HomeMy WebLinkAbout2004 NOI Acknowledgement Complete{� Department of
.FLOR A_ '�1o.0,a lu Environmental Protection
'� Twin Towers Office Building
Jeb Bush 2600 Blair Stone Road
Governor Tallahassee, Florida 32399-2400
June 15, 2004
Jason Milewski
City of Sebastian
1225 Main St.
Sebastian, FL 32958
RE: Project ID: FLRlOR164
Sebastian Admin. Building & Police Evidence Compound
Sebastian, FL 32958
Dear Permittee:
Colleen M. Castile
Secretary
The Florida Department of Environmental Protection has received and processed your Notice of Intent
to Use Generic Permit for Stormwater Discharge from Large and Small Construction Activities (NOI)
and the accompanying processing fee. This letter serves to acknowledge that your NOI is compiete,
your fee is paid -in -full, and your project is covered,under the generic permit effective June 11, 2004.
Your coverage under the generic permit will expire June 10, 2009.
The Generic Permit for Stormwater Discharge from Large and Small Construction Activities (CGP)
was issued under the provisions of Section 403.0885, Florida Statutes, and applicable rules of the
Florida Administrative Code. Until the CGP is terminated, modified or revoked, permittees that have
properly obtained coverage under this permit are authorized to disturb land, to construct and operate
facilities, and to discharge to surface waters in accordance with the terms and conditions of this
permit.
Your project identification nt=mher ig FLRIOR! C-4. P! --ass ,:yak.; rcfaraiica to this nurni;er un &A
future correspondence including any checks made out to the Department.
This letter is not your permit. Your NOI allows you to proceed with construction by complying with the
CGP (DEP Document No. 62-621.300(4)(a)), a copy of which you may obtain online at
http://www.dep.state.fl.us/water/stormwater/npdes/construction3.htm or by contacting the
NPDES Stormwater Notices Center.
Key provisions of the permit are (1) implementation of your stormwater pollution prevention plan
(SWPPP) that was required to be developed prior to NOI submittal; (2) conducting and documenting
routine inspections as required by the permit; and (3) retention of records required by the permit,
including retention of a copy of the SWPPP at the construction site, or at an alternative location as
specified it your NOI, from the date of project initiation to the date of final site stabilization.
"More Protection, Less Process"
Printed on recycled paper.
If your project will continue discharging stormwater associated with construction activity beyond
expiration of the current coverage, request for continued coverage shall be made by filing a completed
NOI at least 2 days before expiration of the current coverage period. If you discontinue discharging
stormwater associated with construction activity, or otherwise qualify to discontinue coverage under
the CGP, you may terminate permit coverage by filing a Notice of Termination of Generic Permit
Coverage (NOT).
If you have any questions concerning this acknowledgment letter, please contact the NPDES
Stormwater Notices Center at (866) 336-6312 or (850) 297-1232.
CERTIFICATE OF SERVICE
THE UNDERSIGNED HEREBY CERTIFIES that the foregoing acknowledgment of coverage under
the Construction Generc Permit Rule 62-621.300(4), F.A.C., was mailed by Science Applications
International Corporation working under FDEP Contract Number WM788, on behalf of the Florida
Department of Environmental Protection, on the date indicated below via the United States Postal
Service.