Loading...
HomeMy WebLinkAbout2001 Tee RelocationW1 Ut i .r HoAe OF FMCAN MAM City of Sebastian, Florida Subject: Hole 11 & 17 Tee Relocation. Agenda No. Runway 9 —27 Department Origin: Go lenurre irector Approved for Submittal bv: Finance Director: General Services Administrator: Jr ty Manager Date Submitted: For Agenda of March 14. 2001 Exhibits: Scope of work, price quote from Links Construction EXPENDITURE REING BUDGET: APPROPRLA.TION REQUIRED: REQUIRED: $250,000 5250,000 SUNEVLARY As indicated in the previous City Council meeting, hole number eleven must be relocated in order to meet F.A.A. regulations regarding the opening of runway 9-27. Even though the runway will not immediately open, addressing this issue while the golf course will be closed for renovations would be a proactive stance on the part of the city. Originally a site was discussed which the LPA Group has determined unfeasible. The site would have conflicted with runway 9-22. The new proposed location, which has been determined feasible by the LPA Group, is located between number fourteen green and number fifteen tee. This area is an excellent area for an exciting, challenging, and aesthetic par three. The design of the new par three would incorporate several characteristics which include elevated tee boxes and adding a body of water which would generate the fill needed for the new hole. An elevated green approximately 6500 square feet in size and two sand bunkers located at each side of the Ereen would also compliment the hole. The new proposed location would require some cart path construction and clearing. The necessary work can be performed before the actual stait of the renovation, as construction would not interfere with play of the course. Additionally, the future opening of runway 9-27 would create some changes to hole number seventeen. The changes to hole seventeen would include moving tees approximately twenty-five yards to the south, gee clearing, and cart path construction. The tree clearing involved would create hole seventeen playing through a "shoot" of trees, adding to the aesthetics of the hole. When Sebastian Golf Course has the planned grand opening, golfer curiosity and excitement will be ever -increased by the promise and challenge of a new par three, as well as by changes in the layout to hole number seventeen. The new par three would have the potential to be the "signature hole" of Sebastian Golf Course. The cost of building a new par three and relocating number seventeen green and tees will not exceed $250,000. RECOMMENDED ACTION Move to award change order # 1 to Links Construction to construct new golf hole and relocate number seventeen tee and green in the amount of 5250,000 and appropriate 5250,000 in Airport Funds for the project. ,�9 LINKS CONSTRUCTION, INC. PROJECT COST BREAKDOWN SHEET PREPARED FOR THE CITY OF SEBASTIAN /01 CITY OF SEBASTIAN HOLE #11 RELOCATION ITEMlDESCRIPTiON QUANTITY UNIT UNIT PRIG= AMOUNT MobNization 1 L S 5,000.00 S 5.000.00 Bond 1 L.S. $ 4,579.50 S 4,579.50 Erosion Control 0 L.S. Clearing/Grubbing 5 ACRE 5 4,043.$0 S 20,219.00 Import Fill 24000 G.Y. S - 5 - On -Site Excavation 24000 C.Y. $ 1.65 $ 39,600.00 Rough Shaping 1 L.S. $12,250.00 S 12,250.00 Finish Shaping 1 L.S. S 11,300.00 S 11,300.40 Greens Construction 6500 S.F. S 3.00 S 23,400.00 Bunker Construction 2700 S.F. S 1,75 5 4,725.00 Soil Amendments 1 L.S. S 2,100.00 5 2,100.00 Certified 419 Sprrps 1' L.S. $ 6,500.00 5 6.540.04 Certified Tifdwarf Sprigs 6500 S.F. $ 0.18 $ 1,170.00 Certified 419 Sod 18000 S.F. $ 0.32 $ 5,760.00 Bahia Sod/Lake Banks 5000 S.F. S 0.28 $ 1,444.00 Fumigation 1 L.S.- Drainage a. 4" solid ads pipe 360 b. 6" solid ads pipe 680 L.F. L'F S 4 00 $ 1,440.00 d. 12" f�yloplast Basins 8 EACH S 6.50 S 6,806.50 e. Lake outfall ditch 1 L.S. 5 280.00 $ 2,240.00 S 2,000.00 2.440.00 Irrigation 1 - TOTAL $150,490.00 LINKS CONSTRUCTION, INC. PROJECT COST BREAKDOWN SHEET PREPARED FOR THE CITY OF SEBASTIAN 317101 CITY OF SEBASTIAN GOLF COURSE HOLE #17 RELOCATION ITEMMESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT Bond 1 L.S. S 1,835.00 S 1,835.00 Erosion Control 1 L.S. S - $ - Ciearina/Grubbing 1 L.S. S 12.000.00 S 12.000.00 Tree Relocation 16 EACH S 150.00 $ 2,400.00 Drains a Swaie Relocation 1 L.S. $ 1,500.00 $ 1,500.00 Import Fill 4670 C.Y. S - S - On -Site EXcaVatlDn 0 C. Y. $ - $ - Rough Shaping 1 L.S. $ 10,500.00 S 10.500.00 Finish Shaping 1 L.S. S 9.500.00 S 9,500.00 Greens Construction 60 S.F. $ 3.60 S 21,600.00 Bunker Constnsction 2700 S.F. S 1.75 S 4.725.00 Soil Amendments 1 L.S. $ 1,900.00 S 1,900.00 Certified 419 Sprigs 1 L.S. S 5,200.00 S 5.200.00 Certified Tfdwarf Sprigs 6000 S.F. $ 0.18 S - Certified 419 Sod 5000 S.F. S 0.32 S 1.600.00 Irrigation 1 L.S. $ - Relocate Irrigation Control 1 L.S. $ 500.00 $ - TOTAL 5 72.760.00 LINKS CONSTRUCTION, INC. PROJECT COST BREAKDOWN SHEET 3/7/01 PREPARED FOR THE CITY OF SEBASTIAN CITY OF SEBASTIAN GOLF COURSE ALTERNATE B!D ITEMS #1 The purpose of this item is to separate the cost involved in removal of existing, and construction of required new concrete cart paths associated with the relocation of two par three golf holes. Cost included in this item: �a. subgrade compaction b. hand forming C. construction of two culvert pipe crossings d. placement of 1350 L.F. of 7' wide 3,000 Ib concrete w/fiber on new Golf Hole #15 e. construction of 850 L.F, of 7- wide 3,000 Ib concrete w/fiber from common area behind Golf Hole # 16 to tie-in point of # 18 cart path. F. Removal and disposal of existing cart on Golf Hole # 17 'AL ALTERNATE #1 S26,750.00 Feb 04 01 10:11P 11nks 5613374298 P•2 February 4, 2001 Mr. Greg Gardner Sebastian Municipal Golf Club 101 E. Airport Drive Sebastian, FL 3958 Reference: Golf Course Improvements Dear Mr. Gardner Steve VanMeter, President I would like to take this opportunity to thank you again for your time in showing me your golf facility and reviewing the proposed scope of work. It is my opinion the changes to your facility can be reached through a positive, creative, and artistic approach. The proposed new par three has the opportunity of being one of the best holes on the golf course. We envision elevating the tees enough to take advantage of the native surrounds and maximize vistas onto the green. The proposed lake would generate the required till needed for the golf hole, as well, the new #17 tee area. We would recommend the new 11`h green be approximately 6500 square feet in size with bunkering protecting a back right championship pin placement, while leaving the majority of the green open to the higher handicap players. Moving of the 17`h tees will create a shortfall of yardage on a very good par three. In order to maintain the quality and integrity of the golf course. we highly recommend the 17`h green moves back to play at least 150 yards from the back tees. We have enclosed a proposal and detailed scope for the 17`h green relocation as an alternate. If the decision is made to apply any of the alternates, an additional bond fee of 1.5% needs to be added to those amounts. Do not hesitate to call if you need further assistance. Sincerely, LINKS CONSTRUCTION, INC. Steve VanMeter President SVM: jn 2517 5E Delano Road, Port St. Lucie, Florida 34953 (561) 335-5185 Fax (561) 3374298 Feb --34 01 08:33p 11nks 5013374298 p.1 LINKS CONSTRUCTION, INC. 214101 PROJECT COST BREAKDOWN SHEET PREPARED FOR THE CITY OF SEBASTIAN On -Site Excavation 24000 CITY OF SEBASTIAN $ 1.65 $ 39,600.00 Rough Shaping HOLE #11 RELOCATION L.S. $12.250.00 ITEMIDESCRIPTION QUANTITY UNIT UNIT PRICE _ AMOUNT I $ $ 5,500.00 3.60 S $ 5,500.00 23,400.00 Bunker Construction Mobilization 1 L.S. 5 5,000,00 S 5.000.00 Bond 1 L.S. $ 3:232.00 S 3,232.00 Erosion Control 0 L.S. $ - S - L.S. $ 4,500.00 $ 4,500.00 Clearing/GrubbingClearing/Grubbing 3.5 ACRE $ 5,000.00 $ 17,500.00 S 1,170.00 Certified 419 Scd 18000 S.F $ nnn r Y $ - $ - On -Site Excavation 24000 C,4, $ 1.65 $ 39,600.00 Rough Shaping 1 L.S. $12.250.00 $ 12,250.00 Finish Shaping Greens Construction 1 6500 L.S. S.F. $ $ 5,500.00 3.60 S $ 5,500.00 23,400.00 Bunker Construction 2700 S.F. $ 1.75 $ 4,725.00 Soil Amendments 1 L.S. S 2.100.00 S 2,.100.00 Certified 419 Sprigs 1 L.S. $ 4,500.00 $ 4,500.00 Certified Tifdwarf S ri s 6500 S.F $ 0.18 S 1,170.00 Certified 419 Scd 18000 S.F $ 0,32 5 5.:60.00 Bahia Sod/Lake Banks 5000 S.F. $ 0.23 $ 1.400.00 Fumigation 1 L.S. S - S - Drainage a. 4" solid ads pipe 360 L. F. - 5 4.00 S 1,440.00 b. 6" solid ads pipe 480 L. F. $ 6.50 $ 3,120.00 d. 12" Nyloplast Basins 7 EACH $ 280.00 5 1.960.00 Concrete Cart Paths 100 L.F. 5 10.75 S 1,076.00 Carl Path Disposal 100 L.F. $ 8.00 $ 800.00 Irrigation TOTAL 1 L.S. $17.450.00 S 17,450.00 $151,982.00 Feb 04 01 08:33P 11nks 5810874298 p.2 LINKS CONSTRUCTION, INC. 210401 I PROJECT COST BREAKDOWN SHEET PREPARED FOR THE CITY OF SEBASTIAN CITY OF SEBASTIAN GOLF COURSE # 17 TEE RELOCATION ITEMIDESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 1 L.S. $ 735.00 $ 735.00 Bond Erosion Control 1 L.S, $ $ �Clearin IGrubbin 1 L.S. $ 5,000.04 $ 5,440.40 Import Fill 4670 C.Y. $ - $ - On -Site Excavation 4670 C.Y. $ 1.55 $ 7,705.50 1 L.S. $ 4,500.70 $ 4,500.40 Rou h Shaping Finish Shaping 1 L.S. $ 1.500.00 $ 1,500.00 Soil Amendments 1 L.S. $ 400.40 3 400.00 Certified 419 Sericis 1 L.S. W 1,800.00 $ 1.800.00 Certified 419 Sod 5440 S.F. $ 0.37. S 1,640.00 1 L.S. S 6,800.00 $ 6,800.00 Irri ation $ 30,040.50 TOTAL Feb 04 01 08:37P 11nks 5613374298 P.1 LINKS CONSTRUCTION, INC. 214101 PROJECT COST BREAKDOWN SHEET PREPARED FOR THE CITY OF SEBASTIAN CITY OF SEBASTIAN GOLF COURSE ALTERNATE BID ITEMS ALTERNATE #1 The purpose of this item is to relocate #17 ,green complex in order to lengthen and enlarge this par 3 By Relflcating the 17th tees, this hole is being reduced in playing length to a sub -standard 120 yard hole. In order to maintain the quality and integrity of the golf course, it is the recommendation of Urks C:onstn:ction that the green complex is shifted back and left of the existing position. Cost included in this item: a. stripping and on-site disposal ^f existing tusf �b. clearing and disposal of vegetation behind green c. excavation and relocation of existing swell behind green d. earthwork and shaping to construct n&N 065C0 square foot green e. construction of new bunker around green (2700-3000 square feet) If. relocate irrigation system and install new 'items as needed 1g, grass green complex and all disturbed areas with certified grass {TOTAL ALTERNATE {#1 $ 32,884.00 ALTERNATE ITEM 92 I This Item Includes all cost asscciated vvith additional concrete cart path Installation - Clear veaetatlon and construct aoDroxirnatly 4Gf1 linear feet of T wide concrete cart path from existing #16 green cornplex area to existing ir11 cart Path. It would also requ!re the widenina cif apercxsmatIv 075 linear cf eastsng I path that ties In with the existina entrance read to 11' in order to a commociate INvo viey traffic. I a. clearing 5 1,20t7.f'°7 b. -of a 36" Er4(:+l e:, 1..'9�''+G.,��iilr'� a,,,,silri:l rn!nz22ge .°.`V�:' y, 1 .6,Dn Go 51.'.-10 ((placryement C. t..l! 00 Ca ware fe?t c 3000 I.."c �:? V - _ th�c f, concrete c2r! pa'h 1¢. TOTAL ALTERNATE #:r2 � 5 17.251.00 i I