17 June 1994 File: 218/39/171
Sebastian: Grade Crossing Rehabilitation
Stratton Avenue, 272974 -H
Notice of Intent to Work
Mr. D. E. Eckis
City Engineer
City of Sebastian
1225 Main Street
Sebastian, FL 32958
Dear Mr. Eckis:
During a recent field inspection, FEC personnel noted the ride quality for both railway and highway traffic over the
above referenced grade crossing has declined to the point of requiring rehabilitation. In order to restore acceptable
levels of surface conditions for both highway and railway traffic, we intend to schedule the rehabilitation work within
the coming sixty days.
In accordance with the terms of the agreement dated 30 August 84, certain portions of the cost of this rehabilitation
are the responsibility of the City. The costs to the City are as outlined in the enclosed estimate and are limited to the
highway portion of the work which includes the crossing surface, asphalt work, and the maintenance of traffic during
the road closure. The total estimated cost to the City for the proposed work is $10,709. It should be noted here that
this is an estimate only and all charges will be billed to the City on an actual cost basis.
Please review the above and the enclosed estimate. If acceptable to the City, please acknowledge this letter by
providing a letter of authorization against which we may bill for this work. In the interim, Mr. J. D. Bussa, FEC's
Roadmaster responsible for the work, will be in contact to coordinate the scheduling of the road closure.
If you have any question concerning the rehabilitation, please do not hesitate to contact me.
Sincerely,
William S. Riehl III
Senior Staff Engineer
enclosure
cc C. R- Lynch
G. E. Clegg - Please proceed with the scheduling of the work.
J. W. Knight - Please annotate your database accordingly.
D. A. Smith - Please retain the estimate for comparison with your final billing.
REHABnXrATE EXISTING TYM T- MODIFIED GBAD.
,cOSMG
I13li
STRATTON AVENL_ . T2974 -H
26.13
DETAE S OF ESTIMATE
180.00
4,704,00
4.00
Day
300.00
r"LMMAUnsal
smax
Ilait
ROAM=
EUoudod
Qwsaia K
QW1
Ihk
&;e"ion
Extended
Sul QW HUd" Total Credit
2.82
To
(312.27)
(879.36)
(1,623.36) 162.34 (1,461.02)
H* -Rail
]
Be
7.11
7.11
7.11
Set
(4.00)
Section Oarg
16.00
Ea
(10.00)
(160.00)
(160.00) 16.00 (144.00)
$ea+on Truck
1
Ea
16.87
16.87
16.87
Su k-9 Oag
TmnpeC
l
Ea
92.68
92.68
101.53
Rgpdaor
0
Ea
34.29
0.00
Gang Truck (I ton)
I
Ea
8.85
8.85
Gang Truck (2 too)
0
Ea
11.29
0.00
Mss Try
Crane
0
Es
11.29
0.00
CroOe
I
Ea
84.87
84.87
84.87
T- A-'bcy
Loader
0
Ea
28.63
0.00
Loam
1
Ea
31.09
31.09
59.72
Tnrck4 --bcy
1
Ea
28.63
28.63
welder
Welding Truck
I
Ea
16.87
16.87
16.87
Materiel Yard
Crone
1
Ea
84.87
84.87
84.87
Work Tram
Locomotive
Other
1
Ea
130.32
130.32
130.32
Signal Truck
1
Be
8.85
8.85
8.85
4ogt
I>n¢
I10iLCAU
Eluootlod
Subtotal lax
& l ;.+dl :
IGfaLCmu
Track Panel
Rail
2.82
Tn
650.00
1,830.40
3,613.52
578.16
4,191.68
Track Ties
20.00
Ea
65.00
1.300.00
Fasteners
36.00
Set
13.42
483.12
Pawl 1- 1121im
Ballast
1.00
Ca
1,095.00
1,095.00
1,315.00
210.40
1,525.40
Field Welds
Cromag Materials
4.00
Ea
55.00
220.00
Crossing Ties
16.00
Ea
75.00
1,200.00
2,675.20
428.03
3,103.23
lmmr Pads
16.00
Be
47.00
752 00
Outer Pads
32.00
Ea
21.00
672.00
Studs
64.00
Ea
0.80
51.20
4x10'
0.00
Ea
450.00
0.00
442
0.00
Ea
500.00
0.00
2x10'
0.00
Es
375.00
0.00
2x12
0.00
Ea
410.00
0.00
Coat OfplmdmmL.Amm
Contract
Place & Compact Asphalt
Maintenance of Traffic
! Credit
Track Panel
Rail
Track Ties
Fasteners
Grossing Materials
( mnmg Tim
Q=
Knit
I13li
Total Cost
26.13
Tn
180.00
4,704,00
4.00
Day
300.00
1,200.00
10.00%
QW1
Ihk
IhIljCmd,
Extended
Sul QW HUd" Total Credit
2.82
To
(312.27)
(879.36)
(1,623.36) 162.34 (1,461.02)
20.00
Ea
(30.00)
(600.00)
36.00
Set
(4.00)
(144.00)
16.00
Ea
(10.00)
(160.00)
(160.00) 16.00 (144.00)
REHABU TTATE EXISTING TYPE T- MODMIED GRAD. - RossING
13.69
13.69
STRATTON AVENLr., 272974 -H
'
DETAE S OF ESTIMATE
11.27
78.89
Ea
13.93
13.93
Workforce Caleulatrorn
Qnty/
Productionâś“
12.94
Hours/
Total
Total
Taal
work
T=k
ih)t
Hari
maker
Haan
LAhM
EWniit =
ComUuct Track Panel
64
Tf
20
3.20
3.20
411.58
271.58
Material Yard
12.94
20.06
Be
12.94
12.94
12.94
20.06
Mobi mawnlMucul C naoli isucn
Section
I
Ls
27.31
42.33
4.00
787.59
568.76
Work Tram
Ea
13.69
13.69
82.98
128.62
Be
Mamtenance of Traffic
I
Ls
Ea
4.00
164.92
28.45
Supervision
Ea
17.33
17.33
34.45
53.40
Be
17.12
Raw" Craning SurSoe
24
Tf
40
0.60
0.60
134.91
101.14
Supervision
Seen=
Crane
Loader
Remove/Replace Track Structure
64
Tf
20
3.20
3.20
1,097.85
1,038.73
Supervision
Section
Crane
Loader
Welder
Work Train
Mamtamc
Line A Surface Track
300
Tf
50
6.00
6.00
610.08
651.83
Supervision
S-ficm8 Gang
Reps Crosmg Surface
.Section
24
Tf
40
0.60
0.60
134.91
101.14
Came
Loader
Place Asphalt
SUP-
1
is
4.00
164.92
26.45
Damobllltn/Slte Cleanup
Section
1
Ls
4.00
574.00
67.48
Total Labor 8c Equipment
4,080.74
2,877.55
Cost QLL`2bbM
1toad11este
Section Gang
Foreman
Laborer
Sur6omg Gang
Foreman
Operator
Tamper Operator
Laborer
Mechanic
Crane
OP-
Loader
Operator
Welder
Welder
Helper
Material Yard
Foremen
OP-
Laborer
Work Train
Ccnductcr
Other
Memtamer
Direct Lobar Burden
Indirect Labor Burden
I
7
1
0
1
0
1
1
I
1
1
1
5
1
1
I
55.00%
0.00%
Be 26.60 26.60 26.60 41.23
BE
13.69
13.69
92.58
143.50
Ea
11.27
78.89
Ea
13.93
13.93
39.00
60.45
Ea
12.94
0.00
Ea
13.80
13.80
Be
11.27
11.27
Be
17.45
0.00
Be
12.94
12.94
12.94
20.06
Be
12.94
12.94
12.94
20.06
Be
14.68
14.68
27.31
42.33
Ea
12.63
12.63
Ea
13.69
13.69
82.98
128.62
Be
12.94
12.94
Ea
11.27
56.35
Ea
17.33
17.33
34.45
53.40
Be
17.12
17.12
Ea
14.52
14.52
14.52
22.51
/
FLORIDA EAST COAST RAILWAY COMPANY
SAINT AUGUSTINE, FLORIDA
SEBASTIAN: REHABILITATE EXISTING TYPE T- MODIFIED GRADE CROSSING
STRATTON AVENUE, 272974 -H
218139/171
01018_0..rq 06117/94
16:22
CROSSING DESCRIPTION
PAVING DESCRIPTION
Length of Crossing Surface: 24 If
Width (Across Road)
28 Ft
Number of Tracks: I EA
Length (Along Road)
80 Ft
Length of Track Panel: 64 If
Projected LiR
3 In
AGREEMENT DESCRIPTION
GANG DESCRIMON
Responsible Patty: City of Sebastian
3 Ft. Pit= Section
Agreement Date: 08/30/84
14 Surfacing Gang 14
Division of Responstbn7ity
1 Crane
Maintenance of Traffic City
I Loader
Crowing Surface City
Track Materials FEC
Track Construction FEC
Paving City
COST RECAPITULATION
10.00%
Salvage
Responsible
work Iran I.Abw Egaimml
Martial
SAOLUGi colfinsubw
CM&
low
Elm
Construct Track Panel 411.58
271.58
4,191.68
n/a 487.48
nh
5,362.33
FEC
MobiaadonNiatcrial Consolidation 787.59 .
588.76
da
n/a 137.63
n/a
1,513.98
FEC
Maintenance of Traffic 164.92
28.45
n/a
1,200.00 139.34
n/a
1,532.70
City
Remove Crossing Surface 134.91
101.14
n4
a/a 23.60
(144.00)
115.65
City
Remove/Replace Track/Crossing Structure 1,097.85
1,038.73
da
n/a 213.66
(1,461.02)
889.21
FEC
Line & Surface Track 610.08
651.83
1,525.40
n/a 278.73
nh
3,066.04
FEC
Replace Crowing Surface 134.91
101.14
3,103.23
n/a 333.93
n/a
3,673.21
City
Place Asphalt 164.92
28.45
n/a
4,704.00 489.74
n/a
5,387.10
City
DemobBirati Sitc Cleanup 574.00
67.48
n/a
n/a 64.15
n/a
705.62
FEC
Totals: 4,080.74
2,877.55
8,820.32
5,904.00 2,168.26
(1,605.02)
22,245.84
TOTAL PROJECT COST:
22,245.84
926.91 VFt
TOTAL COST TO BE BORNE BY FEC:
11,537.18
TOTAL COST TO BE BORNE BY CITY:
10,708.66