Loading...
HomeMy WebLinkAbout2014 - Approval for Grant CommencementA,STb" _SEJ1u HOME OF PELICAN ISLAND AGENDA TRANSMITTAL Subject: Agenda No. 12-b — 13-6:5-7 Tulip Street Improvements Department Origin: City Manager DEP 319 Grant Application Administrative c: City Attorney: ove or Submittal by: ;7.,&* City Clerk: Date Submitted: 4 APR 12 A inn r, ity Manager For Agenda Of: 10 APR 12 Exhibits: EXPENDITURE REQUIRED: AMOUNT BUDGETED: APPROPRIATION REQUIRED: $0 — At This Time $0 Requires Allocation for FY 14 SUMMARY As the City completes resurfacing Englar Drive, the next street scheduled for improvement, per the 2012 Pavement Schedule, is Tulip Drive. Tulip Drive presents some opportunity not only to improve road conditions, but add on -street parking for use at the Barber Street Sports Complex and additional drainage enhancements. Neel -Schaffer has presented an estimated budget of $351,000 to complete all project aspects. Because the project contains creation of a wet -retention area, similar to the Periwinkle Project, this project is a good candidate for the DEP 319 Grant. By receiving funds, the City will minimize project expenses and enable project funding options, potentially over three special revenue funds - Recreational Impact Fees, LOGT or DST, totaling an amount of $175,500. At the project's conclusion there is potential to: ➢ Create Additional Retention Areas, promoting storm water enhancement; Additional Parking for Recreational Purpose (Approximately 50-60 car parking spots),- Rebuild pots);Rebuild Road Bed and Resurface Street The purpose of this agenda item is to authorize Neel -Schaffer to complete the 319 Grant application. Neel -Schaffer has agreed to complete the application at their cost, provided they receive a design CSA to construct the project. RECOMMENDATION Authorize Neel -Schaffer to commence grant application, with the following time line and authorizations: ➢ Grant application is due at the end of April; Grant Award is Scheduled for July,- Funds uly;Funds are Available October 1, 2013 (FY 14); and, Authorize City Manager to Execute CSA in amount of $29,405 should grant be awarded PRELIMINARY CONSTRUCTION COST ESTIMATES Road Name: Tulip Drive Drainage and Detention Basin Date 3121113 Project No. Road No.: Prepared by: FTW Project Location: City of Sebastian Checked by: FTW Project: Tulip Drive from Barber St to Croquet St (1,280 ft) Revised date: Project Site: Tulip Drive Drainage Improvements Preliminary Estimate DESCRIPTION QUANTITY UNITS UNIT COST AMOUNT Traffic Control 1 LS $ 51000.00 $ 5,000.00 8" Base rock compacted for parking area 540 SY $ 25.00 $ 13,500.00 Stamped concrete parking spaces - 4,860 sf 550 SY $ 33.00 $ 18,150.00 Full depth reclamation 31500 SY $ 10.00 $ 35,000.00 Asphalt pavement overlay 400 ton $ 100.00 $ 40,000.00 18" ADS Pipe 540 LF $ 20.00 $ 10,800.00 Miter End Section 2 EA $ 11800.00 $ 3,600.00 Drainage boxes 6 Ea $ 3,000.00 $ 18,000.00 Detention Basin 1 LS $ 150,000.00 $ 150,000.00 Utilities Relocation 1 EA $ 3,000.00 $ 3,000.00 OTHER COSTS SUBTOTAL $ 294,050.00 Preliminary Engineering $20,000 OTHER COSTS (Eng Design and CEI) $ 27,500.00 Construction Engineering $7,500 CONTINGENCIES @ 10% $ 29,405.00 at 12.5% Contract Cost RW Acquisition TOTAL $ 350,955.00 TOTAL OTHER COSTS ROUNDED TOTAL $ 351,000.00