HomeMy WebLinkAbout2009 03 10 Agenda Board of Trustees AGENDA
BOARD OF TRUSTEES OF THE INTERNAL IMPROVEMENT TRUST FUND
MARCH 10,2009
The February 10, 2009 Cabinet Meeting was cancelled. Items 1-5 are being
resubmitted for your review.
*******************************************************************************
Item 1 Stan Mayfield Working Waterfronts 2008 Project Ranking List/Department of
Community Affairs/Florida Communities Trust
REQUEST: Consideration of the Florida Communities Trust, Stan Mayfield Working
Waterfronts 2008 project ranking list for funding.
STAFF REMARKS: The Stan Mayfield Working Waterfronts (SMWW) Florida Forever grant
program was created by the 2008 Legislature in section 380.5105, F.S., within the Florida
Communities Trust(FCT) Act. To fund the program, the Legislature provided 2.5 percent of the
total Florida Forever program distribution, which at the traditional funding level provides $7.5
million annually to the program.
Section 380.503(18), F.S., provided that SMWW grant funds will be used to acquire parcels of
land directly used for the purposes of the commercial harvest of marine organisms or saltwater
products by state licensed commercial fishermen, aquaculturists, or business entities, including
piers, wharves, docks, or other facilities operated to provide waterfront access to licensed
commercial fishermen, aquaculturists or related business entities. The acquisition of land used
for recreational waterfront activities would not be considered within the SMWW program.
SMWW funds may also be used for the acquisition of parcels of land used for exhibitions,
demonstrations, educational venues, civic events, and other purposes that promote and educate
the public about economic, cultural, and historic heritage of Florida's traditional working
waterfronts, including the marketing of the seafood and aquaculture industries.
Pursuant to section 380.5105(2), F.S., Department of Community Affairs' FCT worked jointly
with the Department of Agriculture and Consumer Services (DACS) to develop rules
establishing an application process and a process to evaluate, score and rank the projects. Five
rule development workshops were held in key fishing communities throughout Florida in August
2008. The resulting feedback allowed the development of rules, providing the framework for the
SMWW grant program, that were adopted November 2008. Eligible applicants for this program
are local governments and working waterfront non-profit organizations that are tax exempt under
section 501(c) of the United States Internal Revenue Code. Evaluation criteria outlined in rule
9K-9.006, F.A.C.,provides the basis for scoring and ranking of the projects. The scoring criteria
are broken down into six primary categories; project location, economic considerations, site
suitability/readiness, financial contributions provided by the applicants, community planning
aspects and public education opportunities provided through the projects.
Grant applications for the initial SMWW grant cycle were received over a six week period that
ended with a November 26, 2008 deadline. Twelve projects were submitted for consideration,
two of which were ultimately determined ineligible. Subsequent to the receipt of the
applications, FCT staff, with assistance from DACS and other agencies, evaluated the scoring
criteria and the business summaries submitted by the applicants. Preliminary scores, along with
a determination of the sufficiency of their business summaries were reported to the applicants in
Board of Trustees
Agenda-March 10,2009
Page Two
Item 1, coot.
evaluation reports mailed in January 2009. The week of January 12, 2009, FCT staff performed
site visits to verify that the information submitted by the applicants in their applications was
accurate. Some scoring adjustments were made as a result of the site visits. On January 29,
2009, the FCT Governing Board met to 1) review each application; 2) consider staff
recommended scores and any applicant objections to the scores; and 3) to produce a finalized
ranking list of the eligible applications.
Section 380.5105(4), F.S., mandated FCT to present the ranking list to the Board of Trustees at
the first meeting in February. The finalized ranking list is presented to the Board of Trustees for
its consideration and approval of the projects that may receive funding. The top ranked projects
whose cumulative grant requests total less than the $7.5 million annual SMWW Florida Forever
distribution will be funded. If annual SMWW Florida Forever funds become available the
remaining projects may receive grant request funding in the order they are ranked. Pursuant to
section 380.5105(4), F.S., the Board of Trustees "may remove projects from the ranking list but
may not add projects".
Ranking List
Project Name Applicant FCT Grant
Request
1 Sebastian Working Waterfront
Collaborative City of Sebastian $3,163,500.00
2 Blue Crab Cove Brevard County $2,665,000.00
3 Apalachicola Boat Works City of Apalachicola $1,000,000.00
4 Madeira Beach Fish House & Commercial Southeastern Fisheries
Docks Association $1,605,000.00
5 Key West Historic Shrimp Docks Gulf Fisherman's
Association $4,200,000.00
6 Port Salerno Working Waterfronts
Enhancements Martin County BOCC $2,015,500.00
7 Dixie County Fish House at Horseshoe
Beach Dixie County $1,077,000.00
8 Eastpoint Working Waterfront Franklin County $1,728,000.00
9 Mayfield-Stock Island Maritime Facility Monroe County $7,500,000.00
10 Horseshoe Beach Waterfront Open Air
Seafood Market City of Horseshoe Beach $394,000.00
Total $25,348,000.00
RECOMMEND APPROVAL OF FCT's SMWW 2008 PROJECT RANKING LIST FOR
FUNDING
Board of Trustees
Agenda-March 10,2009
Page Three
******************************************************************************
Item 2 The Fisherman's Marina, LLC/Recommended Consolidated Intent/Lease
Modification
REQUEST: Consideration of an application for a modification of a ten-year sovereignty
submerged lands lease to increase the preempted area from 54,429 square feet to 71,333 square
feet for a 68-slip commercial marina.
APPLICANT: The Fisherman's Marina, LLC
Lease No. 160001762
Application No. 16-261963-002-EM
LOCATION: 451 Trout River Drive
Jacksonville, Duval County
Section 30,Township 01 South,Range 27 East
Aquatic Preserve: No
Waterbody/Classification: Trout River, Class III
Designated Manatee County: Yes, with an approved manatee protection plan
Manatee Aggregation Area: No
Manatee Protection Speed Zone: slow speed minimum wake within 300 feet of
shoreline
CONSIDERATION: $7,883.07, representing: (1) $7,267.96 as the initial lease fee computed at
the base rate of$0.145554 per square foot, discounted 30 percent because 90 percent of the slips
are open to the public for rent on a first-come, first-served basis; and(2) $615.11 as the initial 25
percent surcharge payment for the additional area. Sales tax and county discretionary sales
surtax will be assessed pursuant to sections 212.031 and 212.054, F.S., if applicable. The lease
fee may be adjusted based on six percent of the annual income pursuant to section 18-
21.011(1)(a)1,F.A.C.
STAFF REMARKS: In accordance with rules adopted pursuant to sections 373.427(2), and
253.77(2), F.S., the attached "Recommended Consolidated Notice" contains a recommendation
for issuance of both the permit required under part IV of chapter 373, F.S., and the authorization
to use sovereignty submerged lands under chapters 253, and 258 F.S. The Board of Trustees is
requested to act on those aspects of the activity which require authorization to use sovereignty
submerged lands.
Background
The lease was originally approved by the Board of Trustees on May 4, 1976. The original lease
authorized the preemption of 10,256 square feet of sovereignty submerged lands. On April 17,
2007,the Board of Trustees approved a lease modification authorizing the removal of an existing
16-slip commercial marina and construction of a new 68-slip commercial docking facility with
54,429 square feet of preempted area. The facility was to accommodate vessels ranging from 15
to 40 feet in length,with drafts ranging from 2 to 5 feet.
The lessee, while reviewing the lease area, compared its riparian line to that of the neighboring
marina's lease. At that time, the lessee found that its riparian lines were inaccurately allocated.
In fact, the current southern riparian line actually crosses the neighboring marina's surveyed
Board of Trustees
Agenda-March 10,2009
Page Four
Item 2, Cont.
riparian lines. Once the lessee became aware of this discrepancy, the lessee had its riparian lines
reallocated to be consistent with the Department of Environmental Protection's (DEP) Bureau of
Surveying and Mapping's sponsored study of the effect of shorelines and channel geometry on
the division of riparian rights. With the reallocation of riparian lines, the lessee found that its
riparian area was actually wider than originally determined. The wider riparian area would allow
the lessee to have a larger preempted area and still meet: (1) the 25-foot setback as required in
section 18-21.004(3)(d), F.A.C.; and (2) Board of Trustees-approved special lease condition
which prohibits any farther waterward extension of the docking facility.
Project Detail
With the reallocation of the riparian lines, the lessee proposes to increase the preempted area by
16,904 square feet to accommodate recreational vessels up to 50 feet in length, with drafts
ranging from 2 to 5 feet. The proposed lease modification would authorize a ten-year
sovereignty submerged lands lease preempting 71,333 square feet for a 68-slip commercial
marina to be used in conjunction with an upland marina.
Ninety percent of all of the slips will continue to be available for rent to the general public on a
first-come, first-served basis, pursuant to section 18-21.003(25), F.A.C. This requirement has
been included as a special lease condition.
Noticing
The proposed lease modification was noticed pursuant to section 18-21.004(1)(m), F.A.C.
Thirty-one property owners were specifically noticed and no objections were received by the end
of the commenting period.
Permit Summary
DEP's environmental resource permit authorized sewage pumpout and fueling facilities, and
prohibited liveaboards. The recommendations of the Florida Fish and Wildlife Conservation
Commission (FWC) regarding the protection of manatees were addressed in the permit. Duval
County is a designated manatee county with an approved manatee protection plan. FWC
determined that the proposed project was consistent with the plan.
Comprehensive Plan
A local government comprehensive plan has been adopted for this area pursuant to section
163.3167, F.S. The Department of Community Affairs determined the plan is in compliance. The
proposed action is consistent with the plan according to a letter received from the city of
Jacksonville.
(See Attachment 2,Pages 1-14)
RECOMMEND APPROVAL SUBJECT TO THE SPECIAL LEASE CONDITIONS AND
PAYMENT OF$7,883.07
Board of Trustees
Agenda-March 10,2009
Page Five
Item 3 Boca Ciega Resort Marina, LLC/Recommended Consolidated Intent/Lease
Modification/Authorization
REQUEST: Consideration of an application for (1) modification of a 25-year sovereignty
submerged lands lease to (a)reflect a change in upland ownership; (b) change the use from a multi-
slip dock for temporary mooring only to a mixed use of private residential multi-family docking
facility and a commercial marina; (c) delete Special Lease Condition No. 31. E. that prohibits
further expansion; (d) reduce the term of the lease to 5 years; and (e) increase the preempted area
from 7,728 square feet to 66,843 square feet,more or less, for a 47-slip mixed use private residential
multi-family docking facility and commercial marina; (2) authorization for the placement of 19 reef
balls; and(3) authorization for the placement of 33 cubic yards of riprap along a seawall.
APPLICANT: Boca Ciega Resort Marina,LLC, a Florida limited liability company
Lease No. 521729223
Application No. 52-0213081-002
LOCATION: 8800 Bay Pines Boulevard
St. Petersburg, Pinellas County
Section 01, Township 31 South, Range 15 East
Aquatic Preserve: Boca Ciega Bay, Resource Protection Areas 1 and 3
Waterbody/Classification: Long Bayou, Class III
Outstanding Florida Waters: Yes
Designated Manatee County: No
Manatee Aggregation Area: No
Manatee Protection Speed Zone: No
CONSIDERATION: $11,880.38, representing (1) $9,729.27 as the initial lease fee computed at
the base rate of$0.145554 per square foot; and (2) $2,151.11 as the initial 25 percent surcharge
payment for the additional area. Sales tax and county discretionary sales surtax will be assessed
pursuant to sections 212.031 and 212.054, F.S., if applicable. The lease fee may be adjusted
based on six percent of the annual rental value,pursuant to section 18-21.011, F.A.C.
STAFF REMARKS: In accordance with rules adopted pursuant to sections 373.427(2), and
253.77(2), F.S., the attached "Recommended Consolidated Notice" contains a recommendation
for issuance of both the permit required under part IV of chapter 373, F.S., and the authorization
to use sovereignty submerged lands under chapters 253, and 258 F.S. The Board of Trustees is
requested to act on those aspects of the activity which require authorization to use sovereignty
submerged lands.
Project Synopsis
The applicant is proposing to construct a 47-slip mixed use private residential multi-family
docking facility (18 slips) and a commercial marina (29 slips) over 66,843 square feet of
sovereignty submerged lands to be used in conjunction with an upland 81-unit condominium/hotel.
The proposed docking facility will accommodate vessels ranging in lengths from 30 to 60 feet with
average drafts of 2.5 to 4 feet.
Board of Trustees
Agenda-March 10,2009
Page Six
******************************************************************************
Item 3, coat.
Background
The initial 25-year sovereignty submerged lands lease for the existing docking facility containing
7,728 square feet and 12 transient slips was approved by the Board of Trustees on May 14, 1991.
A storm destroyed a 200-foot-long segment of the docking facility with 8 slips circa 1997. Since
that time, the facility has consisted of a 4-slip dock containing approximately 1,800 square feet
of preempted area. The 1991 lease contained a special lease condition stating that, "The lessee
shall not expand the structure or area included in this lease." The applicant at the time (the
predecessor in title) offered to forego any future expansion of the docking facility as a condition
to meet the aquatic preserve public interest requirement. However, the Department of
Environmental Protection (DEP) is recommending that the Board of Trustees remove this special
lease condition and allow the proposed expansion because: (1) there are no resource concerns
associated with the proposed project (the docking structures on the south side of the facility are
designed to avoid impacts to the oyster bed located adjacent to the seawall); (2) adequate water
depths, good flushing, and water quality exist at the project site; (3) the applicant has offered
public interest in the form of increased public opportunities for access to sovereignty submerged
lands; (4) there is no history of non-compliance with the existing lease; and (5) by rule the term
of the lease will be reduced from 25 years to 5 years.
The upland property was redeveloped in 2005 into a condominium/hotel complex called Boca
Ciega Resort Marina, a condominium and rental resort, with 81 units. Boca Ciega Resort &
Marina Condominium Association, Inc., that controls the riparian shoreline, has granted a
perpetual easement with riparian rights over a 10-foot-wide strip of upland along the entire 609
linear feet of riparian shoreline to the applicant for the purposes of operating both the
condominium and commercial marina portions of the 47-slip docking facility and accepting
responsibility for the sovereignty submerged lands lease. The agreement provides the public
with pedestrian and vehicular ingress and egress to the commercial marina portion of the docking
facility in addition to 14 parking spaces per Pinellas County (County) regulations and coded
access to restrooms inside the condominium complex.
Project Detail
The applicant is proposing to remove the remaining 4-slip dock previously used for temporary
mooring in conjunction with an upland restaurant and construct a 47-slip mixed use private
residential multi-family docking facility and commercial marina. The applicant will provide the
upland condominium unit owners the right of first refusal on the use of up to 18 slips. At least
29 slips, and potentially more if the condominium unit owners choose not to use any of the 18
slips, will be a part of the commercial marina. A minimum of 29 slips will be available for rent
to the public on a first-come, first-served basis pursuant to section 18-21.003(25), F.A.C., which
has been addressed as a special lease condition.
The 18 slips and associated preempted area(a maximum of 18,270 square feet) that may be used
by the upland condominium owners meets the one to one unit to slip ratio pursuant to section 18-
21.004(4)(b)1, F.A.C., and the 30 to 1 preempted area to riparian shoreline ratio pursuant to
section 18-20.019(7)(a), F.A.C. (Boca Ciega Bay and Pinellas County Aquatic Preserve rule). A
special lease condition will require no more than 18,270 square feet be leased, rented or
Board of Trustees
Agenda-March 10, 2009
Page Seven
******************************************************************************
Item 3, cont.
otherwise used by entities having an ownership interest in any residential condominium unit in
the Boca Ciega Resort Marina condominium/hotel complex. Pursuant to section 18-
20.019(7)(a), F.A.C., a perpetual proprietary conservation easement will be granted to the Board
of Trustees over the entire 609 linear feet of riparian shoreline to preclude the construction of
additional docks. This has been included as a special approval condition.
Public Interest
The proposed project is located within the Boca Ciega Bay Aquatic Preserve, in a highly
developed area of the County. Since the project is within an aquatic preserve, it must be in the
public interest, pursuant to section 18-20.004(1)(b), F.A.C. To fulfill this requirement, the
applicant has offered to: (1)provide greater public access to sovereignty submerged lands by the
payment of$200,000 to the County for the construction of a second boat ramp and access lane at
a County-owned boat ramp facility; (2) provide greater public access to sovereignty submerged
lands by making available a minimum of 29 slips for rent to the public on a first-come, first-
served basis; (3) treat greater than 1.25 inches of stormwater (0.50 inches over the minimum
requirement of 0.75 inches); (4) placement of 33 cubic yards of riprap along 220 linear feet of
seawall; and(5) construct 19 reef balls underneath a terminal dock.
Benefits
Benefits of the proposed public interest: (1) The applicant's $200,000 payment for the addition
of a second boat ramp and access lane at the Sutherland Bayou Boat Ramp, owned by the County
in the Town of Palm Harbor, will increase public access opportunities for the boating public to
sovereignty submerged lands within the aquatic preserve. The County has earmarked the funds
for placement in a capital improvement fund specifically established for the construction of the
second boat ramp and access lane. Because the funds have yet to be appropriated by the County
for the improvements, the applicant's contribution will greatly help in jump starting this phase of
improvements.
In addition to the construction of the boat ramp and access lane, money from this fund can be
applied to the environmental resource permit (ERP) application fee, any permit mitigation,
environmental signage, waterway markers, such as speed limits or no wake signs, and
enforcement. The ERP application process will entail a review of any direct and secondary
impacts to occur to Sutherland Bayou, an Outstanding Florida Water, and in particular a review
by the Florida Fish and Wildlife Conservation Commission (FWC), Office of Imperiled Species
Management, of any direct and secondary impacts on manatees.
(2) The provision of a minimum of 29 slips available for rent to the public on a first-come, first-
served basis will go toward restoring some of the many open to the public slips that have been
lost in the last several years due to private redevelopment projects.
(3) The additional one-half inch of stormwater treatment will reduce the amount of pollutants
such as oil, gasoline and tar entering the bay by maintaining a longer period of treatment on the
subject upland property. With the widespread dredging, filling and bulkheading of the Boca
Board of Trustees
Agenda-March 10,2009
Page Eight
******************************************************************************
Item 3, coot.
Ciega Bay Aquatic Preserve shoreline over many years and the consequential loss of mangrove
and marsh habitat, opportunities to restore habitat areas are few.
(4) The construction of the riprap will reduce downdrift erosion or filling due to sand transport
caused by deflected wave energy off the existing seawall and provide habitat for attaching
organisms such as mollusks,barnacles and algae.
(5) The construction of reef balls will provide habitat for oyster reef communities consisting of
other attaching organisms such as barnacles, sea squirts, anemones, sponges, corals and algae
that increase the productivity of the benthic area. Oyster reef communities also filter out water
pollutants and provide diverse food sources for a variety of important fish species such as
redfish, snook, sheepshead, wading birds such as American oystercatcher, ibis and herons, and
other marine species such as blue and stone crabs.
In light of the above, DEP staff is of the opinion that the proposed project is in the public
interest.
Noticing
Twenty-one property owners within a 500-foot radius were provided notice of the proposed
project. DEP received six letters of objection. One of the letters was from a representative of a
127-unit condominium. The objectors raised the following concerns:
(1) potential for greater noise and traffic congestion by patrons using the marina;
(2) potential for more violations by boaters of the existing "No Wake" zone causing
additional shoreline erosion and seawall damage; objector states this situation already
exists from boaters ingressing and egressing the existing marina located adjacent to and
south of the proposed project;
(3) potential for expansion of the docking facility to cause further degradation of Boca Ciega
Bay already suffering from the affects of too many boaters and over development on
the waterfront;
(4) potential for dock construction to cause silting in of access routes to a nearby mobile
home park facility, making navigation to and from the main channel more difficult for
boat owners at that facility.
DEP is of the opinion that the objectors concerns are addressed as follows:
(1) traffic congestion and noise are associated with zoning and land use and under the
purview of the local government of jurisdiction;
(2) enforcement of the "No Wake" zone is under the purview of FWC and the local
government of jurisdiction;
(3) an ERP is required for the proposed project which will include conditions that address
cumulative and secondary impacts as required under the provisions of Part IV of chapter
373,F.S; and
Board of Trustees
Agenda-March 10, 2009
Page Nine
******************************************************************************
Item 3, cont.
(4) the ERP required for the proposed project will contain a specific condition requiring the
placement of turbidity curtains around the perimeter of the construction site to prevent any
silt generated by the construction from migrating from the area.
Permit Summary
DEP's ERP prohibits liveaboards and fueling facilities and requires sewage pumpout facilities.
Specific conditions in the ERP require all CCA pilings to be wrapped to address secondary and
cumulative impacts to the Outstanding Florida Water (OFW). In addition, the requirement to
install sewage pumpout facilities provides DEP with reasonable assurance that water quality
standards in an OFW will not be violated.
Adequate water depths for the size vessels using the marina exist from the proposed project site
to the Gulf of Mexico. In addition, specific conditions in the ERP will require draft restrictions
in certain slips as needed to ensure that there is a one-foot clearance between the bottom of the
boat propeller and the bay bottom to prevent prop dredging.
Commenting Agency
The recommendations of FWC regarding protection of manatees have been addressed in the
permit.
Comprehensive Plan
A local government comprehensive plan has been adopted for this area pursuant to section
163.3167, F.S. The Depailuient of Community Affairs determined that the plan was in
compliance. The proposed action has been determined to be consistent with the adopted plan
according to a permit issued by Pinellas County on March 21, 2006 and a revised permit on July
9,2008.
(See Attachment 3, Pages 1-39)
RECOMMEND APPROVAL SUBJECT TO THE SPECIAL APPROVAL
CONDITIONS, THE SPECIAL LEASE CONDITIONS, AND
PAYMENT OF$11,880.38
*******************************************************************************
Item 4 Mitigation Services PBC, LLC Contract/Mitigation Bank/Lemon Grove Property/
Pal-Mar Florida Forever Project/Determination/Competitive Bid Waiver
WITHDRAWN FROM THE DECEMBER 9,2008 AGENDA
REQUEST: Consideration of a request to (1) allow Mitigation Services PBC, LLC to operate a
mitigation bank, or other mitigation project, on approximately 263.05 acres of state-owned land
known as the Lemon Grove property within the Pal-Mar Florida Forever Project for one ten-year
Board of Trustees
Agenda-March 10,2009
Page Ten
Item 4, cont.
term followed by one five-year renewal term; (2) authorize the negotiation of a contract pursuant
to the terms outlined below to allow Mitigation Services PBC, LLC to establish a mitigation bank,
or other mitigation project, on the Lemon Grove property and delegate authority to the Secretary
of the Department of Environmental Protection, or designee, to approve and consent to the
contract between the Board of Trustees, Mitigation Services PBC, LLC and Florida Fish and
Wildlife Conservation Commission; (3) determine that, pursuant to paragraph 18-2.018(1)(a)
F.A.C., the proposed contract is not contrary to the public interest; (4) determine it is in the public
interest to waive the competitive bid requirements of paragraph 18-2.018(2)(i), F.A.C.; and, (5)
authorize Florida Fish and Wildlife Conservation Commission to be the long-term operation and
maintenance entity pursuant to the South Florida Water Management District permit.
COUNTY: Palm Beach
APPLICANT: Mitigation Services PBC, LLC (Mitigation Services)
LOCATION: Section 33,Township 40 South, Range 40 East
CONSIDERATION: During the term of this contract, Mitigation Services shall be required to
pay Florida Fish and Wildlife Conservation Commission (FWC) a minimum annual fee equal to
the annual market rental rate of$5,261 (Base Fee), plus applicable sales tax, in advance of the
effective date of the contract and on each subsequent anniversary of the effective date of the
contract. In addition to the Base Fee, Mitigation Services shall also be required to pay to FWC the
following additional compensation (Supplemental Payment) at the end of each contract year
unless the Base Fee exceeds both Supplemental Payment amounts:
• $394,500 which is 50 percent of the Department of Environmental Protection (DEP)
approved appraised value of the fee simple estate in the land, divided by the total number
of mitigation bank credits authorized by the South Florida Water Management District
(SFWMD) permit and multiplied by the number of credits sold in a contract year, less the
Base Fee; or
• Six percent of the gross sale price of each mitigation bank credit sold in a contract year,
less the Base Fee, whichever is higher.
Over the life of the contract, Mitigation Services shall be required to pay FWC a minimum of
$394,500. To ensure this payment, Mitigation Services will either pay FWC a $39,450 annual
payment due at the beginning of each year, for the first ten years, or provide financial assurance,
such as a surety bond, that guarantees that when the contract terminates, FWC will receive a
minimum of$394,500.
STAFF REMARKS: On November 13, 2002, the Board of Trustees approved an option
agreement to purchase 2,018.88 acres within the Pal-Mar Florida Forever Project from Palm
Beach County (County). The transaction closed on May 3, 2004. The County had previously
acquired the property from the John D. and Catherine T. MacArthur Foundation(Foundation) and
Board of Trustees
Agenda -March 10,2009
Page Eleven
******************************************************************************
Item 4., cont.
entered into a ten-year mitigation agreement (mitigation agreement) with the Foundation. The
mitigation agreement covering approximately 263.05 acres known as Lemon Grove was assigned
to Mitigation Services and expires March 31, 2009. Mitigation Services has obtained the rights
formerly held by the Foundation to perform mitigation services on the property.
The parcel is managed by FWC under Board of Trustees' Lease No. 4480.
Current Request
On October 28, 2008, the Board of Trustees was asked to consider extending the existing
mitigation agreement and to authorize the operation of a mitigation bank, or other mitigation
project, on Lemon Grove. DEP staff recommended denial of the request. As a landowner, the
Board of Trustees has made a decision not to allow mitigation banking on Board of Trustees'
lands but rather approve project-by-project mitigation. The Board of Trustees had no actual or
constructive knowledge when it purchased the property that the Foundation planned to use the
property as a mitigation bank and there is no language in the mitigation agreement requiring the
Board of Trustees to allow the proposed use or to renew the life of the mitigation agreement in
any form. It was the opinion of DEP staff that continuing the mitigation activities beyond the
current expiration date would necessitate an entirely new agreement, which would then be subject
to the valuation and review processes standard for that type of agreement. The Board of Trustees
deferred action on the request and directed DEP to negotiate the terms of an agreement with
Mitigation Services to use the property for mitigation and restoration purposes. DEP is
recommending that the Board of Trustees, FWC and Mitigation Services enter into a contract
rather than a sublease because this is the form of authorization typically used by SFWMD for
mitigation banks located on its property.
Negotiation Recommendations
As a result of negotiations conducted by DEP with Mitigation Services for mitigation banking on
the Lemon Grove parcel, DEP staff is requesting the Board of Trustees approve the following
recommendations:
• DEP and FWC will negotiate a contract between the Board of Trustees, FWC and
Mitigation Services for a mitigation bank, or other mitigation project, on the Lemon Grove
property.
• The term of the contract will be for ten years with one five-year renewal, at the sole option
of Mitigation Services, if:
o 100 percent success has been demonstrated per the terms of the mitigation bank
permit issued by SFWMD;
o Mitigation Services is in compliance with all of the terms and conditions of the
SFWMD mitigation bank permit,the contract and FWC's management plan; and
o Mitigation bank credits remain to be sold.
Board of Trustees
Agenda-March 10,2009
Page Twelve
Item 4, coat.
• Equitable compensation, required pursuant to paragraph 18-2.018(2)(i), F.A.C., will be
determined by the highest dollar amount among the following calculations:
During the term of this contract, Mitigation Services shall be required to pay FWC
a minimum annual fee equal to the Base Fee, plus applicable sales tax, in advance
on the effective date of the contract and on each subsequent anniversary of the
effective date of the contract. In addition to the Base Fee, Mitigation Services shall
also be required to pay to FWC the following Supplemental Payment at the end of
each contract year unless the Base Fee exceeds both Supplemental Payment
amounts:
• $394,500, divided by the total number of mitigation bank credits
authorized by the SFWMD permit and multiplied by the number y p p y b r of credits
sold in a contract year, less the Base Fee; or
• Six percent of the gross sale price of each mitigation bank credit sold in a
contract year, less the Base Fee, whichever is higher.
Over the life of the contract, Mitigation Services shall be required to pay FWC a
minimum of$394,500. To ensure this payment,Mitigation Services will either pay
FWC a $39,450 annual payment due at the beginning of each year, for the first ten
years, or a surety bond that guarantees that when the contract terminates, FWC will
receive a minimum of$394,500. Neither the contract, nor the land, can be used as
collateral to obtain a surety bond. Details will be defined in the final contract.
• Per paragraph 18-2.018(2)(k)2, F.A.C., Mitigation Services shall be required to pay for the
cost of the appraisal totaling approximately$6,500.
• The SFWMD will be the permitting agency for the mitigation bank.
• Mitigation Services shall set aside a portion of the proceeds from each sale of a full or
partial mitigation credit at Lemon Grove in a maintenance endowment for the perpetual
maintenance of the property. FWC, as lessee of the land, and/or the Board of Trustees, as
owner of the land, will be responsible for the perpetual maintenance of the property. At
the completion of the construction phase of the SFWMD permit, FWC has agreed to
accept the permit for operation and maintenance responsibilities and will be bound by all
terms and conditions of the permit. The funding will be based on the sales of mitigation
credits only. However, this will not relieve Mitigation Services from any other regulatory
requirements or obligations.
• The contract is not assignable or transferrable.
Board of Trustees
Agenda-March 10,2009
Page Thirteen
******************************************************************************
Item 4, coot.
Public Interest Determination
Pursuant to paragraph 18-2.018(1)(a), F.A.C., the decision to authorize the use of Board of
Trustees-owned land requires a determination that such use is not contrary to the public interest.
DEP is recommending the Board of Trustees make such a determination in this case because the
Board of Trustees purchased the Lemon Grove property subject to the mitigation agreement.
While DEP and Mitigation Services disagree as to whether the original mitigation agreement
authorized a mitigation bank, this recommendation is an effort to resolve the disagreement over
what rights existed under the mitigation agreement at the time the Board of Trustees purchased the
property. In addition, the activity will help in the restoration of the property and is a compatible
use within FWC's management plan.
Request to Waive Competitive Bid Requirement
Pursuant to paragraph 18-2.018(2)(i), F.A.C., the Board of Trustees may waive the requirement
for competitive bids if determined to be in the public interest. Mitigation Services has been
working towards a mitigation bank permit under its existing mitigation agreement with the
County on the Lemon Grove property prior to the Board of Trustees purchasing the property.
Mitigation Services claims they have a significant amount of time invested with the SFWMD
staff in preparing for the mitigation bank permit and also a financial investment for expenditures
for the completed surveys and site assessments on the parcel. These investments of time and
money were made to receive the SFWMD permit approval necessary to start the
mitigation/restoration work and will enable Mitigation Services to begin the restoration in a
timely manner. Mitigation Services also has seven years of experience in mitigation banking at a
separate site and according to SFWMD has been found to be in compliance with its current
permit. DEP is recommending the Board of Trustees waive the competitive bid process because
of these factors.
Comprehensive Plan
A local government comprehensive plan has been adopted for this area pursuant to section
163.3167, F.S. The proposed action is consistent with the adopted plan.
(See Attachment 4,Pages 1-11)
RECOMMEND APPROVAL
*******************************************************************************
Item 5 Florida Power Corporation/Progress Energy Florida, Inc. Easement/Marjorie
Harris Carr Cross Florida Greenway/BOT Easement
WITHDRAWN FROM THE DECEMBER 9,2008 AGENDA
REQUEST: Consideration of(1) grant of a non-exclusive easement over approximately 27.017
acres, more or less, of the Marjorie Harris Carr Cross Florida Greenway pursuant to section
253.7827(1), F.S.; and (2) acquisition of an approximately 18-foot-wide by 40-mile-long
Board of Trustees
Agenda-March 10,2009
Page Fourteen
******************************************************************************
Item 5, cont.
perpetual, non-exclusive easement for a public recreational trail; and (3) delegation to Secretary
of the Department of Environmental Protection, or designee, to approve non-substantive changes
to the 27.017-acre easement.
COUNTY: Levy
APPLICANT: Florida Power Corporation, d/b/a Progress Energy Florida, Inc. (PEF)
LOCATION: Section 06, Township 17 South, Range 17 East
CONSIDERATION:
Appraised Value Net Positive Benefit(NPB)(1.5x) Totals
(Deposited into IITF) (Deposited into Escrow Acct.)
Phase I(Years 1 through 3) $ 905,000 $1,357,500* $2,262,500
Phase II(Years 4 through 70)
BOT Rejects Easement from PEF $3,010,000 $4,515,000** $7,525,000
or$6,020,000** or$9,030,000
or or
BOT Accepts Easement from PEF** $6,375,000&$1,150,000*** $7,525,000
TOTALS $3,915,000 $5,872,500 $9,787,500
or$7,377,500 or$11,292,500
*to be used for the design,permitting,and construction of paved public recreational trails and other related facilities
to be determined by OGT
**to be used for the design, permitting, and construction of paved public recreational trails and other related
facilities or for the purchase of replacement lands to be determined by OGT. NPB is $4,515,000 if PEF provides
due diligence products and makes a diligent effort to cure defects, or $6,020,000 if PEF fails to provide due
diligence products or fails to use a diligent effort to cure defects identified by DSL within the limitations outlined in
Staff Remarks
***$6,375,000 credit given to PEF based upon DSL-approved appraised value of PEF Easement. This$6,375,000
credit is applied towards$7,525,000 total consideration for Phase II,leaving a remainder due of$1,150,000
Phase I
$2,262,500 for the first three years of the easement to PEF (PEF Easement), of which (1)
$905,000 of this fee represents the Department of Environmental Protection (DEP), Division of
State Lands' (DSL)-approved appraised value of a three-year easement that will be deposited
into the Internal Improvement Trust Fund; and (2) $1,357,500 of this fee represents the net
positive benefit, which is 1.5 times the DSL-approved appraised value of a three-year easement,
that PEF is required to contribute toward the design, permitting and construction of
approximately 2.7 miles of paved public recreational trails on the Marjorie Harris Carr Cross
Board of Trustees
Agenda-March 10, 2009
Page Fifteen
Item 5, cont.
Florida Greenway (CFG)beginning at Felburn Park east of U.S. Highway 19 and continuing east
to Mullet Point(1.1 miles) and from the Inglis Main Dam to the northwest corner of Inglis Island
(1.6 miles). Any remaining funds will be used to begin the design, permitting and construction
of the Mullet Point Bridge. The bridge will connect the two paved trail segments described
above.
If PEF's federal permit for the Levy Nuclear Power Plant (Power Plant) has not been issued to
p vY ( )
PEF at the end of the initial three-year term, the term may be extended upon mutual agreement of
the parties, and PEF will pay an additional pro rata easement fee to the Board of Trustees and
additional net positive benefit for the construction of public recreational trails and other related
facilities to be determined by DEP's Office of Greenways and Trails (OGT) for a term length
mutually agreed to by DEP and PEF. These payments for the extension of the initial three year
term will be deducted from the remaining easement fee and net positive benefit that PEF owes
for the remaining 67-year easement term. Those payments are discussed in Phase II,below.
Phase II
Upon receipt of its federal permit for the Power Plant, PEF shall be required to pay an additional
fee of$7,525,000 for the life of the easement, not to exceed 70 years, of which(1) $3,010,000 of
this fee represents the DSL-approved appraised value of the remaining 67-year easement term;
and(2) and$4,515,000 of this fee represents the net positive benefit,which is 1.5 times the DSL-
approved appraised value of a 67-year easement. PEF shall be entitled to set off $6,375,000,
which is the DSL-approved appraised value of an approximately 18-foot-wide by 40-mile-long
non-exclusive perpetual easement for a public recreational trail that PEF will grant to the Board
of Trustees (BOT Easement), against this additional $7,525,000 fee. The offset off will be
adjusted at closing for any reduction in the DSL-approved appraised value based upon a review
of the fmal DSL-approved title insurance commitment, environmental site assessment, and
survey. However, if the value of the BOT Easement is reduced by twenty percent (20%) or
more, PEF has the right to pay the consideration for the 27-acre easement as stated above instead
of conveying the BOT Easement and the NPB would remain at the $4,515,000. PEF shall be
required to contribute the remaining $1,150,000 (or the value if adjusted after the due diligence
products are completed) toward the design, permitting and construction of the paved public
recreational trail within the easement area on the raised portion of the existing rail bed on which
the railroad tracks were previously located or for the purchase of replacement lands to be
determined by OGT.
Within six months of closing and prior to DSL's determination to accept or decline the BOT
Easement, PEF will provide, at its sole cost and expense, a fmal title insurance commitment (to
be followed by an owner's marketable title insurance policy (ALTA Form `B" with Florida
revisions)) subject to the limitation on PEF's duty to cure defects identified in the due diligence
products, as stated below, fmal boundary survey, and fmal environmental site assessment(s)
(Phase I and Phase II, if required). Also, PEF shall provide a status report to DSL within six
months from the Board of Trustees' approval of the PEF Easement, which will include an
owners and encumbrance report, Val Maps and graphic depiction of any encumbrances and
encroachments derived from the owners and encumbrance report, and preliminary environmental
Board of Trustees
Agenda-March 10,2009
Page Sixteen
******************************************************************************
Item 5, cont.
site assessment. DSL shall present the report to the Board of Trustees in the form of a negative
response memo or formal agenda item. The acceptance of the BOT Easement is contingent on
DSL's approval of the fmal form and substance of the title insurance commitment, survey, and
environmental site assessment after PEF has cured any issues identified by DSL, provided,
however, that PEF shall not be required to engage in any litigation or precursors to litigation or
to pay more than fair market value to cure defects identified by the due diligence products;
DSL's approval of the terms and conditions of the BOT Easement; and DSL's approval of the
Title, Possession and Lien Affidavit and the Environmental Affidavit to be executed by PEF at
the time of the granting of the BOT Easement. The final title insurance commitment shall be no
more than six months old at closing. The fmal survey shall be certified within 90 days prior to
closing, and the final environmental site assessment shall be no more than 12 months old at
closing. PEF shall pay the documentary revenue stamp tax and all other taxes and costs
associated with the conveyance of the BOT Easement. If, after the exercise by PEF of diligent
effort to cure defects identified by DSL (other than engaging in litigation, precursors to litigation
or paying more than fair market value to cure defects identified by the due diligence products)
DSL does not approve one or more of these items and DSL does not agree to accept the BOT
Easement, PEF shall pay an easement fee of$3,010,000 to the Board of Trustees that will be
deposited in the Internal Improvement Trust Fund, and PEF shall contribute $4,515,000 toward
the design, permitting and construction of public recreational trails and other related facilities to
be determined by OGT. If PEF fails to provide any of the due diligence products or to make a
diligent effort to cure defects identified by DSL (other than engaging in litigation, precursors to
litigation or paying more than fair market value to cure defects), PEF shall pay an additional net
positive benefit by increasing the multiplier for the PEF Easement from 1.5 to 2.0 for the Phase
II easement.
STAFF REMARKS: DSL received a request from PEF for a non-exclusive easement (PEF
Easement) over two parcels of state-owned uplands within the CFG,just west of the Inglis Lock,
in Levy County. The property, former Cross Florida Barge Canal lands, was conveyed to the
Board of Trustees after the deauthorization of the barge canal project in 1991. The site is
managed by OGT under Board of Trustees' Lease No. 4013.
Purpose of PEF Easement
The proposed PEF Easement contains approximately 27.017 acres over, across and upon two
parcels (with Parcel One containing 0.060 acres, more or less, and Parcel Two containing 26.957
acres, more or less) and will be for a term of up to 70 years. The acreage of the PEF Easement
may be slightly amended based on a fmal survey which PEF will provide to DSL within 60 days
of Board of Trustees approval. The proposed PEF Easement is needed initially for site
preparation activities for PEF's proposed Power Plant that will be located on property owned by
PEF approximately three miles north of the CFG. The portion of the PEF Easement that runs
over, across and upon Parcel Two will ultimately be used for a barge slip and staging area for the
delivery of modular components to be used in the construction of the power plant, a boat ramp
and associated parking, access road,upland portions of vehicular access bridge and utility bridge,
blowdown pipes, cooling water intake structure and pipes, transmission lines, and other utility
Board of Trustees
Agenda-March 10,2009
Page Seventeen
******************************************************************************
Item 5, coot.
facilities. The barge slip/boat ramp and bridged vehicular accessway are being permitted
separately and in advance of the final construction permit for the Power Plant so that the
necessary site preparation activities will be completed and not create a delay for construction
following the final certification by the Board of Trustees, anticipated later this summer. For
nuclear power plants, such infrastructure preparation is specifically allowed pursuant to section
403.506(3), F.S. The proposed PEF Easement is the initial phase of the overall Power Plant
project which could potentially impact other Board of Trustees' lands. These potential impacts
could include lands managed by OGT, Division of Forestry and the Florida Fish and Wildlife
Conservation Commission.
The proposed PEF Easement was reviewed and approved by the Acquisition and Restoration
Council (ARC) on October 10, 2008. If PEF requests future authorizations to use state lands,
these authorizations will have to go before ARC and the Board of Trustees for consideration.
When this occurs, the managing agencies will be contacted to process the requests for
authorizations and consideration of net positive benefit.
The purpose of this portion of the PEF Easement that runs over, across and upon Parcel One is to
obtain satisfactory evidence of sufficient upland interest as defined in section 18-21.003(57),
F.A.C., which is required for PEF to obtain a sovereignty submerged lands easement from the
Board of Trustees, and to allow construction, maintenance and operation of access roads, upland
portions of vehicular access bridge and utility bridge, blowdown pipes, cooling water intake
pipes, transmission lines, and other utility facilities. PEF has also applied for a sovereignty
submerged lands easement for a bridge and utility crossing between Parcel One and Parcel Two.
In the future, PEF will also have to apply for a permit to excavate and to dredge the area between
the proposed upland construction and that portion of the canal that links Lake Rousseau and the
Gulf of Mexico in order to use this facility as a barge slip/boat ramp and PEF must obtain prior
Board of Trustees' approval for any excavating and/or dredging in this area.
The upland portion of the barge slip/boat ramp will be located adjacent to the canal. Although
the canal is a navigable waterway; no activities are proposed below the mean high water line at
this time. The Inglis Lock Bypass Channel is not navigable at the location where the bridged
vehicular accessway will be located, as there are barriers to navigation west and east of the
proposed bridge. To the west there is a gated spillway structure, and to the east there is a
causeway crossing with culverts in the channel.
PEF Easement Term
A state site certification application is currently being processed pursuant to the Electrical Power
Plant Siting Act, sections 403.501-518, F.S., for the proposed Power Plant and associated
facilities. PEF has stated that approval of the federal permit could take up to three years or
longer. As a result, DEP is recommending an initial three-year-term length for the PEF
Easement that may be extended upon mutual agreement of the parties if PEF's federal permit
application is still pending and being diligently pursued after three years. If PEF obtains the
federal permit the term of the PEF Easement will automatically be extended so that the total
easement term, including the initial three-year term, is 70 years so long as PEF is in full
Board of Trustees
Agenda-March 10,2009
Page Eighteen
******************************************************************************
Item 5, cont.
compliance with the terms and conditions of the PEF Easement at the time of renewal. The PEF
Easement will contain a special condition that requires PEF to allow public access to the
easement premises, including the boat ramp and associated parking, for public recreational
purposes except when modular plant components or other barge materials are in the active
loading or unloading process, or other utility uses of the easement area require closure of the
easement area to the public for safety reasons. DEP is recommending that the PEF Easement
also contain a special condition that requires PEF, at the sole option and discretion of OGT, to
restore the easement area to the condition as it existed on the date of the grant of the PEF
Easement if PEF does not obtain the federal permit. The PEF Easement shall automatically and
immediately terminate upon PEF's withdrawal of its federal permit application for the Power
Plant or the federal government's denial of the permit.
Future Authorizations/Approvals
Approval of the PEF Easement as requested in this item shall not be construed as a duty in DSL
or the Board of Trustees to approve any future requests for authorizations.
BOT Easement
Immediately upon receipt of its federal permit for the Power Plant, PEF shall grant to the Board
of Trustees a non-exclusive perpetual 18-foot-wide easement for a public recreational trail over,
across and upon an approximately 40-mile-long PEF-owned corridor over the raised rail bed
from Dunnellon, north to Chiefland, within the existing undeveloped utility corridor, contingent
upon DSL's approval of the fmal title insurance commitment, survey, environmental site
assessment, and the terms and conditions of the BOT Easement, and the Title, Possession and
Lien Affidavit, and Environmental Affidavit to be executed by PEF. The proposed trail is part of
the Nature Coast State Trail -Southern Extension via the Progress Energy Corridors, on the OGT
2007-2008 approved Acquisition Project List. The BOT Easement will be situated to utilize the
existing raised rail bed on which the railroad tracks were previously located. Utility facilities
may also be located on the raised portion of the existing rail bed. PEF and OGT will work
together in advance of the easement closing to design, or at a minimum identify placement of
their respective facilities to assure that they can be co-located along the rail bed in a compatible
manner. PEF retains the right to construct railroad facilities in addition to other utility uses
within the easement area. Any future facilities will be constructed so as not to unreasonably
interfere with any OGT trail existing at the time of construction, or PEF agrees to relocate such
trail facilities, at PEF's expense and in a manner acceptable to the Board of Trustees and OGT
that will retain its intended public function. Uses of the corridor by PEF, or others to whom it
may grant rights, shall not unreasonably interfere with OGT's design, use, and management of
the BOT Easement as a public recreational trail.
Management of PEF Easement
PEF and OGT have worked closely to develop this project and will continue to collaborate
through the project's implementation. PEF will undertake construction of all of the proposed
activities on the PEF Easement and will be responsible for the operation and maintenance of the
upland barge slip/boat ramp and bridged vehicular accessway. Because the proposed PEF
Easement is non-exclusive, OGT as the lessee under Board of Trustees' Lease No. 4013
Board of Trustees
Agenda-March 10,2009
Page Nineteen
******************************************************************************
Item 5, cont.
continues to have the right to manage the easement premises. PEF's use of the easement
premises will not interfere with OGT's overall management of the easement premises. The PEF
Easement will contain an acknowledgement that OGT and its employees, contractors and agents
continue to have the right to access the easement premises for all purposes authorized under
Board of Trustees' Lease No. 4013, including but not limited to maintenance and security of the
easement premises. However, it will be necessary to close these areas to the public during
construction of the proposed barge slip and heavy haul road.
Management of BOT Easement
The BOT Easement will be used for an approximately 18-foot-wide by 40-mile-long public
recreational trail over the rail bed from Dunnellon, north to Chiefland, within the existing utility
corridor, and will be situated to utilize the raised rail bed. PEF's utility or other facilities may
also be located on the raised rail bed. OGT and PEF will work together in designing and
constructing their respective facilities to assure that the facilities can be co-located on the raised
rail bed in a compatible manner. PEF's right to use the corridor in the future for the construction,
operation and maintenance of electric transmission and distribution lines and other associated
utility facilities (including access roads or other linear facilities) or for other uses shall not
unreasonably interfere with OGT's design of the trail or its ability to effectively and efficiently
manage the BOT Easement as a public recreational trail.
Comprehensive Plan
A local government comprehensive plan has been adopted for this area, pursuant to section
163.3167, F.S. The proposed action is consistent with the adopted plan.
(See Attachment 5,Pages 1-74)
RECOMMEND APPROVAL
*******************************************************************************
Item 6 BOT/Gulf Sands Properties,LLC/T.I.Holdings,Inc./Settlement Agreement
REQUEST: Consideration of a proposed settlement agreement in the case of Gulf Sands
Properties, LLC and T.I. Holdings, Inc. v. Board of Trustees of the Internal Improvement Trust
Fund, Circuit Court, Sixth Judicial Circuit, State of Florida, Case No. 07-2892-CI.
LOCATION: Treasure Island,Pinellas County
STAFF REMARKS: Gulf Sands Properties, LLC and T.I. Holdings, Inc. (Plaintiffs) filed a
complaint for declaratory judgment, quiet title and temporary taking of certain real property
fronting the Gulf of Mexico within Treasure Island, in Pinellas County, Florida. The Plaintiffs
operate a beachfront restaurant (Restaurant) and claim ownership of 13 lots, seven of which are
•
Board of Trustees
Agenda-March 10,2009
Page Twenty
******************************************************************************
Item 6, cont.
vacant, the rest are utilized by the Restaurant. A portion of the property (Property) is located
waterward of the 1968 mean high water line survey that was established pursuant to a beach
renourishment project conducted by the Army Corp of Engineers.
The Plaintiffs claim title to the Property pursuant to section 253.12(9), F.S., which provides that
title to tidally influenced lands filled prior to July 1, 1975 which might be owned by the state, is
granted to the landowner having record title to the adjacent uplands. However, this section
specifically provided that title did not vest to any person who, as of January 1, 1993, was the
record titleholder of the filled or adjacent upland property and who filled or caused to be filled
the state-owned lands. The Board of Trustees has consistently interpreted this provision to apply
to lands which had been filled without a permit, although the statute does not specifically address
such circumstances.
Lawsuit
The lawsuit is premised on a letter issued by the Board of Trustees' surveyor, asserting that the
Property is state-owned.
• Count I seeks declaratory and injunctive relief, requesting that the Court declare the
Plaintiffs as owners of all of 13 lots in dispute and enjoin the Board of Trustees from
asserting ownership.
• Count II is a quiet title action, which essentially seeks the same relief as Count I,
requesting that the Court remove all "clouds" from the Plaintiffs' title, specifically the
claims of ownership by the Board of Trustees.
• Count III alleges a temporary taking of the Property.
• Count IV claims an inverse condemnation has occurred, resulting in a complete "taking"
of the Property.
The Plaintiffs seek damages, pre judgment interest, attorneys' fees and costs. The Plaintiffs also
reserved their federal causes of action to preserve their rights to seek relief in federal court if the
relief provided in state court proves insufficient.
Terms of the Settlement
The Attorney General's Office is representing the Board of Trustees and has negotiated this
settlement agreement. The material terms of the settlement agreement are as follows:
(1) The Board of Trustees will execute a quit claim deed to the Plaintiffs for Lots 13, 14 and
15 of Block 8 and Lots 6, 7, 8, 9, 10 and 11,Block 10. The deeds will be delivered to the
Plaintiffs for recording.
Board of Trustees
Agenda-March 10,2009
Page Twenty-one
******************************************************************************
Item 6, cont.
(2) The Plaintiffs will execute a special warranty deed (and disclaimer of interests) to the
Board of Trustees for Lots 6, 7, 10 and 11, Blockl2, reserving to the Plaintiffs' riparian
rights on said lots.
(3) The Plaintiffs will execute and deliver to the Board of Trustees a conservation easement
over Lots 6 and 11, Block 10.
(4) The Plaintiffs shall be entitled to conduct activities on Lots 6,7,10 and 11, Block 12 for
purposes not inconsistent with the operations of the Restaurant.
The settlement agreement requires dismissal with prejudice of the litigation and that each party
shall bear its own attorneys' fees and costs. The settlement agreement provides that it is
contingent upon Board of Trustees approval.
(See Attachment 6,Pages 1-61)
RECOMMEND APPROVAL