HomeMy WebLinkAbout2005 Certification of Completiony,, �„ Ft41t{1144
Jeb Bush
Governor
City of Sebastian
1225 Main Street
Sebastian, FL 32958
Department of
Environmental Protection
Central District
3319 Maguire Boulevard, Suite 232 Colleen Castille
Orlando, Florida 32803-3767 Secretary
July 18, 2005
Attention: Jason Milweski, City Airport Manager
Indian River County - PW
Indian River County Utilities
Sebastian Administration Building and Police Evidence Compound
Dear Mr. Milweski:
This acknowledges receipt of certification that the subject water distribution system extension has been
completed in accordance with the plans and related materials permitted by this agency on Permit Number
WD31-0039206-461 elated September 10, 2004 and that the system has passed the pressure and
bacteriological tests that were conducted in accordance with the AW WA Standards.
Based on this certification and satisfactory bacteriological results, we are clearing the system for service..
The responsibility for the microbiological quality of the water at the time it ultimately reaches the
consumer's meter remains entirely with the utility and/or the owner/operator of the system who should
ensure that this quality remains as represented by the bacteriological test results presented. This letter of
clearance does not preclude the need for obtaining acceptance by other entities as may be required.
Sincerely,
C (Y)
Cary M. Padell
Engineer III
Drinking Water Permitting
CMP//1117
cc: Bruce Moia, P.E.
William F. Archebelle, Engineer
DEP Compliance/Enforcement
imilewskiacityofsebastian.org; mbvengc@bellsouth.net; barchebelle@iregov.com