Loading...
HomeMy WebLinkAbout1989 Restoration CorrespondenceCity of Sebastian P. 0. Box 127 Sebastian, Florida Gentlemen: ?RECL., ED JAS FLORIDA EAST COAST RAILWAY COMPANY P. O. DRAWER 1048, ONE MALAGA STREET, ST. AUGUSTINE, FLORIDA 32084 32958 -0127 Janaury 16, 1989 File: 550 (MP 218 + 1711) The crossing at Stratton Avenue, Railway's Milepost 218 + 1711, is currently in need of rebuild in order to provide a smooth riding surface for the motoring public and Railway traffic. It is proposed to repair the track by removing the existing concrete crossing, surfacing the track and replacing the crossing. Paving transitions will be constructed as soon as possible after crossing work is completed. In keeping with agreement between the City and the Raiwlay, you may exercise your option to perform all work in connection with paving the grade crossing. Your approval for this work by the Railway is requested within twenty (20) days in order that the necessary rebuild can be scheduled at an early date. Sii&STOKELY , W. Chief Engineer WSS:JWK:cw Attachment City of Sebastian POST OFFICE BOX 780127 o SEBASTIAN, FLORIDA 32978 TELEPHONE (407) 589 -5330 January 19, 1989 TO: Robert McClary City Manager FROM: Jerry Thomas Public Works 0 The City of Sebastian is in receipt of a letter from F.E.C. railway concerning reconstruction of Stratton Avenue Railroad crossing. Public Works would like to call to the attention of concerned parties that the road right of way of Stratton Avenue is 80 feet. The rail crossing at this time does not accomodate an 80 foot right of way. Prior to FEC restoration, we feel this situation should - be addressed. Thank you.