Loading...
HomeMy WebLinkAbout2003 RFQ&P AddendaMYOF �a HOME OF PELICAN MJW PURCHASING GENERAL SERVICES 1225 MAIN STREET- SEBASTIAN, FLORIDA 32958 TELEPHONE (772) 388-8241 FAX (772) 581-0149 TII EPHONE (772) 589-0743 FAX (772) 589-6880 RFO&P ADDENDUM # 1 DESIGN AND CONST"CTION OF .ADMINISTRATION BUILDING DATE: May 9, 2003 TO: All Design/Build Firms This Addendum hereby becomes an integral part of the RFQ&P under consideration by you as a respondent. The City of Sebastian deems all sealed qualifications and proposals have been proffered in recognition of the entire RFQ&P package- including all issued addenda. This Addendum is being sent to you via, "fax"Should you have any question pertaining to this Addendum, please contact me at 772-589-0743. ADDENDUM MESSAGE 1. The requirement that the City is named as an additional insured party does not apply to Professional Liability Insurance Coverage. 2. The budget for this project is S 1.5 million and in addition to the DesirmBuild Contract, it also includes the costs for services provided by the continuous engineering services firm retained by the City for this project. 3. The Engineer's Conceptual Project Schedule is twelve (12) months. Three (3) months for design and nine (9) months for Construction. Attached is revised page TE -8 (Technical Evaluation). In addition, the City anticipates contract execution in August 2003 and based on that, project start September 1, 2003 and completion August 31, 2004; however, each Design/Build Firm must submit their proposed project schedule and the actual Contract Schedule shall be based on the Design/Build Firm's schedule. 4. This page must be submitted signed, as acknowledgement of receipt, with your qualification nactranP ipt aclmowle d by, Signature Firm Name ysu'S(M. veiro, Buyer SECTION TE - TECHNICAL EVALUATION FORM reg 5/9/1003 drawings and other documents, and all other required activities from Notice To Proceed to Certificate of Occupancy. 2 points will be awarded for each 7 calendar day period less than the allowable project design and construction schedule of three hundred and sixty-five (365) calendar days (20 points max) Supporting comments: TOTAL PROJECT SCHEDULE CRITERIA a. Design Consultant's Design Schedule (30 points max) b. Builder's Construction Schedule (50 points max) c. Proposer's Total Schedule (20 points max) TOTAL PROJECT SCHEDULE SCORE (100 Points max) THIS SECTION LENT BLANK INTENTIONALLY It Administration Building TE -8 Sebastian Municipal Airport points points points points points an or HOPE or PeucrN tsuuND PURCHASING GENERAL SERVICES 1225 MAIN STREET- SEBASTIAN, FLORIDA 32958 TELEPHONE (772) 388-8241 FAX (772) 581-0149 TELEPHONE (772) 589-0743 FAX (772) 589-6880 RFO&P ADDENDUM # 2 DESIGN AND CONSTRUCTION OF ADMINISTRATION BUILDING DATE: May 13, 2003 TO: All Design/Build Finns This Addendum hereby becomes an integral part of the RFQ&P under consideration by you as a respondent. The City of Sebastian deems all sealed qualifications and proposals have been proffered in recognition of the entire RFQ&P package- including all issued addenda. This Addendum is being sem to you via "fax". Should you have any question pertaining to this Addendum, please contact me at 772-589-0743. ADDENDUM MESSAGE 1. It's confimted hereby that due to an error in the numbering sequence there is no item 5 on page 6 of Instructions to Proposers. 2. This page must be submitted signed, as acknowledgement of receipt, with your qualification package. I J gus M. Vieiro, Buyer Lr��/,NA