Loading...
HomeMy WebLinkAbout2014 09 26 Cost EstimatePRELIMINARY CONSTRUCTION COST ESTIMATES Road Name: Grade Crossing Barber St 99th St Schumann Dr Dixie St. and Main St Date 9/26/14 Proiect No. Road No.: Prepared by: FTW Pro'ect Location: City of Sebastian Checked by: CRW Grade crossing improvements at five street crossings Revised date: Pro'ect Site: Five Grade Crossings at Barber St 99th St Schuman Dr Old Dixie and Main St Preliminary Estimate DESCRIPTION QUANTITY UNITS UNIT COST AMOUNT Traffic Control MOT 1 LS $ 2,500.00 $ 2,500.00 Erosion Control and BMP's 1 LS $ 5,000.00 $ 5,000.00 Redo driveway concrete 1 LS $ 2,000.00 $ 2,000.00 Install 4' sidewalk 200 LF $ 32.00 6,400.00 Install strping and pavement legends 1 LS 400.00 400.00 Install new railroad crossing gates Barber SO 2 EA $ 75 000.00 $ 150 000.00 Install new railroad crossing gates 99th SO 2 EA 75 000.00 $ 150 000.00 Install new railroad crossing gates Schumann Dr 2 EA 75 000.00 150 000.00 Install new railraod crossing gates Old Dixie Hwy) 2 EA 75 000.00 150 000.00 Install new railroad crossing gates Main St 2 EA $ 75 000.00 $ 150 000.00 New pavement legends and stir in 1 LS $ 4,000.00 $ 4,000.00 Install sod and grass 1 LS $ 2,000.00 $ 2,000.00 OTHER COSTS SUBTOTAL $ 766,300.00 Preliminary Enaineering OTHER COSTS CEI Services 12 000.00 Construction Engineering CONTINGENCIES @ 10% $ 76,630.00 at 12.5% Contract Cost RW Acquisition TOTAL 854 930.00 ROUNDED TOTAL 855 000.00 Cost for three city crossing 513 000.00 TOTAL LOCAL COST FOR CROSSINGS 110% Local share cost $ 50,000.00