Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2006 - Contract
1 CONSTRUCTION SERVICES AGREEMENT THIS AGREEMENT made this 13th day of July, 2006 by and between the CITY OF SEBASTIAN, a municipal corporation of the State of Florida, 1225 Main Street, Sebastian, Florida, 32958, ( "City ") and Glasgow Equipment Service, Inc. 1750 Hill Avenue, West Palm Beach, Florida 33407 (FL License PCC04530 I /Pollutant Storage Systems Contractor), a Florida corporation authorized to do business in the State of Florida, ( "Contractor. ") WHEREAS, the City desires to engage a Florida licensed contractor who has special and unique competence and experience in providing aircraft fuel tanks and piping, and provide other improvements necessary to complete the Project hereunder; and WHEREAS, the Contractor represents that it has such competence and experience in providing these services; and WHEREAS, the City in reliance on such representation has selected the Contractor in accordance with its procedure for selection of Contractor; and WHEREAS, the City and the Contractor desire to reduce to writing their understanding and agreements on such professional services. IT IS, THEREFORE, AGREED as follows: Aircraft Self- Fueling Facility Bid Documents July 14, 2006 ARTICLE I - THE CONTRACTUAL RELATIONSHIP 1.0 Employment of Contractor The City hereby agrees that it may engage the Contractor and the Contractor hereby agrees to perform professional services for the City in accordance with this Agreement. This Agreement is not an exclusive agreement and the City may employ other contractors, professional or technical personnel to furnish services for the City as the City in its sole discretion finds is in the public interest. The Agreement shall not be construed to create a contractual relationship of any kind between the City and the Subcontractor(s), or, between any person or firm other than the City and Contractor. The Contractor shall not sell, transfer, assign or otherwise dispose of the Contract or any portion thereof, or of his right, title of interest therein or his obligations thereunder, or moneys due or to become due under this Contract. 2.0 Agreement Documents The Agreement Documents (also called CONTRACT DOCUMENTS) consist of this Agreement, Supplemental Agreement(s), Request for Bid Documents, Contract Proposal, Bond Fonns, Plans and Technical Specifications, the Grant Agreement, Work Orders, Change Orders, Addenda if any, any other documents listed in the Agreement Documents, and written modifications issued after execution of this Agreement, if any. 2.1 Intent The Specifications are an integrated part of the Contract Documents and as such will not stand alone if used independently. The Specifications establish minimum standards of quality for this Project. They do not purport to cover all details entering into the design and construction of materials or equipment. The intent of the Agreement Documents is to set forth requirements of performance, type of equipment and structures, and standards of materials and construction. It is also intended to include all labor and materials, equipment, and transportation necessary for the proper execution of the Work, to require new material and equipment unless otherwise indicated, and to require complete performance of the Work in spite of omission of specific reference to any minor component part and to include all items necessary for the proper execution and completion of the Work by the Contractor. Performance by the Contractor shall be required only to the extent consistent with the Agreement Documents and reasonably inferable from them as being necessary to produce the intended results. 2.2 Entire and Sole Agreement Except as specifically stated herein, the Agreement Documents constitute the entire agreement between the parties and supersede all other agreements, representations, warranties, statements, promises, and understandings not specifically set forth in the Agreement Documents. Neither party has in any way relied, nor shall in any way rely, upon any oral or written agreements, representations, warranties, statements, promises or understandings not specifically set forth in the Agreement Documents. 2.3 Amendments The parties may modify this Agreement at any time by written agreement. Neither the Agreement Documents nor any term thereof may be changed, waived, discharged or terminated orally, except by an instrument in writing signed by the party against which enforcement of the change, waiver, discharge or termination is sought. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 2.4 Construing Tenns This Agreement shall not be construed against the party who drafted the same, as both parties have obtained experts of their choosing to review the legal and business adequacy of the same. 2.5 Governing Law and Waiver of Trial by Jury This Agreement shall be governed by the laws of the State of Florida, and any venue for any action pursuant to the Agreement Documents shall be in Indian River County, Florida. The parties hereto expressly waive trial by jury in any action to enforce or otherwise resolve any dispute arising hereunder. 2.6 Term This Agreement shall commence on the day it is executed by both parties and the term of the Agreement shall extend until the Project is complete unless terminated in accordance with the terms hereunder. 3.0 Definition of Terms 3.1 General Whenever the following terms appear in these Agreement Documents, their intent and meaning shall, unless specifically stated otherwise, be interpreted as shown. 3.2 Act Of God The words "Act of God" mean an earthquake, flood, hurricane (or other named tropical event), tornado or other cataclysmic phenomenon of nature. Rain, Wind or other natural phenomenon (including tropical waves and depressions) of normal intensity for the locality shall not be construed as an Act of God. 3.3 ADDENDUM (Re: Bid Documents) A modification of the plans or other contract documents issued by the Owner and distributed to prospective bidders prior to the opening of bids. All Addenda shall be considered as part of the Contract Documents. 3.4 Agreement A written agreement between the Contractor and Owner defining in detail the work to be performed. The words Agreement and Contract, are one and the same. 3.5 A.S.T.M. Designation Wherever the letters "A.S.T,M." are used in the Specifications, it shall be understood as referring to the American Society for Testing Materials. When reference is made to a certain Designated Number of a specification or test as set out or given by the American Society for Testing Materials, it shall be understood to mean the current, up -to -date standard specification or tentative specification for that particular process, material or test as currently published by that group. 3.6 BID or PROPOSAL The bid or proposal is the written offer of a Bidder to perform work described by the contract documents when made out and submitted on the prescribed proposal form properly sealed and guaranteed. The bid or proposal shall be considered as part of the Contract Documents. 3.7 BID BOND or PROPOSAL GUARANTEE: Bidder shall submit a Bid Bond or Proposal Guarantee in the amount of 5% of the Base Bid, in the form of a Cashier's Check, Unconditional Irrevocable Letter of Credit drawn in favor of the City of Sebastian on a National Bank, or a bond from a surety company duly licensed in the State of Florida. Aircraft Self - f=ueling. Facility Bid Documents July 14, 2006 3.8 Bidder An individual, partnership, or corporation submitting a proposal for the work contemplated; acting directly or through a duly authorized representative. 3.9 Change Order A written order issued to the Contractor by the City and covering changes in the plans, specifications, or scope of work when the amount of work changed is not deemed sufficient to require a supplemental agreement, or adjustments in the Contract Price or Contract Time. 3.10 Contract Addendum A special written provision modifying or clarifying the terms and conditions of the Contract. The Contract Addendum shall be considered as part of the contract documents. 3.11 Contractor The word "Contractor" shall mean an individual, partnership, or corporation, and his, their or its heirs, executors, administrators, successors and assigns, or the lawful agent of any such individual, firm, partnership, covenant or corporation, or his, their or its surety under any contract bond, constituting one of the principals to the Contract and undertaking to perform the work herein. 3.12 Directed, Ordered, Approved & Etc. Wherever in the Agreement Document the words "directed ", "ordered ", "approved ", "permitted ", "acceptable ", or words of similar import are used, it shall be understood that the direction, order, approval or acceptance of the Owner is intended unless otherwise stated. 3.13 Engineer A Professional Engineer duly licensed and registered in the State of Florida and designated by the City as Engineer. The City may designate a staff member as Engineer who is not licensed. 3.14 General Conditions The directions, provisions and requirements contained within the Agreement Documents, all describing the general manner of performing the Work including detailed technical requirements relative to labor, material equipment, and methods by which the Work is to be performed and prescribing the relationship between the City and the Contractor. 3.15 Inspector A duly authorized representative of the City assigned to make official inspections of the materials furnished and of the work performed by the Contractor. 3.16 Laboratory Any licensed and qualified laboratory designated by or acceptable to the Owner to perform necessary testing of materials. 3.17 Owner City of Sebastian 3.18 Performance and Payment Bonds Contractor shall submit bonds in the form prescribed by State Law, and generally as shown on sample forms herein, for Performance and Payment, each in the amount of 100 % of the Contract Amount. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 3.19 Plans The official, approved plans, including reproduction thereof, showing the location, character, dimensions and details of the work to be done. All shop drawings submitted by the Contractor shall be considered as part of the contract documents. 3.20 Proposal The proposal or bid is the written offer of a Bidder to perform the work described by the Contract Documents when made out and submitted on the prescribed proposal form, properly signed and guaranteed. The proposal or bid shall be considered as part of the contract documents. 3.21_ Special Conditions Special clauses or provisions, supplemental to the Plans, Standard Specifications and other contract documents, setting forth conditions varying from or additional to the Standard Specifications for a specific project. 3.22 Specifications The directions, provisions, and requirements together with all written agreements made or to be made, setting forth or relating to the method and manner of performing the Work, or to the quantities and qualities of materials, labor and equipment to be furnished under the Agreement. 3.23 Subcontractor An individual, partnership or corporation supplying labor, equipment or materials under a direct contract with the contractor for work on the project site. Included is the one who supplies materials fabricated or formulated to a special design according to the plans and specifications for the particular project. 3.24 Supplemental Agreement A written understanding, or proposal and acceptance, executed between the City and the Contractor subsequent to execution of the Agreement herein with the written consent of the Contractor's Surety, relating to the work covered by the Agreement and clarifying or furthering the terms thereof. A modification to the Agreement shall be made by Contract Addendum. 3.25 Surety Surety is a corporation qualified to act as surety under the laws of Florida, who executes the Contractor's Performance and Payment Bonds and is bound with the Contractor for the acceptable performance of the contracted work and for the payment of all debts pertaining thereto. 3.26 WORK, (The) or PROJECT, (The) The public improvement contemplated in the Plans and Specifications called the Taxiway Rehabilitation and Aircraft Parking Apron Project, and all actions necessary to construct the same. 3.27 Work Order Work orders are work instructions including specification and plans that show the location, character, dimensions and details to the work to be done. Work orders are specific instructions, of limited scope, that will be a part of this contract. Work orders shall be considered as part of the contract documents. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 ARTICLE II - PERFORMANCE 4.0 Plans, Specifications and Related Data 4.1 Intent of Plans and Specifications The intent of the Plans, Specifications, Work Orders and other Contract Documents is that the Contractor furnishes all labor and materials, equipment, supervision and transportation necessary for the proper execution of the Work unless specifically noted otherwise. The Contractor shall do all the work shown on the Plans and described in the Specifications and other Contract Documents and all incidental work considered necessary to substantially complete the Work ready for use, occupancy, or operation in a manner acceptable to the City. 4.2 Conflict In the event of any inconsistency, discrepancy or conflict between the Agreement, the Plans, Specifications, and other Contract Documents, calculated dimensions will govern over scaled dimensions; Technical Specifications shall govern over the general contract provisions, plans, and cited standards or FAA circulars; general contract provisions shall govern over plans, and cited standards or FAA circulars; and plans shall govern over cited standards or FAA circulars. 4.3 Discrepancies in Plans Any discrepancies found between the Plans and Specifications and site conditions, or any errors or omissions in the Plans or Specifications, shall be immediately reported to the Engineer and City. The Engineer shall promptly determine the validity and seriousness of the claimed condition and correct any such error or omission in writing, or otherwise direct Contractor. Any work done by the Contractor after his discovery of such discrepancies, errors or omissions shall be done at the Contractor's risk. Any correction or errors or omissions in Plans and Specifications may be made by the Engineer when such correction is necessary for the proper fulfillment of their intention as construed by him. Where said correction of errors or omissions, except as provided in the next two (2) paragraphs below, adds to the amount of work to be done by the Contractor, compensation for said additional work shall be made under the Paragraph 10.7 CHANGES IN THE IY012K below, except where the additional work may be classed under some item of work for which a unit price is included in the proposal. The fact that specific mention of any part of work is omitted in the Specifications, whether intentionally or otherwise, when the same is clearly shown or indicated on the Plans, or is usually and customarily required to complete fully such work as is specified herein, will not entitle the Contractor to consideration in the matter of any claim for extra compensation, but the said work must be installed or done the same as if called for by both the Plans and Specifications. All work indicated on the Plans and not mentioned in the Specifications or vice versa, and all work and material usual and necessary to make the Work complete in all its parts, whether or not they are indicated on the Plans or mentioned in the Specifications, shall be furnished and executed the same as if they were called for by both the Plans and Specifications. The Contractor will not be allowed to take advantage of any errors or omissions in the Plans and Specifications. The Engineer will provide full information when errors or omissions are discovered. 4.4 Drawings and Specifications at Job Site One (1) complete set of all Plans, Specifications, Work Orders, Addenda, Change Orders, Shop Drawings and samples shall be maintained at the job site, in good order and annotated to show all changes made during the construction process, and shall be available to the Engineer and City at all times. A final copy Aircraft Self-Fueling Facility Bid Documents July 14, 2006 thereof, along with "as- built" record drawings, operations and maintenance manuals„ and data sheets, shall be delivered to the Engineer upon the completion of the Work. 4.5 Dimensions Dimensions shown on the Plans will be used. Where the work of the Contractor is affected by finished dimensions, these shall be verified by the Contractor at site, and he shall assume the responsibility for their use. 4.6 Sampling and Testing Except as otherwise provided, sampling and testing of all materials, and the laboratory methods and testing equipment, required under the Specifications shall be in accordance with the latest standards or tenets of the American Society for Testing Materials. The testing of samples and materials shall be made at the expense of the Contractor, except where indicated otherwise. The Contractor shall furnish any required samples without charge. The Contractor shall be given sufficient notification of the placing of orders for materials to permit testing. As an exception to the above, when the Contractor represents a material or an item of work as meeting Specifications and under recognized test procedures it fails, any re- testing shall be at the Contractor's expense, billed at the Testing Laboratory's standard rate for individual tests. It is expected that all inspections and testing of materials and equipment will be done locally. If the Contractor desires that inspections for tests be made outside of the local area, all expenses, including per diem for the Engineer or Inspectors, shall be borne by the Contractor. 4.7 Shop Drawings The Contractor shall provide shop drawings, setting schedules and other drawings as may be necessary for the prosecution of the Work in the shop and in the field as required by the Plans and Specifications or Engineer's instructions. Deviations from the Plans and Specifications shall be called to the attention of the City at the time of the first submission of shop drawings and other drawings. The City's approval of any shop drawings shall not release the Contractor from responsibility for errors, corrections of details, or conformance with the Contract. Shop drawings shall be submitted according to the following schedule: (a) Three (3) copies shall be submitted to the City at least thirty (30) days before the materials indicated thereon are to be needed or earlier if required to prevent delay of work or to comply with subparagraph (b). (b) The City shall, within fourteen (14) days of the submittal of any shop drawings, return two (2) copies to the Contractor marked with any corrections and changes required and noting if the drawings are acceptable as noted, or if resubmittal is required. (c) The Contractor shall then correct the shop drawings to conform to the corrections and changes requested by the City and resubmit three (3) copies to the City. (d) Two (2) copies of Approved Shop Drawings shall be returned to the Contractor by the City. 4.8 Quality of Equipment and Materials In order to establish standards of quality, the Specifications may refer to certain products by name and catalog number. This procedure is not to be construed as eliminating from competition other products of equal or better quality by other manufacturers where fully suitable in design. The Contractor shall furnish to the City a complete list of his proposed desired substitutions prior to the signing of the Contract, together with such engineering and catalog data as the City may require. Further substitutions may be submitted during the course of work in accordance with Paragraph 4.10 SUBSTITUTION OF EQUIPMENT ANDIOR MATERIAL below. Aircraft Self- Fueling Facility Bid Documents July 14, 2006 The Contractor shall abide by the City's judgment when proposed substitution of materials or items or equipment are judged to be unacceptable and shall furnish the specified material or item of equipment in such case. All proposals for substitutions shall be submitted to the City in writing by the Contractor and not by individual trades or material suppliers. The City will advise of approval or disapproval of proposed substitutions in writing within a reasonable time. No substitute materials shall be used unless approved by City in writing. 4.9 Equipment Approval Data The Contractor shall furnish one (1) copy of complete catalog data for every manufactured item of equipment and all components to be used in the Work, including specific performance data, material description, rating, capacity, material gauge or thickness, brand name, catalog number and general type. This submission shall be compiled by the Contractor and submitted to the City for review and written approval before any of the equipment is ordered. Each data sheet or catalog in the submission shall be indexed according to specification section and paragraph for easy reference. After written approval is received by the Contractor, submission shall become a part of the Contract and may not be deviated from except upon written approval of the City. Catalog data for equipment approved by the City does not in any case supersede the Contract Documents. The acceptance by the City shall not relieve the Contractor from responsibility for deviations from Plans or Specifications, unless he has called the City's attention, in writing, to such deviations at the time of submission, nor shall it relieve him from responsibility for errors of any sort in the items submitted. The Contractor shall check the work described by the catalog data with the Contract Documents for deviations and errors. It shall be the responsibility of the Contractor to insure that items to be furnished fit the space available. He shall make necessary field measurements to ascertain space requirements, including those for connections, and shall order such sizes and shapes of equipment that the field installation shall suit the true intent and meaning of the Plans and Specifications. Where equipment requiring different arrangement of connections from those shown is approved, it shall be the responsibility of the Contractor to install the equipment to operate properly, and in harmony with the intent of the Plans and Specifications, and to make all changes in the Work required by the different arrangement of connections at his own expense. 4.10 Substitution of Equipment and /Or Material After the execution of the Contract Agreement, the substitution of equipment and /or material for that specified will be considered if: Aircraft Self-Fueling Facility Bid Documents July 14, 2006 (a) The equipment and /or materials proposed for substitution is determined by the City to be equal or superior to that specified in the Contract; (b) Unless determined to be of superior quality, the equipment and /or material proposed for substitution is less expensive than that specified and that such savings to the City, as proposed by the Contractor, are submitted with the request for substitution. If the substitution is approved, the Contract price shall be reduced accordingly; and (c) The equipment and /or material proposed for substitution is readily available and its delivery and use, if approved as a substitution, will not delay the scheduled start and completion of the specified work for which it is intended or the scheduled completion of the entire work to be completed under the contract. No request will be considered unless submitted in writing to the City and approval by the City must also be in writing. To receive consideration, requests for substitutions must be accompanied by documentary proof of the actual difference in cost to the Contractor in the form of quotations to the contractor covering the original equipment and/or material, and also equipment and /or material proposed for substitution or other proof satisfactory to the City. It is the intention that the City shall receive the full benefit of the saving in cost involved in any substitution unless the item is substituted for one designated in the Specifications by specific manufacturer's name and type, in which case one -third of the savings shall accrue to the benefit of the Contractor. In all cases, the burden of proving adequate proof that the equipment and /or material offered for substitution is equal or superior in construction and/or efficiency to that named in the Contract shall rest on the Contractor and the proof will be submitted to the City. Request for substitution of equipment and/or material which the Contractor cannot prove to the satisfaction of the City, at its sole discretion and judgment, to be equal or superior in construction and /or efficiency to that named in the Contract will not be approved. 5.0 Materials and Workmanship 5.1 Materials Furnished By the Contractor All materials and equipment used in the Work shall meet the requirements of the respective Specifications, and shall not be used until it has been approved in writing by the City. Wherever the specifications call for an item of material or equipment by a manufacturer's name and type, and additional features of the item are specifically required by the specifications, the additional features specified shall be provided whether or not they are normally included in the standard manufacturer's item listed. Wherever the specifications call for an item of material or equipment by a manufacturer's name and type, and the specified item becomes obsolete and is no longer available, the Contractor shall provide a substitute item of equal quality and performance which is acceptable to the Engineer and City and is currently available, at no increase in Contract price. 5.2 Storage of Materials Materials and equipment shall be stored so as to incur the preservation of their quality and fitness for the Work. When considered necessary, they shall be placed on wooden platforms or other hard clean surfaces, and not on the ground, and /or they shall be placed under cover. Stored materials and equipment shall be located so as to facilitate prompt inspection. Private property zoned for, or adjacent to land zoned for, residential uses shall not be utilized for storage purposes. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 5.3 Rejected Work and Material Any materials, equipment or work which does not satisfactorily meet the Specifications may be condemned by the Engineer or City by giving a written notice to the Contractor. All condemned materials, equipment or work shall be promptly taken out and replaced. All materials and equipment which do not conform to the requirements of the Contract Documents, are not equal to samples approved by the Engineer and City, or are in any way unsatisfactory or unsuited to the purpose for which they are intended, shall be rejected. Any defective work whether the result of poor workmanship, use of defective materials, damaged through carelessness or from other cause shall be removed within ten (10) days after written notice is given by the City, and the work shall be re- executed by the Contractor. The fact that the Engineer or the City may have previously overlooked such defective work shall not constitute an acceptance of any part of it. Should the Contractor fail to remove rejected work or materials within ten (10) days after written notice to do so, the City may remove them and may store the materials and equipment. Satisfaction of warranty work after final payment shall be in accordance with Paragraph 10.15. 5.4 Manufacturer's Direction Manufactured articles, materials and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned as directed by the manufacturer unless herein specified to the contrary. 5.5 Skill and Character of Workmen All workmen must have sufficient knowledge, skill and experience to perform properly the work assigned to them. Any foreman or workman employed by the Contractor or subcontractors who, in the opinion of the Engineer or the City does not perform his work in a skillful manner, or appears to be incompetent or to act in a disorderly or intemperate manner shall, at the written request of the City, be discharged immediately and shall not be employed again in any portion of the Work without the approval of the City. The Contractor shall at all times be responsible for the conduct and discipline of his employees and /or any subcontractor or persons employed by subcontractors, 5.6 Cutting and Patching The Contractor shall do all necessary cutting and patching of the Work that may be required to properly receive the work of the various trades or as required by the Plans and Specifications to complete the Work. He shall restore all such cut or patched work as directed by the Engineer or the City, Cutting of existing structures that could endanger the Work, adjacent property, workmen or the public shall not be done unless approved by the Engineer and under his surveillance. 5.7 Cleaning p The Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by his employees or work. At the completion of the Work, he shall remove all his rubbish, tools, scaffolding and surplus materials and shall leave his work "broom clean" or its equivalent, unless more exactly specified, and shall insure that all debris and other unsightly objects are removed and disposed of in a satisfactory manner. At no additional expense to the City, the Contractor will restore to their original conditions or better, as nearly as practicable, those portions of the site not designated for alteration and all such property, structure, utilities, landscaping, etc., disturbed or damaged during the prosecution of the Work. Final payment will be withheld until such clean up and repairs are completed The Work will be considered complete only after all debris and unused material due to or connected with the Work have been removed and the surrounding area left in a condition satisfactory to the City. In the event the City finds that the Contractor has not complied in keeping the job site clean, the City may, after twenty -four (24) hours written notice to the Contractor to correct the situation, elect to have the job site Aircraft Self-Fueling Facility Bid Documents July 14, 2006 cleaned by an independent labor force. The cost of cleaning by said independent labor force shall be deducted from moneys due the Contractor. 5.8 City's Ownership of Materials Any and all materials, whether structural or natural, found within the limits of the project remain the property of the City unless City ownership is specifically conveyed to the Contractor. All material, equipment and work become the sole property of the City as installed. These provisions shall not be construed as relieving the Contractor from the sole responsibility for all materials and work for which payments have been made, for the restoration of damaged work, or as a waiver of right of the City to require the fulfillment of all the terms of the Contract. 5.9 Guarantee The Contractor shall warrant all equipment furnished and work performed by him for a period of one (1) year from the date of final written acceptance of the Work by City. Satisfaction of warranty work after final payment shall be as per Paragraph 10.15. All equipment and material warranties or guarantees shall be drawn in favor of the City and the originals thereof furnished to the Engineer for review and acceptance prior to final payment. Such guarantee shall in no way limit or relieve the Contractor of liability from subsequent claims of beach of contract due to substandard materials or workmanship, nor shall such warranty period shorten the statute of limitations for bringing a breach of contract or other action based upon any such deficiencies. 6.0 Construction Staking To Be Performed By Contractor 6.1 Personnel Equipment and Record Requirements Adequate field notes and records shall be available for review by the City and Engineer as the Work progresses and copies shall be available if necessary. Any inspection or checking of the Contractor's field notes or layout work by the City and the acceptance of all or any part thereof, shall not relieve the Contractor of his responsibility to achieve the lines, grades and dimensions shown in the PIans and Specifications. Prior to final acceptance of the project, the Contractor shall mark in a permanent manner on the surface of the completed Work all control points shown on the Plans. 6.2 Control Points Furnished By the City The City will provide boundary or other control points and bench marks as shown on the Plans as "Contractor's Survey Control Point ", if any is provided. The Contractor shall be responsible for all survey control of his work during construction. The Contractor shall preserve all reference points and benchmarks furnished by the City. 6.3 Furnishing of Stake Materials The Contractor shall furnish all stakes, templates and other materials necessary for establishing and maintaining the lines and grades necessary for control and construction of the Work. 6.4 Layout of Work Utilizing the control points furnished by the City in accordance with Paragraph 6.2, the Contractor shall establish all horizontal and vertical controls necessary to construct the Work in conformance with the Plans and Specifications. The Work shall include performing all calculations required and setting all stakes needed such as grade stakes, offset stakes, reference point stakes, slope stakes, and other reference marks or points necessary to provide lines and grades for construction of all roadway, bridge and miscellaneous items. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 Survey notes indicating the information and measurements used in establishing locations and grades shall be kept in notebooks and furnished to the Engineer with the record drawings for the Project. 6.5 Specific Staking_ Requirements Stakes to establish lines and grades shall be set at appropriate intervals to assure that the Project is constructed to meet the lines and grades shown on the Plans. For bridge construction stakes and other control, references shall be set at sufficiently frequent intervals to assure that all components of a structure are constructed in accordance with the lines and grades shown in the Plans. 6.6 Payment The cost of performing layout work as described above shall be included in the contract prices for the various items of work to which it is incidental. 6.7 Coordination with City The City's recorded subdivision plats shall be considered correct. The distance, bearing and curve information provided shall be used by the Contractor's surveyor to establish alignment throughout construction. All surveying activities will be coordinated with the City's surveyor as needed for proper completion of all work on the site. Primary control monuments, originally set by the City, that are disturbed or destroyed during construction shall be accurately replaced by the Contractor's surveyor to the satisfaction of the City's surveyor. 6.8 Location of Existing Utilities and Piping All existing underground utilities, such as telephone, cable television and electrical cables must be located by the Contractor prior to starting work. The Contractor shall contact the Utilities at least 48 hours prior to commencing any work within the project area. There may be other utilities within the project area. The cost of substantiating the location of utilities shall be borne by the Contractor and included in the bid price. The Contractor shall be responsible for the repair and/or replacement of utilities which he damages during the course of construction. Utilities deemed to require relocation shall be identified by the Contractor prior to commencing work. The Contractor shall notice the City of the conflict and seek direction from the City prior to proceeding with work. Directions from the City may be to proceed despite conflict, place work order on hold and commence work at a different location, or relocate utilities under separate contract with the utility or a change order to be directed by the City. City reserves the right to authorize the construction, reconstruction, or maintenance of any public or private utility service, FAA or National Oceanic and Atmospheric Administration (NOAH) facility, or a utility service of another governmental agency, at any time during the progress of the work. To the extent that such construction, reconstruction, or maintenance has been coordinated with the City, such authorized work is indicated on the plans. Except as indicated on the plans or contract documents, the Contractor shall not permit any individual, firm or corporation to excavate or otherwise disturb the utility service or facilities located within the limits of the work without written permission of the Engineer. Should the owner of a utility or facility be authorized to perform construction, reconstruction, or maintenance as per this section, during the progress of the work, the Contractor shall cooperate with such owners in arranging and performing the work in this contract so as to facilitate such construction, reconstruction, or maintenance by others whether or not such work by others is indicated on the drawings. When ordered as extra work by the Engineer, the Contractor shall make all necessary repairs to the work Aircraft Self-Fueling Facility Bid Documents July 14, 2006 which are due to such authorized work by others, unless otherwise provided for in the contract, plans or specifications. It is understood and agreed that the Contractor shall not be entitled to make any claim for damages due to such authorized work by others or for any delay to the work resulting from the same. 7.0 Progress and Completion of Work 7.1 Contractor's Obligation Contractor shall supervise and direct the Work, using Contractor's best skill and attention. Contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures and for coordinating all portions of the Work under this Contract, unless the Contract Documents give other specific instructions concerning these matters. Unless otherwise provided in the Contract Documents, Contractor shall provide and pay for labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution and completion of the Work, whether temporary or permanent and whether or not incorporated or to be incorporated in the Work. Unless otherwise provided in the Contract Documents, Contractor shall pay all sales, use and other similar taxes. Contractor shall enforce strict discipline and good order among Contractor's employees and other persons carrying out the Work. Contractor shall not permit employment of unfit persons or persons not skilled in tasks assigned to them. Contractor currently holds and shall maintain at all times during the term of this Contract all required federal, state and local licenses necessary to perform the Work required under the Contract Documents. Contractor shall be responsible to the City for the acts and omissions of Contractor's employees, Subcontractors and their agents and employees, and other persons performing portions of the Work under a contract with Contractor. Contractor shall indemnify, defend and hold City harmless from all claims arising out of or related to its performance of the Work except for acts arising solely from the active negligence of the City. 7.2 ;Start of Construction The Contractor shall commence work on the date specified in the Notice to Proceed subsequently issued by the City, or as specifically noted in any Contract Addendum. However, in no case shall the Contractor commence work until the City has been furnished and acknowledges receipt of the Contractor's Certificates of Insurance and a properly executed performance and payment bond as required. 7.3 Contract Time The contractor shall complete, in an acceptable manner, all of the Work in 120 days, subject to any Addenda or Change Orders hereto. 7.4 Schedule of Completion, The Contractor's schedules are subject to the approval of the City, which shall not be unreasonably withheld, and shall reflect a logical sequence of the various components of work and the anticipated rates of production necessary to complete the Work on or before the completion date. Said schedules shall be submitted within ten (10) days of the execution of the agreement by the City except when requested otherwise and shall be updated and resubmitted to the City on the twenty-fifth {25th} day of every month with the Contractor's pay request. Aircraft Self - Fueling Facility Bid Documents hily 14, 2006 7.5 Coordination of Construction; Preconstruction Conference The Contractor shall coordinate his work with other contractors, the City and utilities to assure orderly and expeditious progress of work. The City shall hold a pre - construction conference at Sebastian City Hall at a time and date mutually agreed upon with the Contractor after the Contract has been awarded and fully executed. 7.6 Property of Others A. Public Ownership The Contractor shall be responsible for the preservation of all public property, trees, monuments, etc., along and adjacent to the street and /or right -of -way, and shall use every precaution necessary to prevent damage or injury thereto. He shall use suitable precautions to prevent damage to pipes, conduits and other underground structures, and shall protect carefully from disturbance or damage all monuments and property marks until a land surveyor has witnessed or otherwise referenced their location and shall not remove them until so directed by the Engineer in writing. The City shall remove and relocate all traffic control signs as required. B. Private Ownership Mail and newspaper boxes, sprinkler systems, ornamental shrubs, lawn ornaments, house numbers, fences, etc. may be removed and relocated by the property owners. The City will not remove, relocate, or re- install mail boxes, sprinkler systems, ornamental shrubs, etc. belonging to a private property owner. However, should such items not be removed or relocated by the start of construction, the Contractor shall remove the objects, in a manner which does not damage or injure the objects at no extra cost to the City, which interfere with the construction of the Project and place them on the property owner's front lawn just outside the project limits. Otherwise, the Contractor shall not enter upon private property for any purpose without obtaining permission from the property Owner thereof. Where extensive intrusions upon private property are required for construction, the City and Contractor shall cooperate to obtain Temporary Construction Easements from the landowner. 7.7 _ Protection of Existing Utilities and Facilities All utilities and all structures of any nature, whether below or above ground, that may be affected by the Work but are not required to be disturbed or relocated by the very nature of the project, shall be protected and maintained by the Contractor and shall not be disturbed or damaged by him during the progress of the Work; provided that, should the Contractor disturb, disconnect or damage any utility or any structure, all expenses of whatever nature arising from such disturbance or the replacement or repair and testing thereof shall be borne by the Contractor. 7.8 Crossing Public Facilities When new construction crosses highways, railroads, streets or similar public facilities under the jurisdiction of state, county, city, or other public agency or private entity, the City through the Engineer shall secure written permission prior to the commencement of construction of such crossing. The Contractor will be required to furnish evidence of compliance with conditions of the permit from the proper authority before final acceptance of the Work by City. Road closures are governed by Paragraph 8.3 below. 79 Changes in the Work The City may order changes in the Work through additions, deletions or modifications without invalidating the Contract; however, any change in the scope of work or substitution of materials shall require the written approval of the City. Compensation and time of completion affected by the change shall be adjusted at the time of ordering such change. New and unforeseen items of work found to be necessary and which cannot be covered by any item or combination of items for which there is a contract Aircraft Self- Fueling Facility [aid Documents July 14, 2006 price shall be classed as changes in the Work. The Contractor shall do such changes in the Work and furnish such materials, labor and equipment as may be required for the proper completion of construction of the work contemplated. In the absence of such written order, no claim for changes in the Work shall be considered. Changes in the Work shall be performed in accordance with the Specifications where applicable and work not covered by the specifications or special provisions shall be done in accordance with specifications issued for this purpose. Changes in the Work required in an emergency to protect life and property shall be performed by the Contractor as required. 7.10 Extension of Contract Time No extension of time shall be valid unless given in writing by the City. No monetary compensation shall be given for such delay. A delay beyond the Contractor's control occasioned by an "Act of God" may entitle the Contractor to an extension of time in which to complete the Work as determined by the City provided, however, the Contractor shall immediately give written notice to the City of the cause of such delay. "Rain day" extensions shall be granted upon written request of the Contractor to the City's Project Manager when said Project Manager determines that weather conditions make it counterproductive to work on said days. "Rain day" requests must be submitted at the end of each work week or be waived, and the cumulative "rain day" extensions granted shall be processed as a Change Order with each pay submittal. In the event that the City suspends the Work as provided in Paragraph 9.3, the Contractor shall be granted an extension of time to complete the Work for as many calendar days as the Work was suspended; except, however, that the Contractor will not be granted an extension of time to complete the Work if the suspension was caused by a fault of the Contractor. 7.11 Correction of Work Contractor shall, at no cost to the City, promptly correct Work failing to conform to requirements of the Contract Documents, whether observed before or after completion of the Work and whether or not fabricated, installed or completed, and shall correct any Work found to be not in accordance with the requirements of the Contract Documents within a period of one (1) year from the date of completion of the Work or by the terms of an applicable special warranty required by the Contract Documents. The provisions of this Paragraph apply to the Work done by Subcontractors as well as to the Work done by direct employees of Contractor. Nothing contained in this Paragraph shall be construed to establish a period of limitation with respect to other obligations which Contractor might have under the Contract Documents. Establishment of the time period of one (1) year as described in Subparagraph 7.1 I(a) above relates only to the specific obligation of Contractor to correct the Work, and has no effect on the time within which the obligations of the Contract Documents may be enforced, nor to the time within which proceedings may be commenced to establish Contractor's liability with respect to Contractor's remaining contractual obligations. 7.12 Liquidated Damages In the event Contractor violates or fails to perform any provision of the Contract Documents, then the City may elect to receive, and Contractor agrees to pay, liquidated damages in the amount of five hundred dollars (5500) per day beyond the agreed milestones completion dates. Inspection of the Work by the City and the subsequent issuance of notice by the City indicating substantial completion will be the date used to signify work completion. If completion is beyond the schedule agreed upon, liquidated damages may be imposed by the City on the Contractor and will be withheld from payment. It is expressly acknowledged by Contractor that said payment shall not be interpreted nor construed as a penalty but is in fact a good faith attempt to fix damages which the City will suffer in the event Contractor fails to perform as required hereunder or violates any provision of the Contract Documents. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 &0 Public Health and Safety 8.1 Protection of Persons and Property The Contractor shall submit, for the City's approval, a project safety and security plan which describes the Contractor's plans and procedures to protect the safety and property of property owners, residents, and passers -by. The plan shall describe measures and precautions to be taken during working hours and non - working hours. A. Safe Precautions and Programs The Contractor shall be responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work in accordance with the U.S. Department of Labor Occupational Safety and Health Act and the laws of the State of Florida. This Contract requires that the Contractor and any and all subcontractors hired by the Contractor comply with all relevant standards of the Occupational Safety and Health Act. Failure to comply with the Act constitutes a failure to perform. The Contractor agrees to reimburse the City for any fines and /or court costs arising from penalties charged to the City for violations of OSHA committed by the Contractor or any and all subcontractors. B. Safety of Persons and Property The Contractor shall take all reasonable precautions for the safety of, and shall provide all reasonable protection to prevent damage, injury or loss to, all employees on the Work and all other persons who may be affected thereby; all the work materials and equipment to be incorporated therein, whether in storage on or off the project site, under the care, custody or control of the Contractor or any of his subcontractors; and other property on the project site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. The Contractor shall be held fully responsible for such safety and protection until final written acceptance of the Work. Fire hydrants on or adjacent to the Work shall be kept accessible to fire fighting equipment at all times. Temporary provisions shall be made by the Contractor to insure the proper functioning of all swales, gutters, sewer inlets, drainage ditches and irrigation ditches, which shall not be obstructed except as approved by the City. The Contractor acknowledges that, in executing the Project, it will operate machinery and equipment that may be dangerous to the adjacent property owners and the general public. The Contractor will be required to conduct excavations for the Project which may be hazardous to person and property. The Contractor shall develop and implement a job safety and security plan which will adequately protect all property and the general public. 8.2 Traffic Control All safety precautions, traffic control, and warning devices necessary to protect the public and workmen from hazards within the right - of- -way shall be in strict accordance with SECTION 142, MAINTENANCE OF TRAFFIC, in the Florida Dept. of Transportation (FDOT) Std. The State of Florida .Manual of Traffic Control and Safe Practices for Street and highway Construction, Maintenance and Utility Operations Specifications for Road and Bridge Construction, latest edition shall be used as minimum standards, as applicable. Further, the Contractor shall carry on the Work in a manner that will cause the least possible obstruction and interruption in traffic, and the least inconvenience to the general public and the residents in the vicinity of the work. Aircraft Self- Fueling Facility Bid Documents July 14, 2006 As to air traffic, it is the explicit intention of the contract that the safety of aircraft, as well as the Contractor's personnel, is the most important consideration. It is understood and agreed that the Contractor shall provide for the free and unobstructed movement of aircraft in the air operations area of the airport with respect to its own operations and the operations of all its subcontractors as specified in Paragraph 8.15 below. It is further agreed and understood that the Contractor shall provide for the uninterrupted operation of visual and electronic signals (including power supplies thereto) used in the guidance of aircraft while operating to, from and upon the airport. With respect to its own operations and the operations of all its subcontractors, the Contractor shall provide marking, lighting, and other acceptable means of identifying personnel, equipment, vehicles, storage areas, as well as any other work area that may be hazardous to the operation of aircraft, fire- rescue equipment or maintenance vehicles at the airport. 8.3 Road Closure and Detours Local traffic shall be maintained within the limits of the Project for the duration of the construction period. Closing to through travel of more than two (2) consecutive blocks, including the cross street intersected will not be permitted without specific authorization of the City. No road or street shall be closed to the public except with the permission of the City and proper governmental authority. When closing of roads is permitted, it shall require forty -eight (48) hours notification to the City. Traffic detours shall be pre- approved prior to closing. "Street Closed to through Traffic" signs and "Detour" routes shall be indicated and maintained by the Contractor when the job is located in a public or private street. 8.4 Provision of Access Where traffic must cross open trenches, the contractor shall provide adequate ingress and egress to dwellings, business facilities, utilities and service. Temporary provisions shall be made by the Contractor to insure the use of sidewalks. The Contractor shall provide suitable crossings at street intersections and driveways, and supply such aid as may be required for pedestrians and motorists, including delivery vehicles, to safely negotiate the construction areas. On completion of Work within any area, the Contractor shall remove all debris, excess materials, barricades and temporary Work leaving walkways and roads in said area clear of obstructions. 8.5 Warning Signs and Barricades A. Within Public Rights -Of= -Way. The Contractor shall provide adequate signs, barricades, warning lights and flagmen, as required, and all such other necessary precautions for the protection of the Work and the safety of the public. All barricades and obstructions shall be protected at night by regulatory signal lights which shall be kept in operation from sunset to sunrise. Barricades shall be of substantial construction and shall be reflective to increase their visibility at night. Suitable warning signs shall be so placed and illuminated at night as to show in advance where construction, barricades or detours exist. Unless so designated in the Bid Documents, no direct payment for this work will be made, but the cost of providing, erecting and maintaining such protection devices, including guards, watchmen and/or flagmen as required shall be considered as included and paid for in the various contract prices of the Work. Warning signs and barricades shall be in conformance with the State of Florida, Manual of Traffic Control and Safe Practices for Street and Highway Construction, Maintenance and Utility Operations, latest edition. The Contractor shall provide and maintain adequate barricades, construction signs, torches, flashers, guards and flagmen as required in pedestrian and vehicular traffic areas. Regulations of local authorities shall be compiled with. Advance warning signs are required on a] I streets where work is being conducted. Lane closures shall be signed and barricaded or coned as indicated in aforementioned FDOT Index. Aircraft Self-Fueling Facility Bid Documents July 14, 2006 Flagmen may be required where traffic and length of lane closure warrant them. Where such a plan is needed, Contractor shall submit and obtain approval of their traffic control plan by the City. B. Within Airport Property. When the work requires closing an air operations area of the airport or a portion of such area, the Contractor shall furnish, erect, and maintain temporary markings and associated lighting conforming to the requirements of AC 150/5340-IF, marking of Paved Areas on Airports. The Contractor shall furnish, erect, and maintain markings and associated lighting of open trenches, excavations, temporary stockpiles, and its parked construction equipment that may be hazardous to the operation of emergency fire- rescue or maintenance vehicles on the airport in reasonable conformance to AC 150/5370 -2D, Operational Safety on Airports During Construction. The Contractor shall identify each motorized vehicle or piece of construction equipment in reasonable conformance to AC 150/5370 -2D. The Contractor shall furnish and erect all barricades, warning signs, and markings for hazards prior to commencing work which requires such erection and shall maintain the barricades, warning signs, and markings for hazards until their dismantling is directed by the Engineer. Open -flame type lights shall not be permitted within the air operations areas of the airport. _8.6 Open Trenches The Contractor shall fully comply with Florida Statutes and OSHA regulations with regard to open trenches during construction. The Contractor shall be place construction hazard fencing along any open trenches during the construction work -day, and shall leave no open trenches or excavations over -night unless properly fenced and with the specific approval of the Engineer or the City. 8.7 Placement of Heavy Equipment The Contractor shall not leave construction equipment parked in front of or on a residential lot overnight or on weekends. At the close of work each day, the equipment shall be driven to and stored in a designated area so that the equipment will not become an "attractive nuisance" to neighborhood children. All equipment left unattended during the course of working day, such as during lunch hours or work breaks, shall not be left in a condition or location which would create a safety hazard to the general Public. All keys shall be removed from the machines during those times. 8.8 Temporary Facilities and Controls The Contractor shall provide controls for sanitary facilities, environmental protection and safety controls on site acceptable to the Florida Department of Health and Rehabilitative Services, Department of Environmental Protection, and St. Johns River Water Management District. 8.9 Sanitary Provision The Contractor shall provide and maintain such sanitary accommodations adequate for the use of his employees and those of his subcontractors, and as may be necessary to comply with the requirements and regulations of the local and state departments of health. Such facilities shall be made available when the first employees arrive on site of the Work, shall be properly secluded from public observation, and shall be constructed and maintained during the progress of the Work in suitable numbers and at such points and in such manner as may be required or approved. The Contractor shall maintain the sanitary facilities in a satisfactory and sanitary condition at all times and shall enforce their use. Contractor shall rigorously prohibit the committing of nuisances on the site of the Work, on the lands of the City or an adjacent property. The City shall have the right to inspect such facilities at all times to determine whether or not they are being properly and adequately maintained. Aircraft Self- Fueling Facility Bid Documents July 14, 2006 Following the period of necessity for such accommodations, they and all evidence affixed thereto shall be removed. 8.10 Water and Electric Supply The Contractor shall make all necessary applications and arrangements, and pay all fees and charges for water and electrical service necessary for the proper completion of the Project up to the time of final acceptance. The Contractor shall provide and pay for any temporary piping and connections. 8.11 Noise Control The Contractor shall provide adequate protection against objectionable noise levels caused by the operation of construction equipment, and shall submit a plan to the Engineer for his review prior to initiation and implementation of the plan. 8.12 Dust Control The Contractor shall provide for adequate protection against raising objectionable dust clouds caused by moving construction equipment, high winds or any other cause, and shall submit a plan to the Engineer for his review prior to initiation and implementation of the plan. 8.13 Water Control The Contractor shall provide for satisfactory disposal of surplus water and shall submit a plan to the Engineer for his review prior to initiation and implementation of the plan. Prior approval shall be obtained from the proper authorities for the use of public or private lands or facilities for such disposal. 8.14 Pollution, Siltation and Erosion Control The Contractor shall provide for and take sufficient precautions to prevent pollution of private and public lands, reservoirs, ponds, rivers, streams, creeks, etc., by the disposal of surplus materials in the forms of solids, liquids or gases including, but not limited to, fuels, oils bitumen, calcium chloride or other harmful materials. Contractor shall conduct and schedule Work operations so as to avoid or otherwise minimize pollution or siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish where there is a high potential for erosion and subsequent water pollution. Erosion control features shall be constructed concurrently with other work and at the earliest practicable time. The Contractor shall prepare a detailed description of Contractor's plan for Erosion and Turbidity Control, including location of erosion control and turbidity control devices, marked on a plan set as needed for clarity. The erosion and turbidity control shall meet the requirements of the St. John's River Water Management District for control of discharge of Total Suspended Matter, and shall prevent water and wind erosion of open excavations and swales. 8.15 Limitation of Operations The Contractor shall control its operations and the operations of its subcontractors and suppliers so as to provide for the free and unobstructed movement of aircraft in the AIR OPERATIONS AREAS of the airport. When the work requires the Contractor to conduct its operations within the Air Operations Area of the airport, the work shall be coordinated with airport management (through the Engineer) at least 48 hours prior to commencement of such work. The Contractor shall not close an Air Operations Area until so authorized by the Engineer and until the necessary temporary marking and associated lighting is in place. When the contract work requires the Contractor to work within an Air Operations Area of the airport on an intermittent basis, the Contractor shall maintain constant communications as hereinafter specified; immediately obey all instructions to vacate the Air Operations Area, and immediately obey all Aircraft Self- Fueling Facility Bid Documents July 14, 2006 instructions to resume work in the Air Operations Area. Failure to maintain the specified communications or to obey instructions shall be cause for suspensions of the Contractor's operations in the Air Operations Area until the satisfactory conditions are provided. The Air Operations Area that cannot be closed to operating aircraft on a continuous basis, and will therefore only be closed on an intermittent basis, are indicated on the drawings or will be designated by the Engineer. Article III - Supervision and Administration 9.0 Engineer, City, Contractor Relations 9.1 Engineer's Responsibility and Authority All work done shall be subject to the construction review of the Engineer and City. Any and all technical questions which may arise as to the quality and acceptability of materials furnished, work performed, or work to be performed, interpretation of Plans and Specifications and all technical questions as to the acceptable fulfillment of the Contract on the part of the Contractor shall be referred to the Engineer who will resolve such questions. 9.2 Engineer's Decision All claims of a technical nature of the City or Contractor shall be presented to the Engineer for resolution. 9.3 Suspension of Work The City shall have the authority to suspend the Work wholly or in part, for such periods as may be deemed necessary and for whatever cause, to include but not be limited to, unsuitable weather or such other conditions as are considered unfavorable for prosecution of the Work, failure on the part of the Contractor to carry out the provisions of the Contract or to supply materials meeting the requirements of the Specifications, or the action of a governmental agency, by serving written notice of suspension to the Contractor. In the event that the Engineer shall become aware of any condition which may be cause for suspension of the Work, the Engineer shall immediately advise the City of such condition, The Contractor shall not suspend operations under the provisions of this Paragraph without the City's permission. 9.4 Construction Review of Work All materials and each part or detail of the Work shall be subject at all times to construction review by the Engineer and the City. The Engineer and the City may appoint inspectors. The Contractor will be held strictly to the true intent of the Specifications in regard to quality of materials, workmanship, and the diligent execution of the Contract. Such construction review may include mill, plant, or shop inspection, and any material furnished under the Specifications is subject to such inspection. The Engineer and the City shall be allowed access to all parts of the Work and shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed review. The City shall not be responsible for the acts or omissions of the Contractor. 9.5 Field Tests and Preliminary Operation The Contractor shall perform the work of placing in operation all equipment installed under this Contract, except as specifically noted hereinafter. The Contractor shall make adjustments necessary for proper operation. The Contractor shall provide construction labor required for preliminary operation of the equipment installed under this Contract. The Contractor shall notify the City when work is considered to be complete, in operating condition, and ready for inspection and tests. Further inspection requirements may be designated in the Technical Specifications. Aircraft Self- Fueling Facility Bid Documents July 14, 2006 The City will conduct tests it deems necessary to determine if the Work functions properly. Arrangements for testing laboratory services will be made by the City. Payment for testing to show compliance with specified requirements will be paid for by the City. The cost of retesting when materials and workmanship fail to meet specified requirements will be deducted from moneys due the Contractor. 9.6 Examination of Completed Work The City may request an examination of completed work of the Contractor at any time before acceptance by the City of the Work and shall remove or uncover such portions of the finished work as may be directed. After examination, the Contractor shall restore said portions of the Work to the standard required by the Specifications. Should the work thus exposed or examined prove acceptable, the uncovering or removing and the replacing of the covering or making good of the parts removed shall be paid for as extra work, but should the work so exposed or examined prove unacceptable, the uncovering, removing and replacing shall be at the Contractor's expense. 9.7 Contractor's Superintendent A qualified superintendent, who is acceptable to the City, shall be maintained on the project and give sufficient supervision to the Work until its completion. The superintendent shall have full authority to act on behalf of the Contractor, and all communications given to the superintendent shall be considered given to the Contractor. In general, such communications shall be confirmed in writing and always upon written request from the Contractor. 9.8 City's Right to Correct Deficiencies Upon failure of the contractor to perform the work in accordance with the Contract Documents, including any requirements with respect to the Schedule of Completion, and after five (5) days written notice to the Contractor, the City may, without prejudice to any other remedy he may have, correct such deficiencies. The Contractor shall be charged all costs incurred to correct deficiencies. 9.9 City's Right to Terminate Contract and Complete Work In the event of any default by the Contractor, the City shall have the right to immediately terminate the Contract upon issuance of written notice of termination to the Contractor stating the cause for such action. This Agreement may be terminated by the City without cause provided at least thirty (30) days written notice of such termination shall be given to the Contractor. In the event of termination, the City may take possession of the Work and of all materials, tools and equipment thereon and may finish the Work by whatever method and means it may select. It shall be considered a default by the Contractor whenever he shall: (a) Declare bankruptcy, become insolvent or assign his assets for the benefit of his creditors. (b) Disregard or violate the provisions of the Contract Documents or City's written instructions, or fail to prosecute the Work according to the agreed schedule of completion including extensions thereof. (c) Fail to provide a qualified superintendent, competent workmen or subcontractors, or proper materials, or fail to make prompt payment therefore. 9.10 Rights of Various Interests Wherever work being done by the City's forces or by other contractors is contiguous to work covered by the Contract, the respective rights of the various interests involved shall be established by the City, to secure the completion of the various portions of the Work in general harmony. Aircraft Selr- Fueling Facility Bid Documents July 14, 2006 9.11 Separate Contracts The City may let other contracts in connection with the Work of the Contractor. The Contractor shall cooperate with other Contractors with regard to storage of materials and execution of their work. It shall be the Contractor's responsibility to inspect all work by other contractors affecting his work and to report to the City any irregularities which will not permit him to complete his work in a satisfactory manner. His failure to notify the City of such irregularities shall indicate the work of other contractors has been satisfactorily completed to receive his work. It shall be the responsibility of the Contractor to inspect the completed work in place and report to the Engineer immediately any difference between completed work by others and the Plans. 9.12 Subcontracts and Purchase Orders Prior to signing the Contract or at the time specified by the City, the Contractor shall submit in writing to the City the names of the subcontractor proposed for the Work. Subcontractor may not be changed except at the request or with the approval of the City. The Contractor is responsible to the City for the acts and omissions of his subcontractors and their direct or indirect employees, to the same extent as he is responsible for the acts and omissions of his employees. The Contract Documents shall not be construed as creating a contractual relation between any subcontractors and the City. The Contractor shall bind every subcontractor by the terms of the Contract Documents. For convenience of reference and facilitate the letting of contracts and subcontracts, the Specifications are separated into title sections. Such separations shall not, however, operate to make the Engineer or City an arbiter to establish limits to the contracts between the Contractor and subcontractors. 9.13 Work During an Emergency The Contractor shah perform any work and shall furnish and install materials and equipment necessary during an emergency endangering life or property. In all cases, he shall notify the Engineer and City of the emergency as soon as practicable, but he shall not wait for instructions before proceeding to properly protect both life and property. 9.14 Oral Agreements No oral order, objection, claim or notice by any party to the others shall affect or modify any of the terms or obligations contained in any of the Contract Documents, and none of the provisions of the Contract Documents shall be held to be waived or modified by reason of any act whatsoever, other than by a definitely agreed waiver or modification thereof in writing, and no evidence shall be introduced in any proceeding of any other waiver or modification. 9.15 Night, Saturday And /Or Sunday Work No night or 'Saturday and Sunday work will be permitted, except in case of emergency, or with prior approval from City, and then only to such extent as is absolutely necessary to protect life or property. This clause shall not pertain to crews organized to perform restoration work which needs no verifying inspection, maintenance work on equipment, or to operate and maintain special equipment such as dewatering pumps which may be required to work 24 hours per day. All such night, Saturday and /or Sunday work must be authorized by the City. 9.16 Unauthorized Work Work done without lines and grades having been established, work done without proper inspection, or any changes made or extra work done without written authority will be done at the Contractor's risk and will be considered unauthorized, and, at the option of the City, may not be measured and paid for. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 9.17 Use Of Completed Portions Of The Work The City shall have the right to use, occupy, or place into operation any portion of the Work that has been completed sufficiently to permit safe use, occupancy, or operation, as determined by the Engineer. If such use, occupancy, or operation increases the cost of or delays the Work, the Contractor shall be entitled to extra compensation, or an extension of time, or both, as determined by the Engineer. However, if Contractor has failed to complete the Work in accordance with the time requirements of the Agreement, no compensation (including set -offs to liquidated damages) shall be allowed for such use or occupancy. 9.18 Contractor's Responsibility For Work Until acceptance of the Work by the City, it shall be under the charge and care of the Contractor, and he shall take every necessary precaution against injury or damage to the Work by the action of the elements or from any other cause whatsoever, whether arising from the execution or from the non- execution of the Work. The Contractor shall rebuild, repair, restore and make good, without additional compensation, all injury or damage to any portion of the Work occasioned by any cause, other than the sole and active negligence of the City, before its completion and acceptance. 10.0 Measurement And Payment 10.1 Detailed Breakdown Of Contract Except in cases where unit prices form the basis for payment under the Contract, the Contractor shall submit a complete breakdown of the contract amount showing the value assigned to each part of the Work, including an allowance for profit and overhead within ten (10) days of the execution of the Contract by the parties. Upon approval of the breakdown of the contract amount by the Engineer and the City, it shall be used as the basis for all requests for payment. 10.2 Request For Pam The Contractor may submit to the City not more than once each month a request for payment for work completed. Where applicable, the Contractor may choose to submit a request for payment at the substantial completion of each work order. The City may elect to provide its own form for the Contractor to submit progress payment requests. The standard form provided by the City, or a form presented by the Contractor having received prior approval from the City, can be used for the submittal of a progress payment. The Contractor shall furnish the Engineer and the City all reasonable facilities required for obtaining the necessary information relative to the progress and execution of the Work. In addition to each month's invoice, an updated project schedule shall be submitted. Each request for payment shall be computed from the work completed to date on all items listed in the detailed breakdown of the contract amount less previous payments and back charges. Progress payments on account of Unit Price Work will be based on the number of units completed at the time the payment request was dated by the Contractor. If payment is requested on the basis of materials and equipment not incorporated in the project but delivered and suitably stored at the site or at another location agreed to in writing, the payment request shall also be accompanied by a bill of sale, invoice or other documentation warranty that the City has received the materials and equipment free and clear of all liens, charges, security interests and encumbrances, all of which shall be satisfactory to the City. No payments shall be made for materials stored on site without approval of the City. An amount of 10% of each monthly pay request shall be retained until final completion and written acceptance of the Work by the City. Payment of the retainage shall be included in the Contractor's final pay request in accordance with Paragraph 10.14. Any deviation in the release or partial release of the 10% retainage shall be at the sole discretion of the City, but in no case earlier than completion of the Engineer's "punch list inspection ". Aircraft Self - Fueling Facility Bid Documents July 14, 2006 Any request for payment shall be accompanied by claim releases for work done or materials furnished in accordance with Paragraph 10.13. Prior to submission of any request for payment by the Contractor, the Engineer shall review the request for payment to determine the following: (a) That the work covered by the request for payment has been completed in accordance with the intent of the Plans and Specifications. (b) That the quantities of work have been completed as stated in the request for payment, whether for a unit price contract or for payment on a lump -sum contract. 10.3 Citys Action On A Request For Payment Within thirty (30) days from the date of receipt of a request for payment the City shall do one of the following: (a) Approve and pay the request for payment as submitted. (b) Approve and pay such other amount of the request for payment in accordance with Paragraph 10.4 as the City shall decide is due the Contractor, informing the Contractor in writing of the reasons for paying the amended amount. (c) Disapprove the request for payment in accordance with Paragraph 10.4 informing the Contractor in writing of the reasons for withholding payment. 10.4 City's Right To Withhold Payment Of A Request For Payment The City may withhold payment in whole or in part on a request for payment to the extent necessary for any of the following reasons: (a) Work not performed but included in the request for payment, or the contract Price has been reduced by written change order. (b) Work covered by the request for payment which is not in accordance with the Plans, Specifications and generally accepted construction practices, including if, in the opinion of the City, there is sufficient evidence that the Work has not been satisfactorily completed, or based upon tests and/or inspections the work is defective or has been damaged requiring correction or replacement . (c) In the event of a filing of a claim or lien, or information received by City of potential filing of a claim or lien against the Contractor or City. (d) Failure of the Contractor to make payments to subcontractors, material suppliers or labor. (e) Damage to another contractor. (f) The City has had to correct a defect in the Work, or there are other items entitling the {City to a set -off against the amount recommended. (g) Default of any of the provisions of the Contract Documents. 10.5 Payment For Uncorrected Work Should the City direct, in writing, the Contractor not to correct work that has been damaged or that was not performed in accordance with the Contract Documents, an equitable deduction from the contract amount shall be made to compensate the City for the uncorrected work. 10.6 Payment For Rejected Work And Materials The removal of work and materials rejected under Paragraph 5.3 and the re- execution of work by the Contractor shall be at the expense of the Contractor and the Contractor shall pay the cost of replacing the destroyed or damaged work of other contractors by the removal of the rejected work or materials and the Aircraft Self- Fueling Facility Bid Documents July 14, 2006 subsequent re- execution of that work. In the event that City incurs expenses related thereto, Contractor shall pay for the same within thirty (30) days after written notice to pay is given by the City. If the Contractor does not pay the expenses of such removal, after ten (10) days written notice being given by the City of its intent to sell the materials, the City may sell the materials and shall pay to the Contractor the net proceeds therefrom after deducting all the costs and expenses that are incurred by the City. If the proceeds do not cover the expenses incurred by the City, such additional amounts may be set -off against any payments due Contractor. 10.7 Changes In The Work A. Change Orders If conditions require a change in the scope of work or additional work varying from the original Plans or Specifications, such change shall be effected by the Contractor when the City issues a written Change Order. The Change Order shall set forth in complete detail the nature of the change, the change in the compensation to be paid the Contractor and whether it is an addition or a reduction of the original total contract cost. Should additional or supplemental drawings be required, they will be furnished by the Engineer. Compensation to be paid to the Contractor for accomplishing the work of a Change Order shall be established in one of the following ways: (a) By lump sum proposed by the Contractor and accepted by the City. (b) By unit prices established and agreed to. (c) By unit prices established for additional kinds of work. (d) By other methods as may be mutually agreed upon. (e) By force account wherein the Contractor provides the labor and materials at Contractor's direct cost plus 15% for overhead and profit. When the force account method is used, the Contractor shall provide full and complete records of all costs for review by the City. B. Claims Claims arising from changes or revisions made by the Contractor at the City's request shall be presented to the City before work starts on the changes or revisions. If the Contractor deems that extra compensation is due for work not covered herein, or in Supplemental Agreement, the Contractor shall notify the City in writing of its intention to make claim for extra compensation before work begins on which the claim is based. If such notification is not given and the City is not afforded by the Contractor a method acceptable to the City for keeping strict account of actual cost, then the Contractor hereby waives its request for such extra compensation. The City is not obligated to pay the Contractor if the City is not notified as described above. The Contractor may refuse to perform additional work requested by the City until an appropriate agreement is executed by the parties. Such notice by the Contractor and the fact that the City has kept account of the costs as aforesaid shall not in any way be construed as proving the validity of the claim. C. Differing Site Conditions Contractor shall promptly, and before such conditions are disturbed, notify City in writing of: 1. Subsurface or latent physical conditions at the site differing materially from those indicated in this Agreement and its subparts; or Aircraft Self - Fueling Facility Bid Documents July 14, 2006 2. Unknown physical conditions at the site, of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inhering in the work of the character provided for in this Agreement. If City finds that conditions materially differ and will cause an increase or decrease in the Contractor's cost or the time required to perform any part of the work under this Agreement, whether or not changed as a result of such conditions, the City shall approve an equitable adjustment and will according modify the Agreement in writing. Any claim for an equitable adjustment of the contract price based upon differing site conditions is specifically conditioned upon prior written approval of the additional compensation by City. No claim of the Contractor under this clause shall be allowed unless the Contractor has given the notice required herein. Further, no claim by the Contractor for an equitable adjustment shall be allowed if asserted after final payment under this Agreement. 10.8 Canceled Items Of Work The City shall have the right to cancel those portions of the contract relating to the construction of any item provided therein. Such cancellation, when ordered by the City in writing, shall entitle the Contractor to the payment of a fair and equitable amount covering all costs incurred by him pertaining to the canceled items before the date of cancellation or suspension of the Work. The Contractor shall be allowed a profit percentage on the materials used and on construction work actually done, at the same rates as provided for "Changes in the Work", but no allowance will be made for anticipated profits. Acceptable materials ordered by the Contractor or delivered on the site before the date of such cancellation or suspension shall be purchased from the Contractor by the City at actual cost and shall thereupon become the property of the City. 10.9 Payment For Work Suspended By The City If the Work or any part thereof shall be suspended by the City as provided in Paragraph 9.3, the Contractor will then be entitled to payment for all work done except as provided in Paragraph 10.4. 10.10 Payment For Work By The City The cost of the work performed by the City removing construction materials, equipment, tools and supplies in accordance with Paragraph 5.7 and in correcting deficiencies in accordance with Paragraph 9.8 shall be paid by the Contractor. 10.11 Payment For Work By City FFolIowing Termination Of Contract A. Termination by City for Cause Upon termination of the contract by the City for cause, including abandonment or termination by Contractor, the City may enter into an agreement with others for the completion of the Work under this Agreement and the Contractor shall be held harmless for the work of others. No further payments shall be due the Contractor until the Work is completed and accepted by the City. If the unpaid balance of the contract amount shall exceed the cost of completing the Work including all overhead costs, Contractor shall be paid up to the amount of the excess balance on a quantum meruit basis for the work done prior to termination. If the cost of completing the Work shall exceed the unpaid balance, the Contractor or its Surety shall pay the difference to the City. The cost incurred by the City as herein provided shall include the cost of the replacement contractor and other expenses incurred by the City through the Contractor's default. In either event, all work done, tracings, plans, specifications, maps, computer programs and data prepared by the Contractor under this Agreement shall be considered property of the City. Aircraft Self- Fucling Facility Bid Documents July 14, 2006 B. Termination by City Without Cause In the event the City without cause abandons, terminates or suspends this Agreement, the Contractor shall be compensated for services rendered up to the time of such termination on a quantum meruit basis and any work done or documents generated by the Contractor shall remain the property of the City. 10.12 Termination Of Contractor's Responsibility The Contract will be considered complete when all work has been finished, the Final construction review is made by the Engineer, and the project accepted in writing by the City. 10.13 Release Of Claims (Interim /Final) The Contractor shall deliver, with each request for payment, a completed Affidavit and Release of Claim on a form supplied by the City. Also, from each supplier or subcontractor who has notified the City of his right to file a Claim (Notice to City) or who is listed in the Contractor's Affidavit and Release of Claim as an unpaid, potential Claimant, a Claimant's Sworn Statement of Account, executed by the supplier or subcontractor, must be attached to each request for payment. If the completed forms are not supplied with the request for payment, the City will notify Contractor of the outstanding claims of record and, if said completed form(s) are not supplied within thirty (30) days, the City shall make joint payments to the Contractor and outstanding claimants. 10.14 Acceptance And Final Payment When it is determined, as a result of a joint inspection of the Work by the Contractor, City, and Engineer that the Work has been completed in accordance with the terms of the Contract Documents, the Engineer shall certify completion of the Work to the City. At that time, the Contractor may submit the Contractor's final request for payment. The Contractor's final request for payment shall be the contract amount plus all approved written additions less all approved written deductions and less previous payments made. As a condition for Final payment, a Contractor's Final Affidavit must be received by the City along with his Final Payment Request and any as -built drawings which may be required. The Contractor shall furnish full and final releases of Claim for labor, materials and equipment incurred in connection with the Work, following which the City will release the Contractor except as to the conditions of the performance bond, any legal rights of the City, required guarantees and satisfaction of all warranty work, and shall authorize payment of the Contractor's final request for payment. 10.15 Satisfaction Of Warranty Work After Final Payment The making of the final payment by the City to the Contractor shall not relieve the Contractor of responsibility for faulty materials or workmanship. The City shall promptly give notice of faulty materials and workmanship and the Contractor shall promptly replace any such defects discovered within one (1) year from the date of final written acceptance of the Work by the City. 11.0 Public Contract Requirements 11.1 Covenant Against Continaent Fees The Contractor warrants that he has not employed or retained any company or person, other than a bona fide employee working solely for the Contractor, to solicit or secure this Agreement and that he has not paid or agreed to pay any person, company, corporation, individual or firm, other than a bona fide employee working solely for the Contractor, any fee, commission, percentage, gift or any other consideration contingent upon or resulting from the award or making of this Agreement. For the breach or violation of this paragraph, the City shall have the right to terminate the Agreement without liability and, at its discretion, deduct from the Agreement price, or otherwise recover, the full amount of such fee, commission, percentage, gift or consideration. Aircraft Self - Fueling Facility Bid Documents July 14, 2006 1 I_.2 Interest Of Members Of City And Others No officers, members or employees of the City and no member of its governing body, and no other public official of the governing body of the locality or localities in which services for the facilities are situated or carried out, who exercises any functions or responsibilities in the review or approval of the undertaking or carrying out of this project, shall participate in any decision relating to this Agreement which affects his personal interest, or have any personal or pecuniary interest, direct or indirect, in this Agreement or the proceeds thereof. 11.3 Certification Of Restrictions On Lobbying, The Contractor agrees that no Federal appropriated funds have been paid or will be paid by or on behalf of the Contractor to any person for influencing or attempting to influence any officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress or an employee of a member of Congress in connection with the awarding of any Federal contract, the making of any Federal Grant, the making of any Federal loan, the entering into of any cooperative agreement and the extension, continuation, renewal, amendment or modification of any Federal contract, Grant, loan or cooperative agreement. Further, Contractor shall fully comply with the Federal Lobbying Disclosure Act of 1995. If any funds other than Federal appropriated funds have been paid by the Contractor to any person for influencing or attempting to influence an officer or employee of any Federal agency, a member of Congress, an officer or employee of Congress or an employee of a member of Congress in connection with any Agreement, the undersigned shall complete and submit the attached Standard Form -LLL "Disclosure Form to Report Lobbying" in accordance with its instructions. Any and all subcontracts executed by Contractor for the Work hereunder shall likewise certify and disclose accordingly 1.1.4 Interest Of Contractor The Contractor covenants that he presently has no interest and shall not acquire any interest, direct or indirect, which shall conflict in any manner or degree with the performance of services required to be performed under this Agreement. The Contractor further covenants that in the performance of this Agreement, no person having any such interest shall be employed. The Contractor shall not undertake any professional work which conflicts with his duties as the City's Contractor without the prior written consent of the City during the term of this Agreement. Any work where the Contractor can reasonably anticipate that it may be called to testify as a witness against the City in any litigation or administrative proceeding will constitute a conflict of interest under this Agreement. 11.5 Public Entity Crimes The Contractor shall file the attached sworn statement which is entitled PUBLIC ENTITY CRIMES, stating whether a person or affiliate as defined in Section 287.133 (l) Florida Statutes, has been convicted of a public entity crime subsequent to July 1, 1989, in accordance with the provisions of said statute. 11.6 Drug -Free Workplace The Agreement documents also consist of the "Drug -Free Workplace Form" which is in accordance with Florida Statute 287.089 and must be signed and instituted. 11.7 Compliance With Laws Contractor shall comply with all applicable federal laws that in any way regulate or impact the Work, including, but not limited to, The Clean Air Act (42 USC §7506(c)), The Endangered Species Act (16 USC §1531, et seq.), Executive Order No. 11593, Executive Order No. 1 1988, Executive Order No. 11990, The Fish and Wildlife Coordination Act (PL 85 -624), The Safe Water Drinking Act Section 1424(e) (PL 93 -523, as amended), The Wild and Scenic Rivers Act (PL 90 -542, as amended), The Demonstration Cities and Metropolitan Development Act of 1966 (PL 89 -754), Section 306 of The Clean Aircraft Selr- Fueling Facility Bid Documents July 14, 2006 Air Act, Section 508 of The Clean Water Act, Executive Order No. 11738, The Civil Rights Act of 1964 (PL 88 -352), The Age Discrimination Act (PL 94 -135), Section 13 of The Federal Water Pollution Control Act (PL 92 -500), Executive Order No. 11246, Executive Order No. 11625, Executive Order No. 12138, Executive Order No. 12549, The Davis Bacon Act (40 USC §276), the Occupational Safety and Health Act and applicable regulations, and the Americans with Disabilities Act (PL 101 -336). 11.8 Insurance The Contractor agrees to carry insurance, of the types and subject to the limits as set forth below and maintain said insurance during the life of this agreement: (a) Workers' Compensation - Contractor shall purchase workers' compensation insurance as required by law. (b) Commercial General Liability - Contractor shall purchase Commercial General Liability insurance with a combined single limit of at least $5,000,000. (c) Commercial Auto Liability - Contractor shall purchase Commercial Auto Liability insurance with a combined single limit of at least $1,000,000. Further, Contractor shall maintain such insurance as is reasonably required to satisfy its obligations under Paragraph 9.18 for the Work paid for by the City but not yet accepted. The insurance company selected shall be A+ or better per the Best's Key Rating Guide. The Contractor and the insurance company(s) shall agree to furnish the City thirty (30) days written notice of their intent to cancel or terminate said insurance. It is the full responsibility of the contractor to insure that all sub- contractors have full insurance coverage as stated above. The Contractor shall not commence the Work under this contract until he has obtained all the insurance required under this paragraph and certificates of such insurance have been submitted to the City, nor shall the Contractor allow any subcontractor to commence work on his subcontract until all insurance required has been so obtained and approved by the City. The Contractor shall carry and maintain until acceptance of the Work, insurance as specified herein and in such form as shall protect him and any subcontractor performing work under this Contract, or the City, from all claims and liability for damages for bodily injury, including accidental death, under this Contract, whether by himself or by any subcontractor or by any one directly or indirectly employed by either of them. The Contractor shall furnish to the City certificates of insurance in duplicate showing proof of insurance, naming the City and the Engineer as additional insured parties, prior to the start of construction as provided in the Contract. 11.9 Bond The Contractor shall provide bonds issued by companies holding certificates of authority as acceptable sureties in the form prescribed by State Law, and generally as shown in these Documents, for Performance and Payment, each in the amount of 100% of the total contract amount. 11.10 Permits All City and St. John's River Water Management District permits and other permits necessary for the prosecution of the Work shall be secured by the City, except for Contractor's licenses and registrations. Contractor shall secure a building permit if required by the City's Building Official. 1 L I 1 Laws To Be Observed The Contractor shall give all notices and comply with all federal, state and local laws, ordinances, permit requirements and regulations in any manner affecting the conduct of the Work, and all such orders and decrees as enacted by bodies or tribunals having any jurisdiction or authority over the Work, and shall indemnify and save harmless the City and Engineer against any expense, claim or liability arising from, or Aircraft Self- Fueling Facility Bid Documents July 14, 2006 based on, the violation of any such law, ordinance, regulation, permit requirements, order or decree, whether by himself or his employees. The failure of the Contractor to adhere to any known law or regulation pertaining to furnishing services under this Agreement shall constitute a material breach of this Agreement. The Contractor acknowledges that this requirement includes compliance with all federal, state and local health and safety rules and regulations. The Contractor shall keep himself fully informed of all existing and pending state and national laws and municipal ordinances and regulations in any manner affecting those engaged or employed in the Work, or in any way affecting the conduct of tribunals having any jurisdiction or authority over the same. If any discrepancy or inconsistency is discovered in the Plans, Specifications, or Contract for this work in relation to any such law, ordinance, regulations, order or decree, he shall forthwith report the same to the Engineer and City in writing. He shall at all times himself observe and comply with and cause all his agents, subcontractors and employees to observe and comply with decrees; and shall protect and indemnify the City and Engineer, their officers, employees and agents against any expense, claim or liability arising from or based upon violation of any such law, ordinance, regulations, orders or decree, whether by himself or his employees. All building construction work alterations, repairs or mechanical installations and appliances connected therewith shall comply with the applicable building rules and regulations, restrictions and reservations of record, local ordinances and such other statutory provisions pertaining to this class of work. 11.12 Debarment And Suspension In accordance with Executive Order 12549, Debarment and Suspension (40 CFR 32), the Contractor shall agree and certify that neither it, nor its principals, is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency; and that the Contractor shall not knowingly enter into any lower tier contract, or other covered transaction, with a person who is similarly debarred or suspended from participating in this covered transaction without prior written approval of the City. [Upon execution of this Agreement by the Contractor, the Contractor shall complete sign and return a copy of the form entitled "Certification Regarding Debarments, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Federally Funded Transactions" attached hereto, and shall include the language of this Paragraph and the attached form in all subcontracts executed to support the Contractor's work under this Agreement. 12.0 Miscellaneous 12.1 Addresses For Notices All notices given under or in connection with any of the Contract Documents shall be delivered in person or by telegraph or registered or certified mail to the parties at the address as either party may by notice designate. 12.2 Written Notice Written notice shall be considered as served when delivered to the designated representative of the Contractor and receipt acknowledged or sent by registered mail to the individual, firm, or corporation to the business address stated in Bid Proposal. Change of Address: It shall be the duty of each party to advise the other parties to the Contract as to any changes in his business address until completion of the Contract. 12.3 Taxes Contractor shall pay all sales or other taxes of any type which may be incurred in connection with the Work hereunder, and shall reimburse the City for any such taxes paid by the City. Aircraft Self- Fueling Facility Bid Documents July 14, 2006 12.4 Time Is Of Vital Importance It is agreed and understood that time is of vital importance with respect to the completion date for the Work and all other provisions of the Contract Documents. 12.5 No Waiver Of Legal Rights Neither the payment for, nor acceptance of the whole or any part of the Work by the City or representatives of the City, nor any extension of time, nor the withholding of payments, nor any possession taken by the City, nor the termination of employment of the Contractor shall operate as a waiver of any portion of the Contract or any power therein reserved or any right therein reserved or any right therein provided, nor shall the waiver by the City of any of the Contractor's obligations or duties under this Agreement constitute a waiver of any other obligation or duty of the Contractor under this Agreement. 12.6 Right To Work Product No reports, data, programs or other material produced in whole or in part under this Agreement shall be subject to copyright by the Contractor, in the United States or in any other country. The City or its assigns shall have the unrestricted authority to publish, disclose, distribute and otherwise use, in whole or in part, any reports, data, programs or other material prepared under this Agreement. All tracings, plans, specifications, maps, computer programs and data prepared or obtained under this Agreement shall remain the property of the City. Any use of any plans and specifications by the City except the use reasonably contemplated by the City at the time the City entered this Agreement will be at the City's risk and Contractor, its officers, directors and employees, will be held harmless from such use. Aircraft Self-Fueling Facility Bid Documents July 14, 2006 IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first above written. ATTEST: TII By: --- $ Name: Sall y A. Ma' MMC� Nrarn Title: City Clerk Title (SEAL) Approved as to Form and Content for: R by the Ci Sebastian Only I Rich'Stringer, City Attortifey Signed, sealed and delivered in the presence of -- CONTRACTOR SEBASTIAN ifnner ager GLASGOW EQUIPMENT SERVICE, INC. I Contractor v Signat e: ,ry �' Cc_ By: Name: Signature: Name: Naive: Title: 1� 6i 9 i ail � Aircraft Self- Fueling Facility Bid Documents July 14, 2006 ATTACHMENT 1 (CONTRACTOR INFORMATION FORM} TO: Sebastian Municipal Airport 1225 Main Street Sebastian, FL 32958 Ladies /Gentlemen: Having carefully examined the Proposal Documents and Drawings entitled Aviation Self -Serve Fuel Facility, Sebastian Municipal Airport, City of Sebastian, Florida, as well as the premises and conditions affecting the work, and confirming that the sites were visited, as required, by Jeffry M. P e 1 e a (Name of Person or Persons) on 4 / 5 / 0(date or dates) the undersigned hereby seeks qualification to furnish all labor and material and to perform all work as required by and in strict accordance with the above -named documents. Respectfully Submitted, Glas ow Ecruipment Service Inc. Peter H. Ward (Name of B' r (Authorized Signature President 4/17/06 1750 Hill Ave. WPB, FL 33407 561 -842 -7236 (Title) (Date) (Address and Telephone No.) FLORIDA STATE CONTRACTOR DATA (Required). *Contractor's License Number: P C C 045031 Classification: Pollutant Storage Systems Contractor Monetary Limit: $3,000.000.00 *ATTACH A COPY OF APPROPRIATE LICENSES Aircraft Self - Fueling Facility Bid Documents Page 23 March 10, 2006 AC# 1 4 2 8 7 0 6 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION i CONSTRUCTION INDUSTRY LICENSING BOARD SEQ #L04052800423 - LICENSE NBR 05/28/2004 030690513 PCCO45031 The POLLUTANT STORAGE SYSTEMS CONTRACTOR Named below IS CERTIFIED Under the provisions of Chapter 489 FS. Expiration date: AUG 31, 2006 WARD, PETER HUGH GLASGOW EQUIPMENT SERVICE INC PO BOX 10087 RIVERIA BEACH FL 33419 -0087 JEB BUSH GOVERNOR DIANE CARR DISPLAY AS REQUIRED BY LAW SECRETARY PALM BEACH COUNTY CONTRACTORS CERTIFICATE OF COMPETENCY EXPLRES SEPT'E -N1BER 30. 20 Or- AUDIT CERMjCATE NLrNfBER CONTROL A'LMMER A- 085 .337 L -10785 7 7777-77-7- NAME PETER FIRM GLASGC) LIjQ11 -1 Mfl T J SERVI CE INC 1750 HILL AVE — i'..ES'T PALM BEACH, FL 33407 CERTIFIED CONTRACTOR GASOLINE TAN} & PU1?F ID . #0005585 f 08/19/03 JES x r" o � SIGNATURE: ATTEST: CONSTRUCA6N INDUSTRY LICENSING BOARD Ox PALM BEACH COUNTY ATTACHMENT 2 (DRUG-FREE WORKPLACE FORM) The undersigned Bidder, in accordance with Florida Statute 287.087 hereby certifies that Glasgow Equipment Service, Inc. does: Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business' policy of maintaining a drug free workplace, any available drug counseling, rehabilitation, employee assistance programs and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or contractual services that are under proposal a copy of the statement specified in Paragraph 1. 4. In the statement specified in Paragraph 1, notify the employees that as a condition of working on the commodities or contractual services that the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to any violation of Chapter 1893 or of any controlled substance law of the United Stated or any state, for a violation occurring in the workplace no later than five (5) days after such conviction. 5. impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug free workplace throuo implementation of Paragraph I through 5. As the person authorized to sign this statement, I certify that this fug: complies fully with the above requirements. Date: 4/17/06 Signature: Aircraft Self - Fueling Facility Bid Documents Page 25 Mareb 10, 2006 ATTACHMENT 3 (PUBLIC ENTITY CRIMES FORM) SWORN STATEMENT UNDER SECTION 287.133(3)(a). FLORIDA STATUES ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS. 1.01 This sworn statement is submitted with Proposal for Aviation Self -Serve Fuel 'Facility, Sebastian Municipal Airport, City of Sebastian Florida. 1.02 This sworn statement is submitted by Glasgow Equipment Service, Inc. (name of entity submitting sworn statement) whose business address is 1750 Hill Ave. WPB, FL 33407 and (if applicable) its Federal Employer Identification Number (FEIN) is 5 9 —10 5 4 3 71 (If the entity has no FEIN, include the Social Security Number of the individual signing this sworn statement:(—). 1.03 My name is Peter H. Ward and my relationship to the (please print name of Individual signing) entity named above is: President 1.04 1 understand that a "public entity crime" is defined in Paragraph 287.133(1)(g), Florida Statues, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any proposal or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United Stag and involving antitrust, fraud, theft, bribery, collusion racketeering, conspiracy, or material misrepresentation. 1.05 1 understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry plea of guilty or nolo contendere. 1.06 1 understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statues, means: (1) A predecessor or successor of a person convicted of a public entity crime: or (2) An entity under the control of any natural person who is active in the management of the entity and who has been convicted of public entity crime. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person wbo has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 1.07 1 understand that a "person" as defined in Paragraph 287.133(1)(c), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity_ The term "person" includes those offers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of an entity. Aircraft Self - Fueling Facility Bid Documents Page 27 March 10, 2006 1.08 Based on information and belief, the statement which 1 have marked below is true in relation to the entity submitting s sworn statement. (Please indicate which statement applies.) Neither the entity submitting this sworn statement, nor any officers, directors, exec fives, partners, shareholders, employees, members, or agents who arc active in management of the entity, nor any affiliate of the entity have been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of the officers, directors, executives, partners, shareholders, employees, members, or agents who are active in management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989, AND (Please indicate which additional statement applies.) There has been a proceeding concerning the conviction before a hearing officer of the State of Florida, Division of Administrative Hearings, the final order entered by the hearing officer did not place the person or affiliate on the convicted vendor list (Please attach a copy of the final order.) The person or affiliate was placed on the convicted vendor list. There has been a subsequent proceeding before a hearing officer of the State of Florida, Division of Administration Hearings. The final order entered by the hearing officer determined that it was in the public interest to remove the person or affiliate from the convicted vendor list (Please attach a copy of the final order.) The person or affiliate has not been placed on the convicted vendor list (Please describe any action taken by or pending with the Department of General Services.) SWORN ST MENT - PUBLIC TY C (CONTU4UED) (sgm) Date: 4/17/06 STATE OF FLORIDA COUNTY OF Palm B e a c h The foregoing instrument was acknowledged before me this 17 t h day of April 7006 by peter H WArd President (title) on behalf of Glasgow Equip . S ve (na of partnership), a partnership. He/she is personally known to me or has produced as identification and did ( ) did not ( ) take an oath. My Co tit fixes: LOUIS F VANTOW Fbw- t;ft m Co y -,u xPkg;w iL2L5_ NOTARY PUBLIC CAmmbWat f DD +rWM END O r �T CRIMES Aircraft Self - Fueling Facility Bid Documents Page 28 March 10, 2006 ATTACHMENT 4 (INSURANCE CHECKLIST) TO: Sebastian Municipal Airport 1225 Main Street Sebastian, FL 32958 The following Proofs of Insurance Coverages are attached for the project entitled Aviation Self -Serve Fuel Facility : Auto Liability Workers Compensation General Liability I hereby understand that the firm listed below is responsible for the work as indicated in the Construction Contract, Section 9.18 if awarded the project. Glasgow Equipment Service, Inc, (Name of Bidder) Date: 4/17/06 Signab=: Aircraft Self - Fueling Facility Bid Documents Page 29 Marcb 10, 2006 n r'...." 0".1 (.I AFDC ACORD- CERTIFICATE OF LIABILITY INSURANCE 02101 /06Dl1YYYI PRODUCER Brown $r Brown, Inc. 1401 Forum Way `e 600 J Palm Beach, FL 33401 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. INSURERS AFFORDING COVERAGE NAIC # INSURED Glasgow Equipment Service Inc 17530 Hill Ave West Palm Beach, FL 33407 INSURERA. Mid Continent Casualty Co. POLICY EXPIRATION DATE MMIDDIYY INSURER B: National Union Fire Ins A INSURER C. GENERAL LIABILITY INSURER D 01131106 INSURER E: EACH OCCURRENCE rnv =DAr_MC THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM DR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. I S LTR D NSR TYPE OF INSURANCE POLICY NUMBER 'POLICY EFFECTIVE DATE MMIDDIS^Y POLICY EXPIRATION DATE MMIDDIYY LIMITS A GENERAL LIABILITY 04GL618976 01131106 01/31/07 EACH OCCURRENCE $1,000,000 DAMAGE TO RENTED PR MI S �g�crupencel $100 000 MERCIAL GENERAL LIABILITY MED EXP (Anyone person) $EXCLUDED CLAIMS MADE 51OCCUR if PERSONAL & ADV INJURY $1,000,000 X I Pollution. Liab GENERAL AGGREGATE $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMPIOP AGG s2,000,000 _ POLICY n PRO JECT n LOC AUTOMOBILE LIABILITY ANY AUTO COMBINED SINGLE LIMIT (Ea accident) $ BODILY INJURY {Per person) S ALL OWNED AUTOS SCHEDULED AUTOS BODILY INJURY (Per accident) $ HIRED AUTOS NON -OWNED AUTOS PROPERTY DAMAGE (Per accident) $ GARAGE LIABILITY AUTO ONLY - EA ACCIDENT S OTHER THAN EA ACC S ANY AUTO S AUTO ONLY: AGG B EXGESSIUMBRELLA LIABILITY BE6849604 01131/06 01/31/07 i EACH OCCURRENCE S1,000,000 AGGREGATE S1,000,000 X OCCUR ❑ CLAIMS MADE S $ DEDUCTIBLE S X RETENTION $ 10,000 WORKERS COMPENSATION AND WC - ° R STAT f U OTH- E.L. EACH ACCIDENT S EMPLOYERS' LABILITY ANY PROPRIETORlPARTNERIEXECUTIVE E.L. DISEASE - EA EMPLOYEE S OFFICERIMEMBER EXCLUDED? E.L. DISEASE - POLICY LIMIT S If yes, describe under SPECIAL PROVISIONS below A OTHER Professional 04GL618976 01/31106 01131107 $1,000,00010ccurence Liability $2,000,000 /Aggregate DESCRIPTION OF OPERATIONS I LOCATIONS 1 VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS r^cD rlrrreTC unr nr=D rAWr.FI I A71ON ACORD 25 (2001108) 1 Of 2 ##M354889 DAG O ACORD CORPORATION 1988 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City Of Sebastian Bldg Dept DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 1n DAYS WRITTEN 1225 Main St NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL Sebastian, FL 32958 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESEN ATIVE ACORD 25 (2001108) 1 Of 2 ##M354889 DAG O ACORD CORPORATION 1988 PRODUCER You're in good hands. COWAN CONSULTING INC 750 S DIXIE HWY STE 8 JUPITER, FL 33458 INSURED DATE (MMIDDIYY) E OF 'LIABILITY INSURANCE 05117/2005 561-575-7374 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. GLASGOW EQUIPMENT SERVICE INC PO BOX 10087 RIVIERA BEACH, FL 33419 INSURERS AFFORDING COVERAGE INSURER A: _ALLSTATE - INSURER B: INSURER C. -- INSURER D: INSURER E COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES- AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR POLICY EFFECTIVE POLICY EXPIRATION TYPE OF INSURANCE POLICY NUMBER GENERAL LIABILITY COMMERCIAL GENERAL LIABILITY CLAIMS MADE F—] OCCUR i LIMITS EACH OCCURRENCE S FIRE DAMAGE {Any one fire} S MED EXP (Any one Person) S PERSONAL & ADV INJURY $ GENERAL AGGREGATE 9 PRODUCTS - COMP/OP AGG $ GEN'L AGGREGATE LIMIT APPLIES PER: POLICY F7 P 1 LOC E RO T i nn AUTOMOBILE LIABILITY A ANY AUTO ALL OWNED AUTOS �X SCHEDULED AUTOS `j�' HIRED AUTOS X I NON-OWNED AUTOS q GARAGE LIABILITY ANY AUTO EXCESS LIABILITY 7 OCCUR I CLAIMS MADE i DEDUCTIBLE RETENTION S WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OTHER 048167406 05121/00 i 05/21/06 DESCRIPTION OF OPERATION SILOCATIONSNEHICLESfEXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS 561- 842 -7402 CERTIFICATE HOLDER X . ADDITIOI CITY OF SEBASTIAN BULDING DEPARTMENT 1225 MAIN STREET SEBASTIAN, FL 32958 ACORD 25 -S (7197) 82853 -1 COMBINED SINGLL LIMI I l $ 6,VUU,UUU (Ea accident) 800It INJURY �, S (Per person) BODILY INJURY S (per accident) PROPERTY DAMAGE 5 (Per accident) AUTO ONLY - EA ACCIDENT S EA ACC S OTHER THAN AUTO ONLY:. AGG S EACH OCCURRENCE S AGGREGATE $ s s S T'ATU- 0TH- LIMITS ER_ ACCIDENT a S SE - EA EMPLOYEE S . E.L. DISEASE - POLICY LIMIT 1 S LETTER: CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR AUTHORIZED ®ACORDCORPORATION 1988 896L fJ0llVdadMO0 MiOOV � (9610 S-9Z 02i00V VMf0'T -r .f0 'OArr S9Orn x -S HSrx n O V 3ALLV-LN3S3dd3d Q3zIaOH1nV 896ZE IJ 'NVIISV936 'SaALLV1N3S3dd3d aO SA35V Sil 'ANVdWOO 9Hl NOdn QNIN ANV dO KLn19Vll 110 NOUVE)M30 ON 3SOdWI IIVHS 3011ON Hon5IIV1N of a8n11Vd ln8 1332{iS NlVVq 5ZZ ` '1131 3H1 01113WVNd30l0H31VO14IIH333H1 0133UON N31-LIHM SAVQ £ 1N31UtlVdK SNIQiln9 lIVN 01 '60AV30N3 11IM ANVdFiOO ONInSSI 3H1 'd0383H1 31VO NOI1Va1dX3 NVIlSV83S JO A,110 31-13. 3NOj39 (33113ONVO 38 S313116d G301HOS90 3A09V 3H1 d0 ANV QMOHS NOUV113ONVO N3010H 31V01d112130 'A31-10d SIHI 213aNn 83AOldW3 31VN831lV NV SI 1N3110 03WVN 3AO9V 3H1. 'A01lOd 031V1S 3A08V 3Hi 213aNn CIE189 SOD 39 lllM '1102IAVd S.'0N1 '3odnOSlViO1JdaV 213aNn OIVd 'ANVdW001N3110 03V4VN 3AO9V 3Hl aOd ONMAOM S33AOldW3 llb' SW311 IV103dSIS31OIH3A ISNOI1VOO11SN011Vd3dO 30 N011dIa393o i I d3Hi09 000 000 L $ 1 33A0ldYd3 V3 - 3SV3SIll l3 900Z11.01L0 SOOZ401L0 IOX3 :388 sa3ol"o 10N1 3ALU 0Hx352l3hLL2idd Rf0130Jd4 8d 3Hi A111113VI1.Sd3AOIdW3 � C619 OM: ONV NOI-LVSN3dW00 s.d3MHOM V o0{}' ()�0` S llWl 1 A01 10d 35V3SI013 000`000`!• sl JN30100VHOVl313? 0 simn5 0 X 'H om I I $ I I mc=i VligNem NVHI a3H10 mo;i V113a8Wn kmisvn SS3aXR s 31VS3dSSV, s I 3ON3tdan000 H'0V3 s 31V038SOV I OlnV ANV A1I118h'n ��VaVJ �� $ 1N30100V HOV3 AINO GJ-nV NVHl H3H10 $ 1N30100V V3 - A1NO OlnV 3SVWV0 A1Pd3dOdd SOlflV 03NMO-NON (1uaprme rad) S ,kNnPNl A11008 { SolnV 03aIH SOlnV (131n(13HOS (uosiad jad) ),anrw AlIO08 Solnv 03NMO -nV OinV ANV $ lIWI13lSNIS 03NISW00 A11118VI131180w01nV $ (uasiad auo AuV) dX3 C3N! lOdd SMOlOV1i1NOO 8 SA13NMO � 411000 E 30M SWIVIO A111I8V(I IVN3Ni10IVI063W'W03 I AJ 1119VI1 lVa3N30 $ (any auo AuV) 30VVYVO 3WA 1 sl 30N3d8n000 NOV3 $ A8(IPNI AOV B IVNOS213d sl oov d01dmo • s1Ona08d 51 31VS3NSJV 1"3N30 Sliwll (AAO01W) 31VCI (AMGQMW ) 31VQ aaawnN A01lfld 3ONVanSNI d0 3dA1 O01 N011VUldX3A3Il0d 3All33dd3 A31Od I 'SWIVlO 01Vd A8 03on03N N338 3AVH AM NMOHS SiMll'S310110d HOns do SNOI110NOO ONV SNOISnloX3 'SNN313H111V 011o3f8nS SI N1383H 0381aOS30 S310110d 3H1A 8 03060ddV 30NVNnSNI 3H l'NIVlN3d AVw NO 03nss1 39 AVNI 31VOIdli833 SIHI HOIHM Ol 103dS3a HIM 1N3wno0O a3H10 NO 10VN1N00 ANV d0 NOI110NOO NO w2I31 '1N3w3a1nO3a ANV ONIONV1SH11M1ON '031VOI0N1 001a3d AOIIOd 3H1 NOd 3AO9V O3wVN 038nSNl 3H10103nSSl N399 3AVH M0138 031Sn 33NVanSNI d0 S310110d 3Hi 1VHl Ad1la30 Ol SI SIHI S3JV213A00 a `. I ANVdWOO �N� `301MAS INMdinn Moosvio O = 2I3AOI&U 31VN21311V. ANVdwoO ELLEE ld 'I1Nb'IW 3AR1a ASNnS QOZO L 8 '0N1 '302Inomvi01 dab' ANVdW00 O3anSNl AN'ddWOO 30Nd21nSS'd 3WOH NV312131NV ANadwoO 0£ 68-Etr1-Ol aJV213AOa JNICf�3OJ31i S31NbdW03 LE6tr-4E [CC -Jd `1W'dIW 'MO-138 S310110d 3H1 AS a3a2I0d3V 3SVH3A00 3H1 N311V OU6 A 311nS °3/1121(3 Ava - rum012j8 LOUT 210 aN31X3 `ON3WV lON 5300 31V013112130 SIHI 1AAQ10H 'dpRlOid 30 'ONI `S30lA2138 X5121 N ©V 31V013112I30 3H1 NOdn S1HOIN ON SM3dNO0 aNV A1NO NOI1VW2103NI d0 N311VW V SV Q3nSSl SI 31VOIALLM30 SIHI LE09ZV # IQ»oS 830n(10ad SOOZvvw)E0 3ONvanSNI J�.L11113VI I J0 3- LVOIJIIM30 1(7800d {AAraarww} 31Va ATTACHMENT 5 (PRICE PROPOSAL) PROJECT LOCATION/DESCRIPTION: Sebastian Municipal Airport. Sebastian Florida, Aviation Self -Serve Fuel Facility Liquidated Damages shall be assessed in the amount of $250 /calendar day for days in excess of 1201 Calendar Days for Construction and substantial completion, 30 for punch -out. Item Description Unit Quantity Price Fuel Tank, Vending and LS I Dispensing System $210,280.00 Remote Piping LF 550 _ 7 4 , 4 4 7.0 0 Spare Sleeves -12" PVC LF 154 $ 10,000.00 Base Bid Price $294,727-00 Additive Bid 1: Fuel Lighting LS 1 N/A Additive Bid 1 Price 0.00 TOTAL BASE BID PRICE WRITTEN OUT: $ Two Hundred Ninety Four Thousand Seven Hundred Twenty Seven and 00 /100 TOTAL ADDITIVE BID 1 PRICE WRITTEN OUT: ZERO Proposal Security The undersigned acknowledges that it has included with its Proposal the required Proposal Security for not less than five percent (5 %) of the total amount of its Proposal. Acceptance of Proposal The Bidder understands and agrees that the Owner reserves the right to accept or reject any or all proposals submitted within one - hundred twenty (120) calendar days from date of price proposal opening. Bidder agrees that it will not withdraw its Proposal for said period of time. The Bidder understands and agrees that the Owner reserves the right to accept or reject any or all alternates, without regard to the listed order. Addenda It is agreed that the undersigned has received all addenda complete as issued by the Owner and that related costs are included in the proposal submitted. The mtdersigncd acknowledges receipt of said addenda as follows: Addendum ## 1 Addendum # Aircraft Self- Fueling Facility Bid Documents dated 4/17/06 dated Page 31 March 10, 2006 Addendum # dated Time Time is of the essence. The undersigned Bidder agrees that, if awarded the Contract hereunder it shall commence the work to be performed under the Contract on the date set by the Owner in its written notice to proceed, continuing the work with diligence and shall complete the entire work within the time specified. Concurrent with the posting, the lowest, responsive, responsible Bidder will be provided a Notice of Intent to Award and four copies (4) copies of the Contract and its Attachments for execution. Failure of the Bidder to return same, fully executed, with all required insurance certificates within the time specified in the Schedule of Events outlined on Page 3 result in contract being; awarded to the next lowest, responsive, responsible Bidder and forfeiture of Proposal Bond_ If the undersigned is notified of the acceptance of this proposal, it agrees to execute within the time specified in the Schedule of Events outlined on Page 3, a Contract for the above work, complete with all required insurance certificates and bond forms. Bidder shall hold the all Bid prices open for 120 days following submission. BIDDERNAME: Glasgow Equipment Service, Inc. BIDDER ADDRESS: 1750 Hill Avenue BIDDER SIGNATURE: Akcraafl Self - Fueling Facility Bid Docunxmts Palm Beach, FL 33407 ' ; i 1.3 TITLE: President Page 32 Mareh 10, 2006 ATTACHMENT b (DESIGNATION OF SUBCONTRACTORS) THIS FORM MUST ACCOMPANY PROPOSAL PRICE FORM AND MUST BE COMPLETED AS APPLICABLE. Use additional sheets as necessary. Name, Address and Telephone Number of Subcontractor Type and Description of Work to be Performed Contract Amount I.R.T. Electrical Svcs Todd Graeber 561- 575 -2073 Electrical 519,549.00 2Envirospec 2755 S. Federal Hwy Boynton Bch, FL 3343 Environmental testing Lab Svcs, underground is 561 -369 -8885 $2900.00 3 $ 4. $ 5. 6. 7. $ TOTAL DOLLAR VALUE OF SUBCONTRACTOR PARTICIPATION: S PERCENT SUBCONTRACTOR PARTICIPATION: ° > Name of BIDDER: Glasgow Equipment Service, Inc. Aircraft Self-Fueling Facility Bid Documents Marcb 10, 2006 Page 33 E :BAST NI LIN IC -1PAL AIRP01 1 ADDENDUM # I AVIATION SELF -SERVE FUEL FACILITY DATE: April 17, 2006 TQ: All Proposers This Addendum becomes hereby an integral part of the bid package under consideration by you as a respondent. The City of Sebastian deems all sealed proposals to have been proffered in recognition of the entire design criteria package — including all issued addenda. This Addendum is being sent to you via electronic mail. In addition a copy is being sent via fax. Should you have any questions pertaining to this Addendum, please contact Mark Jansen at 407 - 306 -0200. ADDENDUM MESSAGE 1. This addendum message includes this page, and the attached 1 page. Attachment No. Pages Description Addendum 1 1 Addendum text. 2. Submitted to the CiW must also include this addenda page submitted & signed as acknowledgement ofil�kcceint of same. Signature Firm Nam — Engineer Aircraft Fueling Facility Addendum 1 Page 1 of 2 April 17, 2006 Jul 20 06 05:08p THE LPFI GROUP INCORPORnTE 407 006 0460 QUOTATION & CONTRACT For Installation or Service GLASGOW EQUIPMENT SERVICE, INC. P.O. BOX 10087 IUVIERA BEACH, FLORIDA 33419 -0087 PHONE (561) 842 -7236 * FAX (561) 842 -7402 CITY OF SEBASTIAN RE: AIRPORT 1225 MAIN STREET SEBASTIAN, FL 32958 IN RESPONSC 70 YOUR INQUIRY, WE SUBMIT T14E FOLLOWING QUOTATION: QUOTATION No. S -0916 A HATE: MAY 16, 2006 PAGE-1—OF-1— p.7 PROVIDE LABOR, EQUIPMENT AND MATERIALS TO INSTALL A 12,000 ABOVEGROUND AVGAS FUEL STORAGE TANK INCLUDING: • SUBMIT PERFORMANCE AND PAYMENT BOND. • PREPARE ENGINEERED ORAWrM'GS AND OBTAW REQUIRED PERMITS. • BARRICADE WORK AIREN. • SAWCUT /BREAKOUT ASPHALT AND PREPARE AREA FOR CONCRETE- SLAB • FURNISH AND POUR STEEL REINFORCED CONCRETE SLAB FOR TANK • FURNISH AND INSTALL CONCRETE REINFORCED STEEL BOLLARDS AROUND TANK SLAB. • FURNISH CRANE. OFFLOAD AND SET ONE (1) 12,000 CALLON DOU'BLEWALL UL -142 ABOVEGROUND FUEL STORAGE. TANK.. • FURNISH / INSTALL ALL REQUIRED VENTS, VALVES, SOLENOID VALVE, TANK FITTINGS, EMERGENCY VENTS AND GORMAN RUPP FILL PUMP WITH VELCON FILTER VESSEL. TANK ALSO INCLUDES HAND PUMP, EXPLOSION PROOF MOTOR STARTED AND ALLOTHER ACCESSORIES FOR 200 GPM FILL. • FURNISIiAND INSTALL DOU13LEWALL FIBERGLASS PIPING, • FURNISH AND INSTALL AVGAS CABINET WITH I" X 75' OF HOSE AND REEL, ONE (1) OPW 295 SA NOZZLE, VELCON FILTER AND STATIC REEL. • FURNISH AND INSTALL APPLIED TECRIVOLOGY GRELII T CARL? READER SYSTEM WITH M -3000 PLUS TERMN&L., • PROVIDE ALL REQUIRED TESTING, STARTUP AND INSPECTIONS TOTAL BID PRICE: S 244,960.00 CONDITIONS AND CLARIFICATIONS: -QUOTE GOOD FORTHIRTY (30) DAYS -SALES TAX NOT INCLUDED -FUEL NOT INCLUDED -NOT RESPONSIBLE FOR UNFORESEEN CONDITIONS OR OBSTRUCTIONS 'NO OTHER WORK INCLUDED OTIRER THAN SPECIFIED - INSTALLATION CERTIFICATION & PROOF OF PROPER OPERATION OF ALL LoQUIPMIENT WILL BE PROVIDED AT COMPLETION OF PROJECT. AS -BUILT DRAWINGS, INSTALLATION AND OPERATION INSTRUCTIONS ALONG WITH TANK CHARTS WILL BE PROVIDED AT COMPLETION AND ACCEPTANCE OF PROJECT. -DUE TO INDUSTRY VOLAT31 -i n, FOR CARBON STEEL AND FUELL, THE PRICING OFFERED IN THIS QUO'T'ATION IS SLBJFrT To REVIEW AT THE TLME OF ORDER PLACEMENT. MATERIAL PRICING WILL BE SUBJECT TO ADJUSTMENT, WITHOUT MARKUP, BASED UPON INCREASES OCCURRING BETWEEN THE DATE OF QUOTATION AND THE TIME OF ORDER PLACEMENT. PAYMENT TERMS: PURCHASE ORDER, PROGRESS PAYMENTS THANK YQU FOR THE OPPORTUN TY TO BE OF SERVICE. FEEL FRET: TO CALL WITH ANY QUESTIONS. SINCERELY, JEFFRY M. PELLG ACCE177ANCE This quotation When acccptcd by the customer, and countersigned by the authorized repna-entative of GLASGOW EQi1 P&I.ZNT SERVICE, hNC.. wit? wastitu a bona ride contract bclween the parties, subject to ail items and conditions on the reverse slde of the fuel quotation 8r. contract, It is expressly agreed that tlicre are no promises, agreements, or understanding, oral or written, not specified in this quotation, Customer Authorized Authnri7cd Glaseow Fnuipment Service, Inc. Jul 20 06 04:28p THE LPA GROUP INCORPORATE 407 306 0460 ATTACEINIENT 5 (PRICE PROPOSAL) PROJECT LOCATION/DESCRIPTION: Sebastian Munfcf al Airnort, Sebastian Roilda Aviatzan Self -Serve Fuel Facility Liquidated Damages shall be assessed in the amount of $250 /calendar day for days in excess of 120 Calendar Days for Construction and substantial completion, 30 for punch -out. Item Description Unit Quantity price Fuel Tank, Vending and LS 1 Dispensing System 12 1 Q , 28 0 . 00 Remote Piping LF 5so 24-4.47.00 Spare Sleeves- 12" PVC LF 150 $ 10,000.00 Base Bid Price $294,727.00 Additive Bid l: Fuel Lighting LS 1 N/A Additive Bid I Price 0.00 P. S TOTAL BASE BID PRICE WRITTEN OUT: Two Hundred Ninety Four Thousand Seven Hundred Twenty Seven and 00 /: TOTAL ADDITIVE BID I PRICE WRITTEN OUT- S ZERO Proposal Security The undersigned acknowledges that it has included with its proposal the required Proposal Security for not less than five percent (51%) of tfie total amount of its Proposal. Acg&ptance of Pmp2sal The Bidder understands and agrees that the Owner reserves the right to accept or reject any or all proposals suanrtittedwithin one hundred twenty (120) calendar days fmm date ofprice proposal opening. Bides ag v3 that 11cw ll no&-ivithdraaw its Pstiposal far said period of time. The Bidder understands and agrees that the Owner reserves the right to accept or reject any or all alternates, without regard to Yne listed order. Addenda It is agreed that the undersigned has received all addenda complete as issued by the Owner and that related costs are included in the proposal submitted. The undersigned acknowledges receipt of said addenda as follows: Addendum # 1 dated 4/17/06 Addendum # dated Aircraft Self- Fueling Facility Bid Document.% Page 31 March 119, 2066 9 BID FORMS Bidders shall submit, on the forms provided (Attachments 1-6), the information required. Bidders that fail to complete and show evidence of compliance with the following subsections shall be considered unqualified, and shall not be given further consideration in the bid process. 9.1 Licensing Bidder shall be licensed in accordance with the following: Chapter 489, Part 1, Florida Statutes and Chapter 61G4, Florida Administrative Code. Bidder shall provide copy of license as part of bid documents. Contractor shall be able to be properly licensed in the City of Sebastian before beginning construction. If the Bidder is a joint venture, the individual empowered by a properly executed Declaration of Joint Venture and Power of Attorney Form shall execute the proposal. The proposal shall clearly identify who will be responsible for the engineering, quality control, and geotechnical and construction portions of the Work, and license numbers and copies of these licenses/professional registrations shall be provided with Attachment 1. 9.2 Drug Free Workplace Statement The Drug -Free Workplace form, as attached hereto, shall be submitted with the qualification package. 9.3 Public Entity Crimes Any person or firm submitting a Proposal in response to this invitation must execute the attached SWORN STATEMENT UNDER SECTION 287.133, FLORIDA STATUES, PUBLIC ENTITY CRIMES, including proper checks) in the space(s) provided, and enclose it with said qualifications package. 9.4 Insurance Cost for all insurance shall be borne by the Bidder. All insurance shall be acceptable to the Owner in its sole discretion. A signed Certificate(s) of Insurance evidencing; required insurance coverages maintained by the Bidder in the types and amounts required hereunder shall be transmitted to Owner prior to Contract execution. Each Certificate(s) shall include a minimum thirty (30) day endeavor to provide written notification to Owner for cancellation or non - renewal of coverage herein. All Bidders shall submit evidence of insurance as indicated in the Construction Contract, Section 11.8. 9.5 Bid Price Bid prices shall be submitted on the Bid Price Form (Attachment 5) attached hereto and shall include prices for the items listed. The prices shall include all costs for all design, geotechnical surveys, architectural services, engineering services, Bidder's quality plan, construction of the Project, and all other work necessary to fully and timely complete that portion of the Project in accordance with the Contract Documents, as well as all job site and home office overhead, and profit, it being understood that payment of that amount for of the Project will be full, complete, and final compensation for the work required to complete the Project. The Bid price shall be delivered in a sealed package, within the time specified in the Schedule of Events outlined on Page 3, to the following: .Aircraft Self - Fueling Facility Bid Documents Sebastian Municipal Airport City of Sebastian 1225 Main Street Sebastian, FL 32958 Page 21 March 10, 2006 CONSTRUCTION CONTRACT for AVIATION SELF - SERVE FUEL FACILITY AT Sponsor /Owner: CITY OF SEBASTIAN BID DOCUMENTS July 11, 2006 Prepared by: THEMLPA GROUP TRANSPORTATION CONSULTANTS 12000 Research Parkway STE 152 Orlando, Florida 32826 407- 306 -0200 / 407 - 306 -0460 (Fax) Contact: Mark C. Jansen, P.E. (mjansen @lpagroup.com) FL Corporate License No. 0004307 SECTION TC TABLE OF CONTENTS 1 Construction Services Agreement ............................................................ ............................... 2 Article I - The Contractual Relationship .......................................................... ............................... 3 1.0 Employment of Contractor .............................................................. ............................... 3 2.0 Agreement Documents ..................................................................... ............................... 3 3.0 Definition of Terms .......................................................................... ............................... 4 Article11 Performance ................................................................................... ............................... 7 4.0 Plans, Specifications and Related Data ............................................ ............................... 7 5.0 Materials and Workmanship .......................................................... ............................... 10 6,0 Construction Staking To Be Performed By Contractor ................. ............................... 12 7.0 Progress and Completion of Work ................................................. ............................... 14 8.0 Public Health and Safety .............................................................. ............................... 17 9.0 Engineer, City, Contractor Rel ations ............................................. ............................... 21 10.0 Measurement And Payment ........................................................... ............................... 24 11.0 Public Contract Requirements ....................................................... 28 12.0 ............................... Miscellaneous ................................................................................ ............................... 31 Aircraft Self - Fueling Facility Bid Documents July 14, 2006