AGENDA TRANSMITTAL
Subject:
Agenda No.
Presidential Street Project
Final Update — Consider Coolidge Addition
Department Origin: Citv.Manacte r
Administrative Sparc; '
City Attorney: i
Ap rove or Submittal by:
City Clerk: v
AI N n r; dity Manager
Nw
i
r
Date Submitted: 1 MAY 13
For Agenda Of: 8 MAY 13
Exhibits:
EXPENDITURE REQUIRED:
$524,919
AMOUNT BUDGETED:
$440,321
APPROPRIATION REQUIRED:
$84,598
SUMMARY
The City received notification from FDEP that we were awarded a 319 Grant to help
offset drainage improvement costs associated with the Presidential Streets Project. The
grant award is $90,000. Once the grant documentation /agreement is provided to the
City, it will come before Council for final approval.
In the interim, the purpose of this item being placed on the agenda is to review the
current project parameters and consider adding Coolidge Street to the project.
The Presidential Street Project has not changed since last reviewed by Council. It aims
to improve drainage, road conditions and "downtown ambience" by constructing new
road base, asphalt overlay, stamped concrete parking spots, sidewalk (not Martin),
street lighting (Washington Only), and landscape (not Martin). The total engineer
estimate for the project is $614,919; however, because of the grant award the total
expenditure required is $524,919 as listed below.
ITEM ESTIMATE
Washington Street $346,757
Cleveland Street $217,966
Martin Street $40,196
CTI Inspection Services $10,000
Less FDEP Grant $90,000
TOTAL PROJECT ESTIMATE $524,919
At this time, Council may want to consider adding Coolidge Street to this project. Earlier
this year, Council postponed the CavCorp Project. However, a goal of Council is to
create additional on- street parking, down -town ambiance and improve street conditions
in the Riverfront District. While a CavCorp design concept could not be agreed upon,
one area of agreement in that project was improvements along Coolidge Street. Frank
Watanabe of Neel- Schaffer has estimated that street, sidewalk, lighting and parking
improvements along Coolidge would be $100,000. In addition, with the CavCorp Project
delayed, $250,000 exists in CRA to cover Coolidge additional and other overruns which
may occur along Washington, Martin and Cleveland.
In considering this project expansion, below are two alternatives for Council to consider.
Go Out To Bid "As -Is" — As currently designed, the project is $84,598 over budget.
This is due to the additional ambience add -ons such as sidewalks, stamped concrete,
landscape and lighting. At this point, staff would recommend going out to bid and
making budget adjustments after the bid process reveals unit pricing. Budget
adjustments may or may not be required.
Go out to Bid w/ Project Expansion — Neel- Schaffer has estimated that similar
improvements can be added to Coolidge Street. This would increase cost by
approximately $104,000 ($100,000 Project Costs; $4,000 Engineering Costs). With the
CavCorp Project on -hold, the CRA fund can absorb an a project expansion of up to
$250,000.
RECOMMENDATION
Staff recommends that Council authorize staff to move forward with the procurement of
this project, including improvements to Coolidge Street. This recommendation will
require an additional allocation from the CRA once final bids are received.
PRELIMINARY CONSTRUCTION COST ESTIMATES
DRAFT
Road Name: Cleveland Street Data 4/2512013
Project No. NS.08024.017 Prepared by: FTW
Project Location: Sebastian, FL Chocked by: FTW
Project: 582 LF of asphalt road with 11' travel lanes, parking, landscaping, drainage and baffle box
and 480 Lf of Indian River Drive drainage improvemnents
Project Site: Cleveland Street
Preliminary Estimate
DESCRIPTION
QUANTITY
UNITS
UNIT COST
AMOUNT
General
Maintenance of Traffic
1
LS
$5,000.00
$ 5,000.00
Mobilization
1
LS
$2,500.00
$ 2,500.00
Traffic Control Officer
0
MH
$0.00
$
Subtotal General
$ 7.500.00
1. Earthwork
Clearing and Grubbing
1.05
AC
$1,000.00
$1,050.00
Remove and Dispose Ex Curb
891
LF
$10.50
$9,355.50
Remove and Dispose Ex Ashpalt
3136
SY
$4.00
$12,544.00
Remove and Dispose Ex Trees
39
EA
$200.00
$7,800.00
Relocate Ex Sewer Valves
6
EA
$500.00
$3,000.00
Relocate Ex Water Meter
1
LS
$500.00
$500.00
Relocate Ex. Power Tie down Cable
1
EA
$500.00
$500.00
Power pole to be relocated
2
EA
$1,000.00
$2,000.00
Relocate Ex. Gate Posts with Chain
2
EA
$200.00
$400.00
Relocate Valve Box
2
EA
$450.00
$900.00
Relocate Ex Mailbox
1
EA
$50.00
$50.00
Relocate Ex bus Sign
1
EA
$200.00
$200.00
Relocate Ex Signs
1
EA
$150.00
$150.00
Relocate Ex Water Box
1
EA
$400.00
$400.00
Demuck Existing Swale Prior to Pipe Installation
1
LS
$1,000.00
$1,000.00
Remove and Dispose Ex Structure
9
EA
$400.00
$3,600.00
Remove and Dispose Ex Drainage Pipe
299
LF
$10.00
$2,990.00
Subtotal 1. Earthwork
$46,439.60
II. Paving /Grading
Grind existing pavement
1
LS
$2,000.00
$2,000.00
Sawcut Ex Driveways
240
LF
$11.00
$2,640.00
Install 1.5" SP 9.5
261
TN
$100.00
$26,100.00
Install Full Depth Reclamation with Cemet Treat Base 8"
3173
SY
$10.00
$31,730.00
Install Type 'F' Curb
196
LF
$16.00
$3,136.00
Install Type 'D' Curb
893
LF
$15.00
$13,395.00
Install Type 'D1" Mad Curb
668
LF
$14.00
$9,352.00
Install Miami Curb
977
LF
$22.00
$21,494,00
Install Stamped Concrete Brick Pattern
2046
SF
$11.50
$23,529.00
6" Subgrade (compacted min. 98% max) for S/W
867
SY
$10.00
$8,670.00
Install 4" thick sidewalk
632
SY
$26.00
$16,432.00
Subtotal 11. Paving /Grading
$158,478.00
III. Drainage
Install Silt Fence
1,242
LF
$2.50
$3,105.00
Install 24" RCP Pipe
827
LF
$32.00
$26,464.00
Install Miami Curb Inlet
10
EA
$1,500.00
$15,000.00
Install Type 'J' Junction Box
5
EA
$2,000.00
$10,000.00
Install Shallow Drainage Areas
5
EA
$250.00
$1,250.00
Install Bag Protection
24
LF
$64.00
$1,536.00
Install 30" RCP
4
LF
$55.00
$220.00
Install Type 9 Inlet
2
EA
$2,350.00
$4,700.00
Install Type 'D' Box
3
EA
$2,000.00
$6,000.00
Install Type 'D' Box w /Grate Top
1
EA
$2,400.00
$2,400.00
Install 30" Slip Line
0
LF
$0.00
$0.00
Install Baffle Box
1
EA
$25,000.00
$25,000.00
Subtotal ill. Drainage
$95,675.00
IV. Landscaping
Install New Trees
15.00
EA
$ 500.00
$7,500.00
Install landscape irrigation
1.00
LS
$ 8,500.00
$8,500.00
Sod Disturbed Areas
1700.00
SY
$ 2.50
$4,250.00
Subtotal IV. Landscaping and Electric
$20,250.00
V. Signage and Striping
Install 6" Double Yellow Striping
546.00
LF
$1.00
$546.00
6" white solid striping for parking
456.00
LF
$1.00
$456.00
Install Stop Bar
2.00
EA
$100.00
$200.00
ADA Ramps
2.00
EA
0350.00
$700.00
Subtotal V. Signage and Striping
$1,902.00
SUBTOTAL 5 330,244.50
CONTINGENCIES @ 5% of Subtotal $ 16,512.23
TOTAL CONSTRUCTION COST $ 346,756.73
III_ NEEL- SCHAFFER 4/25/2013
r
PRELIMINARY CONSTRUCTION COST ESTIMATES
DRAFT
Road Name: Washington Street Date 4/25/2013
Project No. N5.08024.017 Prepared by: FTW
Project Location: Sebastian, FL Checked by: FTW
Project: Washington Street Improvement Project. Modify existing 305 LF of asphalt road to install 11' lanes and Parallel/
Angled Parking, drainage improvements, and landscape. Indian River Dr. pipe swale and install drainage structures.
Project Site: Washington Street
Preliminary Estimate
DESCRIPTION
QUANTITY
UNITS
UNIT COST
AMOUNT
General
Maintenance of Traffic
1
LS
$2,500.00
$ 2,500.00
Mobilization
1
LS
$2,500.00
$ 2,500.00
Traffic Control Officer
0
MH
$0.00
$ -
Subtotal General
$ 5,000.00
1. Earthwork
Clearing and Grubbing
0.60
AC
$1,000.00
$600.00
Remove and Dispose Ex Curb
455
LF
$10.50
$4,777.50
Remove and Dispose Ex Ashpalt
1505
SY
$4.00
$6,020.00
Remove Ex Pipe
72
LF
$20.00
$1,440.00
Relocate Ex Traffic Sign
2
EA
$150.00
$300.00
Remove and Dispose Ex Box Structure and Pipe
5
EA
$1,000.00
$5,000.00
Adjust Ex Water Box w /Traffic Lid:
2
EA
$450.00
$900.00
Remove and Relocate Ex. WPP and St Light
1
EA
$0.00
Relocate Water Mains
1
EA
$500.00
$500.00
Remove Ex. Headwall
2
EA
$1,000.00
$2,000.00
Subtotal 1. Earthwork
$21,537.50
II. Paving /Grading
Grinding existing pavement
1
LS
$1,500.00
$1,500.00
Sawcut Ex Driveways
83
LF
$11.00
$913.00
Install 1.5" SP 9.5 Asphaltic
162
TN
$100.00
$16,200.00
Install Full Depth Reclamation with cement treated base 8"
1970
SY
$10.00
$19,700.00
Install Type 'F' Curb
164
LF
$16.00
$2,624.00
Install Type 'D' Curb
650
LF
$15.00
$9,750.00
Install Type 'D' Modified Curb
60
LF
$14.00
$840.00
Install Miami Curb
493
LF
$22.00
$10,846.00
Install Stamped Concrete Brick Pattern
1287
SF
$11.50
$14,800.50
6" Subgrade (compacted to min. 98% maxi for S/W
53
SY
$10.00
$530.00
Install 4" thick sidewalk
48
SY
$26.00
$1,248.00
Subtotal 11. Paving /Grading
$78,951.50
Ili. Drainage
Install Silt Fence
485
LF
$2.50
$1,212.50
Install 24" RCP Pipe
471
LF
$32.00
$15,072.00
Install 30" RCP Pipe
4
LF
$55.00
$220.00
Install Miami Curb Inlet:
8
EA
$2,000.00
$16,000.00
Install Type 'J' Structure Bottom
4
EA
$2,500.00
$10,000.00
Install Type 'D' Structure with Manhole
2
EA
$2,000.00
$4,000.00
Install Type 'D' Structure with Grate
2
EA
$2,600.00
$5,200.00
Install Baffle Box
1
EA
$25,000.00
$25,000.00
Install Type 9 Inlet
1
EA
$2,350.00
$2,350.00
Subtotal Ill. Drainage
$79,054.50
IV. Landscaping and Electric
Install New Trees
8
EA
$ 500.00
$4,000.00
Install New Pedestrian Street Lights
5
EA
$ 1,500.00
$7,500.00
Install irrigation system
1
LS
$ 8,000.00
$8,000.00
Sod Disturbed Areas
770
SY
$ 2.50
$1,925.00
Subtotal IV. Landscaping and Electric
$21,425.00
V. Signage and Striping
Install 6" Double Yellow Striping
262
LF
$1.00
$262.00
Install 6" Solid White striping for parking
456
LF
$1.00
$456.00
Install Stop Bar
2
EA
$100.00
$200.00
ADA Ramps
2
EA
$350.00
$700.00
Subtotal V. Signage and Striping
$1,618.00
SUBTOTAL $ 207,586.50
CONTINGENCIES @ 5% of Subtotal $ 10,379.33
TOTAL CONSTRUCTION COST $ 217,965.83
�� NEEL-SCHAFFER 4125/2013
PRELIMINARY CONSTRUCTION COST ESTIMATES
DRAFT
Road Name: Martin Street Date 4/25/2013
Project No. NS.08024.017 Prepared by: FTW
Project Location: Sebastian, FL Checked by: FTW
Project: Martin Street. Full Depth Reclamation Cement Treated Base. 2" Asphalt Pavement
Project Site: Cleveland Street
Preliminary Estimate
DESCRIPTION
QUANTITY
UNITS
UNIT COST
AMOUNT
General
Maintenance of Traffic
1
LS
$2,500.00
$ 2,500.00
Mobilization
1
LS
$0.00
$ -
Traffic Control Officer
0
MH
$0.00
$ -
Subtotal General
$ 2,500.00
I. Earthwork
Sawcutt Existing Pavement
162
LF
$11.00
$1,782.00
Remove and Dispose Ex Asphalt
1023
SY
$10.00
$10,230.00
Subtotal I. Earthwork
$12,012.00
II. Paving /Grading
2" Asphalt Pavement Type SR 12.5
118
TN
$100.00
$11,800.00
8" Full Depth Reclamation Cement Treated Base (330
1023
SY
$1 0.00
$ 10,230.00
Subtotal 11. Paving /Grading
$22,030.00
SUBTOTAL $ 36,542.00
CONTINGENCIES @ 10% of Subtotal $ 3,654.20
TOTAL CONSTRUCTION COST $ 40,196.20
RL NEEL- SCHAFFER
Im511. 1..,.Y., tea" e.,ud "pl., 4/25/2013
NOTES
w+ ovosEo1—cE .11- pErc0N—UNC•nta1Xr0MU
sovm of exisnxccxEVEUNO CEN Earwr:.
LEGE-7ND
- - xEwvsaEStRwrsmrtT,ao.m
- .... �rvxcrwapx
'eo *apsx
0 NoEwuxtNewr
®
�
sra.wepvnveexur aRr�aRtp o,n
IV_
O - �,NCr��*pRSR.rN s
- Naw,RSs
� -�,w rRESBross RSNpVm �
.ps,rw«wa.w..s ».o+.rRs
North
,wcROU w.
-PHW SCALE
•
n
v V
,Yxt, ��20M1
air
{
Y W. U
—
0
iwa 1
nxa rag ••
a -.sn
y rs.op
W
zo >
0
i
rw.px
12
12
n
e
_
ROEOSEO 111EM— SURFACE4
T
�d
tt
T
_. - •vim
FZ
7 F
�
2 E
fnZ
9
F 5
EX—
EnvEUtTnF �
__
_tG%
�
5
W
a
8
w
ri w
�i'w
w
0
0
, m nws
,a..00
uwo
,xwO
+swp
twos
NOTICE TO ORAWINO HOLDER
x81geR0E�Fpp1pGINe
REyapKS
pR,]y",rp plipRVAnnu
xaaE�e� = w,s a
"� NEEL- ER
� OMUCAN OUO
CLEVELAND STREET
PRESIDENT STREETS
NWSO.R0xW8G0N2U4NR.F0x 1 7
1- 800 -032 -0770
wrE: asoamar
a°
120119th Place, Suite A-100 Veeeach,
STREET IMPROVEMENT PROJECT
pH ER
E�o3uE
cR.o oe.E:
Florida 32960 PH: (772)770.4707
SEBASTIAN, FLORIDA
FAX: 17721770-6640 CA00008556
— EG.aio:�i]s�' '
NOTES
AFOOOSSD wnsuworox cExremwc ICDNiRM ura a11s B,ss
oBAeErNDFrHaExlsrwawnsHwcrou CEUrERIrtiE
LEGEND III
.sxawnixss�W srReEr uaxra
4rixG SiDEwnLa n•zv ' x„ � BNx I Nortsc
Qj / ���`. — ® —_..® ® srDA,rso �veAtsNrlBNCxa RSOCaDRI A1�L
VI � � r �' i`�4 (Q O sxlsrwBaexwetx
nNDS�➢EWAIkw - Z ® -mtx.vnD'rtuBxreevotxBRB
T ix� r vix wsi[xuws w,nr �� " ° uosrxerr,ex rru[
12 12
11
10 W 10
K 0
gZ
N B \ 111L m0 B
F
W B
U
EAISI D FoAOwAV
M B O
12 0ri, GW K' 0� G' IS
2
1
0 0
NOTICE TO DRAWING HOLDER DFAWIND INFgt. -N Wm... NUMBER:
ae NOU+s BecoFE arrwG E,<EwAInE:rREamw.srFBErB WASHINGTON STREET
s 1 NEEL— SCHAFFER NS.08024.017
9- 800 432 -4 770 atavEVEOer: � sa- uDU,varaucaNeutcnuvox PRESIDENT STREETS
120119th Place, Suite A -100 Vero Beach,
STREET IMPROVEMENT PROJECT sNEe xu mEF:
Dsa�A,"1OS,.• o:va2F Florida 32960 PH: (772)TTO4707 SEBASTIAN, FLORIDA 04
oroIXC: nTw• W,i� FA%: (772) 7(04640 CA00008556 wnr ran E F.E.