINGS: At contract close -out, record drawings shall be delivered to Engineer for review and approval. Drawings shall be prepared by a licensed surveyor and provided in an electronic format (AUTOCAD), and on mylar, and three (3) sets of signed and sealed hard copies. The drawings shall depict depths of various elements of construction in relation to N.G.V.D. (1929); Horizontal and vertical locations of all underground drainage, utilities, irrigation, etc., referenced to permanent surface improvements; horizontal and vertical locations of all surface and above ground improvements including but not limited to pavement, curbs, sidewalks, inlets, manholes, buildings, mechanical/electric facilities, retention ponds, swales, ditches, fences, trees /shrubs; and record drawings must also comply with other local agency requirements, including I.R.C.D.U.S. as -built data required for water and sewer construction (state plane coordinates on all water and sewer utility infrastructure). 6.6 PAYMENT The cost of performing layout work as described above shall be included in the contract unit prices for the various items of work to which it is incidental, unless a separate bid item is included in the Bid Proposal Form. 15 6.7 COORDINATION WITH CITY The City's recorded subdivision plats shall be considered correct. The distance, bearing and curve information provided shall be used by the Contractor's surveyor to establish alignment throughout construction. All surveying activities will be coordinated with the City's surveyor as needed for proper completion of all work on the site. Primary control monuments, originally set by the City, that are disturbed or destroyed during construction shall be accurately replaced by the Contractor's surveyor to the satisfaction of the City's surveyor. 6.8 LOCATION OF EXISTING UTILITIES AND PIPING All existing underground utilities, such as telephone, cable television, water mains, sewer mains, and electrical cables must be located by the Contractor prior to starting work. The Contractor shall contact the Utilities at least 48 hours prior to commencing any work within the project area. There may be other utilities within the project area. The cost of substantiating the location of utilities shall be borne by the Contractor and included in the contract unit prices for the various items of work to which it is incidental. The Contractor shall be responsible for the repair and/or replacement of utilities, which he damages during the course of construction. Utilities deemed to require relocation shall be identified by the Contractor prior to commencing work. The Contractor shall notice the Engineer of the conflict and seek direction from the Engineer prior to proceeding with work. Directions from the Engineer may be to proceed despite conflict, place work order on hold and commence work at a different location, or relocate utilities under separate contract with the utility or a change order to be directed by the Engineer and approved by the City. 7.0 PROGRESS AND COMPLETION OF WORK 7.1 CONTRACTOR'S OBLIGATION Contractor shall supervise and direct the Work, using Contractor's best skill and attention. Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under this Contract, unless the Contract Documents give other specific instructions concerning these matters. Unless otherwise provided in the Contract Documents, Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. Unless otherwise provided in the Contract Documents, Contractor shall pay all sales, use and other similar taxes. 16 Contractor shall enforce strict discipline and good order among Contractor's employees and other persons carrying out the Work. Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. Contractor currently holds and shall maintain at all times during the term of this Contract all required federal, state and local licenses necessary to perform the Work required under the Contract Documents. Contractor shall be responsible to the City for the acts and omissions of Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with Contractor. Contractor shall indemnify, defend and hold the Engineer and City harmless from all claims arising out of or related to its performance of the Work except for acts arising solely from the active negligence of the City. 7.2 START OF CONSTRUCTION The Contractor shall commence work on the date specified in the Notice to Proceed subsequently issued by the City, or as specifically noted in any Contract Addendum. However, in no case shall the Contractor commence work until the City has been furnished and acknowledges receipt of the Contractor's Certificates of Insurance and a properly executed performance and payment bond as required. 7.3 CONTRACT TIME The contractor shall complete, in an acceptable manner, all of the Work in the time stated in the Contract Agreement and any Addenda or Change Orders thereto. 7.4 SCHEDULE OF COMPLETION The Contractor's schedules are subject to the approval of the Engineer and City, which shall not be unreasonably withheld, and shall reflect a logical sequence of the various components of work and the anticipated rates of production necessary to complete the Work on or before the completion date. Said schedules shall be submitted within ten (10) days of the execution of the agreement by the City except when requested otherwise and shall be updated and resubmitted to the Engineer and City on the twenty -fifth (25th) day of every month with the Contractor's pay request. 7.5 COORDINATION OF CONSTRUCTION/PRECONSTRUCTION CONFERENCE The Contractor shall coordinate his work with other contractors, the City and utilities to assure orderly and expeditious progress of work. The City shall hold a pre construction conference at Sebastian City Hall at a time and date mutually agreed upon with the Contractor after the Contract has been awarded and fully executed. 17 GA) 7.6 PROPERTY OF OTHERS A. Public Ownership The Contractor shall be responsible for the preservation of all public property, trees, monuments, etc., along and adjacent to the street and/or right -of -way, and shall use every precaution necessary to prevent damage or injury thereto. He shall use suitable precautions to prevent damage to pipes, conduits and other underground structures, and shall protect carefully from disturbance or damage all monuments and property marks until a land surveyor has witnessed or otherwise referenced their location and shall not remove them until so directed by the Engineer in writing.. B. Private Ownership Mail and newspaper boxes, sprinkler systems, ornamental shrubs, lawn ornaments, house numbers, fences, etc. may be removed and relocated by the property owners. The City will not remove, relocate, or re- install mail boxes, sprinkler systems, ornamental shrubs, etc. belonging to a private property owner. However, should such items not be removed or relocated by the start of construction, the Contractor shall remove the objects, in a manner which does not damage or injure the objects at no extra cost to the City, which interfere with the construction of the Project and place them on the property owner's front lawn just outside the project limits. Otherwise, the Contractor shall not enter upon private property for any purpose without obtaining permission from the property Owner thereof. Where extensive intrusions upon private property are required for construction, the City and Contractor shall cooperate to obtain Temporary Construction Easements from the landowner. 7.7 PROTECTION OF EXISTING UTILITIES AND FACILITIES All utilities and all structures of any nature, whether below or above ground, that may be affected by the Work but are not required to be disturbed or relocated by the very nature of the project, shall be protected and maintained by the Contractor and shall not be disturbed or damaged by him during the progress of the Work; provided that, should the Contractor disturb, disconnect or damage any utility or any structure, all expenses of whatever nature arising from such disturbance or the replacement or repair and testing thereof shall be borne by the Contractor. 7.8 CROSSING PUBLIC FACILITIES When new construction crosses highways, railroads, streets or similar public facilities under the jurisdiction of state, county, city, or other public agency or private entity, the City through the Engineer shall secure written permission prior to the commencement of construction of such crossing. The Contractor will be required to furnish evidence of compliance with conditions of the permit from the proper authority before final acceptance of the Work by City. Road closures are governed by Paragraph 8.3 below. 7.9 CHANGES IN THE WORK The City may order changes in the Work through additions, deletions or modifications without invalidating the Contract; however, any change in the scope of work or substitution of materials shall require the recommendation of the Engineer and the written approval of the City. Compensation and time of completion affected by the change shall be adjusted at the time of ordering such change. New and unforeseen items of work found to be necessary and which cannot be covered by any item or combination of items for which there is a contract price shall be classed as changes in the Work. The Contractor shall do such changes in the Work and furnish 18 such materials, labor and equipment as may be required for the proper completion of construction of the work contemplated. In the absence of such written order, no claim for changes in the Work shall be considered. Changes in the Work shall be performed in accordance with the Specifications where applicable and work not covered by the specifications or special provisions shall be done in accordance with specifications issued for this purpose. Changes in the Work required in an emergency to protect life and property shall be performed by the Contractor as required. 7.10 EXTENSION OF CONTRACT TIME No extension of time shall be valid unless given in writing by the City. No monetary compensation shall be given for such delay. A delay beyond the Contractor's control occasioned by an "Act of God" may entitle the Contractor to an extension of time in which to complete the Work as determined by the City provided, however, the Contractor shall immediately give written notice to the City of the cause of such delay. "Rain day" extensions shall be granted upon written request of the Contractor to the City's Project Manager or Engineer when said Project Manager or Engineer determines that weather conditions make it counterproductive to work on said days. "Rain day" requests must be submitted at the end of each work week or be waived, and the cumulative "rain day" extensions granted shall be processed as a Change Order with each pay submittal. In the event that the City suspends the Work as provided in Paragraph 9.3, the Contractor shall be granted an extension of time to complete the Work for as many calendar days as the Work was suspended; except, however, that the Contractor will not be granted an extension of time to complete the Work if the suspension was caused by a fault of the Contractor. 7.11 CORRECTION OF WORK Contractor shall, at no cost to the City, promptly correct Work failing to conform to requirements of the Contract Documents, whether observed before or after completion of the Work and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of one (1) year from the date of completion of the Work or by the terms of an applicable special warranty required by the Contract Documents. The provisions of this Paragraph apply to the Work done by Subcontractors as well as to the Work done by direct employees of Contractor. Nothing contained in this Paragraph shall be construed to establish a period of limitation with respect to other obligations which Contractor might have under the Contract Documents. Establishment of the time period of one (1) year as described in Subparagraph 7.11(a) above relates only to the specific obligation of Contractor to correct the Work, and has no effect on the time within which the obligations of the Contract Documents may be enforced, nor to the time within which proceedings may be commenced to establish Contractor's liability with respect to Contractor's remaining contractural obligations. 19 7.12 LIQUIDATED DAMAGES In the event Contractor violates or fails to perform any provision of the Contract Documents, then the City may elect to receive, and Contractor agrees to pay, liquidated damages as provided in paragraph 2.6. Inspection of the Work by the City and the subsequent issuance of a notice by the City and Engineer indicating substantial completion will be the date used to signify work completion. If completion is beyond the schedule agreed upon, liquidated damages may be imposed by the City on the Contractor and will be withheld from payment. It is expressly acknowledged by Contractor that said payment shall not be interpreted nor construed as a penalty but is in fact a good faith attempt to fix damages which the City will suffer in the event Contractor fails to perform as required hereunder or violates any provision of the Contract Documents. 8.0 PUBLIC HEALTH AND SAFETY 8.1 PROTECTION OF PERSONS AND PROPERTY The Contractor shall submit, for the City's approval, a project safety and security plan which describes the Contractor's plans and procedures to protect the safety and property of property owners, residents, and passers -by. The plan shall describe measures and precautions to be taken during working hours and non working hours. A. Safety Precautions and Programs The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work in accordance with the U.S. Department of Labor Occupational Safety and Health Act and the laws of the State of Florida. This Contract requires that the Contractor and any and all subcontractors hired by the Contractor comply with all relevant standards of the Occupational Safety and Health Act. Failure to comply with the Act constitutes a failure to perform. The Contractor agrees to reimburse the City for any fines and/or court costs arising from penalties charged to the City for violations of OSHA committed by the Contractor or any and all subcontractors. B. Safety of Persons and Property The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury or loss to, all employees on the Work and all other persons who may be affected thereby; all the work materials and equipment to be incorporated therein, whether in storage on or off the project site, under the care, custody or control of the Contractor or any of his subcontractors; and other property on the project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. The Contractor shall be held fully responsible for such safety and protection until final written acceptance of the Work. 20 Fire hydrants on or adjacent to the Work shall be kept accessible to fire fighting equipment at all times. Temporary provisions shall be made by the Contractor to insure the proper functioning of all swales, gutters, sewer inlets, drainage ditches and irrigation ditches, which shall not be obstructed except as approved by the City. The Contractor acknowledges that, in executing the Project, it will operate machinery and equipment that may be dangerous to the adjacent property owners and the general public. The Contractor will be required to conduct excavations for the Project which may be hazardous to person and property. The Contractor shall develop and implement a job safety and security plan which will adequately protect all property and the general public. 8.2 TRAFFIC CONTROL All safety precautions, traffic control, and warning devices necessary to protect the public and workmen from hazards within the right -of -way shall be in strict accordance with SECTION 102., MAINTENANCE OF TRAFFIC, in the Florida Dept. of Transportation (FDOT) Std The State of Florida Manual of Traffic Control and Safe Practices for Street and Highway Construction, Maintenance and Utility Operations Specifications for Road and Bridge Construction, latest edition. shall be used as minimum standards, as applicable. Further, the Contractor shall carry on the Work in a manner that will cause the least possible obstruction and interruption in traffic, and the least inconvenience to the general public and the residents in the vicinity of the work. 8.3 ROAD CLOSURE AND DETOURS Local traffic shall be maintained within the limits of the Project for the duration of the construction period. Closing to through travel of more than two (2) consecutive blocks, including the cross street intersected will not be permitted without specific authorization of the City. No road or street shall be closed to the public except with the permission of the City and proper governmental authorities (I.R.C., F.D.O.T., as applicable). When closing of roads are permitted, it shall require forty-eight (48) hours notification to the City, I.R.C. or F.D.O.T. (applicable agency with jurisdiction). Traffic detours shall be pre- approved prior to closing. "Street Closed to through Traffic" signs and "Detour" routes shall be indicated and maintained by the Contractor when the job is located in a public or private street. 8.4 PROVISION OF ACCESS Where traffic must cross open trenches, the contractor shall provide adequate ingress and egress to dwellings, business facilities, utilities and service. Temporary provisions shall be made by the Contractor to insure the use of sidewalks. The Contractor shall provide suitable crossings at street intersections and driveways, and supply such aid as may be required for pedestrians and motorists, including delivery vehicles, to safely negotiate the construction areas. On completion of Work within any area, the Contractor shall remove all debris, excess materials, barricades and temporary Work leaving walkways and roads in said area clear of obstructions. 21 8.5 WARNING SIGNS AND BARRICADES The Contractor shall provide adequate signs, barricades, warning lights and flagmen, as required, and all such other necessary precautions for the protection of the Work and the safety of the public. All barricades and obstructions shall be protected at night by regulatory signal lights which shall be kept in operation from sunset to sunrise. Barricades shall be of substantial construction and shall be reflective to increase their visibility at night. Suitable warning signs shall be so placed and illuminated at night as to show in advance where construction, barricades or detours exist. Unless so designated in the Bid Documents, no direct payment for this work will be made, but the cost of providing, erecting and maintaining such protection devices, including guards, watchmen and/or flagmen as required shall be considered as included and paid for in the various contract prices of the Work. Warning signs and barricades shall be in conformance with the State of Florida, Manual of Traffic Control and Safe Practices for Street and Highway Construction, Maintenance and Utility Operations, latest edition. The Contractor shall provide and maintain adequate barricades, construction signs, torches, flashers, guards and flagmen as required in pedestrian and vehicular traffic areas. Regulations of local authorities shall be complied with. Advance warning signs are required on all streets where work is being conducted. Lane closures shall be signed and barricaded or coned as indicated in aforementioned FDOT Index. Flagmen may be required where traffic and length of lane closure warrant them. Where such a plan is needed, Contractor shall submit and obtain approval of their traffic control plan by the City, or other applicable government agencies. 8.6 OPEN TRENCHES The Contractor shall fully comply with Florida Statutes and OSHA regulations with regard to open trenches during construction. The Contractor shall be place construction hazard fencing along any open trenches during the construction work -day, and shall leave no open trenches or excavations over -night unless properly fenced and with the specific approval of the Engineer or the City. 8.7 PLACEMENT OF HEAVY EQUIPMENT The Contractor shall not leave construction equipment parked in front of or on a residential lot overnight or on weekends. At the close of work each day, the equipment shall be driven to and stored in a designated area so that the equipment will not become an "attractive nuisance" to neighborhood children. All equipment left unattended during the course of working day, such as during lunch hours or work breaks, shall not be left in a condition or location which would create a safety hazard to the general public. All keys shall be removed from the machines during those times. 8.8 TEMPORARY FACILITIES AND CONTROLS The Contractor shall provide controls for sanitary facilities, environmental protection and safety controls on site acceptable to the Florida Department of Health and Rehabilitative Services, Department of Environmental Protection, and St. Johns River Water Management District. 22 8.9 SANITARY PROVISION The Contractor shall provide and maintain such sanitary accommodations adequate for the use of his employees and those of his subcontractors, and as may be necessary to comply with the requirements and regulations of the local and state departments of health. Such facilities shall be made available when the first employees arrive on site of the Work, shall be properly secluded from public observation, and shall be constructed and maintained during the progress of the Work in suitable numbers and at such points and in such manner as may be required or approved. The Contractor shall maintain the sanitary facilities in a satisfactory and sanitary condition at all times and shall enforce their use. Contractor shall rigorously prohibit the committing of nuisances on the site of the Work, on the lands of the City or an adjacent property. The City shall have the right to inspect such facilities at all times to determine whether or not they are being properly and adequately maintained. Following the period of necessity for such accommodations, they and all evidence affixed thereto shall be removed. 8.10 WATER AND ELECTRIC SUPPLY The Contractor shall make all necessary applications and arrangements, and pay all fees and charges for water and electrical service necessary for the proper completion of the Project up to the time of final acceptance. The Contractor shall provide and pay for any temporary piping and connections. 8.11 NOISE CONTROL The Contractor shall provide adequate protection against objectionable noise levels caused by the operation of construction equipment, and shall submit a plan to the Engineer for his review prior to initiation and implementation of the plan. 8.12 DUST CONTROL The Contractor shall provide for adequate protection against raising objectionable dust clouds caused by moving construction equipment, high winds or any other cause, and shall submit a plan to the Engineer for his review prior to initiation and implementation of the plan. 8.13 WATER CONTROL The Contractor shall provide for satisfactory disposal of surplus water and shall submit a plan to the Engineer for his review prior to initiation and implementation of the plan. Prior approval shall be obtained from the proper authorities for the use of public or private lands or facilities for such disposal. 8.14 POLLUTION, SILTATION AND EROSION CONTROL The Contractor shall provide for and take sufficient precautions to prevent pollution of private and public lands, reservoirs, ponds, rivers, streams, creeks, etc., by the disposal of surplus 23 materials in the forms of solids, liquids or gases including, but not limited to, fuels, oils bitumen, calcium chloride or other harmful materials. Contractor shall conduct and schedule Work operations so as to avoid or otherwise minimize pollution or situation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish where there is a high potential for erosion and subsequent water pollution. Erosion control features shall be constructed concurrently with other work and at the earliest practicable time. The Contractor shall prepare a detailed description of Contractor's plan for Erosion and Turbidity Control (S.W.P.P.P.), including location of erosion control and turbidity control devices, marked on a plan set as needed for clarity. The erosion and turbidity control shall meet the requirements of the Florida Department of Environmental Protection and the St. John's River Water Management District for control of discharge of Total Suspended Matter, and shall prevent water and wind erosion of the work. The contractor agrees to reimburse the City for any fines and/or court costs arising from penalties charged to the City for violations of E.P.A., FDEP, or SJRWMD permits, permit conditions or regulations committed by the contractor or any subcontractors on this site. Article III SUPERVISION AND ADMINISTRATION 9.0 ENGINEER, CITY, CONTRACTOR RELATIONS 9.1 ENGINEER'S RESPONSIBILITY AND AUTHORITY All work done shall be subject to the construction review of the Engineer and City. Any and all technical questions which may arise as to the quality and acceptability of materials furnished, work performed, or work to be performed, interpretation of Plans and Specifications and all technical questions as to the acceptable fulfillment of the Contract on the part of the Contractor shall be referred to the Engineer who will resolve such questions. 9.2 ENGINEER'S DECISION All claims of a technical nature of the City or Contractor shall be presented to the Engineer for resolution. 9.3 SUSPENSION OF WORK The City shall have the authority to suspend the Work wholly or in part, for such periods as may be deemed necessary and for whatever cause, to include but not be limited to, unsuitable weather or such other conditions as are considered unfavorable for prosecution of the Work, failure on the part of the Contractor to carry out the provisions of the Contract or to supply materials meeting the requirements of the Specifications, or the action of a governmental agency, by serving written notice of suspension to the Contractor. In the event that the Engineer shall become aware of any condition which may be cause for suspension of the Work, the Engineer shall immediately advise 24 the City of such condition. The Contractor shall not suspend operations under the provisions of this Paragraph without the City's permission. 9.4 CONSTRUCTION REVIEW OF WORK All materials and each part or detail of the Work shall be subject at all times to construction review by the Engineer and the City and other government agencies with jurisdiction, including but not limited to F.D.O.T., F.D.E.P., I.R.C., and S.J.R.W.M.D.. The Engineer and the City may appoint inspectors. The Contractor will be held strictly to the true intent of the Specifications in regard to quality of materials, workmanship, and the diligent execution of the Contract. Such construction review may include mill, plant, or shop inspection, and any material furnished under the Specifications is subject to such inspection. The Engineer and the City shall be allowed access to all parts of the Work and shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed review. The City shall not be responsible for the acts or omissions of the Contractor. 9.5 FIELD TESTS AND PRELIMINARY OPERATION The Contractor shall perform the work of placing in operation all equipment installed under this Contract, except as specifically noted hereinafter. The Contractor shall make adjustments necessary for proper operation. The Contractor shall provide construction labor required for preliminary operation of the equipment installed under this Contract. The Contractor shall notify the Engineer and City when work is considered to be complete, in operating condition, and ready for inspection. Further inspection requirements may be designated in the Technical Specifications. The contractor shall conduct tests necessary to determine if the Work functions properly. Arrangements for testing laboratory services will be made by the contractor. Payment for testing to show compliance with specified requirements will be paid for by the contractor. At the city's discretion, the city may re -test or arrange additional testing beyond that normally and typically required to be provided by the contractor. The cost of retesting or additional testing shall be paid by the city, except when materials and workmanship fail to meet specified requirements. Then the cost will be deducted from moneys due the Contractor. 9.6 EXAMINATION OF COMPLETED WORK The Engineer or City may request an examination of completed work of the Contractor at any time before acceptance by the City of the Work and shall remove or uncover such portions of the finished work as may be directed. After examination, the Contractor shall restore said portions of the Work to the standard required by the Specifications. Should the work thus exposed or examined prove acceptable, the uncovering or removing and the replacing of the covering or making good of the parts removed shall be paid for as extra work, but should the work so exposed or examined prove unacceptable, the uncovering, removing and replacing shall be at the Contractor's expense. 25 9.7 CONTRACTOR'S SUPERINTENDENT A qualified superintendent, who is acceptable to the City, shall be maintained on the project and give sufficient supervision to the Work until its completion. The superintendent shall have full authority to act on behalf of the Contractor, and all communications given to the superintendent shall be considered given to the Contractor. In general, such communications shall be confirmed in writing and always upon written request from the Contractor. 9.8 CITY'S RIGHT TO CORRECT DEFICIENCIES Upon failure of the contractor to perform the work in accordance with the Contract Documents, including any requirements with respect to the Schedule of Completion, and after five (5) days written notice to the Contractor, the City may, without prejudice to any other remedy he may have, correct such deficiencies. The Contractor shall be charged all costs incurred to correct deficiencies. 9.9 CITY'S RIGHT TO TERMINATE CONTRACT AND COMPLETE WORK In the event of any default by the Contractor, the City shall have the right to immediately terminate the Contract upon issuance of written notice of termination to the Contractor stating the cause for such action. This Agreement may be terminated by the City without cause provided at least thirty (30) days written notice of such termination shall be given to the Contractor. In the event of termination, the City may take possession of the Work and of all materials, tools and equipment thereon and may finish the Work by whatever method and means it may select. It shall be considered a default by the Contractor whenever he shall: (a) Declare bankruptcy, become insolvent or assign his assets for the benefit of his creditors. (b) Disregard or violate the provisions of the Contract Documents or City's written instructions, or fail to prosecute the Work according to the agreed schedule of completion including extensions thereof. (c) Fail to provide a qualified superintendent, competent workmen or subcontractors, or proper materials, or fail to make prompt payment therefore. 9.10 RIGHTS OF VARIOUS INTEREST Wherever work being done by the City's forces or by other contractors is contiguous to work covered by the Contract, the respective rights of the various interests involved shall be established by the City, to secure the completion of the various portions of the Work in general harmony. 9.11 SEPARATE CONTRACTS The City may let other contracts in connection with the Work of the Contractor. The Contractor shall cooperate with other Contractors with regard to storage of materials and execution of their work. It shall be the Contractor's responsibility to inspect all work by other contractors affecting 26 his work and to report to the City any irregularities which will not permit him to complete his work in a satisfactory manner. His failure to notify the City of such irregularities shall indicate the work of other contractors has been satisfactorily completed to receive his work. It shall be the responsibility of the Contractor to inspect the completed work in place and report to the Engineer immediately any difference between completed work by others and the Plans. 9.12 SUBCONTRACTS AND PURCHASE ORDERS Prior to signing the Contract or at the time specified by the City, the Contractor shall submit in writing to the City the names of the subcontractor proposed for the Work. Subcontractor may not be changed except at the request or with the approval of the City. The Contractor is responsible to the City for the acts and omissions of his subcontractors and their direct or indirect employees, to the same extent as he is responsible for the acts and omissions of his employees. The Contract Documents shall not be construed as creating a contractual relation between any subcontractors and the City. The Contractor shall bind every subcontractor by the terms of the Contract Documents. For convenience of reference and facilitate the letting of contracts and subcontracts, the Specifications are separated into title sections. Such separations shall not, however, operate to make the Engineer or City an arbiter to establish limits to the contracts between the Contractor and subcontractors. 9.13 WORK DURING AN EMERGENCY The Contractor shall perform any work and shall furnish and install materials and equipment necessary during an emergency endangering life or property. In all cases, he shall notify the Engineer and City of the emergency as soon as practicable, but he shall not wait for instructions before proceeding to properly protect both life and property. 9.14 ORAL AGREEMENTS No oral order, objection, claim or notice by any party to the others shall affect or modify any of the terms or obligations contained in any of the Contract Documents, and none of the provisions of the Contract Documents shall be held to be waived or modified by reason of any act whatsoever, other than by a definitely agreed waiver or modification thereof in writing, and no evidence shall be introduced in any proceeding of any other waiver or modification. 9.15 NIGHT, SATURDAY AND /OR SUNDAY WORK Saturday and Sunday work will be permitted with prior approval from City. This clause shall not pertain to crews organized to perform restoration work which needs no verifying inspection, maintenance work on equipment, or to operate and maintain special equipment such as dewatering pumps which may be required to work 24 hours per day. 9.16 UNAUTHORIZED WORK Work done without lines and grades having been established, work done without proper inspection, or any changes made or extra work done without written authority will be done at the 27 Contractor's risk and will be considered unauthorized, and, at the option of the City, may not be measured and paid for. 9.17 USE OF COMPLETED PORTIONS OF THE WORK The City shall have the right to use, occupy, or place into operation any portion of the Work that has been completed sufficiently to permit safe use, occupancy, or operation, as determined by the Engineer. If such use, occupancy, or operation increases the cost of or delays the Work, the Contractor shall be entitled to extra compensation, or an extension of time, or both, as determined by the Engineer. However, if Contractor has failed to complete the Work in accordance with the time requirements of the Agreement, no compensation (including set -offs to liquidated damages) shall be allowed for such use or occupancy. 9.18 CONTRACTOR'S RESPONSIBILITY FOR WORK Until acceptance of the Work by the City, it shall be under the charge and care of the Contractor, and he shall take every necessary precaution against injury or damage to the Work by the action of the elements or from any other cause whatsoever, whether arising from the execution or from the non execution of the Work. The Contractor shall rebuild, repair, restore and make good, without additional compensation, all injury or damage to any portion of the Work occasioned by any cause, other than the sole and active negligence of the City, before its completion and acceptance. 10.0 MEASUREMENT AND PAYMENT 28 10.1 DETAILED BREAKDOWN OF CONTRACT Except in cases where unit prices form the basis for payment under the Contract, the Contractor shall submit a complete breakdown of the contract amount showing the value assigned to each part of the Work, including an allowance for profit and overhead within ten (10) days of the execution of the Contract by the parties. Upon approval of the breakdown of the contract amount by the Engineer and the City, it shall be used as the basis for all requests for payment. 10.2 REQUEST FOR PAYMENT The Contractor may submit to the City not more than once each month a request for payment for work completed. Where applicable, the Contractor may choose to submit a request for payment at the substantial completion of each work order. The City may elect to provide its own form for the Contractor to submit progress payment requests. The standard form provided by the City, or a form presented by the Contractor having received prior approval from the City, can be used for the submittal of a progress payment. The Contractor shall furnish the Engineer and the City all reasonable facilities required for obtaining the necessary information relative to the progress and execution of the Work. In addition to each month's invoice, an updated project schedule shall be submitted. Each request for payment shall be computed from the work completed to date on all items listed in the detailed breakdown of the contract amount Less previous payments and back charges. Progress payments on account of Unit Price Work will be based on the number of units completed at the time the payment request was dated by the Contractor. If payment is requested on the basis of materials and equipment not incorporated in the project but delivered and suitably stored at the site or at another location agreed to in writing, the payment request shall also be accompanied by a bill of sale, invoice or other documentation warranty that the City has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, all of which shall be satisfactory to the City. No payments shall be made for materials stored on site without approval of the City. An amount of 10% of each monthly pay request shall be retained until final completion and written acceptance of the Work by the City. Payment of the retainage shall be included in the Contractor's final pay request in accordance with Paragraph 10.14. Any deviation in the release or partial release of the 10% retainage shall be at the sole discretion of the City, but in no case earlier than completion of the Engineer's "punch list inspection Any request for payment shall be accompanied by claim releases for work done or materials furnished in accordance with Paragraph 10.13. Prior to submission of any request for payment by the Contractor, the Engineer shall review the request for payment to determine the following: (a) That the work covered by the request for payment has been completed in accordance with the intent of the Plans and Specifications. (b) That the quantities of work have been completed as stated in the request for payment, whether for a unit price contract or for payment on a lump -sum contract. 10.3 CITY'S ACTION ON A REQUEST FOR PAYMENT Within thirty (30) days from the date of receipt of a request for payment the City shall do one of the following: (a) Approve and pay the request for payment as submitted. (b) Approve and pay such other amount of the request for payment in accordance with Paragraph 10.4 as the City shall decide is due the Contractor, informing the Contractor in writing of the reasons for paying the amended amount. (c) Disapprove the request for payment in accordance with Paragraph 10.4 informing the Contractor in writing of the reasons for withholding payment. 10.4 CITY'S RIGHT TO WITHHOLD PAYMENT OF A REQUEST FOR PAYMENT The City may withhold payment in whole or in part on a request for payment to the extent necessary for any of the following reasons: (a) Work not performed but included in the request for payment, or the contract Price has been reduced by written change order. (b) Work covered by the request for payment which is not in accordance with the Plans, Specifications and generally accepted construction practices, including if, in the opinion of the City, there is sufficient evidence that the Work has not been satisfactorily completed, or based upon tests and/or inspections the work is defective or has been damaged requiring correction or replacement 29 30 (c) In the event of a filing of a claim or lien, or information received by City of a potential filing of a claim or lien against the Contractor or City. (d) Failure of the Contractor to make payments to subcontractors, material suppliers or labor. (e) Damage to another contractor. (f) The City has had to correct a defect in the Work, or there are other items entitling the City to a set -off against the amount recommended. (g) Default of any of the provisions of the Contract Documents. 10.5 PAYMENT FOR UNCORRECTED WORK Should the City direct, in writing, the Contractor not to correct work that has been damaged or that was not performed in accordance with the Contract Documents, an equitable deduction from the contract amount shall be made to compensate the City for the uncorrected work. 10.6 PAYMENT FOR REJECTED WORK AND MATERIALS The removal of work and materials rejected under Paragraph 5.3 and the re- execution of work by the Contractor shall be at the expense of the Contractor and the Contractor shall pay the cost of replacing the destroyed or damaged work of other contractors by the removal of the rejected work or materials and the subsequent re- execution of that work. In the event that City incurs expenses related thereto, Contractor shall pay for the same within thirty (30) days after written notice to pay is given by the City. If the Contractor does not pay the expenses of such removal, after ten (10) days written notice being given by the City of its intent to sell the materials, the City may sell the materials and shall pay to the Contractor the net proceeds therefrom after deducting all the costs and expenses that are incurred by the City. If the proceeds do not cover the expenses incurred by the City, such additional amounts may be set -off against any payments due Contractor. 10.7 CHANGES IN THE WORK A. Change Orders If conditions require a change in the scope of work or additional work varying from the original Plans or Specifications, such change shall be effected by the Contractor when the City issues a written Change Order. The Change Order shall set forth in complete detail the nature of the change, the change in the compensation to be paid the Contractor and whether it is an addition or a reduction of the original total contract cost. Should additional or supplemental drawings be required, they will be furnished by the Engineer. Compensation to be paid to the Contractor for accomplishing the work of a Change Order shall be established in one of the following ways: (a) By lump sum proposed by the Contractor and accepted by the City. (b) By unit prices established and agreed to. (c) By unit prices established for additional kinds of work. (d) By other methods as may be mutually agreed upon. (e) By force account wherein the Contractor provides the labor and materials at Contractor's direct cost plus 15% for overhead and profit. When the force account method is used, the Contractor shall provide full and complete records of all costs for review by the City. B. Claims Claims arising from changes or revisions made by the Contractor at the City's request shall be presented to the City before work starts on the changes or revisions. If the Contractor deems that extra compensation is due for work not covered herein, or in Supplemental Agreement, the Contractor shall notify the City in writing of its intention to make claim for extra compensation before work begins on which the claim is based. If such notification is not given and the City is not afforded by the Contractor a method acceptable to the City for keeping strict account of actual cost, then the Contractor hereby waives its request for such extra compensation. The City is not obligated to pay the Contractor if the City is not notified as described above. The Contractor may refuse to perform additional work requested by the City until an appropriate agreement is executed by the parties. Such notice by the Contractor and the fact that the City has kept account of the costs as aforesaid shall not in any way be construed as proving the validity of the claim. 10.8 CANCELED ITEMS OF WORK The City shall have the right to cancel those portions of the contract relating to the construction of any item provided therein. Such cancellation, when ordered by the City in writing, shall entitle the Contractor to the payment of a fair and equitable amount covering all costs incurred by him pertaining to the canceled items before the date of cancellation or suspension of the Work. The Contractor shall be allowed a profit percentage on the materials used and on construction work actually done, at the same rates as provided for "Changes in the Work but no allowance will be made for anticipated profits. Acceptable materials ordered by the Contractor or delivered on the site before the date of such cancellation or suspension shall be purchased from the Contractor by the City at actual cost and shall thereupon become the property of the City. 10.9 PAYMENT FOR WORK SUSPENDED BY THE CITY If the Work or any part thereof shall be suspended by the City as provided in Paragraph 9.3, the Contractor will then be entitled to payment for all work done except as provided in Paragraph 10.10 PAYMENT FOR WORK BY THE CITY The cost of the work performed by the City removing construction materials, equipment, tools and supplies in accordance with Paragraph 5.7 and in correcting deficiencies in accordance with Paragraph 9.8 shall be paid by the Contractor. 10.11 PAYMENT FOR WORK BY CITY FOLLOWING TERMINATION OF CONTRACT A. Termination by City for Cause Upon termination of the contract by the City for cause, including abandonment or termination by Contractor, the City may enter into an agreement with others for the completion of the Work under this Agreement and the Contractor shall be held harmless for the work of others. No further payments shall be due the Contractor until the Work is completed and accepted by the City. If the unpaid balance of the contract amount shall exceed the cost of completing the Work 31 including all overhead costs, Contractor shall be paid up to the amount of the excess balance on a quantum meruit basis for the work done prior to termination. If the cost of completing the Work shall exceed the unpaid balance, the Contractor or its Surety shall pay the difference to the City. The cost incurred by the City as herein provided shall include the cost of the replacement contractor and other expenses incurred by the City through the Contractor's default. In either event, all work done, tracings, plans, specifications, maps, computer programs and data prepared by the Contractor under this Agreement shall be considered property of the City. B. Termination by City Without Cause In the event the City without cause abandons, terminates or suspends this Agreement, the Contractor shall be compensated for services rendered up to the time of such termination on a quantum meruit basis and any work done or documents generated by the Contractor shall remain the property of the City. 10.12 TERMINATION OF CONTRACTOR'S RESPONSIBILITY The Contract will be considered complete when all work has been finished, the fmal construction review is made by the Engineer, and the project accepted in writing by the City. 10.13 RELEASE OF CLAIMS (INTERIM/FINAL) The Contractor shall deliver, with each request for payment, a completed Affidavit and Release of Claim on a form supplied by the City. Also, from each supplier or subcontractor who has notified the City of his right to file a Claim (Notice to City) or who is listed in the Contractor's Affidavit and Release of Claim as an unpaid, potential Claimant, a Claimant's Sworn Statement of Account, executed by the supplier or subcontractor, must be attached to each request for payment. If the completed forms are not supplied with the request for payment, the City will notify Contractor of the outstanding claims of record and, if said completed form(s) are not supplied within thirty (30) days, the City shall make joint payments to the Contractor and outstanding claimants. 10.14 ACCEPTANCE AND FINAL PAYMENT When it is determined, as a result of a joint inspection of the Work by the Contractor, City, and Engineer that the Work has been completed in accordance with the terms of the Contract Documents, the Engineer shall certify completion of the Work to the City. At that time, the Contractor may submit the Contractor's final request for payment. The Contractor's final request for payment shall be the contract amount plus all approved written additions less all approved written deductions and less previous payments made. As a condition for Final payment, a Contractor's Final Affidavit must be received by the City along with his Final Payment Request and any as -built drawings which may be required. The Contractor shall furnish full and final releases of Claim for labor, materials and equipment incurred in connection with the Work, following which the City will release the Contractor except as to the conditions of the performance bond, any legal rights of the City, required guarantees and satisfaction of all warranty work, and shall authorize payment of the Contractor's final request for payment. 32 10.15 SATISFACTION OF WARRANTY WORK AFTER FINAL PAYMENT The making of the final payment by the City to the Contractor shall not relieve the Contractor of responsibility for faulty materials or workmanship. The City shall promptly give notice of faulty materials and workmanship and the Contractor shall promptly replace any such defects discovered within one (1) year from the date of final written acceptance of the Work by the City. 11.0 PUBLIC CONTRACT REQUIREMENTS 11.1 COVENANT AGAINST CONTINGENT FEES The Contractor warrants that he has not employed or retained any company or person, other than a bona fide employee working solely for the Contractor, to solicit or secure this Agreement and that he has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for the Contractor, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this paragraph, the City shall have the right to terminate the Agreement without liability and, at its discretion, deduct from the Agreement price, or otherwise recover, the full amount of such fee, commission, percentage, gift or consideration. 11.2 INTEREST OF MEMBERS OF CITY AND OTHERS No officers, members or employees of the City and no member of its governing body, and no other public official of the governing body of the locality or localities in which services for the facilities are situated or carried out, who exercises any functions or responsibilities in the review or approval of the undertaking or carrying out of this project, shall participate in any decision relating to this Agreement which affects his personal interest, or have any personal or pecuniary interest, direct or indirect, in this Agreement or the proceeds thereof. 11.3 CERTIFICATION OF RESTRICTIONS ON LOBBYING The Contractor agrees that no Federal appropriated funds have been paid or will be paid by or on behalf of the Contractor to any person for influencing or attempting to influence any officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress or an employee of a member of Congress in connection with the awarding of any Federal contract, the making of any Federal Grant, the making of any Federal loan, the entering into of any cooperative agreement and the extension, continuation, renewal, amendment or modification of any Federal contract, Grant, loan or cooperative agreement. If any funds other than Federal appropriated funds have been paid by the Contractor to any person for influencing or attempting to influence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress or an employee of a member of Congress in connection with any FDOT Joint Participation Agreement, the undersigned shall complete and submit Standard Form- "Disclosure Form to Report Lobbying" in accordance with its instructions. 11.4 INTEREST OF CONTRACTOR The Contractor covenants that he presently has no interest and shall not acquire any interest, direct or indirect, which shall conflict in any manner or degree with the performance of services 33 required to be performed under this Agreement. The Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed. The Contractor shall not undertake any professional work which conflicts with his duties as the City's Contractor without the prior written consent of the City during the term of this Agreement. Any work where the Contractor can reasonably anticipate that it may be called to testify as a witness against the City in any litigation or administrative proceeding will constitute a conflict of interest under this Agreement. 11.5 PUBLIC ENTITY CRIMES The Contractor shall file the attached sworn statement which is entitled PUBLIC ENTITY CRIMES, stating whether a person or affiliate as defined in Section 287.133 (1) Florida Statutes, has been convicted of a public entity crime subsequent to July 1, 1989, in accordance with the provisions of said statute. 11.6 DRUG -FREE WORKPLACE The Agreement documents also consist of the "Drug -Free Workplace Form" which is in accordance with Florida Statute 287.089 and must be signed and instituted. 11.7 COMPLIANCE WITH LAWS Contractor shall comply with all applicable federal laws that in any way regulate or impact the Work, including, but not limited to, The Clean Air Act (42 USC §7506(c)), The Endangered Species Act (16 USC §1531, et seq.), Executive Order No. 11593, Executive Order No. 11988, Executive Order No. 11990, The Fish and Wildlife Coordination Act (PL 85 -624), The Safe Water Drinking Act Section 1424(e) (PL 93 -523, as amended), The Wild and Scenic Rivers Act (PL 90 -542, as amended), The Demonstration Cities and Metropolitan Development Act of 1966 (PL 89 -754), Section 306 of The Clean Air Act, Section 508 of The Clean Water Act, Executive Order No. 11738, The Civil Rights Act of 1964 (PL 88 -352), The Age Discrimination Act (PL 94 -135), Section 13 of The Federal Water Pollution Control Act (PL 92 -500), Executive Order No. 11246, Executive Order No. 11625, Executive Order No. 12138, Executive Order No. 12549, The Davis Bacon Act (40 USC §276), the Occupational Safety and Health Act and applicable regulations, and the Americans with Disabilities Act (PL 101 -336). 11.8 INSURANCE The Contractor agrees to carry insurance, of the types and subject to the limits as set forth below and maintain said insurance during the life of this agreement: (a) Workers' Compensation Contractor shall purchase workers' compensation insurance as required by law. (b) Commercial General Liability Contractor shall purchase Commercial General Liability insurance with a combined single limit of at least $1,000,000. (c) Commercial Auto Liability Contractor shall purchase Commercial Auto Liability insurance with a combined single limit of at least $1,000,000. Further, Contractor shall maintain such insurance as is reasonably required to satisfy its obligations under Paragraph 9.18 for the Work paid for by the City but not yet accepted. 34 The insurance company selected shall be A+ or better per the Best's Key Rating Guide. The Contractor and the insurance company(s) shall agree to furnish the City thirty (30) days written notice of their intent to cancel or terminate said insurance. It is the full responsibility of the contractor to insure that all sub contractors have full insurance coverage as stated above. The Contractor shall not commence the Work under this contract until he has obtained all the insurance required under this paragraph and certificates of such insurance have been submitted to the City, nor shall the Contractor allow any subcontractor to commence work on his subcontract until all insurance required has been so obtained and approved by the City. The Contractor shall carry and maintain until acceptance of the Work, insurance as specified herein and in such form as shall protect him and any subcontractor performing work under this Contract, or the City, from all claims and liability for damages for bodily injury, including accidental death, under this Contract, whether by himself or by any subcontractor or by any one directly or indirectly employed by either of them. The Contractor shall furnish to the City certificates of insurance in duplicate showing proof of insurance, naming the City and the Engineer as an additional insured party, prior to the start of construction as provided in the Contract. 11.9 BOND The Contractor shall provide Bonds in the form prescribed by State Law, and generally as shown in these Documents, for Performance and Payment, each in the amount of 100% of the total contract amount. 11.10 PERMITS All City and St. John's River Water Management District permits and other permits necessary for the prosecution of the Work shall be secured by the City, except for the following permits /approvals that the contractor shall secure: Contractor's licenses and registrations, SJRWMD Consumptive Use Permit for construction de- watering activities, F.D.E.P. N.O.I to use Generic Permit for the Discharge of Produced Groundwater from any Non Contaminated Site Activity, and any building permit's required by the City's Building Official. 1 1.11 LAWS TO BE OBSERVED The Contractor shall give all notices and comply with all federal, state and local laws, ordinances, permit requirements and regulations in any manner affecting the conduct of the Work, and all such orders and decrees as enacted by bodies or tribunals having any jurisdiction or authority over the Work, and shall indemnify and save harmless the City and Engineer against any expense, claim or liability arising from, or based on, the violation of any such law, ordinance, regulation, permit requirements, order or decree, whether by himself or his employees. The failure of the Contractor to adhere to any known law or regulation pertaining to furnishing services under this Agreement shall constitute a material breach of this Agreement. The Contractor shall keep himself fully informed of all existing and pending state and national laws and municipal ordinances and regulations in any manner affecting those engaged or employed in the Work, or in any way affecting the conduct of tribunals having any jurisdiction or 35 12.0 MISCELLANEOUS authority over the same. If any discrepancy or inconsistency is discovered in the Plans, Specifications, or Contract for this work in relation to any such law, ordinance, regulations, order or decree, he shall forthwith report the same to the Engineer and City in writing. He shall at all times himself observe and comply with and cause all his agents, subcontractors and employees to observe and comply with decrees; and shall protect and indemnify the City and Engineer, their officers, employees and agents against any expense, claim or liability arising from or based upon violation of any such law, ordinance, regulations, orders or decree, whether by himself or his employees. All building construction work alterations, repairs or mechanical installations and appliances connected therewith shall comply with the applicable building rules and regulations, restrictions and reservations of record, local ordinances and such other statutory provisions pertaining to this class of work. 12.1 ADDRESSES FOR NOTICES All notices given under or in connection with any of the Contract Documents shall be delivered in person or by telegraph or registered or certified mail to the parties at the address as either party may by notice designate. 12.2 WRITTEN NOTICE Written notice shall be considered as served when delivered to the designated representative of the Contractor and receipt acknowledged or sent by registered mail to the individual, firm, or corporation to the business address stated in Bid Proposal. Change of Address: It shall be the duty of each party to advise the other parties to the Contract as to any changes in his business address until completion of the Contract. 12.3 TAXES Contractor shall pay all sales or other taxes of any type which may be incurred in connection with the Work hereunder, and shall reimburse the City for any such taxes paid by the City. 12.4 TIME IS OF VITAL IMPORTANCE It is agreed and understood that time is of vital importance with respect to the completion date for the Work and all other provisions of the Contract Documents. 12.5 NO WAIVER OF LEGAL RIGHTS Neither the payment for, nor acceptance of the whole or any part of the Work by the City or representatives of the City, nor any extension of time, nor the withholding of payments, nor any possession taken by the City, nor the termination of employment of the Contractor shall operate as a waiver of any portion of the Contract or any power therein reserved or any right therein reserved or any right therein provided, nor shall the waiver by the City of any of the Contractor's obligations or duties under this Agreement constitute a waiver of any other obligation or duty of the Contractor under this Agreement. 36 12.6 RIGHT TO WORK PRODUCT No reports, data, programs or other material produced in whole or in part under this Agreement shall be subject to copyright by the Contractor, in the United States or in any other country. The City or its assigns shall have the unrestricted authority to publish, disclose, distribute and otherwise use, in whole or in part, any reports, data, programs or other material prepared under this Agreement. All tracings, plans, specifications, maps, computer programs and data prepared or obtained under this Agreement shall remain the property of the City. Any use of any plans and specifications by the City except the use reasonably contemplated by the City at the time the City entered this Agreement will be at the City's risk and Contractor, its officers, directors and employees, will be held harmless from such use. 12.7 HOLD HARMLESS Contractor agrees to hold harmless the City of Sebastian, the Sebastian Municipal Airport, and its employees /officers /officials from all claims related to this agreement. IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written. ATTEST: THE CITY OF SEBASTIAN Sally A. Maio, City Clerk Al Minner, City Manager MMC (SEAL) Approved as to Form and Content for: Reliance by the City of Sebastian Only Robert A. Ginsburg, City Attorney Signed, sealed and delivered in the presence of: NAME: NAME: 37 CONTRACTOR West Construction Co., Inc. By: Name: Title: ID THE LPA GROUP INCORPORATED Transportation Consultants 615 CRESCENT EXECUTIVE COURT, SUITE 200 LAKE MARY, FL 32746-2146 407 306-0200 FAX 407 -306 -0460 September 4, 2009 Mr. Joe Griffin Airport Manager City of Sebastian 202 Airport Drive East Sebastian, Florida 32958 Subject: Sebastian Municipal Airport Runway 4 -22 Improvements Revised Scope and Fee Proposal Transmittal Dear Mr. Griffin: Enclosed, please find a revised scope and fee proposal for the Runway 4 -22 Improvements Project. Construction Administration services have been added. We hope that you find this proposal agreeable, and we look forward to working with you on this important project. Please feel free to call me in the Orlando Office at 407 306 -0200 if you have any questions. Sincerely, THE LPA GROUP INCORPORATED Robert K. Hambrecht, P.E. Project Manager cc: Mark Kistler, LPA (e -mail) File (FAH412032.1c) Attachments: Exhibit A Scope of Work Exhibit B Hour and Fee Estimate Design Exhibit C Project Sketch ATLANTA BATON ROUGE CHARLESTON CHARLOTTE COLUMBIA GREENSBORO GULFPORT KNOXVILLE MOBILE MYRTLE BEACH• ORLANDO RALEIGH RICHMOND SARASOTA TALLAHASSEE TAMPA WEST PALM BEACH FAH412032 (Project Identification No.) (Work Authorization No.) It is agreed to undertake the following work in accordance with the provisions of our Non Exclusive Agreement for Continuing Professional Engineering Services dated May 27, 2009. Description of Assignment: (Attached Exhibit A) Provide the City of Sebastian with Engineering, Design, Bidding and Construction Administration services for the improvements to Runway 4 -22 to include removing pavement from the shoulders and the useable width for the entire 4,000' length. Electrical improvements will relocate edge lights and other navigational aids. Basis of Compensation/Period of Services: (Attached Exhibit B) THE LPA GROUP will provide the above services for a Lump Sum amount of$87,289.00 (Eighty -seven Thousand Two Hundred Eighty -nine and No Cents) These services will be performed in accordance with the schedule in Exhibit A, and the Man Hour and Fee Estimate, Exhibit B. Agreed as to scope of services, time schedule, and budget: For the CITY OF SEBASTIAN (FLORIDA) For THE LPA GROUP INCORPORATED Date: Date: Attachments: Exhibit A: Scope of Work Exhibit B: Manhour Estimate Exhibit C: Project Sketch CITY OF SEBASTIAN (Florida) Work Authorization for Professional Services SEBASTIAN MUNICIPAL AIRPORT RUNWAY 4 -22 IMPROVEMENTS Runway 4 -22 Improvements Exhibit A Sebastian Municipal Airport Runway 4 -22 Improvements Scope Description Introduction The Sebastian Municipal Airport (Airport) has requested the services of THE LPA GROUP INCORPORATED (LPA) for the following task: Runway 4 -22 Improvements (Project) This project generally consists of the preparation of construction drawings and Technical Specifications. This project also generally consists of construction phase services as described under Phase 3 of this document. This project is more fully described in the document that follows. Exhibit B contains the Hour and Fee estimate for this task and Exhibit C depicts a sketch of the proposed improvements. Project Description This project consists of removing pavement from the shoulders and the useable width of Runway 4 -22 for the entire 4,000' length. The runway is currently 100' wide with 25' paved shoulders. This project will narrow the width to 78' and remove all shoulder pavement. Other components of this project involve: Relocating the elevated runway edge lights to the correct offset from the new edge of pavement. Relocating flush, in- pavement edge lights at taxiway/ runway intersections. Adjusting the Runway Threshold Lights (RTL's) to the new pavement width. Remove conflicting markings on adjoining taxiways and re -mark. Adjust markings at intersection of Runway 8 -26. Remark the runway for Visual markings. LPA will develop bidding documents and construction documents indicating the proposed improvements including safety and construction phasing details. LPA will perform the necessary coordination with permitting agencies; however, it is assumed that there will be no SJRWMD permit required for this project. 1 Phase 1- Design 1.1 Pre Design Phase Services to be provided by LPA A pre -design field review will be performed by members of the design team. Notes and a photo log will be produced from this visit. Due to the fast track nature of this project, no field survey information will Page A -1 of A -5 September 2009 Construction Plans will consist of: Cover Sheet Project Layout Plans MOT and Safety Plans Demolition Plans Grading Plans Pavement Marking Plans Cross Sections (every 50' -100') Misc. Details Electrical Plans and Details be obtained. Instead, LPA will rely on existing information obtained from the Airport from past projects and as -built field condition data. Geotechnical data will be obtained. Meetings: LPA will attend a kick -off meeting with the Airport to discuss items such as phasing, hours of construction operation, durations, and budgets. LPA will attend a pre application meeting with SJRWMD and prepare necessary paperwork for a "No Permit Required" submittal. 1.2 Design Phase Services to be provided by LPA LPA will provide the following basic design services for this project (see Exhibit B for hour and cost breakdown): Coordination with the City LPA will conduct two (2) meetings with the City of Sebastian to review the progress of the bidding documents. Technical Specifications LPA will prepare Technical Specifications for demolition, pavement markings and electrical construction. Front End/Contract documents LPA will prepare the advertisement, bid forms, general conditions, special conditions, and review the City of Sebastian's modified construction contract. The City of Sebastian will provide the Contract and General Provisions document. Engineers Report A detailed report of the design parameters will be prepared for the Airport's use. It shall include a detailed cost estimate in budgeting and evaluating bids. There shall be a draft bid set prepared for the City's review prior to proceeding to complete bid documents. LPA will provide five (5) half -size sets of Plans, Specifications, and the Engineer's Report to the City and regulatory agencies. Bidding Documents LPA will prepare the following Final Documents for the City. It is noted that the City of Sebastian will provide contract documents. LPA will provide the five (5) sets of documents for: Drawings (to be provided by LPA). Technical Specifications (to be provided by LPA). Bid Documents (to be provided by LPA). Contract Documents (to be provided by the City). 2 Phase 2 Bidding Services 2.1 Bidding Services LPA will perform general coordination and: Prepare for and attend the Pre -Bid Conference; Assist with the preparation of addenda as necessary; Runway 4 -22 Improvements Page A -2 of A -5 September 2009 Assist the City in opening, tabulating, and evaluating bids; and Assist the City in preparing the construction contracts. 3 Phase 3 Construction Administration 3.1 Construction Administration LPA will perform construction administration services to include limited project oversight and contract administration. These services shall be utilized to observe the progress of the Contractor(s)' construction, monitor construction progress, perform general coordination with Contractor(s), review shop drawings and submittals, respond to RFI's and questions, attend meetings, prepare minutes, review pay requests, and perform site visits. LPA shall have an advisory role on the following tasks: Construction Progress Observation: LPA will make visits to the site at bi- weekly intervals in order to observe as an experienced and qualified design professional the progress of the various aspects of the Contractor(s)' work. Based on information obtained during such visits and on such observations, LPA shall endeavor to determine in general if such work is proceeding in accordance with the Approved Contract Documents and LPA shall keep the Airport informed of the progress of the work. LPA shall not, during such visits or as a result of such observations of the Contractor(s)' work in progress, supervise, direct, or have control over the Contractor(s)' work, nor shall LPA have authority over or responsibility for the means, methods, techniques, sequences, or procedures of construction selected by the Contractor(s), for safety precautions and programs incident to the work of the Contractor(s) or for any failure of the Contractor(s) to comply with laws, rules, regulations, ordinances, codes, or orders applicable to the Contractor(s) furnishing and performing their work. Accordingly, LPA can neither guarantee the performance of the construction contracts by the Contractor(s) nor assume responsibility for the Contractor(s)' failure to furnish and perform their work in accordance with the Documents. Defective Work: During such visits and on the basis of such observations, LPA will inform the Airport of deficiencies in the Contractor(s)' work while it is in progress if LPA believes that such work will not produce a completed Project that conforms generally to the Approved Design -Build Documents or that it will prejudice the integrity of the design concept of the Project as reflected in the Approved Contract Documents. LPA will prepare a report based on observations of each site visit for distribution to the Airport and the Contractor(s). Disputes between Airport and Contractor(s): LPA shall act as the initial interpreter of the requirements of the Approved Contract Documents and judge of the acceptability of the work or the interpretation of the requirements of the Approved Contract Documents pertaining to the execution and progress of the work. LPA shall not be liable for the results of any such interpretations or decisions rendered in good faith. Review Monthly Pay Applications: LPA shall review the monthly pay applications from the Contractor(s) and verify quantities /percentage of work completed during the pay application period. LPA shall make a recommendation for payment to the Airport for the Airport to then release payment to the Contractor(s). Runway 4 -22 Improvements Page A -3 of A -5 September 2009 Substantial Completion and Final Inspection: LPA shall make a site visits to determine substantial and final completion. LPA shall prepare and issue a punch list of deficient items following the substantial completion site visit for the Contractor(s) to address prior to final completion. LPA shall issue a Letter of Completion following a satisfactory final inspection. Assumptions: 1. When possible, site visits will be held with the Airport's representative and the Contractor(s) present to review the progress of the work. Exclusive of site visits related to Preconstruction, this task assumes biweekly site visits during the course of the Project, along with the Substantial Completion and Final Inspections (approximately 6 site visits). 2. Applications for payment will be processed monthly (2 total). Deliverable: Narrative field report of observations after each visit and recommendations for payment following each pay application. Contractor(sl' Completion Documents: LPA will review maintenance and operation instructions, schedules, guarantees, bonds and certificates of inspection, tests, and approvals which are to be assembled by the Contractor(s) in accordance with the Approved Contract Documents (but such review will only be to determine that their content complies with the requirements of, and in the case of certificates of inspection, tests, and approvals, the results certified indicate compliance with, the Approved Contract Documents), and shall transmit them to the Airport with written comments. Completion Inspections: LPA shall conduct inspections (maximum of one (1) day for substantial completion) or observe the Contractor(s) demonstrations to determine if the work or parts of the work are partially accepted, substantially complete, or ready for a final inspection as defined in the General Provisions of the Construction Contract. Such inspections shall advise if the completed work is acceptable to the Airport and other governing agencies. Assumptions: 1. All Contractor(s) completion documents will be presented in one (1) submittal for review and comment. 2. Visits will be held with the City of Sebastian Project Representative and the design -build entity present to review the completion of the work. 3. Exclusive of site visits related to periodic construction observation or other applications for payment, this task assumes an additional one (1) site visit during the course of the Project. Deliverables: 1. Comments on completion documents. 2. Advice for determining the substantial completion of the work and review of the Contractor(s)' list of incomplete items. Runway 4 -22 Improvements Page A -4 of A -5 September 2009 4 Phase 4 Closeout Services 4.1 Closeout Services Upon construction completion, LPA will prepare an updated Airport Layout Plan (ALP) for submission to the appropriate agencies. These revised elements of the overall ALP set will be prepared in conformity with the FAA/FDOT Airport Layout Plan drawing standards. Assumptions: 1. The update of the existing ALP includes only the general area of new construction. 2. Modifications will be made to the existing electronic files. Deliverables: 1. Five (5) prints of an updated Airport Layout Plan for submission to the FAA and the Florida Department of Transportation. 2. One (1) electronic file of the Airport Layout Plan. LPA will assist the Airport with the closeout of the Project with the Contractor(s) as well as with the following agencies: The Florida Department of Transportation (FDOT) The Federal Aviation Administration (FAA) The Contractor(s) shall prepare and LPA will certify and deliver as-built drawings, test results, bill of sale, and any other required documentation for agency closeout. 4.2 Subconsultants LPA shall contract with testing firm(s) as necessary for material and construction quality assurance testing during construction. LPA shall have authority, as the Airport's representative, to require special inspection or testing of the work, and shall receive and review all certificates of inspections, testing and approvals required by laws, rules, regulations, ordinances, codes, orders or the Contract Documents (but only to determine generally that their content complies with the requirements of, and the results certified indicate compliance with, the Contract Documents). Testing is expected but not limited to the following elements: earthwork and concrete. LPA will review tests and notify the Airport of the results of each test. Schedule Plans and Specifications shall be completed within two weeks of the Notice to Proceed. The construction services phase shall be shall be 70 days for construction, 30 days for material procurement, and 30 days for punch list and project closeout for a total of 130 days. Runway 4 -22 Improvements Page A -5 of A -5 September 2009 Runway 4-22 Improvements Item/Task Description 2009 Rate a $201.00 a $171.00 $171.00 w $144.00 coo Designer 0 0 r o Technician Technical o Assistant 0 Phase 1 Design Advertise and Coordinate 4 Coordination with City Distribute Bidding Documents 2 1 2 Coordination with Subconsultants Pre Conference 2 3 3 4 Prepare Base Maps -Bid Answers to Bidders /Issue Addenda 2 5 8 Geometric Design Bid Opening 2 6 10 03 Site Visit Review Bids for Responsiveness 2 8 8 4 Coordination with FDOT Certified Bid Tabs /Award Contract 1 1 1 4 4 Coordination with FAA (Airspace Checklist) Contract Preparation 1 1 2 2 8 Review Meeting with City 4 Pre Application meeting with SJWMD 4 Prepare /Submit Preliminary Plans Cover Sheet 2 Project Layout Safety Plan 1 1 2 4 4 General Notes Summary of Quantities 1 1 1 1 4 Phasing Plan 2 1 1 5 9 Typical Sections 1 2 4 7 Demolition Plans 1 4 7 6 18 Grading Plans 1 2 8 5 16 Cross Sections 3 3 6 12 Miscellaneous Details 2 6 8 Runway/ Taxiway Pavement Marking 1 3 4 2 10 Erosion Control Details 2 4 6 Construction Cost Estimate 1 2 5 3 11 Engineer's Report 6 4 10 Technical Specifications 2 3 5 10 Quality Control 1 2 2 5 Project Management 6 6 Phase 1 Design Hours 1 24 21 47 54 53 25 225 Phase 1- Design Fee $201 $4,104 $3,591 $6,768 $5,832 $4,346 $1,900 $26,742.00 Exhibit B: Hour and Fee Estimate Sebastian Municipal Airport Page B -1 of 3 Phase 2 Bidding Advertise and Coordinate 4 4 Distribute Bidding Documents 2 2 Pre Conference 4 4 8 -Bid Answers to Bidders /Issue Addenda 4 8 12 Bid Opening Review Bids for Responsiveness 2 2 4 8 Certified Bid Tabs /Award Contract 4 4 8 Contract Preparation 2 8 10 Exhibit B: Hour and Fee Estimate Sebastian Municipal Airport Page B -1 of 3 Runway 4-zz Improvements Item/Task Description 2009 Rate $201.00 C a $171.00 Phase 3: Construction Administration cientist a Designer 1 c N Technician 0 0 r ical tant lelcl Phase 2- Bidding Hours 0 6 Review Shop Drawing Submittals 14 4 2 2 52 4 4 12 Prepare for and attend Preconstruction Conference 2 2 6 $2,432 $5,474.00 6 14 Coordination with Owner As -Built Certification 4 4 2 6 Coordination with Contractor FAA AIP Survey Certification 16 8 8 2 10 Weekly Site Visits Phase 4: Closeout Services Hours 40 24 4 12 40 Review Pay Applications 8 68 3 $4,104 $684 2 5 Substantial Completion and Punchlist $608 4 4 4 12 Final Inspection 4 4 1 9 Construction Completion Certification 2 2 4 Phase 3: Construction Administration Hours 20 5 64 0 0 23 112 Phase 3: Construction Administration Fee (LS) $3,420 $855 $9,216 $0 $0 $1,748 $15,239 Runway 4-zz Improvements Item/Task Description 2009 Rate $201.00 C a $171.00 Phase 4: Closeout Services cientist a Designer 1 c N Technician 0 0 r ical tant lelcl Phase 2- Bidding Hours 0 6 FDOT Closeout 14 2 0 4 52 4 1 11 FAA Closeout Update ALP $2,016 2 4 $2,432 $5,474.00 4 1 11 As -Built Certification 4 4 2 10 FAA AIP Survey Certification 16 8 8 4 36 Phase 4: Closeout Services Hours 24 4 12 0 20 8 68 Phase 4: Closeout Services Fee (LS) $4,104 $684 $1,728 $0 $1,640 $608 $8,764 Runway 4-zz Improvements Item/Task Description 2009 Rate $201.00 C a $171.00 Design Phase Subconsultants (Lump Sum) cientist a Designer 1 c N Technician 0 0 r ical tant lelcl Phase 2- Bidding Hours 0 6 Topographic Survey 14 0 0 32 52 Phase 2 Bidding Fee $0 $0.00 Electrical Design $2,016 $0 $0 $2,432 $5,474.00 $15,000.00 Geotechnical $1,700.00 Fixed Fee on Subconsultants (10 $1,670.00 Design Phase Subconsultants (Lump Sum) Fee $18,370.00 Runway 4-zz Improvements Item/Task Description 2009 Rate $201.00 C a $171.00 C in $171.00 cientist a Designer 1 c N Technician 0 0 r ical tant lelcl Phase 2- Bidding Hours 0 6 0 14 0 0 32 52 Phase 2 Bidding Fee $0 $1,026 $0 $2,016 $0 $0 $2,432 $5,474.00 Exhibit B Hour and Fee Estimate Sebastian Municipal Airport Design Direct Expenses (Lump Sum) Reproduction Travel Posta•e Design Direct Expenses (Lum Sum) Fee $500.00 $0.00 $100.00 $600.00 9/4/2009 Item/Task Description 2009 Rate n c a $201.00 Project c Manager 0 4' Senior (Engineer o /Scientist) a Engineer o /Scientist 0 Designer 0 0 r c° c ian Technical o Assistant 0 leaol Construction Phase Subconsultants Hillers Electrical En•ineerin. $8,000.00 Qual' Assurance Testin. $3,000.00 Fixed Fee on Subconsultants (10 $1,100.00 Construction Phase Subconsultants Fee $12,100.00 Exhibit B Hour and Fee Estimate Sebastian Municipal Airport Rnnwav 4.22 Imnrnvaments Page B -3 of 3 Subject: Stan Mayfield Working Waterfront Program Proposed Modification Ap rov: d for Submittal by: p Ii/ Grant Agenda No. Departme Finance. t oq, 0q Ori i GM .1 4' City Attorney: City Clerk: Date Submitted: For: Meeting /i Ei. October 8, 2009 of Oct. 14, 2009 ►nner, City Manager Exhibits: EXPENDITURE REQUIRED: $4,015,000 AMOUNT BUDGETED: $3,163,500 SMWW Grant $351,500 CRA Match APPROPRIATION REQUIRED: $500,000 CRA Fund CnYOF HOME OF PELICAN ISLAND AGENDA TRANSMITTAL SUMMARY The Working Waterfront Committee has requested that the City consider a modification to the project boundaries. The City was awarded funding through the Stan Mayfield Working Waterfront Grant that provides 90% of purchase price for the two properties commonly known as Hurricane Harbor and Sebastian Entertainment. The City applied for and received funding for the portion of the grant commonly known as "b a) Acquisition of a parcel(s) of land directly used for the purpose of commercial harvest of marine organisms or saltwater products by state licensed commercial fisherman, aquaculturists or business entities, including piers, wharves, docks or other facilities operated to provide waterfront access to licensed commercial fisherman, aquaculturists or business entities. b) Acquisition of a parcel(s) of land used for exhibitions, demonstrations, educational venues, civic events and other purposes that promote and educate the public about economic, cultural and historic heritage of Florida's traditional working waterfronts, including the marketing of seafood and aquaculture industries. During the course of the summer, while the State conducted the appraisals and began land acquisition negotiations, the Working Waterfront Committee identified the Dabrowski /Offshore Marina property, due south of Hurricane Harbor, as a key parcel. This was the parcel Fisherman's Landing Sebastian, Inc. sought for purchase in order to acquire a commercial dock and fish house. This application was not funded. At the PARCEL ORG STATE FUNDING ORG CITY FUNDING ORIGINAL MODIFIED TOTAL STATE MODIFIED CITY MODIFIFED TOTAL Hurricane Harbor $2,250,000 $250,000 $2,500,000 $2,250,000 $250,000 $2,500,000 Entertainment Ctr $900,000 $100,000 $1,000,000 $0 $0 $0 Dabrowski Parcel $0 $0 $0 $900,000 $600,000 $1,500,000 TOTAL $3,150,000 $350,000 $3,500,000 $3,150,000 $850,000 $4,000,000 C NOTE time of application, the Fisherman's Landing Sebastian, Inc. had not yet received their 501(c)3 status from the Internal Revenue Service and their application was denied. Since the time of application the group has received their not for profit status certification. At this time, City staff is now aware that the Sebastian Entertainment Center will not be purchased. Please note, that appraisal information and negotiated prices are still confidential. However, with the Sebastian Entertainment Center not being purchased, approximately $900,000 of grant funding is available. If the City does not amend the grant at this time, the money will return to the State. Because the Working Waterfront Committee has suggested that the City Council consider purchase of the Dabrowski parcel, now is the ideal time to formally consider a grant modification, as the State has not re- opened and will not be funding additional grant rounds in the coming year. Preliminary conversations with the FCT staff have indicated that they are amenable to the project boundary modification because it would further the overall goals of the grant program. This parcel would fulfill the acquisition goals outlined in part "a It is anticipated that an additional $500,000 would be needed from the City to purchase this property. This property includes a commercial dock and a fishhouse. If the land acquisition is made, the City could lease the dock and fishhouse to Fisherman's Landing Sebastian, Inc. in order to manage the fishing operation. Attached is a copy of the Fisherman's Landing Sebastian, Inc. grant application. For your information, Martin County has a similar situation whereby the County owns the docks in Port Salerno and leases them to a fishing group. Below is a chart which depicts how funds can be shifted to accommodate the additional expenditure through CRA funding. All land acquisition costs are estimates. There is the potential that if the appraisal is equal to the original amount budgeted for the Sebastian Entertainment Center, than no additional funding would be necessary. If the City Council approves, Staff will send a written request to the Florida Communities Trust (FCT) staff for their review. FCT staff will consider the boundary request and if approved, will initiate the appraisals for the parcel. FCT staff has indicated that modifying the project boundaries will not delay the acquisition currently being negotiated. RECOMMENDATION Approve project boundary modification request and additional funding for transmittal to Florida Communities Trust (FCT). RESOLUTION NO R -09 -41 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SEBASTIAN, FLORIDA, REQUESTING A BOUNDARY MODIFICATION AND INCREASING FUNDING ALLOCATION FOR THE APPROVED STAN MAYFIELD WORKING WATERFRONT GRANT; PROVIDING FOR CONFLICTS AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS the Florida Communities Trust, has been authorized to provide funding opportunities to local governments or non profit entities to preserve and promote Sebastian's heritage commercial fishing industry through the Stan Mayfield Working Waterfronts grant program. WHEREAS the City has acknowledged that the purpose of the Stan Mayfield Working Waterfronts program is to further the protection and continuation of working waterfronts in the State of Florida. "Working Waterfront" is defined in the Florida Statute as: (a) A parcel or parcels of land directly used for the purposes of the commercial harvest of marine organisms or saltwater products by state licensed commercial fishermen, aquaculturists, or business entities, including piers, wharves, docks, or other facilities operated to provide waterfront access to licensed commercial fishermen, aquaculturists, or business entities; or (b) A parcel or parcels of land used for exhibitions, demonstrations, educational venues, civic events, and other purposes that promote and educate the public about economic, cultural, and historic heritage of Florida's traditional working waterfronts, including the marketing of the seafood and aquaculture industries. WHEREAS the City was awarded up to $3,163,500.00 from Florida Communities Trust on April 13, 2009, to be utilized to acquire the two parcels of land outlined in the original application fulfilling the goals of the program as outlined in part (b) above. WHEREAS the State conducted two appraisals and sent a written offer for the Sebastian Entertainment parcel, which was rejected by the property owner and no longer being considered for acquisition. WHEREAS the City now requests a boundary modification to start the acquisition process for the parcel commonly known as Dabrowski/ Offshore Marina containing a commercial dock and historic fish house. This parcel would be considered for purchase instead of the Sebastian Entertainment parcel. WHEREAS the City will commit funding to the amended project. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SEBASTIAN FLORIDA as follows: Section 1. APPROVAL. The City Council hereby expresses its support and request approval of boundary modification. Section 2. AUTHORIZATION. Authorizes the City Manager to transmit a letter with this resolution to the Florida Communities Trust program. Section 3. CONFLICTS. All resolutions or parts of resolutions in conflict herewith are hereby repealed. Section 3. EFFECTIVE DATE. This resolution shall take effect immediately upon its adoption. This resolution was moved for adoption by Council Member The motion was seconded by Council Member and, upon being put to a vote, the vote was as follows: Mayor Richard H. Gillmor Vice Mayor Jim Hill Councilmember Andrea Coy Councilmember Dale I. Simchick Councilmember Eugene Wolff The Mayor thereupon declared this Resolution duly passed and adopted this 14 day of October, 2009. City Clerk City Attorney CITY OF SEBASTIAN, FLORIDA By: Mayor Richard H. Gillmor ATTEST: Approved as to Form and Legality for Reliance by the City of Sebastian only: Sally A. Maio, MMC Robert A.Ginsburg November 25, 2008 Fisherman's Landing Sebastian, Inc. PO Box 780126 Sebastian, FL 32978 Mr. Ken Reecy Community Program Manager Florida Communities Trust 2555 Shumard Oak Boulevard Sadowski Building, Suite 310 Tallahassee, Florida 32399 -2100 Dear Mr. Reecy: On behalf of Fishermen's Landing Sebastian, Inc., I am pleased to submit the enclosed grant application (one original and two copies) to Florida Communities Trust's Working Waterfronts Program. This application is for acquisition of Fishermen's Landing Sebastian, Inc, 1532 Indian River Drive, Sebastian, FL 32958. Parcel number 31390600001001000002.0. If the project site is selected for funding, Fishermen's Landing Sebastian, Inc., is committed to fulfilling all commitments made in the grant application. We have received an opinion from the local government planning staff determining that the proposed use of the project site is consistent with the local comprehensive plan. I also certify that condemnation or the threat of condemnation has not been used and will not be used to acquire any portion of the project site. hereby authorize Charlie Sembier, director, to act as the Key Contact for the project. I understand that all correspondence concerning the grant application will be directed to this person. You may reach him at 772 473 -1578 or Bsembler @aol.com or by mail at 6945 49 Street, Vero Beach, FL 32967. Sincerely, Ed Mangano, President 1 Florida Communities Trust Application Form SMWW -1 Stan Mayfield Working Waterfronts Grant Application Form In Accordance With Rule 9K- 9.003(1), F.A.C. 1. PROJECT NAME Fisherman's Landing Sebastian 2. APPLICANT NAME Fisherman's Landing Sebastian, Inc. (Name of Local Government or Nonprofit Working Waterfront Organization) Nonprofit Working Waterfront Organization, must provide the required information requested in Exhibits J, K and L. 3. PARTNERSHIP APPLICATION Is this a Partnership Application between a Local Government and Nonprofit Working Waterfront Organization? YES NO X If yes, provide the name of the Nonprofit Working Waterfront Organization. Also, provide an application transmittal letter from the partnering agency. 4. KEY CONTACT PERSON Note: The key contact is required to be an employee of the Local Government or Nonprofit Working Waterfront Organization. Identify only one key contact person. Key Contact Name Charles W. Sembler Title Director Department Mailing Address 6945 49 Street City Vero Beach Phone Number 772 473 -1578 Fax Number E -mail Address bsembleraol.com Chief Administrator for the Local Government Name Phone Number Note: If the Applicant's principal office address is a post office box, a delivery address is also required. Delivery Address City FL Zip Code 5. PROJECT SITE LOCATION Form SMWW -1 (Fffaotiva 1 (Descriptive project name) First Middle Initial Last FL Zip Code 32967 County Indian River Section 06 Township 31S Range 39E Note:. Include all directional designations (Township either North or South Range either East or West). 6. TOTAL PROJECT ACREAGE .38 acres (upland), .76 acres (submerged lease assigned to land owner), total 1.14 Acres Pons. 1 Indicate the approximate acreage of the Project Site. 7. ACQUISITION TYPE The Applicant must fill out one of the following acquisition types, as appropriate. 1.14 Acres X Fee Simple The Project Site will be a joint acquisition with both FCT and the Applicant participating in the Acquisition process. Less than fee Working Waterfront Covenants FCT and the Applicant will acquire a Tess than fee interest in the site acquiring the development rights off the property while still allowing the owner to continue operation of the site as a Working Waterfront. 1 Number of separate ownerships to be acquired within the Project Site. Note: No Project Site can contain more than 3 ownerships. 8. ESTIMATED PROJECT COSTS Enter an amount on each line and round to the nearest hundred dollars. a. Land purchase price (estimated) 2,000,000.00 b. Acquisition costs (estimated) Cost of certified survey(s), appraisal(s), appraisal review(s), title report(s), 45,000.00 title insurance premiums) and environmental audit(s). c. Total Project Costs [Add a. and b.] 2 9. AWARD AMOUNT AND MATCH Dollar Amount Percentage of Award a. FCT grant award amount (1) 2,045,000.00 100 (2 decimal places) b. Match amount (2) 0.00 0 (2 decimal places) c. Total Project Costs [Add a. and b.] 2,045,000.00 0 (Should equal 8.c above) (1) The total amount of any Award or combination of Awards applied for by any Local Government(s) or Nonprofit Working Waterfront Organization(s) under any Application(s) or Partnership Application(s) for any project(s) shall not exceed funds available during any one cycle. (2) No match is required. Points are awarded in the criteria (4)(a) 1 and 2 for various levels of match. 10.SOURCE OF MATCH Not Applicable No Match Proposed Check the appropriate response(s) below to indicate eligible source(s) of Match: Existing or future cash from the Applicant. Cash or grant from federal, state, regional, county, municipal, or other agency. Cash from a private Donation. Value of real property donated by the landowner in a documented bargain sale or Donation agreement. Note: If the source of the Match is from a third party, provide documentation indicating source and amount. Form SMWW-1 (Effective Pans. 9 OWNERSHIP AND ACQUISITION PLAN List all property owners and parcel tax identification numbers for all parcels. Requirement: Provide a willing owner letter for all parcels listed below (Exhibit H). Owner's Name Parcel Tax ID Number(s) Owner's Mailing Address Owner's Name Parcel Tax ID Number(s) Form SMWW -1 (Effective Parcel Tax ID Number(s) Owner's Name Anna Dabrowski Authorized Agent: David A. Dabrowski (son) 31390600001001000002.0 Owner's Mailing Address Anna Dabrowski, 20100 Renfrew, Detroit, MI 48221 David Dabrowski (authorized agent), 9225 87 Street, Vero Beach, FL 32967 (772) 589 -3957 Phone Owner's Mailing Address Phone Phone Page 3 The purpose of the Stan Mayfield Working Waterfronts Program is to further the protection and continuation of Working Waterfronts in the State of Florida. "Working Waterfront" is defined in the Florida Statute as: (a) A parcel or parcels of land directly used for the purposes of the commercial harvest of marine organisms or saltwater products by state licensed commercial fishermen, aquaculturists, or business entities, including piers, wharves, docks, or other facilities operated to provide waterfront access to licensed commercial fishermen, aquaculturists, or business entities; or (b) A parcel or parcels of land used for exhibitions, demonstrations, educational venues, civic events, and other purposes that promote and educate the public about economic, cultural, and historic heritage of Florida's traditional working waterfronts, including the marketing of the seafood and aquaculture industries. The project proposed for funding in the grant application trust clearly further the purposes of a Working Waterfront as outlined above. Form SMWW -1 (Effective Panes 4 Project Summary or Business Summary Business Summary The disappearance of commercial fishing and working waterfronts in Florida has been astonishing; their losses leaving scars on our shores, economy and cultural heritage. Today, only a fraction of Florida's 1,197 miles of coastline are devoted to commercial fishing. Portions of our state's working waterfronts are being sold weekly and converted to other uses, often times as second homes and condominiums. As a result, Florida's historic fishing industry and the rich cultures once prevalent in its waterfront villages are in peril. The Stan Mayfield Working Waterfront Act recognizes the need to preserve our State's esteemed fishing traditions and provides for crucial commercial waterfront access: 'The Legislature finds that the quality of life, environmental quality, as well as the viability and vitality of the urban areas of this state are directly linked to urban open space and greenways. The creation of greenways; expansion of green spaces; enhancement of recreation areas; preservation of working waterfronts; and protection and restoration of urban lakes, rivers, and watersheds in the urban areas of this state are necessary to link populated areas with natural areas, preserve unique cultural and heritage sites, provide land for recreational opportunities to enhance the health and well -being of the urban residents of this state, improve water quality, reduce the level of urban crime and violence, and build confidence and self esteem among the urban youth of this state. fs 380.502 Fisherman's Landing Sebastian, Inc. is dedicated to "Preservation by Maintaining" Our organization's approach acknowledges that some things cannot be "fixed" quickly, and that the framework of an object's original state must inevitably change. Preservation by Maintaining calls for a dynamic approach to that which is being preserved; it is a gradual shift from focusing on individual buildings, to a broader focus on the more organic segments of the constructed and living maritime community. Preservation by Maintaining must be dynamic, or "holistic in order to create self- sustaining models; the true goal of preservation. Even a goal like the preservation of an individual threatened species is dependent upon the larger objective of maintaining a balance in habitat. In other words, preserving the overall environment is critical to sustaining the various species within it; they are interdependent. If the Florida commercial fisherman is to survive, it is vital that we preserve the environment in which tie exists; Florida's working waterfronts and the communities which surround and interact with them. With its abundant natural resources (fish and shellfish populations), available shoreline, deep water access, existing infrastructure and no other competitive venues, the Sebastian area currently provides an excellent opportunity to embark upon a successful working waterfront model. In fact, Sebastian historically and currently possesses all the attributes needed to be hailed as "the model' working waterfront conservation program. A Brief History First known as Newhaven, the coastal area located at the south end of the Indian River Lagoon was renamed Sebastian in 1884. Fishing in the area for subsistence and recreation had flourished since the time of the Ais Indians, and was the mainstay of the small community. By the end of the 1800's, two things helped establish Sebastian as a small, but lively and important fishing village. Henry Flagler's Florida's East Coast Railroad provided fishermen and citrus growers with the fastest shipping possible to the country's northeast markets. Combined with John Gorrie's ice machine, it became possible to transport highly perishable products over long distances; and the town of Sebastian prospered. Four firms were engaged in the fish business during the winter of 1895 -96, shipping goods mostly to New York, Richmond, and New Orleans. Opportunity seemed limitless, and it didn't take long for a full fledged industry to be set in motion. In its heyday, some nineteen fishhouses were located along the Indian River. Sebastian's Archie Smith Wholesale Fish Company, no longer in business, is now an official historic site on the U.S. National Register of Historic Places. Commercial fishing, citrus, tourism, and a host of smaller industries continued to fuel the area's economy and growth until World War I1. Today, however, only the remnants of a once mighty fishing industry remain. Countless hurricanes, government regulations, net bans, foreign competition, skewed property taxes, pollution, and residential development are just a few things that contributed to Sebastian's historic and cultural collapse. Form SMWW -1 (Effective Paoe 5 The Indian River Lagoon no longer provides a nucleus and much needed infrastructure for commercial fishing operations. As a result, the number of profitable ventures has declined. While some finfish is still harvested and there is a modest and viable farm raised clam industry, there is also a gaping "hundred- mile hole" between Cape Canaveral and Ft. Pierce where fishermen can no longer efficiently make a living. It's not uncommon to see commercial fishing boats tied to sea walls along the hundred -mile stretch, impatiently waiting to find makeshift docking facilities with enough deep water and infrastructure to handle their catches. Often times, they are forced to waste fuel and valuable time traveling to the north and south of Sebastian to unload. In spite of these obstacles, the determination of this die -hard fishing breed, combined with battered, but renewable, fishing infrastructure presents a rare and timely opportunity. The City of Sebastian has clearly demonstrated its desire to resurrect and preserve its historic working waterfront. Cultural preservation, like the conservation of our natural resources, depends upon leadership, management, the resources of civil society and the popular will. Sebastian possesses nearly all of these traits. Land acquisition is critical. Provided the necessary funding for land acquisition, Fisherman's Landing Sebastian, Inc. and the local community are prepared to nurture, rebuild and maintain an environment to facilitate a maritime renaissance for perpetuity; a living cultural heritage comprised of both the old and the new. This rebirth of the area's commercial fishing industry will assist in fulfilling current consumer demand for local seafood products and provide a myriad of employment opportunities during and after the development stages. Within eyesight of Sebastian is Pelican Island. The Park is renowned as the United State's first National Wildlife Preserve. The Sebastian area is poised for yet another first: To be Florida's first and nation's most successful working waterfront program. While similar initiatives can be found in the Northeastern United States, our plan is unique in that it embraces a multitude of commercial waterfront and educational activities at a single location. Florida Communities Trust can be instrumental in making this vision a reality by partnering with Fisherman's Landing Sebastian, Inc. Once the necessary land is acquired, we are prepared to execute the following: Overview of Strategies Land Acquisition o Application to Florida Communities Trust working waterfront grant program for initial funding. The current site is ideally suited for the business proposal and can be acquired from a single private owner on a Fee Simple offering. It should be noted that the current owner is motivated by the Stan Mayfield Working Waterfront Act. While the current owner is not engaged in commercial fishing; she is committed to the spirit and intent of the new legislation; to preserve Florida's working waterfronts; Development of Non Profit Fisherman's Cooperative o Recruit and formally contract with commercial fishermen, aquaculturists, brokers, wholesalers, distributors and retailers for utilization of facilities and /or products provided by the Cooperative; Budgeting o Develop a comprehensive business plan and a formalized extensive budget for capital improvements, recruitment, operations, marketing and maintenance; Restoration of Fishhouse o Reconstruct existing facilities and develop a new two -story structure for commercial utilization (minor and major restorations) as outlined in the FCT application. The fishouse redesign will incorporate venues for public educational viewing and participation (photos and exhibits); Restoration of Docking Facilities o Reconstruct and expand existing, damaged and decaying docking facilities to facilitate commercial utilization (minor and major restorations) as outlined throughout the FCT application. Commercial and recreational boat facilities will be identified (photos and exhibits); Enhancement of Aquaculture Facilities o Improve existing facilities (clam processing) for commercial utilization, value -added processing and public viewing opportunities (photos and exhibits); Restoration of On Dock Rail Transport System o Reconstruct a vintage rail transfer system to facilitate efficient movement of products and supplies to and from fishhouse and distribution channels. Public viewing venues will be incorporated (photos and exhibits); Multi -Media Educational Venues o Develop interactive educational and promotional kiosks, displays and signage within fishhouse, along all linear docks and public walkways as outlined throughout the FCT application. Emphasis will be placed on cultural heritage in context with modern -day business practices; rm SMWW -1 (Effective Pane R Eco- Tourism Venues o Develop an integrated system of public participation eco- tourism venues and provide a schedule of "Info tainment" events and programs as outlined in the FCT application; Marketing Partnership o An on -going marketing, advertising and promotional program will be developed and implemented with the Florida Department of Agriculture and Consumer Services, Division of Marketing and Development, Bureau of Seafood and Aquaculture. This program will maximize commercial use and public participation while raising awareness of Florida's seafood industry and rich heritage. The Sebastian Chamber of Commerce, Visit Florida and the Florida Department of Transportation can also contribute toward these marketing efforts; Destination and Product "Branding" o Fisherman's landing will provide unique educational and entertainment experiences for all visitors. Products and services from the area will also be unique and meet the current consumer demand for "locally produced" items. The area's aquaculture production is considered "eco- friendly" and has excellent value -added qualities. Venue merchandising opportunities are limitless. All these attributes will lead toward a "Sebastian Brand" identification program to enhance marketing efforts and profitability; Maintenance Program o Marine facility maintenance is complicated. A comprehensive program will be developed by a team of maritime experts and rigidly followed to keep all facilities in optimal condition; Develop Ongoing Growth and Expansion of the Waterfront Model o Fisherman's Landing Sebastian, Inc. will work with the City of Sebastian and Indian River County to acquire adjacent lands (from private landowners), incorporate the City's Riverfront Development Project, expand the size and scope of the working waterfront and contribute to the current goals stated in their Community Redevelopment and Comprehensive Growth Plans. Closing Statements: Given the magnitude of the Fisherman's Landing working waterfront initiative, it is not possible to thoroughly detail all of the specific business elements within the parameters of this application. The strategies listed above should be considered in context with the brief explanations throughout the application, photos, and exhibits; and with an understanding that a comprehensive business plan will be developed. The master plan will communicate immediate objectives, long -term goals, and specific criteria to measure success. Particular attention will be focused on cooperative participation, industry profitability and visitor attendance. The purpose of this outline is to communicate the vision of Fisherman's Landing Sebastian, Inc. and petition for assistance from the Florida Communities Trust. The vision and master plan of Fisherman's Landing Sebastian, Inc. creates a new model for the local community that involves cooperative commercial fishing and aquaculture, processing and distribution; public education and recreation; retail merchandise outlets, entertainment, public dining, and eco- tourism all laced with traditional and cultural flavor. Ideally located adjacent to major transportation corridors, interstate highways and Florida's hub of tourism, we believe Sebastian will become an attraction for out -of -state tourists and a destination for citizens looking for "Stay- cations" during tough financial times. The long -term goals include attracting other related businesses further bolstering the local and State economies. While cultural heritage preservation is not yet as engrained as conservation of nature, the movement is rapidly growing in Florida. More than ever before, people and organizations now understand that cultural resources are critical to the State's memory, survival of local economies and Floridians' very sense of themselves. Florida Communities Trust holds a financial lifeline for Florida's seafood industry and the steeped traditions of Sebastian. Fisherman's Landing Sebastian, Inc. holds a vision, drive and expertise to develop and sustain a traditional working waterfront. In fact, our team maritime experts has centuries of experience in the development and operation of commercial fishing enterprises (bios attached). With the enactment of the Stan Mayfield Working Waterfront Act and a recent Constitutional Amendment providing tax incentives for such properties, it is clear that our State's citizens and leaders value commercial fishing and view our shared cultural heritage as a public good. We are prepared to start the process in Sebastian and welcome the opportunity for onsite communication and master plan development. Form SMWW -1 (Effective Paae 7 PROJECT EVALUATION CRITERIA Answer the following questions, as applicable to the proposed project. Where requested, provide support documentation or attached Exhibits. Note: Provide a response to each of the following criteria, either yes or no. If the answer to a criterion is checked no, move to the next question. If the answer to a criterion is checked yes, provide a response as appropriate and limit your response to no more than 1/2 page. Any criterion that is not addressed or is left blank will not be evaluated and no points will be awarded. (1) Location (a) The Project Site is located within the boundary of a locally designated Community Redevelopment Area as defined in s. 163.340, F.S. and furthers the adopted community redevelopment plan (10 points). YES X NO If yes provde documentation from the local government that the Project Sites located v,fithin a Community Redevelopment Area, provide a neap showing the boundaries of the CRA. and provide a copy of the adopted corn iu redevelopment plan. Were all three documents provided in the grant application? YES X Documented in Exhibit M NO If documentation is not provided, no points will be awarded. (b) The Project Site is adjacent to state -owned submerged lands designated as an aquatic preserve identified in s. 258.39, F.S. (10 points). YES X NO If yes, provide documentation from the Department of Environmental Protection's Office of Coastal and Managed Areas, including a map and letter, that the Project Site is adjacent to state -owned submerged lands designated as an aquatic preserve. Were both documents provided in the grant application? YES X Documented in Exhibit N NO If documentation from the Department of Environmental Protection's Office of Coastal and Managed Areas is not provided, no points will be awarded. (c) The Project Site is located within a municipality with a population Tess than 30,000 (10 points). YES X NO If yes, provide documentation from the FCT web site showing that the Project Site is in a municipality with a population less than 30,000. Was documentation provided in the grant application? YES X Documented in Exhibit 0 NO If documentation is not provided, no points will be awarded (d) The Project Site is within an area designated as an active "Waterfronts Florida Partnership Community" (9 points). YES NO X If ve,s, provide documentation from the Depart en, o1 Community Waterfronts c F P :I.il'!!'lit'r f :ltr.�i: i1 at -fii' nt.� s Partners ,p, `f'i Riding acid letter, that the Project Site s located wit, acts "Waterfronts i. map j i 71t� I 'dt tF `,i; i!ft :3 d" w}i Florida i= Partners .'ip Community", Form SMWW -1 (Effective Page 8 Were both documents provided in the grant application? YES Documented in Exhibit NO X If documentation from the Department of Community Affairs' Waterfronts Florida Partnership is not provided, no points will be awarded. (e) The Project Site provides services and is located within 15 miles of a state designated aquaculture "High Density Lease Area" (5 points). YES X NO If yes, provide documentation from the Department of Agriculture a o Consumer Service including a rnaap and letter the Project Site is located with n 15 miles of a stale -'a% Eilated aquae u :urt High .)e'ns Lease Area'. Were both documents provided in the grant application? YES X Documented in Exhibit P NO If documentation from the Department of Agriculture and Consumer Services is not provided, no points will be awarded. (f) The Project Site is within an area designated as a "Rural Area of Critical Economic Concern" (4 points). YES NO X if yes, provide documentation from t ie FCT web site showing that the Project Site is in 'Rural Area of Critical Economic Concern", Was the documentation provided in the grant application? YES Documented in Exhibit NO X If documentation is not provided, no points will be awarded. (2) Economic Consideration (a) The proposed project provides an economic benefit to the community (10 points); YES X NO If yes, discuss now the acquisition development and management of the Project Site will provide an economic benefit to the community. The State of Florida's "Enterprise Florida" agency recently reported that the state's economy is experiencing a contraction in both output and employment, and has been propped up by continued performance in several critical sectors including exports, government, tourism and agriculture. While Sebastian is experiencing downward economic pressure, the area also holds agriculture, seafood, and tourism assets all recognized as viable; but not fully and creatively developed. Almost all successful entrepreneurs and reputable business schools confirm that organizations entering an economic downturn with a pre established and creative strategic plan with emphasis on development and marketing strategies are best positioned to approach recessions as economic opportunities to strengthen their competitive advantages and derive value from its assets. Investing in Sebastian's existing waterfront assets will immediately yield employment opportunities and facilitate local economic growth. Restorations, news construction and business development will prompt local spending, circulate funds and ultimately yield additional tax revenues for City, County and State governments. This project is, literally, `Main street economic stimulus" (b) The Project Site is located in a municipality or in the unincorporated county with a growth rate that exceeds the average growth rate for the state, as shown by population increase since the last census (10 points); YES X NO if yes. prove documentation from the FCT web site rh v r� Sh s in t the yes, web :,z: �;.s aE .'�...Is the z r;; "t.,L Site i. an arca that a growth rate for the state, as shown by population increase since the fast census Form SMWW -1 (Effective Was the documentation provided in the grant application? YES X Documented in Exhibit Q NO If documentation is not provided, no points will be awarded Penn Q Provide photographs of the tac (c) The Project Site has sustained hurricane damage in the past 5 years such that operating capacity was reduced or normal operations were interrupted for a period of not Tess than two weeks (5 points). YES X NO It yes, provide documentation showing that the Project Site has sustained significant hurricane damage in the past 5 years, including identifying the hurricane and provide a state or federal doc .rne t verifying that the project site sustained significant hurricane damage such as a copy i t` :e e of t at or r., C.:., :lf;', i. partrr ^nt C3: Environmental f'i'otc ;ticn'S Emergency �`iiz :h :eri7<s< t ie repair of the docking facility, Was the documentation provided in the grant application? YES X Documented in Exhibit R NO If documentation is not provided, no points will be awarded (3) Site Suitability /Readiness (a) The Project Site contains existing structures that can be used or require only minor improvements, for use as commercial saltwater fisheries or aquaculture operations (points may be awarded based on the following criteria): (1) Docking facility for commercial fishing vessels (12 points); YES X NO If yes, describe the existing facility, car (Ilion of the existing structure and proposed uses for the dockiric facility. Provide photographs of the docking facility. Minor repairs include replacing broken, cracked or decaying boards that could pose a potential hazard to workers or visitors on the site. Some functional pilings will be replaced to prevent damage to watercraft mooring at the facility. While some of the existing pilings currently provide adequate support for a simple single -use dock structure, our development plans call for replacement with taller pilings to avoid hazards with larger commercial and recreational vessels. These replacements are not considered "major" due to the nature of the work, and the commercial use of the facility will not be disrupted during repairs. Were photographs of the existing docking facility provided? YES X Documented in Exhibit S NO If photographs are not provided, no points will be awarded (2) A Seafood House or other buildings to be used for Working Waterfronts Business (10 points); YES X NO If yes, describe the existing facility, i'ond tion of the existing structure, and proposed use for the facility. The clam "raceways" (flowing cultivation chambers) presently located between the North and South docks will be renovated both aesthetically and structurally for more efficiency and to allow better visibility (as an educational venue) for visitors. The truck loading and logistics center is a site structure that will also receive minor repairs (replaced decking). Were photographs of the existing facility provided? YES X Documented in Exhibit T NO If photographs are not provided, no points will be awarded (3) Boat ramp for commercial fishing vessels (8 points); YES NO X if yes, describe the xistii t 'fit 1 ?f. r? ;i is i'. o uct 51-4 r L,.i3 t r�. Et Pro pncto rr i o i boat rt rr r', uses for the boat ramp. Form SMWW -1 (Effective Page 10 Were photographs of the existing boat ramp provided? YES Documented in Exhibit NO X If photographs are not provided, no points will be awarded (4) Storage area for traps, nets, and other gear needed for commercial fishing or aquaculture operations (4 points); YES X NO if yes, describe the existiria area and proposed uses for the storage area. Provde photograps of the storage area. A portion of the site has been set aside for the storage of algae push nets and other aquaculture cultivation equipment used by Cooperative members in the cultivation and processing of commercial shellfish. Were photographs of the storage area provided? YES X Documented in Exhibit U NO If photographs are not provided, no points wiH be awarded (b) The Project Site has a submerged land lease from the Board of Trustees, Environmental Resource Permit, or Wetland Resource Permit for the existing or proposed docking facility (7 points); If yes provide a copy of the subrnerged land lease from the Board of Trustees, Environmental ReoourcoPannit Wetand Resource Perni. for the existing or proposed dockiny facity. Was the documentation provided in the grant application? YES X, Docurnented in Exhibit V NO |fdocumentation is not provided, no points will be awarded (c) The Project Site has obtained all necessary permits from the local government for existing or proposed uses on the uplands (7 points); If yes, discuss the existing or proposed uses of the upland and what local permits are required, Provide a letter from the local gove[mnentb|Rnningur building department that the Project Site has obtained aU necessary perrnits for tho e>dsting or proposed uses on the upands Was the documentation provided in the grant application? YES X Documented in Exhibit W NO If documentation is not provided, no points will be awarded (d) The proposed project will be acquired using a Iess-than-fee Working Waterfront Covenant for all of the land to be acquired (5 points). YES NO X yes, describe the existina or proposed activi hat MI be conducted to further continuation of Working Waterfront activities in that area Provide an affidavit from the owner that they are willing to sell the dev:-)1opment rights off the prooerty and continue 0 operate the site to further the continuation of Working Waterfront activities on the site. Was the affidavit provided? YES Documented in Exhibit NO X If the affidavit is not provided, no points will be awarded Form SMWW-1 (Effective 1 Facie 11 (e)The Project Site will participate in Florida's Clean Marina Program (4 points). YES X NO The applicant will work with the r Dep tm t of En .nt P n c Marina t t` r� t;n` :r'ie'?r°"ir,.� c:l litri:=4 n `C implement a c.ri �arl'13 '!'S;. "arT' z:4c the Project Site. w (4) Financial Contribution 156 Form SMWW-1 (Effective (a) Providing a share of the eligible Match. The Applicant is committed to: Not Applicable Provide photographs of the existing facility or the area for the proposed structure. (1) Provide a Match between 25 percent to 34 percent of the Project Costs, or, for Small Local Governments as defined in 9K- 9.002(21) and Nonprofit Working Waterfront Organizations, a Match between 10 percent and 19 percent of the Project Costs (5 points); or YES NO X (2) Provide a Match of 35 percent or more of the Project Costs, or, for Small Local Governments as defined in 9K- 9.002(21) and Nonprofit Working Waterfront Organizations, a Match of 20 percent or more of the Project Costs (10 points). YES NO X (b) The applicant has committed to major restoration of an existing docking facility for commercial fishing vessels or to construct a new docking facility for commercial fishing vessels (8 points); YES X NO For the major restoration of an existing docking facility, describe the existing docking facility, condition of the existing docking facility, what repairs the applicant will do to bring the structure into working condition, and proposed uses of the structure. For the construction of a new docking facility describe the size of the proposed docking facility and the proposed use of the structure. The proposed docking area needs to be boated in a rm n mi rn of 3 feet of water at Mean Low Water and not located over any sea grass beds. Provide documentation from a surveyor, engineer or environmental consultant, showing that the dooming ari=a located in at least 3 feet of water at itfean Low Water and that there no grass beds in the decking area. Decking for the South Dock was totally destroyed by hurricanes in 2004. Presently, fishermen use the make -shift facilities to tie up their boats, but shore access is only available via a narrow and precarious arrangement of unattached boards. New supports and marine decking will return the dock to a complete commercial facility. A fully functional "retro" push -car rail system will also be installed along the South Dock. This system will permit efficient loading of ice, bait, equipment and other supplies for fishing vessels. The two way transportation system will also help fishermen move daily catches from vessels to the fishouse and truck loading center in an efficient manner. These facilities are deemed critical to users. Fishermen are currently using wheelbarrows to manually load product. Was the documentation of the docking area and photographs of the existing facility or area of the proposed structure provided? YES X Documented in Exhibit X and AB NO If the documentation and photographs are not provided, no points will be awarded Page 12 (c) The applicant has committed to major restoration of an existing Seafood House or other building(s) used for Working Waterfront Business or to construct a new Seafood House or other buildings of at least 1,000 square feet to be used for Working Waterfront Business (6 points); YES X NO i r the major restoration of an waist utr cure describe th st r, t:_ c r f existing e ��xi.: ;i: i Sa: i..t "z :Jitit�n of the xi5tiil� 3tru cu'e, what repairs the ziriplir a 'MI: do to bring the s ructure into :-working condition, and prop e uses of the structure. For the construp, n Cif a new building, de s�;ril: and the proposed ..se of the structure. Provide phctograp is of the existing i ifiy or the area for tt r r000seci st.rrictt Pro roc% tiff $st 3 (5) Community Planning Form SMWW -1 (Effective neeos to be located in a emir proposed size of Inc new _.tructurc (min ;miii i of 1,000 square feet) The existing Fishhouse was damaged beyond repair by hurricanes Frances and Jeanne in 2004. The structure will be rebuilt using the current "footprint", however, the new building will be significantly larger and of two -story design. The bottom level will be modeled after a classic "open floor" fishhouse using a "track- transport system and provide entry points on three sides (North, East and South). These portals will allow multiple boats to be off loaded in two different zones simultaneously (North and East). Product will be moved into the fishhouse, sorted and weighed with hanging scales; iced, packed; and transported to the truck loading center using the vintage retro rail system (photo). The second story of the fishhouse will incorporate a wide open center -floor viewing area. The "see- through" flooring will allow real -time observation of the work occurring on the first level and on all functional decks. High -tech electronic media will also be used in the ceiling to educate and entertain visitors, who gain access to the upper level via a sweeping, ADA- approved ramp connected to a boardwalk along the shoreline. Were photographs of the existing facility or area of the proposed structure provided? YES X Documented in Exhibit Y NO If the photographs are not provided, no points will be awarded (d) The applicant has committed to major restoration of an existing boat ramp for commercial fishing vessels or to construct a new boat ramp for commercial fishing vessels (4 points). YES NO X For Inc major rest era :ion of an exi sti. g boat ramp, describe the cony; it <can of the existing moat r- i. applicant will do to bring the structure into working condition, and proposed uses of the structure. For the constrl ctior' of a new boat ramp, describe the r dosed size. pr s ru .ture. si,ir gi;rleer of environmental rt. r 1 t9F Shi)Wir t i' at Mean L ow Water and that here 110 OraSS bed r 1 boat Tramp and the n pc sect use of the rid not repairs tree (a) The project is located in a Future Land Use category, zoning district, or overlay district that has been identified for the protection and preservation of Working Waterfronts (5 points); YES X NO the Inc of the boat ramp is Was the documentation of the boat ramp area and photographs of the existing facility or area of the proposed structure provided? YES Documented in Exhibit NO X If the documentation and photographs are not provided, no points will be awarded Page 13 •t 1 _r Li cJ: a:if #n 'se catr,igw rft'or. .:s. turtiler "Chapter 1: Future Land Use Element" of the City of Sebastian's Comprehensive Plan Goals, Objectives and Policies (Exhibit Z), in Objective 1 -1.2 states: "Commercial development shall be comprised of a wide range of business uses. The City shall promote the image and function of the central business district the area generally located as the City's center for commerce as well as civic and cultural enrichment. In this pursuit the City shall enhance the identity, design, and vitality of the waterfront corridor which provides a unique waterfront activity center within the central core area of the City." Exhibit Z also contains a letter, dated November 2, 2008, from the City of Sebastian's Growth Management Director that acknowledges that "Yes. The zoning, future land use category and comprehensive plan objectives all further the goal of a working waterfront." Policy 1 -1.2.4 (Page 1 -3) defines the city's Riverfront Corridor and Map 1 -1 on Page 9 shows the location of Fisherman's Landing within a Commercial Marine Waterfront area. The third document in Exhibit Z is a copy of the Treasure Coast Regional Planning Council's Riverfront District Master Plan for the City of Sebastian's Riverfront District, which includes the Fisherman's Landing location (identified on Page 2). Was a copy of the map and description of the category or district provided? YES X Documented in Exhibit Z NO If a copy of the map and description are not provided, no points will be awarded (b) The project furthers local government comprehensive plan objectives and policies that ensure the protection and preservation of Working for use by commercial fishermen, aquaculturists, or business entities that support these industries (5 points); YES X NO if policies are ves or po o c Les, identify which b ec fili furthered red: ov.de a summary objective, nd c f .t �:r; o` the policy ;t;" e a v�..s,,.€ i?e how the local government's comprehensive plan's objectives and policies further the. protection and preservation of Working Waterfronts for Use by commercial fishermen, aquaculturists, or business entities that support these industries, Vide a Copy o t?'.^ loc,21 government's comprehensive pan's objectives and policies that ensure the servation of V orkino Waterfronts for use by commercial fishermen. aquaculturists, e ousin ss €mti s industries. Again, Objective 1 -1.2 of the City of Sebastian's Comprehensive Plan Goal, Objectives and Policies (Exhibit Z) states: "Commercial development shall be comprised of a wide range of business uses. The City shall promote the image and function of the central business district, the area generally located as the City's center for commerce as well as civic and cultural enrichment. In this pursuit the City shall enhance the identity, design, and vitality of the waterfront corridor which provides a unique waterfront activity center within the central core area of the City." Exhibit Z also contains a letter, dated November 2, 2008, from the City of Sebastian's Growth Management Director that acknowledges that "Yes. The zoning, future land use category and comprehensive plan objectives all further the goal of a working waterfront." Policy 1 -1.2.4 (Page 1 -3) defines the city's Riverfront Corridor, Map 1 -1 on Page 9 shows the location of Fisherman's Landing within a Commercial Marine Waterfront area. The City's Community Redevelopment Master Plan (Exhibit M, Pages 34 and 35), FLUE (Future Land Use Element) Policies 1- 1.2.4, 1- 1.5.1, 1 -3.3.4 and 1-3.3.6, along with Objectives 1 -1.5 and 1 -3.3 define the City's vision and plans for revitalization and preservation of its Riverfront Corridor. The third document in Exhibit Z is a copy of the Treasure Coast Regional Planning Council's Riverfront District Master Plan for the City of Sebastian's Riverfront District, which includes the Fisherman's Landing location (identified on Page 2). Were copies of the policies or objectives provided? YES X Documented in Exhibit I NO If a copy of the policies or objectives are not provided, no points will be awarded Form SMWW -1 (Effective coon and s port Page 14 c e projec urthers local government comprehensive plan objectives and policies to provide facilities that promote and educate the public about the economic, cultural and historical heritage of Florida's traditional Working Waterfronts (3 points). YES X NO (6) Public Education Form SMWW -1 (Effective of the idea pt. i about Km g Y to €;:rfL C Y€ Jf, F�if.f t €..w 9 a(.. ot As stated in 5(b) above: Objective 1 -1.2 of the City of Sebastian's Comprehensive Plan Goal, Objectives and Policies (Exhibit Z) states: "Commercial development shall be comprised of a wide range of business uses. The City shall promote the image and function of the central business district, the area generally located as the City's center for commerce as well as civic and cultural enrichment. In this pursuit the City shall enhance the identity, design, and vitality of the waterfront corridor which provides a unique waterfront activity center within the central core area of the City." Exhibit Z also contains a letter, dated November 2, 2008, from the City of Sebastian's Growth Management Director that acknowledges that "Yes. The zoning, future land use category and comprehensive plan objectives all further the goal of a working waterfront." Policy 1 -1.2.4 (Page 1 -3) defines the city's Riverfront Corridor, Map 1 -1 on Page 9 shows the location of Fisherman's Landing within a Commercial Marine Waterfront area. The City's Community Redevelopment Master Plan (Exhibit M, Pages 34 and 35), FLUE (Future Land Use Element) Policies 1- 1.2.4, 1- 1.5.1, 1 -3.3.4 and 1- 3.3:6, along with Objectives 1 -1.5 and 1 -3.3 define the City's vision and plans for revitalization and preservation of its Riverfront Corridor. The third document in Exhibit Z is a copy of the Treasure Coast Regional Planning Council's Riverfront District Master Plan for the City of Sebastian's Riverfront District, which includes the Fisherman's Landing location (identified on Page 2). Were copies of the policies or objectives provided? YES X Documented in Exhibit Z NO If a copy of the policies or objectives are not provided, no points will be awarded (a) The Project Site provides a permanent structure containing displays of artifacts and other items open to the public that provide information about the economic, cultural or historic heritage of Florida's traditional Working Waterfronts (4 points); YES X NO !f yes, describe tile' pe'r? saner structure of artifacts ilif tic y its :i'id Dille te r ims t l be Y proposed struct r provide lb out 71 t'{ aout the economic, cultural 't's. i o a' t r t i 3 z,r��;� €fie r S t`ae t public. DD.DAesv„ t io a proximate location of t T c c Furl l tll� ad L, C�" l�: �l �'i. e'li w C >rJ to the .Y s. °.I., W€ +:�:,i N ov`rl�:4. The nucleus of the Fisherman's Landing Sebastian project is a two -story fishhouse, designed as a functioning workplace for fishermen on the lower level, and an observation education venue for the public on the upper level. A portion of the upper -level flooring will be constructed of "see-through" building materials which will allow real -time observation of the work occurring on the first level and on all functional decks. High -tech electronic media will also be used in the ceiling to educate and entertain visitors. Sebastian's historic fishing heritage and current marine practices will also be prominently displayed in high -tech and traditional exhibits throughout the waterfront visitor areas. The upper level will also feature open -air walls which will provide visitors with a panoramic view of the Indian River Lagoon, including Pelican Island, known as the nation's first designated national wildlife refuge. This bonus attraction will provide visitors with photographic locations and memorable views of the entire Indian River Lagoon. A boardwalk will be constructed along the site's north boundary to allow visitors safe access to the dock area where they can get "up close and personal" with fishermen as they prepare to go fishing and unload upon return. Kiosks and signage along the boardwalk, in conjunction with photographic displays and historic maritime artifacts, will provide additional educational experiences. Page 15 (b) The Project Site contains a structure(s) that is listed on the National Register of Historic Places administered by the National Park Service (3 points); YES NO X Form SMWW -1 (Effective Were both documents provided in the grant application? YES Documented in Exhibit NO If documentation from the Division of Historical Resources is not provided, no points will be awarded. (c) Interpretive kiosk or signs will be provided that educate the public about the economic, cultural, or historic heritage of Florida's traditional Working Waterfronts (2 points). YES X NO if yes, describe the proposed k F J traditional d T t o ai i E: f _£S r E s ✓E 41 L or spcin w it! bi. provided. 3 ec. i of Interpretive kiosks and displays will be located along the boardwalk as described in Part 6 (a); and in the upper -level visitor's area. The kiosks will feature both historic and modern -day marketing, educational and promotional materials developed by the Fisherman's Landing Sebastian, Inc., the fisherman's Cooperative, the Department of Agriculture and Consumer Services' Bureau of Seafood and Aquaculture and other interested local and State businesses and agencies. Page 16 (BITS Each of the following exhibits is required to be submitted with the grant Application. Provide a label and tab for each exhibit and please ensure that all exhibits are legible and of an appropriate scale. If two or more exhibits are consolidated, make sure this is reflected on the exhibit label. If a specific exhibit is not applicable, include an exhibit page with a statement that it is "Not Applicable." Locate the exhibits behind the project evaluation criteria section of the Application. Exhibits A United States Geological Survey 7 1/2 minute quadrangle map with the boundary of the Project Site clearly delineated. B County Tax Appraiser's map clearly delineating the Project Site boundary, names of the property owners, and parcel tax identification numbers, and ownership boundaries using an appropriate scale. C Aerial photograph (1 inch 2,000 feet or greater detail) with the Project Site boundary clearly delineated. D Physical improvements map of an appropriate scale that clearly delineates all existing physical improvements, alterations, or disturbances occurring on the Project Site, and including all cleared areas, buildings, roads, fences, docks, power lines, billboards, boat ramps, parking areas and known easements and rights -of -ways, and the approximate acreage of the foregoing. E Conceptual site plan that clearly delineates the Project Site boundary and shows the approximate location of all proposed site improvements. F One set of labeled photographs of the Project Site which depict all on -site features on the Project Site and including, waterbodies, shorelines, historical features and existing improvements. Each photograph submitted shall include a legend that identifies the photograph location and key features that the photograph is intended to depict. G If applicable, evidence of status as a Nonprofit Working Waterfront Organization as defined in subsection 9K- 9.002(16), F.A.C. H A signed statement from the owner(s) of each parcel indicating their willingness to consider an offer to purchase their parcel(s). If it is a less than fee acquisition, provide an affidavit from the owner that they are willing to sell the development rights off the property and to continue to operate the site as a Working Waterfront. I A copy of each Local Comprehensive Plan objective and policy cited in the grant Application that applies to the Project Site. Please highlight or underline the applicable plan directive being referenced. J If the Applicant is a Nonprofit Working Waterfront Organization, evidence of status of the organization, including documentation from the Internal Revenue Service that the organization is recognized as a 501(c)(3) organization, a copy of the Bylaws, and a copy of the Articles of Incorporation. K If the Applicant is a Nonprofit Working Waterfront Organization, they shall provide documentation that they have funds on hand, or letters of commitment to provide the funds prior to closing on the Project Site: (1) Fee simple acquisition, an amount equal to ten percent of the Project Cost shall be set aside as a management endowment fund for the Project Site, or (2) Less than fee Working Waterfront Covenant, an amount equal to five percent of the Project Cost shall be set aside as a management endowment fund for the Project Site. L If the Applicant is a Nonprofit Working Waterfront Organization, they shall provide a guaranty or pledge by a Local Government, the Water Management District, or the Board of Trustees to act as a backup manager to take over the responsibility for management of the Project Site in the event the Nonprofit Working Waterfront Organization is unable to. Form SMWW -1 (Effective Page 17 I Subject: Roseland Road /Airport A/• ro J. r Submittal by: Buffer Agenda No. Department Orig City Attorney: City Manager City Clerk: Date Submitted: 9 OCT 09 1;; ne City Manager Exhibits: EXPENDITURE REQUIRED: N/A AMOUNT BUDGETED: N/A APPROPRIATION REQUIRED: N/A 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 SEDIG HOME OF PELICAN ISLAND AGENDA TRANSMITTAL FINDINGS It has been determined that the report titled "Sebastian Municipal Airport Master Plan March 2002" may be incorrect. The error concerns whether the intent of the 2002 City Council required a 50 -foot vegetative landscape buffer between the Sebastian Municipal Airport (SMA) and Roseland Road right -of -way. This error was found on Thursday, October 1, 2009 when the Offices of the City Manager and Clerk researched the history and documentation presented to City Council during the adoption of the 2002 SMA Master Plan in February 2002. The publicly distributed 2002 SMA Master Plan does not depict the requirement to maintain a vegetative buffer in the text or on the Airport Layout Plan (ALP). In short, Section 7 of the report provides "Refined Alternatives" and the only mention of a buffer is for Scrub Jay protection along the eastern boundary of the SMA. This is in conformity with the HCP -ITP. On page 7 -7, a section is titled Future Land Use. This section reads as follows: FUTURE LAND USE Sebastian Municipal Airport has committed much of its available land area for development of either airfield or general aviation facilities. Additional land to the east and west of these facilities is available for commercial and industrial development. Remaining areas of land not presently committed to development in most instances are situated in areas either difficult to develop, such as off the ends of the runways, or surrounded by active airfield pavements. Throughout the study, the goal has been to satisfy the needs of the airport and facilitate revenue generation, all while ensuring the safety and compatibility of the areas surrounding the airport. The airport developments proposed in this study and on the ALP set do not require any of the current City of Sebastian or Indian River County land use designations to change. Likewise, no property acquisitions for the airport are required for the planned development. It contains no language requiring a vegetative buffer. However, in researching the agenda packets distributed to the City Council in the City Clerk's laserfiche, a SMA Master Plan titled Final Draft and dated February 1, 2002 provides for a buffer. Per this document, a buffer regulation was to be placed in the Land Development Code (LDC). To date, no requirement for a buffer is in the LDC. It is believed that when City Council approved the SMA Master Plan, the Final Draft document was reviewed and approved; not the publicly reproduced SMA Master Plan March 2002. In Section 7 on page 7 -7, Council reviewed a subsection that read as follows (note the highlighted differences which require a 50 -foot vegetative buffer): FUTURE LAND USE AND VEGETATIVE BARRIER Sebastian Municipal Airport has committed much of its available land area for development of either airfield or general aviation facilities. Additional land to the east and west of these facilities is available for commercial and industrial development. Remaining areas of land not presently committed to development in most instances are situated in areas either difficult to develop, such as off the ends of the runways, or surrounded by active airfield pavements. Throughout the study, the goal has been to satisfy the needs of the airport and facilitate revenue generation, all while ensuring the safety and compatibility of the areas surrounding the airport. The airport developments proposed in this study and on the ALP set do not require any of the current City of Sebastian or Indian River County land use designations to change. Likewise, no property acquisitions for the airport are required for the planned development. Rather, enhancements to the land development code have been made to preserve the current surroundings of the airport. The most notable is the requirement for a 50 -foot vegetative barrier off of Roseland Road. Currently, a 53 -foot right -of -way exists between the centerline of Roseland Road and the airport property line. In addition, an additional 50 -foot buffer will be added to the City of Sebastian Land Development Code. This buffer will require a 50 -foot vegetative barrier along the entire east side of the airport. This buffer, which is depicted on the ALP, is intended to maintain the "look and feel" of the Roseland Road corridor as it is today." The office of the City Manager has reviewed other documents. The documents researched where the (1) minutes to the February 13, 2002 Regular Meeting; (2) video of the February 13, 2002 Regular Meeting; (3) various ALPs; (4) files on the Airport Technical Review Committee; and, (5) resident petitions. CITY COUNCIL MINUTES/VIDEO There is no specific mention to the buffer requirement. The SMA Master plan was approved unanimously. Likewise, the video did not show public input on the buffer issue. Most discussion and public input centered on the location of the Sebastian Skydive drop zone and runway 31/13 closure. AIRPORT TECHNICAL ADVISORY COMMITTEE An Airport Technical Advisory Committee met several times. Some records indicate who was invited to participate for expert testimony and guidance. Some correspondence refers to a September 18, 2001 meeting where the buffer may have been discussed. It is assumed that the bulk of discussion took place at this level. There were no formal minutes for the meetings of the Airport Technical Advisory Committee. AIRPORT LAYOUT PLANS The Airport Layout Plans (ALP) in draft form depict a 50 -foot buffer. Final documents do not show a buffer. RESIDENT PETITIONS One file are several petitions from Sebastian and Roseland residents urging a buffer. Documents that the City Managers Office considered relevant are attached hereto and include: Section 7 of the March 2002 SMA Master Plan Section 7 -7 of the SMA Master Plan dated /titled Final Draft February 1, 2002 Minutes from the Regular City Council Meeting of February 13, 2002 September 2001 Draft ALP March 2002 Final ALP Updated 2007 ALP Council Information letter from former City Manager Terrance Moore reference of Technical Review Committee Meeting for September 18, 2001. Cover correspondence from the LPA Group providing final delivery of 2002 SMA Master Plan ACTION INITIATED BY THE CITY MANAGER From the information researched, it is reasonable to infer that a vegetative buffer was planned. However, it appears that from final draft (February 1, 2002) to the final public copy (March 2002) of the SMA Master Plan, the intent was not executed. As such, it is reasonable and proper to begin the buffer regulation process now. That process has three steps. First, staff will initiate a meeting with the Planning and Zoning Commission. By code, LDC modifications require a recommendation by the P/Z and ordinance by the City Council. R Second, Council will be required to hear the P/Z recommendation and pass an ordinance should the buffer regulation be added to the LDC. Third, at the time Council considers the LDC modification, SMA Master Plan and the SMA ALP should be properly documented. BOARD OF ADJUSTMENT With regard to the Robert Denton appeal, heard by the Board of Adjustment on Wednesday, September 30, 2009, staff is of the opinion that the construction of the About Kayaks sign and the buffer are separate issues. Action to develop buffer regulations is not part of additional sign consideration. Should the Board of Adjustment wish to reconsider the action taken to deny the Denton appeal, a party voting in favor of the motion (to deny appeal) must move to reconsider. 1 arra SEBASTIAN MUNICIPAL AIRPORT SEBASTIAN 10 5t Mt HOML OF �FLCJW LSWiD Master Plan Update overflights. Currently, all four runway ends at Sebastian Municipal have standard left -hand traffic patterns. It is the intention of Airport Management and the City of Sebastian to publish right -hand traffic patterns for Runway 22 and Runway 27. This means that all of the traffic and turns associated with Runway 4 -22 will be on the northeast side of the runway and all of the traffic and turns associated with Runway 9 -27 will all be on the north side of the runway. The intent is to reduce as much as possible the number of aircraft flights over residential areas. It should be noted that proper procedures at an uncontrolled field like Sebastian Municipal require that aircraft enter the traffic pattern in level flight, abeam the midpoint of the runway, and at pattern altitude. These procedures are documented in the FAA's Aeronautical Information Manual (AIM) Basic Flight Information and Air Traffic Control Procedures. While these changes in traffic patterns will not eliminate those aircraft that deviate from the proper traffic patterns or those that use straight -out departures, it should help reduce the number of flights over the communities surrounding the airfield. However, it is difficult to control those aircraft that operate beyond the boundaries of the standard sized traffic pattern. Scrub Jay Buffer The Florida scrub jay has been well documented in the vicinity of the airfield by the Florida Game and Fresh Water Fish Commission. In 1999, a Florida scrub jay management plan was written, which incorporated portions of the Sebastian Municipal Airport. To facilitate recommendations in this plan, the City of Sebastian, the FAA, and FDOT agreed to provide a 100 -foot wide flight corridor for the Florida scrub jay. This buffer zone is depicted on the ALP set. During the layout of the proposed facilities, no impacts were made to this 100 -foot wide path that primarily follows the property line on the north side of the airport. Wetlands and Water Quality At the onset of the master plan, a field investigation was conducted to determine the extent of wetlands on the airport property. This study did not include any wetland flagging, nor was it coordinated with the Army Corps of Engineers or St. John's River Water Management District. However, it did provide useful information that was utilized in the location of future facilities. As for water quality, a complete master drainage study is also being conducted simultaneous with this master plan. The master drainage study incorporates all of the existing and proposed facilities depicted on the ALP set in the following chapter. Future Land Use Sebastian Municipal Airport has committed much of its available land area for development of either airfield or general aviation facilities. Additional land to the east and west of these facilities is available for commercial and industrial development. Remaining areas of land not presently committed to development in most instances are situated in areas either difficult to develop, such as off the ends of runways, or surrounded by active airfield pavements. Throughout the study, the goal has been to satisfy the needs of the airport and facilitate revenue generation, all while ensuring the safety and compatibility of the areas surrounding the airport. The airport developments proposed in this study and on the ALP set do not require any of the current City of Sebastian or Indian River County land use designations to change. Likewise, no property acquisitions for the airport are required for the planned development. SUMMARY The preceding sections have reviewed a series of issues and questions that arose from discussions of the alternatives as well as the review of the previous chapters. With these refinements in mind, the next step of the 7( mra SEBASTIAN MUNICIPAL AIRPORT SEBASTIAN Master Plan IiRd a i T'r V A& $P FIB 26?- overflights. Currently, all four runway ends at Sebastian Municipal have standard left -hand traffic patterns. It is the intention of Airport Management and the City of Sebastian to publish right -hand traffic patterns for Runway 22 and Runway 27. This means that all of the traffic and turns associated with Runway 4 -22 will be on the northeast side of the runway and all of the traffic and turns associated with Runway 9 -27 will all be on the north side of the runway. The intent is to reduce as much as possible the number of aircraft flights over residential areas. It should be noted that proper procedures at an uncontrolled field like Sebastian Municipal require that aircraft enter the traffic pattern in level flight, abeam the midpoint of the runway, and at pattern altitude. These procedures are documented in the FAA's Aeronautical Information Manual (AIM) Basic Flight Information and Air Traffic Control Procedures. While these changes in traffic patterns will not eliminate those aircraft that deviate from the proper traffic patterns or those that use straight -out departures, it should help reduce the number of flights over the communities surrounding the airfield. However, it is difficult to control those aircraft that operate beyond the boundaries of the standard sized traffic pattern. Scrub Jay Buffer The Florida scrub jay has been well documented in the vicinity of the airfield by the Florida Game and Fresh Water Fish Commission. In 1999, a Florida scrub jay management plan was written, which incorporated portions of the Sebastian Municipal Airport. To facilitate recommendations in this plan, the City of Sebastian, the FAA, and FDOT agreed to provide a 100 -foot wide flight corridor for the Florida scrub jay. This buffer zone is depicted on the ALP set. During the layout of the proposed facilities, no impacts were made to this 100 -foot wide path that primarily follows the property line on the north side of the airport. Wetlands and Water Quality At the onset of the master plan, a field investigation was conducted to determine the extent of wetlands on the airport property. This study did not include any wetland flagging, nor was it coordinated with the Army Corps of Engineers or St. John's River Water Management District. However, it did provide useful information that was utilized in the location of future facilities. As for water quality, a complete master drainage study is also being conducted simultaneous with this master plan. The master drainage study incorporates all of the existing and proposed facilities depicted on the ALP set in the following chapter. Future Land Use and Vegetative Barrier Sebastian Municipal Airport has committed much of its available land area for development of either airfield or general aviation facilities. Additional land to the east and west of these facilities is available for commercial and industrial development. Remaining areas of land not presently committed to development in most instances are situated in areas either difficult to develop, such as off the ends of runways, or surrounded by active airfield pavements. Throughout the study, the goal has been to satisfy the needs of the airport and facilitate revenue generation, all while ensuring the safety and compatibility of the areas surrounding the airport. The airport developments proposed in this study and on the ALP set do not require any of the current City of Sebastian or Indian River County land use desi tions to change. Likewise, no property acquisitions for the airport are required for the planned development ther, enhancements to the land development code have been made to preserve the current surroundings of the airport. The most notable is the requirement for a 50 -foot vegetative barrier off of Roseland Road. Currently, a 53 -foot right -of -way exists between the centerline of Roseland Road and the airport property line. In addition, an additional 50 -foot buffer will be added to the City of Sebastian Land Development Code. This buffer will require a 50 -foot vegetative barrier along the entire east side 7 -7 A 2002 3 SEBASTIAN MUNICIPAL AIRPORT Master Plan Update P MI A Ft. Zan. SUMMARY 7 -8 �Q SEBAS'T'IAN Noes OF PELICAN SLAM) L of the airport. This buffer, which is depicted on the ALP, is intended to maintain the "look and feel" of the Roseland Road corridor as it is today'."* The preceding sections have reviewed a series of issues and questions that arose from discussions of the alternatives as well as the review of the previous chapters. With these refinements in mind, the next step of the process is to develop the ALP set to depict the existing and future airport facilities. The drawings that make up this set are discussed in the following chapter. 2002 1 1 1 1 Motion carried 5 -0. 1 02.029 Sebastian Municipal Airport Master Plan (Airport Transmittal 2/5/02, Final Draft Under Separate Cover) 1 1 1 1 Tape II, Side I (9:1 p.m.) 1 1 1 1 1 1 1 1 1 1 Regular City Council Meeting February 13. 2002 Page Ten ROLL CALL: Mr. Hill -aye Mr. Coniglio -aye Mayor Barnes -aye Mr. Barczyk -aye Mr. Majcher -aye F'�8 13 U The City Manager stated industry standard calls for airports to development a master plan that is updated every five years. Doug DeCarlo, LPA Group, Inc., stated master plans are required to receive federal and state funding so that airport needs are documented. He stated the City's key issues included pavement, maximizing land use to instigate economic growth, industrial park development, utility extension and access roads. Mr. DeCarlo explained this report also includes demand /capacity growth and requirements which included use altematives and a layout plan to identify the scope of uses for the airport. Bill Ramsey, 141 Edward Drive, spoke on the need for runways. Peter Feaman, attorney representing Skydive Sebastian, spoke in opposition of the final draft which includes a possible future drop zone for Skydive in the northwest comer of the airport. He requested the master plan adoption be postponed. The City Manager stated the City is willing to work with FDOT, FAA and Skydive Sebastian on a drop zone. Bob Denton, 11245 Roseland Road stated the final review committee did not promise Skydive Sebastian the south area in between the runways. He also spoke on the hazards of the southem in -field drop zone. Mr. DiCarlo stated that the FAA did not approve of the southern in -field and existing drop zones because people would be walking over runways and aircraft would intersect with aircraft. Allen Holden, a Vero Beach pilot, spoke on the hazards of the southern drop zone and traffic patterns. MOTION by Hill/Majcher "I could discuss this, I mean I would move to pass the master plan tonight for discussion." Discussion continued on both parties compromising. 10 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Regular City Council Meeting February 13, 2002 Page Eleven Motion carried 5 -0. 17. Being no further items, Mayor Bames adjoumed the meeting at 10:03 p.m. Approved at the Feb 27 th 2002 Regular City Council Meeting. ti■) OVA g. Walter Bames, Mayor Sally A. Mai CMC City Clerk ROLL CALL: Mr. Coniglio -aye Mayor Bames -aye Mr. Barczyk -aye Mr. Majcher -aye Mr. Hill -aye 11 l7$ 1 ;UNWAY DATA f 4-22 FUTURE SAME SAME SAME 0.00 SAME SAME SAME SAME MRL NON- PREtl911N 31 3W IdYd SdO LEM. 005-B 7 I OMMEMIll W8029'45.25' 1 90F A-U ITEM AIRPORT ELEVATION AIRPORT HIGHEST ELEVATION AIRPORT LOWEST ELEVATION RUNWAY INTERSECTION ELEVATION AIRPORT REFERENCE POINT NC A. DHC -1 R 4 NONE NONE 20:1 19.8' MSL Na4V31.Zr LA We030'01.II N m W a 0: S 8 rb2..o Wg N F yW� i N N 1y�� Nm se aco n Lruros emo! lsN .£'55 1.43E TH3L1/tSYA Sd9 a AVN 001 -9 1- g 9z a M F Z 04 n a 3,110.2 ir 'o S3rYi I NE -I 3-300 R/W 31 NONE NONE 20:1 21.1' MSL Na4YN.7O 1'002D'29.44'LON ITEM RUNWAY CATEGORY (NPIAS) RUNWAY DIMENSIONS TRUE' BEARING EFFECTIVE GRADIENT (S) SAFETY AREA 09M. (R/W EMS) OBJECT FREE DIM. (R/W ENDS) PAVEMENT TYPE PAVEMENT STRENGTH RUNWAY UGHTING I RUNWAY MARKING TA70WAY AIRCRAFT REFERENCE CODE CRITICAL AIRCRAFT NAVIGATIONAL AIDS VISUAL AIDS APPROACH SLOPE RUNWAY END ELEVATION RUNWAY END COORDINATES (NAD 83) AIRPORT DATA 7 3LON 33S 3LON 3S 310N 3LON X35 3aruri 11-8 311VS 3NV5 ,t9'L R9t'.ZN .055 .591 .I'£Z .IT:'Z ONU SIX3 OMMEMIll W8029'45.25' 1 90F A-U ITEM AIRPORT ELEVATION AIRPORT HIGHEST ELEVATION AIRPORT LOWEST ELEVATION RUNWAY INTERSECTION ELEVATION AIRPORT REFERENCE POINT if P All 9z a wl ce ffig 140 rvEg 14 4 1 4 .gts1 41 c3 4 Sig sa M 2 1 z ta frip 1 1 1 L 101 me 9 2 0 i 6 g 20 of z E 2 44 41 N 7 44 Y 44 u 1. 7 0 b 44 n 44 O 44 44 5 a O 51 4/ f 0 T CO e- a c 1. co CD 7a V 10 Imeimem 5 a H 0 O Q O.' A B M 0) 1 0 r AIRPORT DATA j I Z 310N 335 1 ,1 "1Z 3antru i SWILSO3 Z 310N 33S 1 S "9 Z 31ON 33S .1 Z 31 335 I .S 3WVS 3WYS 4.06 ,OPPP.6ZO9M ,SZ' $4Z.OWW ,C9L$.9Y1ZN ,9VOS,911ZN NOLLVATS9 I i RUNWAY NTERSECTON ELEVATION AIRPORT REFERENCE POINT 301110NO1 I 30RLLLV1 3003 33N3t1 3a 140i0aN j SVIdN) 13131 33Na3S 11:10d8N "0/115311014 d GL XVW NV3W S CV- ft) o or Er ot NM N rr 2 z d b 5 a z vy mrcM 8 2 0 Z aa3 J w as rT II d t® atm YEA I N6• ee Ib4� 4, p ,r O• �a7 oyd� -ryes 0 0 F 0 0 0 g 4' 4 80 M n Q z 4. z K a V g n a A d d A g a Es Es 8 N 2 0 3 3 2 A I a 1 s 1 z 3 N rn 1 A g a 1 a te N 2 K Z. S 5 n W 2 A A i a 0 z Z 6 u z 41 b n 3 an 0 e r 1 s o• w m U Dzo I 1 v to M O. t0 S LL z <P^o` o MO co KZ�d� n.RZ§ g r NM NM BUILDING DATA TABLE APPROVALS DESCRIPIION MI MI MI I= MN r•• MO MI OM OM RUNWAY DATA NOLUIRDS30 111 v3to 33w .oargo.wmwm VIW c.1.3.05 v iac MOE raINWAv ORMECTON WE /PM 03 39 cliaoreavd iterliowd cnautw SWIM SOWN r 1110. WPM. CWIVILW I 199.4.1 9Z Mad I 11 I 9 Mai 11111 Oat) dS 00047 i RUNW EX11311NO aces.sz Was. tan., W70 71:71). aro OK. MN 114..0E1 Elam. OZ v ASZ I /1 1,141 9Z Wel ..alcaraw an .arecteao• s Dary Idvd CI Mid W IP si 4 RFURE 1111111111 511 g.. I taS 1indatOrc T. vs lanalvd 7 WO wviS 3101 wv 1 loomed loi3a30 Scam. Mtizt NIC DE zios v r_ WarS0100fra 111 IW21 ii 1_ .09 Mad tai Ivn90 ss psf ,IP 413.0 3101.31 )11..r111 1.1.) »I3.3 709.911 I%) IN3190110 ...as WU. 'NO Weld .taarso WO idol vas ware A.L3dIS I WI171393.0.1 (9.3 0.1) IVO Zi011 I unvon AWIP4113 I 1.119101i1.911.1.1Wid 1.21.11V1VOURO 3303 3310)1.131.1.10111V AVA.0001. .0110. It...12 hil 4 i11 4 h 1 LEGEND NOLUIRDS30 3.107 WM. toll 3.11 nou..u.s. 71■11 044.11111.1 v3to 33w .oargo.wmwm VIW c.1.3.05 S9.117100103 530.1.3i 30V tSGlOd 1 SW 90:11.313 MOE raINWAv ORMECTON WE /PM 03 39 cliaoreavd iterliowd cnautw SWIM SOWN r 1110. WPM. CWIVILW sLmon WGNOUU 1 SEWS.% A.M. I Ivd MOAN. I II kno.....m.noz.. fon. Oat) dS 00047 i 101$1111 IMAM O:31 wt. .1 9 .an X dS est Mow. coils Ma DHOWS iS SoCv II IIII ria— (1) ONUSIX3 RIMS aat x FUTURE BUILDING DATA TABLE aNnOuS 3OY13 d011 56 6 6666 DUSTING BUILDING DATA 7 6665 5 NOI1d1210530 Wawa .000I is cast ¥VVNfltIMfl a 0051% lawel•Ma AC mak. kno.....m.noz.. fon. Oat) dS 00047 i WWI iS wawa. Oa, own dS est Mow. coils Ma DHOWS iS SoCv I "OWDO18 J L .ge n h r\ 9 1 1 9 1 9 1 1 8 1 9 8 V Is z 1- 0 9 NMI NM EMI I= NM MN •111 NM OM MN MI NM MN AIRPORT DATA CISN) 1 d01 DUSTING BUILDING DATA 7 lawS SO N�LdHDSO TOSIVE11.11210‘11. 1 ...WNW ...we.. timalliam MOM )1130 ion Cum Id snow., lellihaM,YAMbraCJILW,9A Ononns 30.79114.11210.1.v oarladn02 30190.1011.1 rinvs..1113313 —.0.. 'ON 'pine .37: J L .ge n h r\ 9 1 1 9 1 9 1 1 8 1 9 8 V Is z 1- 0 9 NMI NM EMI I= NM MN •111 NM OM MN MI NM MN AIRPORT DATA IIIIIII r NM I MN MN I r. NM OM MI 1 111111111.11111111 1_ CIA ImpuemATom Len 7 61/ii`4 C'M /4/111 tiu' 1 1 1 1 1 City Council Information LetW' $eptember 7, 2001 processes. Feel free to Pag 2 inspection p you may have ed on a punch lists and recent insp concerns y identified all o f to provide further contact g t his issue, as we will be more than happy should any y ou wish to address any regarding t rt clarification. .tens of Pro ose d Sebastian Munici al Air o 'final Gila date faster Ptan er the anticipated final Sebastian last week's Information Letter, been schedulembers here M reposed in Workshop Council scheduled a1 Airport Master Planning a 6 :00 p.m. in City ter 7 and 8 of the Munictp September 18 copies of Chap p l a ce Tuesday p ou r personal cop (i.e. airfield er 7 fndi8 lities, Ha ll attached are y nd respective at City lining both refined alternatives as the proposed plan, out retiminary draft document o illllds meeting. l airfield facilities and en s►ronmen a ent genera o rt. Th p th aforem layout plans for the airport. a leisure. outline to facilitate discussion contents at your primary her its Feet free to read and deciP Em o ee A reCiation Picnic Rem inder Employee nni take afternoon, ri b e g Road 512. Just a reminder about place tomorro 12:00 t the City f Sebastian's Second Ann as p.m. a the Picnic t ion Post 189 grounds service a es a the American Legion dunk tank, food and beverage p Jude the city s. The event is anticipated to end Fell as various outh oriented activitie our children grandchildren and other family w as 00 pm youth free to stop by if you are also invitedc circa 4:00 p•m. F me mbers are put of th a Historic ion Board meeeisentation finder that l will be out of the office beginning late Monday morning r Just a rem Hat1101d Sebastian with Mayor Barnes to mak a p to travel to Tallahassee for the is o Preservation to resent the City o al fo funding to finance the Sebastian City rep r proposal for fu effort the are scheduled to speak relative to ou p September 11th. We late School interior rnoonTuesday, p hereby 1 will i t back Elementary learly afte circa late morning evens grant application cycle is return to Sebastian late theven►ng, therefore likely morning. This particular in City Hall the following 1 1 1 1 1 1 1 1 1 1 1 1 Ii_ THE LPA GROUP INCORPORATED Transportation Consultants 1 1 ilewski, C.M. Airport Manager Sebastian Municipal Airport 1225 Main Street Sebastian, FL 32958 Re: Final Airport Master Plan Document Sebastian Municipal Airport 1 Dear Mr. Milewski: The LPA GROUP INCORPORATED is pleased to present the final approved Master Plan Update for the Sebastian Municipal Airport. Based on our scope of work, this final transmittal consists of 25 bound reports. Enclosed please find 22 of the 25 final reports. As promised, two (2) copies have been forwarded to Mr. Matthew Thys of the Federal Aviation Administration Airports District Office (FAA ADO) and one (1) copy to Ms. Rebecca Rivett of the Florida Department of Transportation (FDOT). This transmittal also includes two (2) CD -ROMs containing document, exhibit, JACIP, and AutoCAD drawing digital files for your use. Previously, we had transmitted the final full size Airport Layout Plan sets, including one mylar set to be used for future reproductions. It has been our pleasure working with you, Mr. Terrence Moore, Mr. Terry Hill, Mr. Mark Mason, Mr. Tracy Hass, and other members of the City of Sebastian staff. As such, we look forward to assisting the City in any future projects that require additional planning services. Should you have any questions or concerns, please feel free to contact me at (407) 306 -0200. 1 Sincerely, THE LPA GROUP INCORPORATED 12000 RESEARCH PARKWAY, SUITE 152 ORLANDO, FL 32826 -3287 407 -306 -0200 FAX 407 -306 -0460 L f*a. 'Diu'# y t.errg. Douglas J. DiCarlo Project Manager Enclosures Cc: Dave Rickerson, LPA Orlando Office Mohsen Mohammadi; LPA Tampa Office 1 C:\Documents and Settings \ddicarlo\My Documents \X26 \Documents\X26- 0048.doc ATLANTA BATON ROUGE CHARLESTON CHARLOTTE CHICAGO COLUMBIA GREENSBORO GULFPORT JACKSONVILLE KNOXVILLE MOBILE ORLANDO RALEIGH RICHMOND SARASOTA TALLAHASSEE TAMPA WEST PALM BEACH