A. Recommendation to City Council - Review of Capital Improvement Program and
Capital Outlay Items Greater than $50,000 - 6 Year Schedule FY 2014/2015
through 2019/2020
As Local Planning Agency:
B. Public Hearing - Review and Make a Recommendation to City Council Regarding
Ordinance 0 -14 -04 which Proposes an Amendment to the Land Development
Code, Article III, Section 54 -2 -3.2 Regarding Procedures and Criteria for Review of
Temporary Uses/ Special Events
8. CHAIRMAN MATTERS:
9. MEMBERS MATTERS:
10. DIRECTOR MATTERS: All Aboard Florida - Power Point Presentation
11. ATTORNEY MATTERS:
12. ADJOURNMENT
ANY PERSON WHO DECIDES TO APPEAL ANY DECISION MADE ON THE ABOVE MATTERS,
WILL NEED A RECORD OF THE PROCEEDINGS AND MAY NEED TO ENSURE THAT A VERBATIM
RECORD OF THE PROCEEDINGS IS MADE, WHICH RECORD INCLUDES THE TESTIMONY AND
EVIDENCE UPON WHICH APPEAL IS TO BE HEARD. SAID APPEAL MUST BE FILED WITH THE CITY
CLERK'S OFFICE WITHIN TEN DAYS OF THE DATE OF ACTION. (286.0105 F.S.)
IN COMPLIANCE WITH THE AMERICANS WITH DISABILITIES ACT (ADA), ANYONE WHO NEEDS
SPECIAL ACCOMMODATIONS FOR THE MEETING SHOULD CONTACT THE CITY'S ADA COORDINATOR
AT (772)- 589 -5330 AT LEAST 48 HOURS PRIOR TO THE MEETING.
TWO OR MORE ELECTED OFFICIALS MAY BE IN ATTENDANCE.
ANNOUNCEMENTS:
Chmn. Dodd announced that Mr. Paul was excused from the meeting and that Mr. McManus
would vote in his place.
APPROVAL OF MINUTES:
MOTION by Roth /Carter to accept the minutes of the March 6, 2014 meeting as written. Motion
was approved unanimously by voice vote.
OLD BUSINESS: None
NEW BUSINESS:
A. QUASI - JUDICIAL PUBLIC HEARING — SITE PLAN MODIFICATION — CUMBERLAND
FARMS — TOTAL SITE REDEVELOPMENT: DEMOLITION, NEW 4,920 SF BUILDING,
ADDITIONAL GAS PUMPS, RELOCATION OF CANOPY, UNDERGROUND FUEL
TANKS & ACCESS DRIVE — 957 SEBASTIAN BOULEVARD — C -512
(COMMERCIAL -512) ZONING DISTRICT
Chairman Dodd asked the Commissioners if they had any ex -parte communication to disclose.
There was none. The applicants /representatives and staff were sworn in by the City Attorney.
Mr. Bruce Barkett, Esq., represented the applicant, and gave a brief history of the site, citing
existing non - conformities with the current code and Overlay District regulations, noting a side
yard encroachment, an access drive too close to the intersection, the canopy front -yard
encroachment, etc. He discussed how the new site plan would address the non - conformities and
meet the current overlay requirements. He noted the civil engineer, Mr. Craig Carden of Core
States, would be arriving shortly, and that the District Manager of Cumberland Farms, Mr. Craig
Williams, was present also.
CITY OF SEBASTIAN
C
PLANNING AND ZONING COMMISSION
MINUTES OF REGULAR MEETING
APRIL 17, 2014
.V)
Chairman Dodd called the meeting to order at 7:00 P.M.
21
12
cx
CE
CL C
s
The pledge of allegiance was said by all.
C 0
m
ca U
ROLL CALL: PRESENT: Mr. Roth Mr. McManus (a)
—
(/)
05
'i7 M
Q
Mr. Dodd Mr. Qizilbash
Al � .0
>
Ms. Kautenburg (a) Mr. Durr
O
O
C
Mr. Carter Mr. Reyes
450
GL a UR
¢ CL
N
Ms. Dale Simchick, IRC School Board Liaison
EXCUSED: Mr. Paul
ALSO PRESENT: Dorri Bosworth, Planner
Robert Ginsburg, City Attorney
Linda Lohsl, Recording Secretary
ANNOUNCEMENTS:
Chmn. Dodd announced that Mr. Paul was excused from the meeting and that Mr. McManus
would vote in his place.
APPROVAL OF MINUTES:
MOTION by Roth /Carter to accept the minutes of the March 6, 2014 meeting as written. Motion
was approved unanimously by voice vote.
OLD BUSINESS: None
NEW BUSINESS:
A. QUASI - JUDICIAL PUBLIC HEARING — SITE PLAN MODIFICATION — CUMBERLAND
FARMS — TOTAL SITE REDEVELOPMENT: DEMOLITION, NEW 4,920 SF BUILDING,
ADDITIONAL GAS PUMPS, RELOCATION OF CANOPY, UNDERGROUND FUEL
TANKS & ACCESS DRIVE — 957 SEBASTIAN BOULEVARD — C -512
(COMMERCIAL -512) ZONING DISTRICT
Chairman Dodd asked the Commissioners if they had any ex -parte communication to disclose.
There was none. The applicants /representatives and staff were sworn in by the City Attorney.
Mr. Bruce Barkett, Esq., represented the applicant, and gave a brief history of the site, citing
existing non - conformities with the current code and Overlay District regulations, noting a side
yard encroachment, an access drive too close to the intersection, the canopy front -yard
encroachment, etc. He discussed how the new site plan would address the non - conformities and
meet the current overlay requirements. He noted the civil engineer, Mr. Craig Carden of Core
States, would be arriving shortly, and that the District Manager of Cumberland Farms, Mr. Craig
Williams, was present also.
PLANNING AND ZONING COMMISSION
MINUTES OF REGULAR MEETING OF APRIL 17, 2014
Ms. Bosworth gave a staff presentation, expressing that the project was full of.details, and that
staff and the applicant worked on completing items and non - compliances from over the years,
such as missing easements and /or abandonments, unity of title, etc. She explained that the
project was re- designed midway thru the review process when the applicant purchased additional
property from the adjacent commercial site to the west (A.R.T. Plaza, 967 Sebastian Boulevard).
Division of Lot and site plan modification applications was submitted for that action. She noted
the stormwater system for the new Cumberland Farms has been designed to handle run -off from
both sites, and 8 parking spaces located on the new CF site, though to be jointly used, will be
credited only towards the A.R.T. Plaza's parking requirements. Ms. Bosworth then discussed the
front setback variance granted by the Board of Adjustment for the new canopy, reviewed items in
the staff report, went over the City's dilemma regarding traffic flow and directing truck traffic onto
Barber Street into the residential district, the Air Tower location, and discussed the recommended
conditions of approval. She stated the City's consulting engineer, Mr. Frank Watanabe, P.E.,
Neel- Schaffer Inc., was present and available for questions.
Mr. Dodd asked if maintenance of the stormwater system was a joint responsibility. He had seen
the notes on the CF site plan regarding a maintenance schedule for the system and asked if the
site plan modification for the ART Plaza had been approved with the same schedule. Ms.
Bosworth stated the joint parking and stormwater agreement had not yet been submitted for
review, and the Plaza site plan approval was conditional on receipt of an executed agreement.
Mr. Barkett acknowledged that a cooperative agreement was in the works. He also stated his
client's preference was to allow the trucks to turn left onto Barber Street to get to the intersection.
Additional suggestions were discussed, such as exiting back onto CR 512, reversing the truck
flow and entering from Barber Street, and using the alleyway.
Mr. Dodd inquired about the necessary abandonment of easement. Ms. Bosworth stated the
application had been submitted.
Mr. Carter thanked Cumberland Farms for investing in the community and improving the corridor
with the new site. He stated his concerns were also the truck traffic turning right into the
residential district and the Air Tower. Mr. Watanabe explained the details and engineering
standards of requiring the Right Turn Only on to Barber Street, and suggested reversing the
proposed truck route to have them enter off of Barber Street instead of CR 512.
Mr. Durr agreed reversing the route seemed to address the dilemma, and safety should be first
concern. He asked if there were any pollution retardant baffles proposed for any of the
stormwater structures. Ms. Bosworth stated they had asked the engineer to add a [stormwater
system] maintenance schedule to the plan. Mr. Durr felt there should also be an oil /gas separator
on the site because of the proposed use and assumed spillage. Mr. Durr also clarified that the
proposed stormwater storage tanks were not the same as an exfiltration system.
Mr. Qizilbash had questions regarding how the parking was calculated using the floor plan and
wanted to know if parking for employees had been considered since service area was not used in
the calculations. Ms. Bosworth reviewed that, per code, the spaces were calculated from the retail
area, which was defined in the code as "area accessible by the public." Also, although credited to
the ART Plaza, there were 8 additional shared spaces available on the CF site. Mr. Qizilbash
had drainage design questions, which the project engineer was not present yet to answer.
Mr. Roth asked if the landscape code had changed, and a discussion ensued with Ms. Bosworth
regarding the proposed landscape plan. Mr. Roth had further questions regarding the rear
dumpster area, the Air Tower, parking spaces over the underground tanks, and staff
recommendations being very appropriate.
Mr. McManus voiced his concerns regarding the "right turn only" proposal for the exit onto Barber
Street and felt it handicapped the site tremendously.
2
PLANNING AND ZONING COMMISSION
MINUTES OF REGULAR MEETING OF APRIL 17, 2014
Mr. Reyes asked if the proposed stormwater system needed vents, as shown on the product
details. Mr. Watanabe stated no, it was a contained system, but that annual maintenance and a
cleaning program was a must for the system to function properly. Some systems do have oil /gas
separators, but as proposed, the system did meet all DEP requirements. Mr. Reyes had further
questions regarding a skimmer in a control structure draining into the rear swale, and the
Commission discussed pollution retardant principles with Mr. Watanabe. Mr. Reyes also stated
his concerns with the proposed paving and grading at the CR 512 entrance with regards to the
flow of the drainage water and lack of drainage structures. He felt the grading high points should
be raised, and had doubts about the type of system being used. Mr. Dodd suggested staff meet
with the project engineer to discuss the oil /gas separator issue. Mr. Reyes had further questions
regarding the rear swale area near the new dumpster pad and a possible ponding issue. Mr.
Watanabe stated the best fix was to re -grade that area [vs. piping].
Ms. Kautenburg stated she was looking forward to the improvement of the area.
Ms. Simchick stated she was glad the Commissioners were discussing the traffic concerns with
the new site because of its proximity to the Barber Street Sports Complex.
Mr. Roth stated he commended the lighting plan for not filtering into the neighboring residential
area.
Chmn. Dodd opened the hearing for Public Input at 7:53 pm. No one spoke in favor, or in
opposition, of the application.
Chmn. Dodd discussed the truck traffic issue with staff and the city attorney as to what kind of
statement the Commission could make, since they understood the city needed to adhere to
standard engineering practices, but noted everyone did not want the trucks in the residential
district. After discussion, the Commission agreed their responsibility was to public safety, and
they would request the applicant to review and revise the truck route plan. Suggestions were
discussed by the Commissioners — using the alleyway, restricting trucks only, specific times for
truck deliveries, etc. Ms. Bosworth stated the project engineer had relayed that reversing the
truck route would not be viable because of the hose location on the gas delivery trucks.
Chmn. Dodd reviewed the other issues discussed — parking calculation concerns [resolved
through the submission of the required parking agreement], drainage issues by the CR 512
access [the project engineer to review], and necessity of an oil /gas separator near fuel tanks and
additional baffle boxes.
The project engineer, Mr. Carden, had still not arrived, and Mr. Barkett requested the
Commission let him review their concerns with him.
MOTION by Durr /Carter "to approve with the conditions 1) review of the drainage design by CR
512 to insure drainage is being controlled as best as possible, 2) consideration of pollution
retardant baffles and an oil /water separator, 3) an alternative truck route, and 4) including staff
recommendations."
Mr. Ginsburg paraphrased the motion to "include the staff conditions plus further consideration of
these specific issues to the satisfaction of staff." Mr. Durr /Carter concurred. Ms. Bosworth asked
to add a condition that the Air Tower be relocated. Mr. Durr /Carter concurred.
ROLL CALL: Mr. Durr
yes Mr. Qizilbash yes
Mr. Roth
yes Mr. Dodd yes
Mr. McManus
yes Mr. Reyes yes
Mr. Carter
yes
3
PLANNING AND ZONING COMMISSION
MINUTES OF REGULAR MEETING OF APRIL 17, 2014
The vote was 7 -0. Motion carried.
CHAIRMAN MATTERS:
Chmn. Dodd congratulated Mr. Griffin on his appointment as City Manager.
MEMBERS MATTERS:
Mr. Carter inquired about his previous request to light the sign in front of City Hall. Ms. Bosworth
stated she would get the answer.
Mr. Durr thanked staff for the complete review and staff report of the project.
Mr. Roth also thanked staff for the long hours invested in the project and putting all the pieces
together.
Mr. Reyes asked who maintained CR 512 and noted it had not been mowed lately [Indian River
County], mentioned an area of Indian River Drive that was very dark at night near Capt. Hirams,
and inquired about the construction activity along CR 512. Ms. Bosworth stated Florida City Gas
was extending gas lines to US Hwy #1 and Indian River Drive then north to the Sebastian River
Medical Center.
DIRECTOR MATTERS:
Ms. Bosworth informed the Commission a new Environmental Specialist had been hired, Ms.
Cindy Watson.
ATTORNEY MATTERS:
Mr. Ginsburg stated that he also felt Mr. Griffin was an excellent choice for City Manager, and that
staff had done a great job on this project. He praised the Commission for their ability to review
and read the plans and professionally discuss the difficult issues.
Chairman Dodd adjourned the meeting at 8:18 p.m. (db)
n
ALSO PRESENT: Frank Watanabe, PE, Community Development Director
Jan King, Sr. Planner
Robert Ginsburg, City Attorney
Dorri Bosworth, Planner /Recording Secretary
ANNOUNCEMENTS:
Vice -Churn. Paul announced that Mr. Durr and Chmn. Dodd were excused from the meeting and
that Ms. Kautenburg and Mr. McManus would vote in their place. [Mr. Roth previously noted his
absence with the Secretary and also has an excused absence].
Mr. Paul stated approval of the minutes was being removed from the agenda. He also welcomed
Mr. Frank Watanabe as the new Community Development Director, and stated the Commission
looked forward to working with him.
APPROVAL OF MINUTES: Removed from agenda
OLD BUSINESS: None
NEW BUSINESS:
A. QUASI - JUDICIAL PUBLIC HEARING — CONDITIONAL USE PERMIT — A BUSINESS
OFFICE WITH A DRIVE - THROUGH FACILITY (SEACOAST NATIONAL BANK) —
1627 U.S. HIGHWAY #1, SEBASTIAN CENTER — CR (COMMERCIAL RIVERFRONT)
ZONING DISTRICT
The applicant/representative and staff were sworn in by the City Attorney. Vice -Churn. Paul
asked the Commissioners if they had any ex -parte communication to disclose. There was none.
Mr. Geoff Barkett, P.E., of Schulke, Bittle, & Stoddard, Inc., represented the applicant, and
explained that the project consisted of creating a drive - through lane behind the building for
Seacoast Bank who was opening a new office in one of the units at that location. The request
required a Conditional Use Permit. He stated the drive -up system was approximately 2' X 3' in
size with a canopy covering it, and there was no new impervious area proposed. [Mr. Peter Satur
of Seacoast Bank was also present.]
Ms. King reiterated that the hearing was only for the Conditional Use Permit request and not a
review of the property site plan. She noted that the Staff Report outlined the specific criteria
Q
C1
I
_s
0
ad
C
CITY OF SEBASTIAN
C O
PLANNING AND ZONING COMMISSION
MINUTES OF REGULAR MEETING
JULY 3, 2014
cu E
Vice Chairman Paul called the meeting to order at 7:00 P.M.
a E
O
The pledge of allegiance was said by all.
�U
CALL:
�
>
ROLL PRESENT: Mr. McManus (a) Mr. Qizilbash
S
>
Ms. Kautenburg (a) Mr. Mr. Carter
O O C
Mr. Paul Mr. Reyes
W Q
Cl) N
a
L 0.
EXCUSED: Chmn. Dodd, Mr. Roth, Mr. Durr
ALSO PRESENT: Frank Watanabe, PE, Community Development Director
Jan King, Sr. Planner
Robert Ginsburg, City Attorney
Dorri Bosworth, Planner /Recording Secretary
ANNOUNCEMENTS:
Vice -Churn. Paul announced that Mr. Durr and Chmn. Dodd were excused from the meeting and
that Ms. Kautenburg and Mr. McManus would vote in their place. [Mr. Roth previously noted his
absence with the Secretary and also has an excused absence].
Mr. Paul stated approval of the minutes was being removed from the agenda. He also welcomed
Mr. Frank Watanabe as the new Community Development Director, and stated the Commission
looked forward to working with him.
APPROVAL OF MINUTES: Removed from agenda
OLD BUSINESS: None
NEW BUSINESS:
A. QUASI - JUDICIAL PUBLIC HEARING — CONDITIONAL USE PERMIT — A BUSINESS
OFFICE WITH A DRIVE - THROUGH FACILITY (SEACOAST NATIONAL BANK) —
1627 U.S. HIGHWAY #1, SEBASTIAN CENTER — CR (COMMERCIAL RIVERFRONT)
ZONING DISTRICT
The applicant/representative and staff were sworn in by the City Attorney. Vice -Churn. Paul
asked the Commissioners if they had any ex -parte communication to disclose. There was none.
Mr. Geoff Barkett, P.E., of Schulke, Bittle, & Stoddard, Inc., represented the applicant, and
explained that the project consisted of creating a drive - through lane behind the building for
Seacoast Bank who was opening a new office in one of the units at that location. The request
required a Conditional Use Permit. He stated the drive -up system was approximately 2' X 3' in
size with a canopy covering it, and there was no new impervious area proposed. [Mr. Peter Satur
of Seacoast Bank was also present.]
Ms. King reiterated that the hearing was only for the Conditional Use Permit request and not a
review of the property site plan. She noted that the Staff Report outlined the specific criteria
Q
C1
I
_s
0
PLANNING AND ZONING COMMISSION
MINUTES OF REGULAR MEETING OF JULY 3, 2014
required for the conditional use and how it was met by the proposed site improvements. Staff
recommended approval.
Ms. Kautenburg verified that nothing else at the site was being changed. Ms. King stated the
landscaping would not change, but additional signage may be added.
Mr. Carter asked if there would be adequate parking for the bank. Mr. Barkett explained that after
the site was destroyed from the hurricanes, when it was repaired parking was increased.
Mr. Qizilbash suggested speed limit and pedestrian crossings signs by the drive - through lane.
Mr. Barkett stated he would check if there was existing signage, and install if necessary.
Mr. Paul asked if the by -pass lane would be another drive - through lane. Mr. Barkett stated no,
and the northern end of the by -pass lane was also a loading zone. Mr. Paul noted when he was
at the site, cars were parked in the one -way drive aisle at the north end of the building, and
perhaps a No Parking sign was needed.
Vice Chmn. Paul opened the hearing for public input at 7:11 pm. No one spoke in favor, or in
opposition, of the application.
MOTION by Carter /Qizilbash "to approve the Conditional Use Permit at 1627 US Highway #1 for
a drive - through facility ".
ROLL CALL: Mr. Qizilbash yes Ms. Kautenburg yes
Mr. Reyes yes Mr. McManus yes
Mr. Paul yes Mr. Carter yes
The vote was 6 -0. Motion carried.
CHAIRMAN MATTERS: Mr. Paul wished the community a Happy July 4'h holiday.
MEMBERS MATTERS: None
DIRECTOR MATTERS: None
ATTORNEY MATTERS: None
Vice Chairman Paul adjourned the meeting at 7:14 p.m.
4
(db)
CU OF
SEBAST_"
HOME OF PELICAN ISLAND
To: Planning and Zoning Commission
From: Ken Killgore, Finance Director
Copies: Joe Griffin, City Manager
Debra Krueger, Administrative Services Director
Date: July 25, 2014
Subject: Proposed Capital Improvement Program
Enclosed is the Proposed Capital Improvement Program (CIP) for the period from FY 2015
through FY 2020. This is scheduled to be included on the agenda for the Planning and Zoning
Commission meeting on Thursday, August 7th. I will have a brief power -point presentation to
highlight the key elements of this important document.
A special meeting /workshop is scheduled to be held by the City Council on Monday, August 11th
to review and discuss the CIP and Annual Operating Budget. We hope the Planning and Zoning
Commission will review the scheduled capital improvements and offer comments that you
collectively feel the City Council should consider as they go through this process.
Following my presentation and any questions or discussions, it would be appropriate for a
motion to be adopted. If you are in agreement with the proposed CIP, the motion could be:
"7 move that the currently proposed Capital Improvement Program be
recommended to the City Council with no changes ".
If you wish for the City Council to consider changes, the motion could be expanded to say:
"I move that the currently proposed Capital Improvement Program be
recommended to the City Council with increases or decreases to
look forward to the meeting and should you have any questions, please do not hesitate to give
me a call or send an email.
-1 454_L__
Ken Killgore
Finance Director
City of Sebastian
(772) 388 -8205
kkillgore (a�-cityofsebastian.org.
r
CITY OF SEBASTIAN, FLORIDA
CAPITAL IMPROVEMENT PROGRAM
FISCAL YEAR 2015 -20
CAPITAL IMPROVEMENT PROGRAM
City of Sebastian's adopted financial policies requires the City to coordinate the development of the Capital
Improvement Program with the development of the strategic plan and operating budget, as well as ensuring
compliance with the Comprehensive Plan Capital Improvement Element. Operating expenditures and
revenues associated with new capital improvements will be projected and included in the Capital
Improvement Program Five -Year Forecast. The Capital Improvement Program is updated and approved by
the City Council annually and encompasses a period of six years.
What are Capital Improvements?
Capital improvements include construction, reconstruction, expansion, upgrades and major repairs to streets,
drainage systems, buildings, computer systems, parks, recreation centers, airport facilities, the cemetery, the
golf course and other major components of the City's infrastructure. Vehicles and equipment additions and
replacements are also included in the capital improvement program for consistency with the criteria used for
defining capital purchases in the accounting records and the annual operating budget. Therefore, items in the
Capital Improvement Program generally cost more than $750 and are expected to last at least one year.
Policies Used in Developing the Capital Improvement Program
Capital projects submitted for approval must be justified in terms of how the project supports the
achievement of the City's Strategic Priorities. Projects are prioritized and approved based on the relevancy
of the project to the City's Strategic Plan and the impact on the end stakeholder(s). The following statements
are included in the City's adopted Financial Policies:
1. The City shall adopt an annual Capital Budget based on the Capital Improvement Program. Future
capital improvement expenditures necessitated by changes in population, real estate development, or
in economic base will be calculated and included in the capital improvement budget projections.
2. The City shall make all capital improvements in accordance with an adopted Capital Improvement
Program budget.
3. The City will determine and use the most prudent financial methods for acquisition of capital
improvement projects based upon market conditions at the time of acquisition.
The pages that follow provide details and summary information on capital purchases scheduled for the next
six years for all the City's operations. The expected sources of funding are identified for all the capital
purchases but are ultimately dependent on the funds being legally appropriated within the City's adopted
annual operating budget. Changes may ultimately be made in conjunction with alternative sources as they
become available or adjustments may become necessary due to reductions in projected revenues. The timing
of projects identified may also be altered from year to year to meet changing circumstances.
(ra-)
List of Proiects
General Government
Audio Visual Equipment
Computer Replacements
Servers and Server Upgrades
Computer Upgrades
FDLE Computer Firewall
Police Department
Police Officer Equipment
Evidence Drying Cabinet
Zetron Instant Replay
Police Vehicles and Equipment
Police Public Parking
Roads and Special Projects
Public Works Equipment
Sign Replacement
Indian River Drive Light Poles
Street Repaving
Sidewalk Construction
Yacht Club Pier Decking
Barber Street Bridge Repairs
Pedestrian Bridges
Fleming Street Paving
Coolidge Street Paving
Tulip Drive Construction
Stormwater
Stormwater Equipment
1/4 Swale Improvements
Road Crossing /Sideyard Pipes
Tulip Drive Road Crossing
Potomac Ditch
Tandum Dump Truck
Pipe Sliplining
Bevan Ditch Piping
Stormwater Pond Installation
Vac Truck
Dump Truck
Transport Truck
Fleet Management
Deisel Fuel Tank Software
Parks & Recreation
Baseball Field Lighting
Riverview Park Playground
Riverview Park Sidewalks
Median Trees/Schrub /Mulch
Riverview Park Tables /Benches
Community Center Paving
Skate Park Rebuild
Equipment Building
Bleacher Shields
Cemetery
Storage Building
Facilities Maintenance
Break Room Appliances
Roof Repairs
Paint City Hall
City Hall Parking Lot
Police Station Air Conditioner
Parking Lot Refurbishment
Public Works Compound Work
Golf Course
Golf Cart Fleet
Fuel Tank
Tractor and Fairway Mower
Rebuild Greens
Airport
Construct Hangar
Construct Access Road West
Building
Vehicles
Totals
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
SUMMARY OF CAPITAL PURCHASES AND IMPROVEMENTS
FY 2014 -15 FY 2015 -16 FY 2016 -17 FY 2017 -18 FY 2018 -19 FY 2019 -20 Totals
7,000
35,000
50,000
5,000
18,200
1,000
368,000
50,000
47,000
30,000
60,000
40,000
200,000
460,037
200,000
102,000
500,000
25,000
100,000
4,000
10,000
50,000
125,000
2,000
75,000
-
-
-
165,000
-
15,000
15,000
15,000
15,000
15,000
50,000
50,000
50,000
50,000
50,000
-
5,000
-
5,000
-
10,200
10,200
10,200
10,200
10,200
13,000
-
-
-
-
330,000
300,000
316,000
470,000
300,000
222,600
194,500
167,500
110,000
255,000
30,000
30,000
-
-
-
5,000
5,000
5,000
5,000
5,000
100,000
-
100,000
-
120,000
50,000
50,000
50,000
50,000
50,000
500,000
-
-
40,000
-
-
-
-
30,000
-
-
-
500,000
500,000
500,000
500,000
500,000
50,000
50,000
50,000
50,000
50,000
50,000
-
-
-
-
200,000
-
-
-
140,000
100,000
-
-
-
750,000
-
500,000
-
-
-
340,000
-
-
-
-
150,000
-
-
-
125,000
-
300,000
50,000
100,000 - -
100,000 - -
- 100,000 -
50,000
50,000 - -
50,000 - -
50,000 - -
150,000 - -
333,450 -
15,000
55,000 -
- 165,000
7,000
165,000
110,000
300,000
15,000
69,200
1,000
13,000
2,084,000
50,000
996,600
90,000
25,000
320,000
250,000
60,000
500,000
80,000
200,000
460,037
200,000
132,000
3,000,000
250,000
50,000
200,000
140,000
100,000
750,000
500,000
340,000
150,000
125,000
25,000
300,000
50,000
100,000
4,000
10,000
50,000
125,000
100,000
100,000
100,000
2,000
75,000
50,000
50,000
50,000
50,000
150,000
333,450
15,000
55,000
165,000
650,000 - - 650,000
- - 800,000 - - 800,000
18,500 43,500 - - - - 62,000
3,302,737 3,159,300 2,779,700 2,568,700 2,038,650 1,355,200 15,204,287
6
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
SUMMARY OF CAPITAL IMPROVEMENT PROJECTS
Grouped by Department
General Government
Police Department
Public Works Department
Roads and Special Projects
Stormwater
Fleet Management
Parks & Recreation
Cemetery
Facilities Maintenance
Golf Course
Airport
Building
Total by Departments
Grouned by Function
General Government
Public Safety
Transportation
Parks & Recreation
Physical Environment
Total by Functions
SUMMARY
FY 2014 -15 FY 2015 -16 FY 2016 -17 FY 2017 -18 FY 2018 -19 FY 2019 -20 Total
$ 97,000 $ 65,000 $ 70,000 $ 65,000 $ 235,000 $ 65,000 $ 597,000
437,200 353,200 310,200 326,200 480,200 310,200 2,217,200
1,037,037
947,600
279,500
322,500
165,000 430,000
3,181,637
602,000
900,000
1,970,000
890,000
825,000 550,000
5,737,000
25,000
-
-
-
- -
25,000
289,000
500,000
50,000
-
-
839,000
-
-
100,000
-
-
100,000
77,000
350,000
-
-
- -
427,000
70,000
-
-
165,000
333,450 -
568,450
650,000
-
-
800,000
- -
1,450,000
18,500
43,500
-
-
- -
62,000
$3,302,737
$3,159,300
$ 2,779,700
$2,568,700
$2,038,650 $1,355,200
$15,204,287
$ 174,000 $
415,000
$ 170,000
$ 65,000 $
235,000 $
65,000
$ 1,124,000
455,700
396,700
310,200
326,200
480,200
310,200
2,279,200
1,712,037
947,600
279,500
1,122,500
165,000
430,000
4,656,637
359,000
500,000
50,000
165,000
333,450
-
1,407,450
602,000
900,000
1,970,000
890,000
825,000
550,000
5,737,000
$3,302,737 $3,159,300 $ 2,779,700 $2,568,700 $2,038,650 $1,355,200 $15,204,287
Grouned by FundinLy Source
General Fund
$ 110,200
$ 460,800
$ 219,700
$ 192,700 $
DST
2,178,037
2,320,000
2,395,000
1,466,000
LOGT
30,000
135,000
35,000
105,000
Recreation Impact Fees
175,000
200,000
-
-
Riverfront CRA
114,000
-
-
-
Stormwater Fund
102,000
-
30,000
-
Golf Course
55,000
-
-
165,000
Building Fund
18,500
43,500
-
-
Grants /Bank Notes
520,000
-
-
640,000
Cemetery
-
-
100,000
-
135,200 $ 280,200 $ 1,398,800
1,565,000 950,000 10,874,037
5,000 125,000 435,000
- - 375,000
114,000
132,000
220,000
- - 62,000
333,450 - 1,493,450
- 100,000
Total Funding Sources $ 3,302,737 $ 3,159,300 $ 2,779,700 $ 2,568,700 $ 2,038,650 $ 1,355,200 $15,204,287
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -20 CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local
Recreation
General
Option
Impact
Stormwater Cemetery
Grants/
Riverfront
Fund
Gas Tax
DST
Fees
utility Trust
Golf Bank Note
CRA
Building
Total
FISCAL YEAR 2014/2015
General Government
Audio Visual Equipment
7,000
7,000
Servers and Server Upgrades
35,000
.35,000
Computer Upgrades
50,000
50,000
FDLE Computer Firewall
5,000
5,000
Police Department
Police Officer Equipment
18,200
18,200
Evidence Drying Cabinet
1,000
1,000
Police Vehicles and Equipment
368,000
368,000
Police Public Parking
50,000
50,000
Roads and Special Projects
Public Works Equipment
47,000
47,000
Sign Replacement
30,000
30,000
Yacht Club Pier Decking
60,000
60,000
Pedestrian Bridges
40,000
40,000
Fleming Street Paving
200,000
200,000
Coolidge Street Paving
460,037
460,037
Tulip Drive Construction
200,000
200,000
Stormwater
Stormwater Equipment
102,000
102,000
1/4 Swale Improvements
500,000
500,000
Fleet Management
Deisel Fuel Tank Software
25,000
25,000
Parks & Recreation
Riverview Park Sidewalks
100,000
100,000
Median Trees /Schrub/Mulch
4,000
4,000
Riverview Park Tables/Benches
10,000
10,000
Community Center Paving
50,000
50,000
Skate Park Rebuild
125,000
125,000
Facilities Maintenance
Break Room Appliances
2,000
2,000
Roof Repairs
75,000
75,000
Golf Course
Fuel Tank
15,000
15,000
Tractor and Fairway Mower
55,000
55,000
Airport
_
Construct Hangar
130,000
520,000
650,000
Building
Vehicles
18,500
18,500
Total FY 2014 /2015
$ 110,200
$ 30,000 $
2,178,037
$ 175,000
$ 102,000 $ - $
55,000 $ 520,000
$ 114,000
$ 18,500 $
3,302,737
FISCAL YEAR 2015/2016
General Government
Servers and Server Upgrades
Computer Upgrades
Police Department
Police Officer Equipment
Zetron Instant Replay
Police Vehicles and Equipment
Roads and Special Projects
Public Works Equipment
Sign Replacement
Indian River Drive Light Poles
Street Repaving
Sidewalk Construction
Barber Street Bridge Repairs
Pedestrian Bridges
Stormwater
1/4 Swale Improvements
Road Crossing/Sideyard Pipes
Tulip Drive Road Crossing
Potomac Ditch
Pipe Sliplining
Parks & Recreation
Baseball Field Lighting
Equipment Building
Bleacher Shields
Facilities Maintenance
Paint City Hall
City Hall Parking Lot
Police Station Air Conditioner
Parking Lot Refurbishment
Public Works Compound Work
Building
Vehicles
Total FY 2015/2016
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -20 CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation
General Option Impact Stormwater Cemetery
Fund Gas Tax DST Fees utility Trust
15,000
10,200
13,000
222,600
30,000
5,000
100,000
50,000
150,000
50,000
330,000
50,000
500,000
40,000
500,000
50,000
50,000
200,000
100,000
300,000
50,000
50,000
50,000
100,000
100,000
Grants/ Riverfront
Golf Bank Note CRA Building Total
43,500
15,000
50,000
10,200
13,000
330,000
222,600
30,000
5,000
100,000
50,000
500,000
40,000
500,000
50,000
50,000
200,000
100,000
300,000
100,000
100,000
50,000
50,000
50,000
50,000
150,000
43,500
$ 460,800 $ 135,000 $ 2,320,000 $ 200,000 $ - $ - $ - $ - $ 43,500 $ 3,159,300
i�'i
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -20 CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local
Recreation
General
Option
Impact Stormwater Cemetery
Grants/ Riverfront
Fund
Gas Tax
DST
Fees utility Trust Golf
Bank Note CRA Building Total
FISCAL YEAR 2016/2017
General Government
Servers and Server Upgrades
15,000
15,000
Computer Upgrades
50,000
50,000
FDLE Computer Firewall
5,000
5,000
Police Department
Police Officer Equipment
10,200
10,200
Police Vehicles and Equipment
300,000
300,000
Roads and Special Projects
Public Works Equipment
194,500
194,500
Sign Replacement
30,000
30,000
Indian River Drive Light Poles
5,000
5,000
Sidewalk Construction
50,000
50,000
Stormwater
Stormwater Equipment
30,000
30,000
1/4 Swale Improvements
500,000
500,000
Road Crossing/Sideyard Pipes
50,000
50,000
Tandum Dump Truck
140,000
140,000
Bevan Ditch Piping
750,000
750,000
Stormwater Pond Installation
500,000
500,000
Parks & Recreation
Riverview Park Playground
50,000
50,000
Cemetery
Storage Building
100,000
100,000
Airport
Total FY 2016/2017
$ 219,700
$ 35,000 $
2,395,000
$ - $ 30,000 $ 100,000 $ -
$ - $ - $ - $ 2,779,700
FISCAL YEAR 2017/2018
General Government
Servers and Server Upgrades
Computer Upgrades
Police Department
Police Officer Equipment
Police Vehicles and Equipment
Roads and Special Projects
Public Works Equipment
Indian River Drive Light Poles
Street Repaving
Sidewalk Construction
Stormwater
1/4 Swale Improvements
Road Crossing/Sideyard Pipes
Vac Truck
Golf Course
Rebuild Greens
Airport
Construct Access Road West
Total FY 2017/2018
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -20 CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Local Recreation
General Option Impact Stormwater Cemetery Grants/ Riverfront
Fund Gas Tax DST Fees utility Trust Golf Bank Note CRA Building Total
$ 15,000
10,200
167,500
5,000
100,000
50,000
316,000
50,000
500,000
50,000
340,000
160,000
165,000
640,000
15,000
50,000
10,200
316,000
167,500
5,000
100,000
50,000
500,000
50,000
340,000
165,000
800,000
$ 192,700 $ 105,000 $ 1,466,000 $ - $ - $ - $ 165,000 $ 640,000 $ - $ - $ 2,568 700
1 1� 1
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -20 CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
r/
Local
Recreation
General
Option
Impact Stormwater Cemetery
Grants/ Riverfront
Fund
Gas Tax
DST Fees utility Trust Golf
Bank Note CRA Building
Total
FISCAL YEAR 2018/2019
General Government
Computer Replacements
165,000
165,000
Servers and Server Upgrades
15,000
15,000
Computer Upgrades
50,000
50,000
FDLE Computer Firewall
5,000
5,000
Police Department
Police Officer Equipment
10,200
10,200
Police Vehicles and Equipment
470,000
470,000
Roads and Special Projects
Public Works Equipment
110,000
110,000
Indian River Drive Light Poles
5,000
5,000
Sidewalk Construction
50,000
50,000
Stormwater
1/4 Swale Improvements
500,000 -
500,000
Road Crossing/Sideyard Pipes
50,000
50,000
Dump Truck
150,000
150,000
Transport Truck
125,000
125,000
Golf Course
Golf Cart Fleet
333,450
333,450
Total FY 2018/2019
$ 135,200
$ 5,000 $
1.,565,000 $ - $ - $ -
$ 333,450 $ - $ - $
2,038,650
r/
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -20 CAPITAL IMPROVEMENT PROGRAM
BY FUNDING SOURCE
Grand Total $ 1,398,800 $ 435,000 $ 10,874,037 $ 375,000 $ 132,000 $ 100,000 $ 220,000 $ 1,493,450 $ 114,000 $ 62,000 $ 15,204,287
11 ✓
Local
Recreation
General
Option
Impact Stormwater Cemetery
Grants/ Riverfront
Fund
Gas Tax
DST Fees utility Trust Golf
Bank Note CRA Building= Total
FISCAL YEAR 2019/2020
General Government
Servers and Server Upgrades
15,000
15,000
Computer Upgrades
50,000
50,000
Police Department
Police Officer Equipment
10,200
10,200
Police Vehicles and Equipment
300,000
300,000
Roads and Special Projects
Public Works Equipment
255,000
255,000
Indian River Drive Light Poles
5,000
5,000
Street Repaving
120,000
120,000
Sidewalk Construction
50,000
50,000
Stormwater
1/4 Swale Improvements
500,000
500,000
Road Crossing/Sideyard Pipes
50,000
50,000
Total FY 2019/2020
$ 280,200
$ 125,000 $
950,000 $ - $ - $ -
$ - $ - $ - $ 1,355,200
Grand Total $ 1,398,800 $ 435,000 $ 10,874,037 $ 375,000 $ 132,000 $ 100,000 $ 220,000 $ 1,493,450 $ 114,000 $ 62,000 $ 15,204,287
11 ✓
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
Project Name:
Funding Source:
Justification:
GENERAL GOVERNMENT
kudio Visual Equipment Project Description:
3eneral Fund Puchase of a Macintosh computer and a spare camera for the Cit.
Council Chambers.
k Macintosh computer is necessary to handle the laserfishe records system. The spare camera is needed a
L backup in case the existing camera should not be operable.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20
$ 7,000 $ - $ - $ - $ - $ - $
Operating Impact (Savings):
$ - $ (560) $ 140 $ 840 $ 1,540 $ 2,100 $
Project Name:
Funding Source:
Justification:
Total
7,000
4,060
computer Replacements
JProject Description:
Discretionary Sales Tax
I Replace all desktop and laptop employee computers.
k City -wide replacement of all desktops and laptops was done in July 2014. It is anticipated that
;omplete change out of these computers should be completed every five years to keep up -to -date wit]
echnology and maintain reliability and performance.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20
$ - $ - $ - $ - $ 165,000 $ - $
Operating Impact (Savings):
$ - $ - $ - $ - $ - $ (13,200) $
Project Name:
Funding Source:
Justification
Total
165,000
(13,200)
Servers and Server Upgrades
Project Description:
General Fund
Replacing two physical servers each year and upgrading a backup
server.
Fo maintain reliability and performance, it is recommended that two physical servers be replaced eacl
year. In addition, a backup server needs to be upgraded next year.
Project Costs:
FY 14 -15
FY 15 -16 FY 16 -17
FY 17 -18 FY 18 -19
FY 19 -20 Total
$ 35,000
$ 15,000 $ 15,000
$ 15,000 $ 15,000 $
15,000 $ 110,000
Operating Impact (Savings):
Total
$ . 50,000
$ -
$ (2,800) $ (500)
$ 3,300 $ 8,600 $
14,700 $ 23,300
Project Name:
I Computer Upgrades
Project Description:
(Savings):
IDiscretionary Sales Tax
Computer equipment and software upgrades.
Funding Source:
Justification:
k readily available source of funding is needed to keep up -to -date with new technology and cover the cos
)f implementing new software releases.
Project Costs:
FY 14 -15
FY 15 -16 -
FY 16 -17
FY 17 -18 FY 18 -19
FY 19 -20
Total
$ . 50,000
$ 50,000
$ 50,000
$
50,000 $ 50,000
$ 50,000 $
300,000
Operating Impact
(Savings):
$ -
$ (4,000)
$ (3,000)
$
3,000 $ 14,000
$ 29,000 $
39,000
Project Name:
I FDLE Computer Firewall
I Project Description:
Funding Source:
Discretionary Sales Tax
Wpjzrade
Firewall for compliance with FDLE requirements.
Justification:
IThis is required by
FDLE regulations.
Project Costs:
FY 14 -15
FY 15 -16
FY 16 -17
FY 17 -18 FY 18 -19
FY 19 -20
Total
$ 5,000
$ -
$ 5,000
$
- $ 5,000
$ - $
15,000
Operating Impact (Savings):
$ - $ 500 $ 1,000 $ 2,000 $ 3,000 $ 4,500 $ 11,000
Ills
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
Project Name:
Funding Source:
PUBLIC SAFETY
Police Officer Equipment
Project Description:
General Fund
Replace night vision equipment, a ballistic shield, tactical vest and
bullet proof vest.
Justification: This will improve investigative capabilities and enhance the safety of Police Officers by replacing these
equipment items.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 18,200 $ 10,200 $ 10,200 $ 10,200 $ 10,200 $ 10,200 $ 69,200
Operating Impact (Savings):
$ - $ (2,366) $ (1,026) $ 1,732 $ 5,489 $ 9,613 $ 13,443
Project Name: I Evidence Drying Cabinet JProject Description:
Funding Source: lGeneral Fund IPurchase of an Evidence Drying Cabinet.
Justification: IThis will be used by the.Police Investigative Division to dry and preserve vital evidence.
Project Costs:
Project Description:
Discretionary Sales Tax
14/15 350K Patrol Units (7),18K Boat Motor.
15/16 300K Patrol Units (6),15K Light Tower, 15K Speed Trailer.
16/17 300K Patrol Units (6).
FY 14 -15
FY 15 -16 FY 16 -17
18/19 300K Patrol Units (6),170K 200kw Generator.
FY 17 -18
FY 18 -19
FY 19 -20
Total
$ 1,000
$ - $ -
$
-
$ -
$
-
$
1,000
Operating Impact (Savings):
$ -
$ (130) $ 20
$
170
$ 300
$
390
$
750
Project Name:
JZetron Instant Replay
Project Description:
Funding Source:
lGeneral Fund
lReplace the instant replay unit.
Justification:
This replaces the aging instant replay
unit that is currently used.
Project Costs:
FY 14 -15
FY 15 -16 FY 16 -17
FY 17 -18
FY 18 -19
FY 19 -20
Total
$ -
$ 13,000 $ -
$
-
$ -
$
-
$
13,000
Operating Impact (Savings):
$ -
$ - $ (1,690)
$
215
$ 2,064
$
3,591
$
4,180
Project Name:
Funding Source:
Police Vehicles and Equipment
Project Description:
Discretionary Sales Tax
14/15 350K Patrol Units (7),18K Boat Motor.
15/16 300K Patrol Units (6),15K Light Tower, 15K Speed Trailer.
16/17 300K Patrol Units (6).
17/18 300K Patrol Units (6), 16K 2 Trailers.
18/19 300K Patrol Units (6),170K 200kw Generator.
19/20 300K Patrol Units (6).
Justification: These are scheduled replacements of Police Department vehicles and equipment due to high mileage and
maintenance needs.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 368,000 $ 330,000 $ 300,000 $ 316,000 $ 470,000 $ 300,000 $ 2,084,000
Operating Impact (Savings):
$ - $ (80,960) $ (116,760) $ (112,960) $ (67,960) $ (48,840) $ (427,480)
Project Name: I Police Public Parking I Project Description:
Funding Source: [Discretionary Sales Tax I Creation of handicap narkine areas closer to the
Justification: This is needed to provide handicap parking spaces that is closer and more convenient for visitors to the
Police Station.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 50,000 $ - $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ 1,000 $ 2,000 $ 3,000 $ 4,000 $ 5,000 $ 15,000
Cld.)
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - ROADS AND SPECIAL PROJECTS
Project Name:
Public Works Equipment Project Description:
Funding Source General Fund 14/15 l OK Enclosed Trailer PW -325 Roads, 3K Air Compressor Fleet,
Justification:
Project Costs:
9K Enclosed Trailer Parks, 5K Equipment Trailer Parks, 20K Pickup
Truck Parks.
FY 14 -15
15/16 70K Bob Cat Skid Steer PW -76 Roads, 15K Used 6,000 lb. Fork
FY 16 -17
Lift Fleet, 12K 4 -Post Vehicle Lift Fleet, 9K Enclosed Trailer Parks,
FY 17 -18 FY 18 -19
5K Equipment Trailer Parks, 50K Pickup Trucks (2) Parks, 9K
Truckster Parks, 50K Tractor Parks,2.6K Trailer Cemetery.
$ 47,000
16/17 25K Pickup Truck PW -301 Roads, 85K Backhoe PW -29 Roads,
194,500
12K Trailer PW -76 Roads, 10K Open Trailers (2) PW -358 and PW-
167,500 $ 110,000
360 Roads, 50K Pickup Trucks (2) Parks, 12.5K Trailer Parks.
$
17/18 50K Pickup Trucks (2) PW -05 and PW -300 Roads, 45K One
Operating Impact
Ton Sign Truck PW -08 Roads, 35K Tractor PW -337 Roads, 37.5K
Shop Truck RM -503 and Utility Bed Fleet.
18/19 60K Cat Loader Roads, 50K One Ton Utility Bed Truck Roads.
19/20 165K 18yd /Dump Truck PW -14 Roads, 25K Batwing 15'
$ -
Mower P -381 Parks 65K 3/4 Ton Trucks 2 P -315 and P331 Parks.
These are scheduled replacements of equipment used in the Public Works Department, except for the
Stonnwater Division that is included separately.
Project Costs:
FY 14 -15
FY 15 -16
FY 16 -17
FY 17 -18 FY 18 -19
FY 19 -20
Total
$ 47,000
$ 222,600 $
194,500
$
167,500 $ 110,000
$ 255,000
$
996,600
Operating Impact
(Savings):
$ -
$ (10,340) $
(54,612)
$
(70,442) $ (59,002)
$ (13,958)
$
(208,354)
Project Name:
I Sign Replacement
Project Descri tion:
Funding Source:
JLocal Option Gas Tax I
City-wide
replacement of street and traffic signs.
Justification:
INew regulations are requiring this to be done. It will be completed in three phases.
Project Costs:
FY 14 -15
FY 15 -16
FY 16 -17
FY 17 -18 FY 18 -19
FY 19 -20
Total
$ 30,000
$ 30,000 $
30,000
$
- $ -
$ -
$
90,000
Operating Impact
(Savings):
$ -
$ (1,500) $
(600)
$
2,700 $ 10,500
$ 17.100
$
28.200
Project Name: 11ndianRiver Drive Light Poles JProject Description:
Funding Source: ILocal Option Gas Tax I Cleanup and repainting of Light Poles on Indian River Drive.
Justification: IThese light poles are in need of being cleaned up and repainted.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 25,000
Operating Impact (Savings):
$ - $ - $ 150 $ 450 $ 900 $ 1,500 $ 3,000
Project Name: I Street Repaving Project Description:
Funding Source: ILocal Option Gas Tax lResurfacing of roadways.
Justification:
This is necessary to keep the streets in good condition. Repaving is expected to reduce pot -hole repairs
and complaints, as well as insurance claims for damages and liability.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 100,000 $ - $ 100,000 $ - $ 120,000 $ 320,000
Operating Impact (Savings):
$ - $ - $ (7,000) $ (2,000) $ (4,000) $ 14,000 $ 1,000
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - ROADS AND SPECIAL PROJECTS
Project Name:
Sidewalk Construction Project Description:
Funding Source: 113iscretionary Sales Tax Installation of new sidewalks throughout the City.
Justification: JProject focuses on the safety of residents and bikers.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000
Operating Impact (Savings):
- (3,500) (4,500) (3,000) $ 5,000 $ (6,000)
Project Name:
Funding Source:
Justification:
acht Club Pier Decking lProiect Description:
iscretionary Sales Tax I Replace boards on the Yauht Club fishing pier.
'his pier has several boards which are cracked. This project would replace the old decking with
omposite decking that will last a longer period of time.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 60,000 $ - $ - $ - $ - $ - $ 60,000
Operating Impact (Savings):
$ - $ (4,200) $ (600) $ 3,000 $ 6,600 $ 9,000 $ 13,800
Project Name:
I Barber Street Bridge Repairs
lProject Description:
Funding Source:
IDiscretionary Sales Tax
I Reconstruct the Barber Street Bridge.
Justification: This project is needed to maintain the bridge to DOT standards based on yearly bridge inspections.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 500,000 $ - $ - $ - $ - $ 500,000
Operating Impact (Savings):
$ - $ - $ (35,000) $ (5,000) $ 25,000 $ 55,000 $ 40,000
Project Name:
I Pedestrian Bridges
Project Description:
IDiscretionary Sales Tax
Deck reconstruction on two pedestrian bridges.
Funding Source:
Justification: The decks for the pedestrian bridges at Barber Street and Periwinkle Drive need of reconstruction.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 40,000 $ 40,000 $ - $ - $ - $ - $ 80,000
Operating Impact (Savings):
$ - $ - $ 6,000 $ 18,000 $ 28,000 $ 36,000 $ 88,000
Project Name:
Fleming Street Paving
lProject Description:
Funding Source:
Discretionary Sales Tax
lReconstruction of Fleming Street.
Justification: IThis highly used roadway needs to be reconstructed.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 200,000 $ - $ - $ - $ - $ - $ 200,000
Operating Impact (Savings):
$ - $ (14,000) $ (4,000) $ 6,000 $ 32,000 $ 34,000 $ 54,000
Project Name:
Coolidge Street Paving
Project Description:
Funding Source: IDiscretionary
Sales Tax lReconstruction
of Coolidge Street.
Justification: lCoolidge needs to be reconstructed and completed with paving, parking and replaced curbing.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 460,037 $ - $ - $ - $ - $ - $ 460,037
Operating Impact (Savings):
$ - $ (32,203) $ (9,201) $ 13,801 $ 73,606 $ 78,206 $ 124,210
c "4 )
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - ROADS AND SPECIAL PROJECTS
Project Name: ITulip Drive Construction Project Description:
Funding Source: IDiscretionary Sales Tax I Completion of Tulip Drive Reconstruction and Added Parking.
Justification: IThis will continue with reconstruction work initiated in FY13 -14 in conjunction with a Grant.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 200,000 $ - $ - $ - $ - $ - $ 200,000
Operating Impact (Savings):
$ - $ (14,000) $ (4,000) $ 6,000 $ 32,000 $ 34,000 $ 54,000
PUBLIC WORKS - STORMWATER UTILITY
Project Name: Stormwater Equipment Project Description:
Funding Source: Stormwater Utility Fund FY 14 -15 50K Pickup Trucks (2) SW -619 and SW -618, 48K One Ton
Crew Cab SW -606, 4K Pumps /cutoff saws.
FY 16 -17 30K 4X4 Pickup SW -614
Justification: To schedule an orderly replacement of equipment that is essential to the operations of the stormwater
maintenance program.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 102,000 $ - $ 30,000 $ - $ - $ - $ 132,000
Operating Impact (Savings):
$ - $ (22,440) $ (12,240) $ (8,640) $ 8,640 $ 15,720 $ (18,960)
Project Name:
1/4 Swale Improvements Project Descri tion:
Funding Source:
Justification: IThis continues the program of addressing drainage issues throughout the City.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 3,000,000
Operating Impact (Savings):
$ - $ 10,000 $ 30,000 $ 60,000 $ 100,000 $ 150,000 $ 350,000
Project Name:
Road Crossing/Sideyard Pipes Project Description:
Funding Source:
Discretionary Sales Tax
Installation of 1/4 round in swales.
Justification: IThis continues the program of addressing drainage issues throughout the City.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 500,000 $ 3,000,000
Operating Impact (Savings):
$ - $ 10,000 $ 30,000 $ 60,000 $ 100,000 $ 150,000 $ 350,000
Project Name:
Road Crossing/Sideyard Pipes Project Description:
Funding Source:
Justification: This work helps to eliminate major flooding throughout the City by replacing failing pipes under
roadways. It also saves on maintenance done by the mowing contractor by eliminating the sideyard
ditches that require maintenance.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000
Operating Impact (Savings):
$ - $ - $ 500 $ 1,500 $ 3,000 $ 5,000 $ 10,000
Project Name: ITulip Drive Road Crossing Project Description:
Funding Source: I Discretionary Sales Tax Pipe Replacement
Justification: This will replace the road crossing pipe under Tulip Drive near Laconia Street, which needs to be upsized
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ 500 $ 1,000 $ 1,500 $ 2,000 $ 5,000
lP5-)
Discretionary Sales Tax
Replacement of road crossing pipes and sideyard piping.
Justification: This work helps to eliminate major flooding throughout the City by replacing failing pipes under
roadways. It also saves on maintenance done by the mowing contractor by eliminating the sideyard
ditches that require maintenance.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 250,000
Operating Impact (Savings):
$ - $ - $ 500 $ 1,500 $ 3,000 $ 5,000 $ 10,000
Project Name: ITulip Drive Road Crossing Project Description:
Funding Source: I Discretionary Sales Tax Pipe Replacement
Justification: This will replace the road crossing pipe under Tulip Drive near Laconia Street, which needs to be upsized
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ 500 $ 1,000 $ 1,500 $ 2,000 $ 5,000
lP5-)
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS- STORMWATER UTILITY
Project Name:
Funding Source:
Justification
Project Costs:
Potomac Ditch JProject Description:
Discretionary Sales Tax JPiping of open ditch.
This is necessary to pipe the Potomac open ditch from Roseland Road to the entrance of the Boy Scout
Camp. This will assist in water flow and reduce erosion and ditch maintenance.
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 200,000 $ - $ - $ - $ - $ 200,000
Operating Impact (Savings):
$ - $ - $ 2,000 $ 4,000 $ 6,000 $ 8,000 $ 20,000
Project Name:
Funding Source:
Justification:
Project Costs:
RV 1 d -1 f
Tandum Dump Truck JProject Description:
Discretionary Sales Tax IReplace an existing dump truck.
It is anticipated that this major piece of equipment will need to be replaced at the scheduled time.
FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ 140,000 $ - $ - $ - $ 140,000
Operating Impact (Savings):
$ - $ - $ - $ (53,200) $ (49,000) $ (44,800) $ (147,000)
Project Name:
Funding Source:
Pipe Sliplining Project Description:
Discretionary Sales Tax Slipling of several pipes.
Justification: IThis will rehabilitate the pipes in a number of identified locations without removal and replacement.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 100,000 $ - $ - $ - $ - $ 100,000
Operating Impact (Savings):
$ - $ - $ 2,000 $ 4,000 $ 6,000 $ 8,000 $ 20,000
Project Name: JBevan Ditch Piping JProject Description:
Funding Source: IDiscretionary Sales Tax I Install pipes and catch basin in a major ditch.
Justification:
Project Costs:
PV ld -iG
This is to assist in the overall drainage of the area from Laconia to Bevan and alleviate the maintenance
problems being experienced due to errosion.
FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ 750,000 $ - $ - $ - $ 750,000
Operating Impact (Savings):
$ - $ - $ - $ 7,500 $ 15,000 $ 22,500 $ 45,000
Project Name:
Funding Source:
Justification:
Project Costs:
FY 14 -15
Stormwater Pond Installation
Project Description:
IDiscretionary Sales Tax
Creation of anew Stormwater pond.
This would create a stormwater pond similar to the one installed on Periwinkle at a location such as
FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
- $ - $ 500,000 $ - $ - $ - $ 500,000
Operating Impact (Savings):
$ - $ - $ - $ 5,000 $ 10,000 $ 15,000 $ 30,000
r, (I,)
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - STORMWATER UTILITY
Project Name: Vac Truck Project Description:
Funding Source: Discretionary Sales Tax lReplace the existing Vac Truck SW -618.
Justification: 11t is anticipated that this major piece of equipment will need to be replaced at the scheduled time.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ - $ 340,000 $ - $ - $ 340,000
Operating Impact (Savings):
$ - $ - $ - $ - $ (129,200) $ (119,000) $ (248,200)
Project Name:
Funding Source:
Justification:
Project Costs:
FY 14 -15
Dump Truck JProject Description:
Discretionary Sales Tax IReplace the existing Dump Truck SW -615.
It is anticipated that this major piece of equipment will need to be replaced at the scheduled time.
FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ - $ - $ 150,000 $ - $ 150,000
Operating Impact (Savings):
$ - $ - $ - $ - $ - $ (57,000) $ (57,000)
Project Name: ITransportTruck I Project Description:
Funding Source: IDiscretionary Sales Tax lReplace the existing Transport Truck SW
Justification: It is anticipated that this major piece of equipment will need to be replaced at the scheduled time.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ - $ - $ 125,000 $ - $ 125,000
Operating Impact (Savings):
$ - $ - $ - $ - $ - $ (47,500) $ (47,500)
PUBLIC WORKS - FLEET MANAGEMENT
Project Name: Deisel Fuel Tank Software JProject Description:
Funding Source: I Discretionary Sales Tax Upgrade of software for the deisel fuel tank.
Justification: This software is necessary for proper use of the deisel fuel tank located at the City garage.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 25,000 $ - $ - $ - $ - $ - $ 25,000
Operating Impact (Savings):
$ - $ 1,750 $ 3,500 $ 5,250 $ 7,000 $ 8,750 $ 26,250
PUBLIC WORKS -PARKS AND RECREATION
Project Name:
I Baseball Field Lighting
I.Project Description:
Funding Source:
Discretionary Sales Tax
I Upgrade
lights at the Barber Street Sports Complex with energy
Justification:
IThese are the oldest lights in the City
and need to be replaced.
Project Costs:
FY 14 -15
FY 15 -16 FY 16 -17
FY 17 -18 FY 18 -19 FY 19 -20 Total
$ -
$ 300,000 $ -
$
- $ - $ - $ 300,000
Operating Impact
(Savings):
$ -
$ - $ (24,000)
$
(15,000) $ (6,000) $ 3,000 $ (42,000)
,_ J
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - PARKS AND RECREATION
Project Name: IRiverview Park Playground Project Description:
Funding Source: IDiscretionary Sales Tax Add rubber surface and replace fencing.
Justification: This will make a better surface below the play area and improve the fencing.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ 50,000 $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ - $ 1,500 $ 3,000 $ 4,500 $ 9,000
Project Name:
Funding Source:
Justification:
Riverview Park
ect Description:
Park.
These sidewalks have numerous cracks and broken edges and in some areas, they have settled and art
treating trip and fall hazards. The entire sidewalk system will be replaced in an effort to upgradt
Uverview Park and resolve these safety concerns.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 100,000 $ - $ - $ - $ - $ - $ 100,000
Operating Impact (Savings):
$ - $ (7,000) $ (2,000) $ 3,000 $ 16,000 $ 17,000 $ 27,000
Project Name:
Median Trees /Schrub /Mulch Project Description:
Funding Source:
IZiverfront CRA Improve
Justification: This is desirable to enhance the appearance of the medians.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 4,000 $ - $ - $ - $ - $ - $ 4,000
Operating Impact (Savings):
$ - $ 400 $ 800 $ 1,200 $ 1,600 $ 2,000 $ 6,000
Project Name: I Riverview Park Tables /Benches Project Description:
Funding Source: lRiverfront CRA I Replacement of picnic tables and benches.
Justification:
V4any of the existing picnic tables and benches are in very bad shape and should be replaced with a mort
.miform design.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 10,000 $ - $ - $ - $ - $ - $ 10,000
Operating Impact (Savings):
$ - $ (800) $ 200 $ 1,200 $ 2,000 $ 2,600 $ 5,200
Project Name: lCommunity Center Paving Project Description:
Funding Source: lRecreation Impact Fees IPave the parking lot and improve drainage and lighting.
Justification: IThe Community Center continuously hosts classes and events during the day and in the evenings. It is
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 50,000 $ - $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ (4,000) $ (2,500) $ (1,000) $ 500 $ 2,000 $ (5,000)
6)
the landsca in of US# 1 Medians.
Justification: This is desirable to enhance the appearance of the medians.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 4,000 $ - $ - $ - $ - $ - $ 4,000
Operating Impact (Savings):
$ - $ 400 $ 800 $ 1,200 $ 1,600 $ 2,000 $ 6,000
Project Name: I Riverview Park Tables /Benches Project Description:
Funding Source: lRiverfront CRA I Replacement of picnic tables and benches.
Justification:
V4any of the existing picnic tables and benches are in very bad shape and should be replaced with a mort
.miform design.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 10,000 $ - $ - $ - $ - $ - $ 10,000
Operating Impact (Savings):
$ - $ (800) $ 200 $ 1,200 $ 2,000 $ 2,600 $ 5,200
Project Name: lCommunity Center Paving Project Description:
Funding Source: lRecreation Impact Fees IPave the parking lot and improve drainage and lighting.
Justification: IThe Community Center continuously hosts classes and events during the day and in the evenings. It is
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 50,000 $ - $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ (4,000) $ (2,500) $ (1,000) $ 500 $ 2,000 $ (5,000)
6)
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - PARKS AND RECREATION
Project Name:
Funding Source:
Justification: This facility is well used and has not had any major repairs for some time. Replacement of the ramps is
important for safety reasons.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 125,000 $ - $ - $ - $ - $ - $ 125,000
Operating Impact (Savings):
$ - $ (35,000) $ (32,500) $ (30,000) $ (27,500) $ (25,000) $ (150,000)
Project Name: JEquipment Building Project Description:
Funding Source: lRecreation Impact Fees I Construct a facility to house equipment and tools.
Justification: Parks and Recreation crews are currently working out of a utility shed and a larger facility is needed to
house maintenance equipment and tools.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 100,000 $ - $ - $ - $ - $ 100,000
Operating Impact (Savings):
$ - $ - $ (9,000) $ (8,000) $ (6,000) $ (5,000) $ (28,000
Project Name: I Bleacher Shields Project Description:
Funding Source: lRecreation Impact Fees JAcquire bleacher shields.
Justification: This will provide cover from the sun for attendees at events at the Barber Street Sports Complex.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 100,000 $ - $ - $ - $ - $ 100,000
Operating Impact (Savings):
$ - $ - $ 3,000 $ 6,000 $ 9,000 $ 12,000 $ 30,000
PUBLIC WORKS - CEMETERY
Project Name:
Funding Source:
Justification
Storage Building
Project Description:
Cemetery Trust Fund
Constuct a concrete block building with windows, garage door and
regular door. Includes electric for recepticals and overhead lighting.
This would provide a secure place to keep maintenance equipment and the scissor lift and trailer on site
and out of the elements. The scissor lift is used for placing cremains in the free standing wall
columbarium, which is too high to remove granite doors without a problem.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ 100,000 $ - $ - $ - $ 100,000
Operating Impact (Savings):
$ - $ - $ - $ 1,000 $ 2,000 $ 3,000 $ 6,000
PUBLIC WORKS - FACILITIES MAINTENANCE
Project Name:
Funding Source:
Break Room Appliances
I Project Description:
General Fund
lReplace appliances in the City Hall Breakrooms
Justification: 1A refrigerator and other appliances are aging and some need to be replaced.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 2,000 $ - $ - $ - $ - $ - $ 2,000
Operating Impact (Savings):
$ - $ 60 $ 120 $ 180 $ 240 $ 300 $ 900
l 1 `f
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
PUBLIC WORKS - FACILITIES MAINTENANCE
Project Name:
Funding Source:
Justification:
Roof Repairs
JProject Description:
IDiscretionary Sales Tax
I Reconstruct the roofs on City Hall and Police Station.
Minor repairs have been made continuously over the past number of years on both roofs. Leaks have been
a frequent occurance and the roofs have numerous patches and bubbles on both of them.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 75,000 $ - $ - $ - $ - $ - $ 75,000
Operating Impact (Savings):
$ - $ 1,500 $ 3,000 $ 4,500 $ 6,000 $ 7,500 $ 22,500
Project Name: I Paint City Hall JProject Description:
Funding Source: IDiscretionary Sales Tax JPaint exterior of old and new City Hall.
Justification: These buildings are in need of exterior painting.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ 1,500 $ 3,000 $ 4,500 $ 6,000 $ 15,000
Project Name:
City Hall Parking Lot
Project Description:
Funding Source: Discretionary Sales Tax I Seal coat and stripe parking lots at the City Hall complex.
Justification: These parking lots should be seal coated and striped in conjuction with the painting of the buildings.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ 1,000 $ 2,000 $ 3,000 $ 4,000 $ 10,000
Project Name:
JPolice Station Air Conditioner
I Project Description:
Funding Source:
113iscretionary Sales Tax
I Replace the roof top air conditioner.
Justification: (This unit is exposed to salty air and is showing rust and oxidation.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ (9,000) $ (8,500) $ (8,000) $ (7,500) $ (33,000)
Project Name: I Parking Lot Refurbishment Project Description: Ll
Funding Source: I General Fund Seal restri a and update signage at several parking lots.
Justification:
Several parking lots need to be addressed. This work would seal, restripe and replace outdated signage at
Schumann Park, Barber Street Sports Complex, Police Department and Yacht Club.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 50,000 $ - $ - $ - $ - $ 50,000
Operating Impact (Savings):
$ - $ - $ 1,000 $ 2,000 $ 3,000 $ 4,000 $ 10,000
Project Name: I Public Works Compound Work I Project Description:
Funding Source: lGeneral Fund IMake improvements to the Public Works Compound.
Justification: INeeds painting, weave fencing, parking lot sealing, striping, signage and covered equipment storage.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ 150,000 $ - $ - $ - $ - $ 150,000
Operating Impact (Savings):
$ - $ - $ 3,000 $ 6,000 $ 9,000 $ 12,000 $ 30,000
l dv i
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
Justification:
GOLF COURSE FUND
Project Name:
I Golf Cart Fleet
JProject Description:
Funding Source:
113ank Note
lReplace 86 Golf Carts.
Justification:
Carts were acquired in October 2013 via 4 year bank note and are expected to be replaced in FY 18 -19.
Project Costs:
FY 14 -15
FY 15 -16 FY 16 -17
FY 17 -18 FY 18 -19 FY 19 -20
Total
$ -
$ - $ -
$ - $ 333,450 $ -
$ 333,450
Operating Impact (Savings):
$ -
$ - $ -
$ - $ - $ (26,676)
$ (26,676)
Project Name:
IFuelTank
JProject Description:
Funding Source:
IDiscretionary Sales Tax
lReplace the fuel tank.
Justification:
This fuel tank needs to be replaced
and will be located in the new golf course maintenance
facility.
Project Costs:
FY 14 -15
FY 15 -16 FY 16 -17
FY 17 -18 FY 18 -19 FY 19 -20
Total
$ 15,000
$ - $ -
$ - $ - $ -
$ 15,000
Operating Impact (Savings):
$ -
$ (1,050) $ (750)
$ (450) $ (150) $ 150
$ (2,250)
Project Name:
Tractor and Fairway Mower
Project Description:
Funding Source:
Golf Course Capital Fund
$15K Tractor and $40K Fairway Mower.
Justification:
These are equipment re lacements needed for maintenance of the golf course.
Project Costs:
FY 14 -15
FY 15 -16 FY 16 -17
FY 17 -18 FY 18 -19 FY 19 -20
Total
$ 55,000
$ - $ -
$ - $ - $ -
$ 55,000
Operating Impact (Savings):
$ -
$ (12,100) $ (6,600)
$ (1,100) $ 6,600 $ 8,800
$ (4,400)
Project Name:
Rebuild Greens
Project Description:
Funding Source:
Golf Course Ca ital Fund
Fumigate and rebuild the greens.
Justification:
this would include fumigation to treat the different grass mutations growing on the greens. Withir
•eason, it would bring the greeens out to their original dimensions.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ - $ 165,000 $ - $ - $ 165,000
Operating Impact (Savings):
$ - $ - $ - $ - $ (3,300) $ 3,300 $ -
this would include fumigation to treat the different grass mutations growing on the greens. Withir
•eason, it would bring the greeens out to their original dimensions.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ - $ 165,000 $ - $ - $ 165,000
Operating Impact (Savings):
$ - $ - $ - $ - $ (3,300) $ 3,300 $ -
CITY OF SEBASTIAN, FLORIDA
FISCAL YEAR 2015 -2020
CAPITAL IMPROVEMENT PROJECT REQUEST AND JUSTIFICATION FORM
AIRPORT FUND
Project Name:
Funding Source:
Construct Hangar
Project Description:
80% FAA and FDOT Grants.
Completion of new hangar project initiated in FY 13 -14.
City Matching Requirements
FY 15 -16 149.5K Compact Pickup with extended cab, 24K 4 door
from Discretionary Sales Tax
Utility Vehicle.
Air ort West development requires infrastructure.
Justification:
Economic development and infrastructure improvements require additional aviation hangars.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 650,000 $ - $ - $ - $ - $ - $ 650,000
Operating Impact (Savings):
$ - $ 6,500 $ 13,065 $ 19,630 $ 26,195 $ 32,760 $ 98,150
Project Name:
Funding Source:
Justification:
Project Costs:
FY 14 -15
Construct Access Road West
Project Description:
80% FAA and FDOT Grants.
Design Build Access Road West.
City Matching Requirements
FY 15 -16 149.5K Compact Pickup with extended cab, 24K 4 door
from Discretionary Sales Tax
Utility Vehicle.
Air ort West development requires infrastructure.
FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ - $ - $ - $ 800,000 $ - $ - $ 800,000
Operating Impact (Savings):
$ - $ - $ - $ - $ 24,000 $ 48,000 $ 20,000
BUILDING FUND
Project Name:
Funding Source:
Vehicles
Project Description:
Building Fund Revenues
FY 14 -15 18.5K Compact with extended cab.
FY 15 -16 149.5K Compact Pickup with extended cab, 24K 4 door
Utility Vehicle.
Justification:
Replacement of vehicles used for building inspections.
Project Costs:
FY 14 -15 FY 15 -16 FY 16 -17 FY 17 -18 FY 18 -19 FY 19 -20 Total
$ 18,500 $ 43,500 $ - $ - $ - $ - $ 62,000
Operating Impact (Savings):
$ - $ (4,070) $ (11,790) $ (5,590) $ 1,350 $ 8,180 $ (11,920)
cm OF
SEBAS-TV-%
HOME OF PELICAN ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
1225 MAIN STREET ■ SEBASTIAN, FLORIDA 32958
TELEPHONE (772) 589 -5518 ■ FAX (772) 388 -8248
www.cityofsebastian.org
MEMORANDUM
TO: Local Planning Agency (Planning and Zoning Commission)
RE: Proposed Land Development Code Amendment to Article III — Procedures
and criteria for review of temporary uses; specifically Section 54 -2 -3.2
DATE: July 31, 2014
During a calendar year, staff processes an average of 20 -25 temporary use /special event
applications. These are the events /uses not held at Riverview Park or on public property
but those occurring at privately -owned locations. The Ordinance establishing the
procedures and criteria was adopted in 1995, and in the ensuing 20 years there have not
been any reviews or revisions to these regulations. Attached are definitions, as noted in
the LDC, for some of the terms used in the section. The nature of the temporary uses and
events have evolved over the years, and as such, have made it hard to adhere to the
present code, especially within recent times. As such, staff has prepared Ordinance 0 -14-
04 for your consideration.
In addition to the proposed changes as outlined in Exhibit A of the Ordinance, staff is
requesting the Commission to offer guidance on what defines "temporary ". For example,
would a quarterly Gun Show held at the same location be considered a temporary use?
Consider the monthly flea markets held at the local churches and civic organizations.
Currently, the flea markets require a temporary use permit, and are usually requested for
9 months of the year. This past year, staff received six applications for such flea markets.
Should this number of monthly events still be considered temporary, and how many
should occur before it is determined to be a permanent use of the site, requiring zoning
compliance? One of the current requirements of temporary uses is that "The activity must
be a permitted or conditional use within the zoning district ". Most of the properties
holding monthly flea markets are zoned PS (Public Service). Staff is proposing to
eliminate this requirement, but would like the Commission's input.
Guidance is also requested on boat and car tent sales. Typically the applicants are out -of-
area dealers. Are they competing with our local dealers/businesses, or offering more
options for our residences? Should the sales be limited to a number per year? Per site or
per dealer? Indian River County's code for boat- and car tent sales, in summary, states
that only 12 permits per calendar year will be issued — 6 to local dealers/businesses and 6
to out -of -area dealers, first come /first serve. This number would be unnecessary for
Sebastian, but consideration of a lower limit may be an option.
At this time, staff is also proposing to revise the current fee for temporary uses /special
events, which is $125 plus a $200 bond. In many instances, particularly for the simpler
events, or for the smaller fundraisers, this amount seems excessive, and the applicant
usually requests a waiver of the fee. In other instances where applicable, to be more
accommodating, staff began accepting one fee for 2 or 3 re- occurring events at the same
location if they were noted on the same application. But this has developed into 9
monthly flea markets on one application now paying only $125.
Accordingly, staff would like to offer two suggestions for consideration. 1) Reduce the
permit fee to $35 for each event. Re- occurring events would pay per number of dates.
Or 2) establish a tiered fee schedule, depending on your discussion of temporary:
1 event $35
2 to 4 events $150
5 to 7 events $250
8 to 9 events $350
Many of the events /temporary uses require an inspection by the Building Department
regarding [larger] tent installations, temporary electrical hook -ups, etc., and public
safety /traffic monitoring by the Police Department on the day of the event.
Staff appreciates your review of the proposed Ordinance and looks forward to a
discussion of the changes.
If you have further questions regarding the attached Ordinance or proposed amendment,
please feel free to give me a call. I can be reached at (772) 388 -8232.
Dorri Bosworth, Plannef,
Community Development Department
LDC Section 54 -5 -22.2
DEFINITIONS:
Host site: The parcel of land upon which a temporary use or special event is
conducted.
Special Event: The temporary use of facilities, parking areas and other open
space for an event held by owner, nonowner, religious organizations,
recreational /entertainment groups or local civic organizations. Special
events may include circuses, carnivals, festivals, fairs, special exhibitions,
concerts, church revivals and other similar activities.
Temporaty use: A use established for a fixed period of time with the intent
to discontinue such use upon expiration of the time period.
Transient merchant: Any person or business entity that engages in the
temporary sale of any merchandise not within an enclosed structure. The
following will not be considered to be transient merchants:
(1) Any merchants within enclosed structures who temporarily display
their merchandise outside of the structure on their premises
provided the display does not delete any required parking.
(2)Any merchants who have received site plan approval from the
planning and zoning commission for a specific outside sales and /or
display area.
Exhibit A
Sec. 54- 2 -3.2. - Procedures and criteria for review of temporary uses.
A temporary use shall be allowed for transient merchants and special events on privately -owned
property upon issuance of a temporary use permit by the city manager or his designee, based upon
compliance with all applicable regulations of this chapter and other city regulations.
(a) A temporary use permit will be issued if the following requirements and standards are met:
(1) The ontivity must he a permitted OF renditienol iioe I.YithiR the -senine distript
(2) Only temporary pavilions may be erected and utilized for the operation. All facilities used
shall be self- contained and mobile or portable. No mobile homes or trailers that exceed
300 square feet in area may be utilized. All temporary facilities designed to be occupied by
the public must be inspected by the fire department after installation, and prior to
occupancy.
(3) No utility connection shall be permitted except for temporary electrical power which must
be approved by the building department.
(4) Drier to the issuance of any permit If the applicant is not the owner of the event location, a
cash bond in the amount of $200.00 shall be submitted to the city. Within seven days after
a temporary use permit expiration, all items related to the operation or event shall be
removed from the site. The city may use the entire amount of submitted funds to pay for
disposal of all related items remaining on the site seven days after permit expiration. The
city may also use such funds to remove prohibited off - premise signs during and /or after the
event. Upon vacating and cleaning up a site, an applicant may request, in writing, return of
the submitted funds. Permit applicants will be refunded the submitted cash bond amount if:
a. The city has not used the funds under the conditions described above; and
b. The site is inspected by the city, it is verified that the site has been cleaned up, and all
temporary use items have been removed.
c. In cases where the city has used the $200.00 cash bond for site cleanup or off -
premise sign removal, no subsequent temporary use permits shall be issued to the
same applicant whose vacated operation caused cash bond default and resultant
cleanup by the city.
(5) Holders of temporary use permits for an activity shall not be required to obtain a44
business tax receipt for that activity provided that no permanent
modifications are made to the site to accommodate re- occurring events. Permanent
modifications will require a site plan application and business tax receipt.
(6) No temporary use shall operate within a public right -of -way. No operation within an
easement shall be permitted unless specifically allowed by all parties having interest in
such easement.
(7) Unimproved lots within industrial or commercial districts may be utilized if, in the opinion of
the city manager and his support staff, the temporary use will not be detrimental to the
health, safety and general welfare of the public.
(8) A maximum of 30% of the required parking stalls of the host site may be utilized by the
temporary use. This percentage may be increased based on satisfactory documentation
indicating additional parking and /or transportation needs have been provided for the total
impact of the proposed event.
(9) Food concessions may be permitted as accessory to the temporary use. The applicant
must obtain a temporary license from the state department of business regulations for the
proposed concession facilities.
Page 1
(10) Temporary toilet facilities may be required by the applicant depending on location and size
of the event. Amount will be determined by the building official based on estimation of
attendance of the event.
(11) Applicant must provide, at his own expense, additional and /or special crowd control and
security if determined necessary by the police chief based on the size of the event.
(12) [Reserved.]
(13) Prior to city manager review, approval must be obtained from the police chief and the
building director. Approval or denial shall be based on items (1) through (11) above and
consideration shall be reviewed on the total magnitude of impact that may be detrimental to
the health, safety and general welfare of the community.
Sec. 54- 2 -3.3. - Time limits.
(a) Transient merchants of any seasonal sales merchandise such as Christmas tree and firework sales
or other similar use shall be in operation not more than 45 consecutive days per sale /event on any
given site.
(b) Transient merchants of any non - seasonal sales merchandise shall be in operation not more than ten
consecutive days per sale /event on any given site. [For consideration — Establish a maximum
number of similar events per year at any given site ? ?]
(c) Special events and special vehicle and boat sale events shall be in operation not more than seven
consecutive days per sale /event on any given site. [For consideration — Establish a maximum
number of similar events per year at any given site ? ?]
Sec. 54- 2 -3.4. - Application.
(a) Temporary use permits shall be obtained by furnishing a completed application for such permit to the
groyAh .,,anagernen community development department. The following information as applicable
shall be provided:
(1) Application to be made by the owner or lessee of the host site.
(2) Location of site and the specific location for the requested use.
(3) Beginning and ending dates of the event.
(4) Hours of operation of the event.
(5) Name of individual in charge of the event.
(6) After hours emergency phone number for person responsible for event.
(7) A drawing showing dimensions of the site or an existing site plan for the host site including
location and dimensions of all existing driveways, entrances, exits, and parking spaces.
(8) A drawing depicting location and dimensions of all temporary pavilions, displays areas, sanitary
facilities, and concessions for the temporary use.
(9) Indicate how parking and traffic flow will be directed on to and within the event site.
(10) Estimation of maximum peak hour attendance of the event to determine sanitary needs, parking
and traffic impact.
(11) If existing parking spaces of a permanent use (such as a shopping plaza) are to be utilized by
patrons and employees of the temporary use event during normal operating hours, calculations
shall be submitted demonstrating that the event will not utilize more than 30% of the required
parking stalls of the existing host site. If usage does exceed 30% percent, documentation
Page 2
indicating additional parking and /or transportation arrangements must be provided for the total
impact of the proposed event.
If the event is being held during non - operating hours for the host site, the 30% restriction may
be lifted upon demonstration that there will still be sufficient parking available for patrons of the
temporary event.
(12) I GGatinn and dirnencinn of all cinnc to be used.
(13) All applications must be made on the form prescribed by the city and submitted no later than
3021 days prior to the scheduled event. The °nnliratinn foe shall he $25.00 and the permit fee
shall be .Fees for temporary uses shall be established by Resolution of the City
Council. Applications submitted less than 21 days before the scheduled event will be assessed
a penalty fee as established in the Resolution to be used for expedited processing. Fees may
not be waived for any application.
(b) A copy of the application and all supporting documents will be forwarded to the police chief and the
building official for review and comments. All comments and recommendations will then be attached
to the application and forwarded to the city manager or his designee for approval or denial.
(c) The application, with all the supporting documents, will be reviewed by the city manager, or his
designee. If approved by the city manager, the applicant shall post the $200.00 cash bond prior to
the issuance of the temporary use permit. If denied, applicant will be notified, along with the reasons
for denial. The police department and the fire departmen+ Will be notified on all approved requests for
temporary use permits.
Sec. 54- 2 -3.5. - Signs.
(a) All signs being utilized as sitefor the temporary use or special event must be located onsite, must
conform to the city sign regulations as outlined in the land development code, and must be removed
upon expiration of the temporary use permit or upon vacation of the site. Off - premise signs are
prohibited.
(b) Signs used in conjunction with approved activities or special events for which a temporary use permit
has been obtained shall not be calculated against the three banner signs permitted per site per year.
Page 3
ORDINANCE NO. 0 -14 -04
AN ORDINANCE OF THE CITY OF SEBASTIAN, FLORIDA, AMENDING LAND
DEVELOPMENT CODE SECTION 54 -2 -3.2 REGARDING PROCEDURES AND
CRITERIA FOR REVIEW OF TEMPORARY USES; PROVIDING FOR CONFLICTS;
PROVIDING FOR SEVERABILITY; PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Council has determined that the Land Development Code of the
City of Sebastian should be reviewed and updated from time to time; and
WHEREAS, the City Council wishes to revise the fees for temporary uses and special
events; and
WHEREAS, the Local Planning Agency held a public hearing on August 7, 2014, and
made a recommendation to City Council to Ordinance 0- 14 -04.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA, as follows:
Section 1. That the Code of Ordinances, Chapter 54 Land Development Code, City
of Sebastian, Florida, is hereby amended as follows:
Exhibit A
Section 2. SEVERABILITY. In the event a court of competent jurisdiction shall
determine that any part of this Ordinance is invalid, the remainder of the Ordinance shall not be
affected and it shall be presumed that the City Council of the City of Sebastian did not intend to
enact such invalid provision. It shall further be assumed that the City Council would have
enacted the remainder of this Ordinance without said invalid provision, thereby causing said
remainder to remain in full force and effect.
Section 3. CONFLICT. All ordinances or parts of ordinances in conflict herewith
are hereby repealed.
Section 4. EFFECTIVE DATE. This Ordinance shall take effect upon its adoption
by the City Council.
The foregoing Ordinance was moved for adoption
. The motion was seconded by Councilmember
upon being put to a vote, the vote was as follows:
Mayor Bob McPartlan
Vice -Mayor Jim Hill
Councilmember Jerome Adams
Councilmember Andrea Coy
Councilmember Richard Gillmor
by Councilmember
and,
The Mayor thereupon declared this Ordinance duly passed and adopted this
, 2014
ATTEST:
Sally A. Maio, MMC
City Clerk
CITY OF SEBASTIAN, FLORIDA
Mayor Jim Hill
Approved as to form and legality for
reliance by the City of Sebastian only:
Robert A. Ginsburg, City Attorney
Words stricken shall be deleted; words underlined constitute the proposed amendment; remaining
provisions continue in effect.
day of