HomeMy WebLinkAbout2014 - Contract1,41, o L/s, �m BA LA� , HOME OF PELICAN ISLAND CITY COUNCIL AGENDA TRANSMITTAL FORM Council Meeting Date: 26 February 2014 Agenda Item Title: Award Continuing Services Agreement (CSA) to Baker, Inc. for Hangar C Recommendation: Authorize the City Manager to execute a CSA with Baker, Inc., for Hangar C Development not to exceed $172,848. Background: On 23 October 2013, Council approved acceptance of a FDOT JPA that provided the first year funding, $700,000, in the development of Hangar C at the Sebastian Airport. City/Airport match is $135,000 as approved in the 2013114 CIP budget. In the 2014/15 proposed budget, FDOT will contribute $520,000 and the City/Airport match will be $130,000 from CIP funding to complete the project. The planning, design, bidding, and permitting phase of the project is proposed in the attached "Scope of Work" from one of the CCNA approved airport consulting engineers, Baker, Inc. Baker's proposal is $172,848. Airport staff s economic development strategy for the construction of Hangars A & B consisted of finding a potential tenant and proposing to the City Council lease parameters. Eagle Air Transport, Inc. (Eagle Air) has been recruited as Hangar C's first tenant. Eagle Air is not a stranger to the Sebastian airport. Based in the Chicago area, they provide leased aircraft services to Skydive Sebastian. Their use of a proposed Hangar C would be to house and maintain their aircraft and to expand the skydive business by pursuing Department of Defense/military contract services for skydive/jump qualifications and re -qualification. Hangar C is planned to be approximately 5,000 sq. ft. larger than Hangars A & B (20,000 v. 15,000). Eagle Air would lease approximately 15,000 sq. ft. and the City/Airport would retain 5,000 sq. ft. for airport equipment storage, or future expansion possibilities. If Agenda Item Requires Expenditure of Funds: Total Cost: $172,848 Amount Budgeted in Current FY: $875,000 If Cost Requires Appropriation: Amount of Appropriation Required: Fund to Be Utilized for Appropriation: Attachments: A. Civil Site Design Scope of Work - Baker, Inc. B. Memorandum of Understanding - Eagle Air Transport City Manager Authonzatio ` Date: -2 '! /e - EXHIBIT Al CIVIL SITE DESIGN SCOPE OF WORK SEBASTIAN MUNICIPAL AIRPORT SEBASTIAN HANGAR C PROJECT DESCRIPTION Michael Baker Jr. Inc. (BAKER) understands that the Sebastian Municipal Airport (Airport) and the City of Sebastian intend to construct a hangar on the Airport property through an 80/20 grant from the FDOT in the total budget amount of $1.525M. The hangar is intended for a proposed tenant interested in storing Twin Otter and Cessna Caravans. The hangar floor area will be approximately 14,899 sq. ft. (105' xl4l') plus two adjoining lean to's of 3,000 sq. ft. each. The site work will include a parking lot, utilities, storm water, and milling and overlay of the apron area in front of the proposed hangar. Scope of Professional Services includes design, permitting, and bidding. The professional disciplines included as part of the scope are Architectural, Civil, Electrical, Mechanical/Plumbing, Structural, and Landscape Architecture. Survey, Geotechnical Investigation, and Utility Locates are also included as part of the scope of work. BAKER will perform the Professional Services for this Project, producing a Construction Documents package for use in permitting of the Project. Compensation for this work will be a Lump Sum Fee, as described in Exhibit B attached to this document. The project will include the following civil engineering design services: General • Project Management • Project Coordination • Client Meetings • Site Investigation • Quality Control Design • Demolition • Vehicle Pavement Design • Horizontal and Vertical Geometry • Security Fencing and Gates • Drainage • Site Grading • Utilities (Water, Sewer, Electric, Data) • Fire Protection System Connection • ADA Accessibility • City of Sebastian Design Requirements • Landscape and Irrigation Sebastian Hangar C Exhibit A I- Page 1 of 4 2/07/2014 Civil Scope Documentation • Plans • Quantity Calculations • Cost Estimates • Engineer's Report • Specifications • Permitting Permitting: • St. Johns River Water Management District (SJRWMD) Environmental Resource Permit (ERP) for Drainage • FDEP Water & Sewer • City of Sebastian Land Development • FAA Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) Phase I — Initial Investigation and 45% Design Phase 1 services will involve inventory, preliminary design and the production of 45% plans. BAKER will acquire any existing Record Drawings or Construction Plans and will perform a visual evaluation of the site. BAKER will also review and evaluate the pavement and soils data in the project area. Topographic surveys, utility locates, and geotechnical investigation to determine the project site conditions will be performed. See Exhibit B for a detailed list of tasks to be performed under this phase. Deliverables: BAKER will provide a total of four (4) copies, three (3) to the Airport and one (1) to Tenant, of the Preliminary Design package for review and approval, which would include Plans, Engineers Report, and Probable Construction Cost Estimate. Phase 2A — 90% Design Documents Upon authorization by the Airport, BAKER will proceed with Phase 2 - 60% Design Documents. See Exhibit B for a detailed list of tasks to be performed under this phase. Deliverables: BAKER will provide a total of four (4) copies, three (3) to the Airport and one (1) to Tenant, of the 60% Design package for review and approval, which would include Plans, Engineers Report, Probable Construction Cost Estimate, and Technical Specifications. Phase 2B —Final Contract Bid Documents Upon authorization by the Airport, BAKER will proceed with the Final Contract Documents. See Exhibit B&C for a list of tasks to be performed under this phase. Deliverables: Sebastian Hangar C Exhibit A 1 -Page 2 of 4 Civil Scope 2/07/2014 BAKER will provide four (4) copies, three (3) to the Airport and one (1) to Tenant, of the Final (100%) Plans, Project Manual, Engineers Report, and Probable Cost Estimate. Provide sets of Final Signed and Sealed Construction Documents for Bidding, Permitting and Approval by authorities having jurisdiction. Phase 3 — Bidding See Exhibit B and C for a list of tasks to be performed under this phase. PROJECT MANAGEMENT A. Contract Management: This task involves the internal management of the contract including general project bookkeeping, cost tracking, billing, filing, record keeping and contract coordination with project sub -consultants. The Project Manager (PM) will maintain and monitor project schedules to ensure critical milestones are met by the design team. B. Meetings: The PM will attend all submittal review meetings; meetings where critical items are discussed and coordinated; be present or conduct meetings with government agencies, utilities, permitting agencies, tenants, operations, and other affected parties. Minutes to all meetings conducted shall be prepared. C. Coordination: The PM will be readily available to the design team, coordinate review and regulatory agency approvals, and schedule/conduct design team meetings. The PM will keep the airport apprised of the work progress, schedule, and anticipated review dates by means of phone calls, emails or review meeting minutes. The PM will be the point person for interfacing with the Airport Staff, Airport/Authority Departments, Tenants, and CMR. D. Production: A key component independent of the Quality Control process is to ensure the overall design is consistent with the airports desired objectives. The PM will review all plans, reports, minutes, schematics, and calculations to ensure these objectives are met. PERMITTING Permitting services include meeting with agencies, application preparation & submission, preparation of exhibits, and addressing comments. The nature of this project will require partial approvals so that construction can begin prior to completion of all design items. This approach will require additional applications, plan modifications, and continuous coordination. The following permit approvals will be obtained: • SJRWMD Environmental Resource Permit (ERP) for Drainage • FDEP Water & Sewer • Land Development and Building Plans Review • FAA Obstruction Evaluation/Airport Airspace Analysis (OE/AAA) and Shadow Study • FAA Categorical Exclusion OTHER PROVISIONS Sebastian Hangar C Exhibit Al -Page 3 of 4 Civil Scope 2/07/2014 The Airport will provide BAKER and the sub consultants with access to the site and all available information pertinent to this project, including access to as -built drawings and documents on existing conditions within the project limits. The Airport will also provide to BAKER all criteria and requirements, including all design and construction standards, which the Airport will require to be included in the Drawings and Specifications. The Airport will provide access to pertinent information regarding airport property, boundary, easement, right-of-way and other information necessary for the design and permitting of the project. The Airport may negotiate additional contract(s) with BAKER for services beyond the scope of this project. SCHEDULE Estimated Notice -To -Proceed Date: March], 2014 The total duration for design is 180 days. Sebastian Hangar C Exhibit A 1 - Page 4 of 4 Civil Scope 2/07/2014 EXHIBIT A-2 ARCHITECTURE DESIGN SCOPE OF WORK SEBASTIAN MUNICIPAL AIRPORT SEBASTIAN, FLORIDA PROJECT DESCRIPTION The City of Sebastian intends to make improvements to the Sebastian Municipal Airport by constructing a 1 story approximate 14,899 sq. ft. Storage Hangar building and 3,000 sq. ft. lean- to on 2 sides of the hangar totaling 6,000 sq. ft. of future offices / storage. The details of this building include the following: Pre-Engineered/Pre-Fabricated Metal Building A masonry firewall between the hangar and office space 28' High by 100' Wide Horizontal Sliding Hangar Doors Overhead Doors to allow egress and access of aircraft pull -tugs Mechanically Ventilated Louvers (HV) Associated Site improvements (Refer to Civil Scope of Services) THE MICHAEL BAKER CORPORATION will perform the following Basic Services for this project. The total cost for this scope of services is $114,697 TASK I - Thru 100% Construction Documents & Bidding: Task I - Phase 1: Preliminary thru Design Development (45%) Summary of Services: The following services will be performed in Phase I.- 1) : 1) General project coordination and formulation. 2) Coordination in development of Site Plan 3) Coordination meetings with Airport Staff and SUBCONSULTANTS. 4) Building & Fire Codes Review and meeting with Building Department 5) Review of existing drawing records and Prepare Design Development Drawings. 6) Prepare Preliminary Cost Estimate. Deliverables: Payment for Task I - Phase 1 will be made after the following deliverables are received.• Six (6) copies of the Preliminary Design A progress report or other means of verification will be provided with each invoice attesting to the work performed. Task I — Phases 2A & 2B — Construction Documents (90% & 100%) Summary o Services: The following services will be performed in Phases 2A & 2B.- Sebastian B: Sebastian Hangar C City of Sebastian A2 Page l of 3 2/07/2014 Fran 'ta; 'v�zrr - •� 1) Based on the approved Design Development Documents and any further adjustments in the scope or quality of the Project or in the construction budget authorized by the OWNER, BAKER shall prepare, for approval by the OWNER, Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the Project. 2) BAKER shall assist the OWNER in the preparation of the necessary bidding information, bidding forms, the Conditions of the Contract, and the form of Agreement between the OWNER and the Contractor. 3) BAKER shall advise the OWNER of any adjustments to previous preliminary estimates of Construction Cost indicated by changes in requirements or general market conditions. 4) BAKER shall assist the OWNER in connection with the City's responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project. Upon receiving the 90% comments, BAKER will proceed with the development of 100% Documents. Final Signed and Sealed Contract Documents will be delivered to the OWNER for Bidding. Permit Applications and documents will be submitted for approval. Deliverables: Payment for Task 1— Phase 2 & 3 will be made after the following deliverables are received.• • Six (6) copies of the 90% Plans and Specifications will be submitted • Three (3) sets signed and sealed of Final Contract Documents will be prepared. • Final Construction Plans and Specifications in reproducible format will also be submitted • A progress report or other means of verification will be provided with each invoice attesting to the work performed. Task I - Phase 3— Bidding and Award of Contract After authorization to proceed with the Bidding Phase, BAKER shall: 1) Assist the OWNER in advertising for and obtaining bids for the contract for construction, materials, equipment and services; and attend pre-bid conference. 2) Furnish Contract Documents. 3) Issue addenda, as required to interpret, clarify or expand the Bidding Documents. 4) Consult with and advise OWNER as to the acceptability of subcontractors, suppliers and other persons and organizations proposed by the prime contractor(s). 5) Assist OWNER in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment and services. Deliverables: Payment for Task 1— Phase 3 will be made after the following deliverables are received: • Recommendation ofAward • A tabulation of the bids received will be prepared and distributed. • Three (3) copies of the Contract for Construction, suitable for execution will be furnished • A progress report or other means of verification will be provided with each invoice attesting to the work performed. Sebastian Hangar C City of Sebastian A2 Page 2 of 3 2/07/2014 This Scope of Services does not include Resident Project Representative (RPR) Services. Sebastian Hangar C 2/07/2014 City of Sebastian A2 Page 3 of 3 EXHIBIT B Sebatian Municipal Airport- Hangar "C" FEE SUMMARY �z'cyr�:, �.:rtir3'e^mr^s�-. � .::'�`^aC �s'..�•,�'�. ;,.+iY"c,.�.�. f ��.. S��l�,`,' x �x-^4 s...i?'4-� r s T�•°�S °C.-`ts��.t�o:i'£'a�� 1 DESIGN SERV[CEa. Task I Phase 1 (Architecture) - 45% Design Phase 1 (Civil) - Initial Investigation and 45% Design Phase 2A (Architecture) - 90% Design Phase 2A (Civil) - 90% Design Phase 213 (Architecture) - Final Documents Phase 2B (Civil) - Final Documents Phase 3 (Architecture) - Bidding Phase 3 (Civil) - Bidding subtotal Direct Costs Subconsultants Bobe Associates Consultanting Engineers- MEP Bowen Engineering Corp- Structural Engineering Miller Legg- Landscaping and Irrigation KSM Geotechnical Velcon Group Inc.- Survey Reimbursables Task I Total (Arch and Civil) (Lump Sum): architecture $20,314.00 $21,636.00 $10,350.00 $10,144.00 engineering $18,716.00 $26,250.00 $7,672.00 $5,668.00 $62,444.00 $58,306.00 $10,306.00 $7,730.00 $3,912.00 $84,392.00 $6,500.00 $1,200.00 $3,200.00 $4,250.00 $73,456.00 COMBINED $920,750.00 $957,848.00 PERMITTING SERVICES: Permitting (Land Development, Utilities, FDEP Water and Sewer, OE/AAA, SJWMD, FAA Categorical $15,000.00 $95,000.00 Exclusion) (Lump Sum) TOTAL FEE (LUMP SUM): $84,392.00 $88,456.00 $172,848.00 Sebastian Hangar C B-1 of 5 Fee Summary EXHIBIT B MANHOUR AND FEE ESTIMATE Sebatian Municipal Airport- Hangar "C" Phase 1 (Civil) - Initial Investigation and 46% Design Item/Task Description Sr. Project Manager Project Manager Project Engineer Designer Technician Clerical Totals Project Management 1 10 2 13 Project Coordination with Airport 6 1 7 Subconsultant Coordination 2 4 6 Process Survey 2 2 Survey Verification 4 4 Quality Control 8 3 11 45% Review Meeting 3 3 6 45% Review Meeting Minutes 2 4 6 45%° Design: Parking Lot Pavement Design 1 3 4 Code Research 1 4 5 Horizontal Geometry (Parking Lot) 6 6 Fence Layout 1 1 Preliminary Drainage Investigation 1 2 4 7 Preliminary Utility Investigation 1 2 4 7 460/6 Cover Sheet 1 1 Project Layout & Safety Plan 1 1 General Notes 1 1 Phasing Plan 1 2 3 Parking Pavement Sections 1 3 4 Existing Information and Demolition Plan 1 4 5 Parking Staking Plan 1 4 5 Existing Utility Plan 1 3 4 Utility Layout Plan 1 4 5 Drainage Pipe Layout Plan 1 4 5 4S°!o_Dq�umettlta#Eon : .! •, •'- ... ' ..< ,` Quantities 2 2 4 Cost Estimate 4 4 Engineer's Report 1 4 3 8 Total: 9 27 34 24 31 10 135 Rate/Hour: $201.00 $171.00 $144.00 $108.00 $82.00 $76.00 Total Labor. $1,809.00 $4,617.00 $4,896.00 $2,592.00 $2,542.00 $760.00 $17,216.00 Total Direct Costs $1,500.00 Total Phase 1 Civil(Lump Sum): $18,716.00 Sebastian Hangar C B-2 of 5 Civil EXHIBIT B MANHOUR AND FEE ESTIMATE Sebatian Municipal Airport- Hangar "C" Phase 2B (Civil) - Final Documents Sebastian Hangar C 134 of 5 Civil Sr. Project Project Project Item/Task Description Manager Manager Engineer Designer Technician Clerical Total Project Management 6 2 8 Project Coordination with Airport 1 1 2 Subconsultant Coordination 2 2 Incorporate 90% Review Comments 1 8 9 Prepare Final Drawings 2 8 10 Prepare Final Project Manual 2 4 6 Prepare Final Engineer's Report 2 2 4 Prepare Final Quantities & Cost Estimate 2 4 6 Quality Control 8 1 2 11 Total: 8 8 13 0 20 9 58 Rate/Hour: $201.00 $171.00 $144.00 $108.00 $82.00 $76.00 Total Labor: $1,608.00 $1,368.00 $1,872.00 $0.00 $1,640.00 $684.00 $7,172.00 Total Direct Costs $500.00 Total Phase 213(Lump Sum): $7,672.00 Sebastian Hangar C 134 of 5 Civil EXHIBIT B MANHOUR AND FEE ESTIMATE Sebastian Hangar C B-3 of 5 Civil Sebatian Municipal Airport- Hangar "C" Phase 2A Civil - 90% Design Sr. Project Project Project Item/Task Description Manager Manager Engineer Designer Technician Clerical Total General. Project Management 1 6 4 11 Project Coordination with Airport 4 1 5 Subconsultant Coordination 1 3 4 Quality Control 8 3 11 90% Review Meeting 4 4 8 90% Review Meeting Minutes 1 4 5 'Finalize .. Parkin Lot Pavement Desi n 9 g 1 Finalize Horizontal Geometry (Parking 1 1 Lot) Site Grading 1 8 9 Apron Grading 12 12 Drainage Basin Delineation 4 2 6 Drainage Pond Sizing 2 4 6 Drainage Pipe Sizing 4 4 8 Water & Sewer Design 2 14 6 22 ADA Sidewalk and Ramp 1 2 3 Soil Erosion & Abatement Plans 1 1 2 Staking Plans & Construction Details 4 4 (Parking Lot) Grading and Drainage Plans 1 4 5 Utility Relocation Plans 1 2 3 f� Water & Sewer Plans 1 1 6 8 Security Fence and Gate Details 1 2 4 7 Signage Plan and Details 1 4 5 Pavement Marking Plan and Details 2 2 Drainage Details 2 2 4 Water and Sewer Details 2 4 6 ADA Details 1 1 Update from 30%: Phasing Plan 1 1 Parking Pavement Sections 1 1 Existing Information and Demolition 1 1 Plan Existing Utility Information 1 1 90% DocumO'nih- on; �~ ~ Quantities 2 2 4 Cost Estimate 1 2 1 4 Engineers Report 1 4 4 9 Project Manual (Front End & Tech) 1 16 4 21 Total: 9 23 63 52 36 18 201 Rate/Hour. $201.00 $171.00 $144.00 $108.00 $82.00 $76.00 Total Labor: $1,809.00 $3,933.00 $9,072.00 $5,616.00 $2,952.00 $1,368.00 $24,750.00 Total Direct Costs $1,500.00 Total Phase 2A(Lump Sum): $26,25 .00 Sebastian Hangar C B-3 of 5 Civil EXHIBIT B MANHOUR AND FEE ESTIMATE Sebatian Municipal Airport- Hangar "C" MANHOUR ESTIMATE Phase 3 Civil - Biddin 7-7-71 Total Direct Costs $750.00 Total Phase 3(Lump Sum): $5,668.00 Sebastian Hangar C B-5 of 5 Civil Sr. Project Project Project Item/Task Description Manager Manager Engineer Designer Technician Clerical Totals Project Management and Coordination 1 5 6 Attend Pre -Bid 8 2 2 12 Answers to Bidders Questions/Civil Addenda Items 3 2 2 7 Attend Bid Opening 2 2 Recommendation of Award/Contracts 2 2 4 Total: 8 10 9 0 0 4 31 Rate/Hour: $201.00 $171.00 $144.00 $108.00 $82.00 $76.00 Total Labor: $1,608.00 $1,710.00 $1,296.00 $0.00 $0.00 $304.00 $4,918.00 Total Direct Costs $750.00 Total Phase 3(Lump Sum): $5,668.00 Sebastian Hangar C B-5 of 5 Civil Exhibit "C" CITY OF SEBASTIAN - HANGAR C Hour and Fee Estimate - Architecture TASK I - Thru 100% Construction Documents & Bidding ltent/Task Description Senior (Engineer! Arch I Planner /Scientist) Engineer Arch I Planner /Scientist Design Architect Designer Admin (Clerical) Total 2013 Rate $201.00 $171.00 $108.00 $108.00 $76.00 TASK I - Thru 100% Construction Documents & Bidding: Task I - Phase 1: Preliminary thru Design Development 45% Programming meetings) with Owner Coordination with Design Team Attend meeting(s) & coordinate Conceptual Site Plan w/ Client Coordinate Conceptual Site Plan drawings Building & Fire Code Review Initial Meeting with Building Department Prepare Design Development Drawings and specs Prepare Preliminary Cost Estimate Prepare Project Schedule I Status Quality Review Submit DD package and attend Review Meeting 3 4 7 2 6 2 2 12 2 8 1 11 2 8 2 1 13 2 B 2 12 4 4 8 4 40 1 22 8 74 1 6 7 2 4 2 8 2 2 2 2 1 9 — 2 2 2 4 10 TOTAL. HOURS 23 5 92 32 19 171 TOTAL FEE . .` ........ `. ''..4823; Task I - Phase 2A: Construction Documents 90%) Coordinate with Subconsuttents & City Update Drawings per DD Review Meeting Coordinate/Prepare Construction Documents and Specs Update Project Schedule / Status Update Cost Estimate Review meeting with Building Department Quality Review Submit 90% Documentation (8 copies) Review Meeting with City 2 6 8 2 6 8 2 8 48 26 14 98 2 4 6 2 3 2 7 4 4 8 4 4 6 2 16 1 2 I 4 2 9 8 8 16 TOTAL HOURS 27 11 84 35 18 176 TOTAL FEES : S 5,427: _S. 1881 ' .S 9,072 S 3,888 `S 1;368. $ ,21:636 Task I - Phase 28:100% Construction Documents Coordinate with Suboonsultants & City Update Design per 90% Review Meeting Finalize Construction Documents and Specs Finalize Project Schedule / Status Finalize Cost Estimate Quality Review Submit 100% Documentation 8 copies) 2 2 2 2 2 2 30 16 18 68 2 2 4 1 4 5 2 2 2 6 1 2 3 1 7 TOTAL HOURS 8 2 44 19 21 94 TOTALFEES .._..__;<.r.x.,$342 .... _ ...,...� 752 ,,.., ..$2.052. :..$1,598. .:$10.350 2/7/2014 Page C-1 of 2 Exhibit "C" CITY OF SEBASTIAN - HANGAR C Hour and Fee Estimate - Architecture TASK I - Thru 100% Construction Documents & Bidding ItemlTask Description Senior (Engineer f Arch I Planner /Scientist) Engineer I Arch I Planner 15cientist Design Architect Designer Admin (Clerical) Total 2013 Rate $201.00 $171.00 $108.00 $108.00 $76.00 Task 1- Phase 3: Bidding and Award of Contract Assist in distributing Bidding Documents 2 4 4 10 Pre -Bid Conference 8 8 16 Answers to Bidders/lssue Addenda 8 10 4 22 Review Bids for Responsiveness 2 10 12 Certified Bid Tabs/Assist w/ Award Contract 2 4 4 10 Assist City w/ Contract Preparation 2 2 4 8 TOTAL HOURS 24 0 38 0 16 78 TOTAL FEES ... $4 824 $0 .. .. $4,104 = $t) $1:296 $10;144 Task I Labor Totals Total Estimated Hours: 82 18 258 87 74 519 Total Estimated Labor Costs(Lump Sum): .St8,482 X13 078 .::: #27,t3,e4 :: ' S9 396 S6;6?�4.. 162 444.00 Task I Subconsultants Fees Bobes Associates Consulting Engineers, Inc. — Mechanical/Bldg Electrical/Plumbing Engineering $10,306.00 Bowen Engineering Corporation (BEC) - Structural Engineering $7,730.00 Task I Total Professional Fees & Costs Professional Design Fees iso,480;00 Estimated Reimbursable Expenses 53,91x 00 TASK I TOTAL LUMP SUM AMOUNT: 184;3$2,}0 2/7/2014 Page C-2 of 2 .. F.t..:.i... ...xi1!. # .r. "".3•�"ytr �;}}�} Y Y, r Y S17 � .7 � :.' � �l' �' 1 - i. _"J St -;}F; F.a s x. •i 1� T4s ;. b.,. ... zr Yvr } _i�"�Ei�i�. P. F Ent3 �•r�, r-a:.� � ..m- � yu.s •iii. "il � ' iii r�,�r + °s t t y Eco -x rii rix. ^� .q .. i._ sS.artlf i � # r, E ?} �•+r i flrT ly_.� 3 i if 3 � u.. ' .�j R �L'N#rT 3 ���c3 d E C a `'a yr� J f �• �fi i F i r � �. Y,ti�-i i... xJ lf. rsfY, .Yi r. _ irY t - t -'T._. � si.ri tl f r Er -. •, ii�. �x _ y t J t.n , 1 t ; sY... a ^i •,.zv �'' S E r(}'� -}-. f acs z r ai E s i jjj pis! tr t 3 ?U, 'lWt 7 t #t s kE t t!r J =ex tE�f jaY._ S•-�_».zxEi�•s'�$�:yu4� a '� _fy �- � �' E � '}. r # i� �° s,i#� t^i I'Y� �1." •,zc:tt� •�',r ri {rt t#r j rnf �} tt i M�r { ya k`y J } k"xa ' 2 } �� x i ['?,• i}�u E li #� ¢ fa i TA E +t4i�°i Moa I Mg F jf d iw,'7.t # fE it F 9 $f Jd St f ri�Ci 1 lot •ii # } 9 S 7a rt3 rE#{l},� t rtti t', h14 }P3 tc p s r '..: "F E +°fit j##r # kSPr }Frit i P4 ¢#- x ? � i + i � {#� #YJ ro# SY E� # €Y t#, ',}32 i} � �� • 3 fE I FSE ri t3i#�•'. Ys y Jf sr j t {j y } I ,. {ESS J •r i �e '..r ,S - . t Yr 1 Ri �EF IM 3 sa �s i r , �# -� �� t� y, �`i� . SE �' .: tj3l4 `. 't' .��� .S 'C.'3 t•...1: 'rF �y�. � g E . g J -<Sr i ,..8 _ �iir??� _.s_? Y r: .r • s ty:'" -ts•:-:. - Yr E ft'f[ . k ;.°-e z t ,ytii {r ¢ r; ~< Y-st.., .Yi'i W ra .i ; {1 d t f6 rEj�.3.S ! s 2 t #i Ei at>✓ "``� w # ` I iE;#¢(ig:3? p , Y 1F.3 ` � f � s <{ s :itb';f�Pe�', �. zs a: pp #•�} > ,�#f. .% r .z K� t, ,�,� . � �. 17 i t., ti�� t:> ,f 4� gg ! ., ,.if a > .in •s r: F rF°#�S�? S'i�3 p9i�� it..x � �;�sE} i •a:t.� � s�-• ��� �3r � a. ��� ;.� �s �ra i�Y . }fir i t#��: i 7 #f �r.F {fYdi .:s: ��� .i{ �i•"ia �.� �. 3' �� ;� i t{�i ',' f F � ' + ` .,%b; � :xS# 3 3f,� f# �• rY} '�} s�J � 9 s a•++; " s "' 'i}}'aE ?Yi Y °•'i � " �� iir ;;� ''t t�� y �' � > sftr t t,#�fi < `f F T _ '` tz? 6 :raw � i 3�{; > r ��'.�f.f • �.E [51. ,�:s }'C�°�}.,�'3� ,..,3i� }}>z;.ct �it`T'#i � �€:i., �...=s.>� .:Srt.�;;.;a�� s�E..;z #�•�Yt4�.a' � -•: t t da .e, iE K •' � � a � y ss�xrr �'s >„Y = s"st �,;,. Er, k ���• • t. a ° %` F� a� is}i� # 'x .iri i f : a � s� ;-a# ,;�€ E ;: M," . it :. n ,n :,, s � .�. 'i "EE # F,`j ;' •� Y s�� ���"Y •;: ittE frt � ES! 3 �J`L . t}��•'t i ra_'i i4 z#, • Y .e�i ;_'7. '" y ' { a��r£ :� r',S ti rt Y 3 3'§x' i a, �' a e , y'i. ::E ii r'I;l;7�i7 i fL` E t {? ,'. ,r t,d{ [' �Y yy <�..� i�#r �. � -x<.n f f : ti:f i '� '�' nrJ � •i<.#r #•s i ,re „ r 5? i' d. ,:�� •F�:, ' �'?E �3'��Yd.t�;�; `' r' ?� k� .� C 1[i• i ,t 3{ t2.' i } .:.� JF i . � i f S,:• ix `�, :Yi j ,� f.S.i� '•iy> { I' {{ '•i�i?it .6e: fP ; �kyjd�J���}:,t'..rz:'a'"-' � .!'> ` _x.,c, .. t �.:..3.s� t - nis Yrs 3 '� ,.TY� > .,.•:.r,'i1 " -� x. "� f 3 � �;yil_, •. i .-::t: r x`15, f.. t q E+= t w�i.-�� „r.l t :iL ti.. 4 _x• . rx". f' T�.r t �.y 'E t'. �,��}1 f - �G= ri :.ir• err. r. � E i-' 3'••rit fN+— ET_,l � qtr •• y. '?�,'� . � � r., t �;i .r� � i �,1 t -'�� ,� ,fFg x =s 1 � r. � . i-y� }[• i i it 'i.. •y s f�j r "� �j,,j�S^ � � J'ui. L�'?ft y ..,,r r t- #E' ..�� _ .:i r.`i Y} 3'S}t�S:>�i' : AIM "t=• '".] ... .�sf �Ff 3�1; .. "�yii' ,.T`7 f-� St ;,j! k' 'x ♦ s 3'°^� ^".E"i• t rS " ' .1511' '<' �r - r , i; "µ,E. ii•'�� :�'-'. t ; .. � yF �x• - _� f x a �.. `CP9,.�9 .r ��`j�C 1•'f-"�{�. Ett �. i.. 3 ;..f �, y �y..�}�r{ f _ ,. z... " r jS�33� a ;t ez!y x lx r :r,.I�'�i� s S s a ;.q � r' '•'E�� i t � ���� y' t?� :i'�;&:y iF. S..,T:. ^,�" ::. �%'i.&�i. Fs }� .:, , i3'v :E 'L .,qtR c .- �;'� !.. Y _ JE' _.� : - � E � f�`�.-`> ++ 3 � t�i�:r�r..� . ' 7 •� j�:�t�. e tet.-���$��,d� 'a.48�i�s: Y � x F� <°+E�lsy r z � c J �' ce 'a!� ,._,+t•. �r'I A", x�r� � � ,' '°`Ri x 3�E'T_.. �''T+ °''C't• 'Ktts� t: r .: _w.�, :.::ii:tt::�ir:at! , "Cr:i.:R Y>">Nede�•i' 4...r�:..:n-st.. ,. �_..s .s.:.. _ �r�,r - t�,.,., '._.i.. r.....s:�' .•'r.... -t� ......._....... <..�-�, - .';..r`ir�:?��t---= .::ir,......:` rY..r�.. ,"�.. ::%»:!�, : a r zijt r f PSitfE1{4g #ri�oF r�J"uY Mol., j i{ S' ijis �� i r{ t t fi P �E' # t�t E !� t It 3r1"`� S iiq _.#1 F i ,i 3. (i �I�E �16I It, %. " {P :µ:J 'a. yiw 1 1 :. -•'�f� � L1:AM t..i ^S # ' 1 #t{#i f Y t �c.-st .aes.t -f �' �-a 'ti!"` i" jS,$i•1 R. � a u ' �3A1 1! ` F 3 i.xY2 X-•" f#e. & t, y i t i. 2-2r� ESP i 33 f r, s 3��ifz, r r 1; 1Th I E f •r; trx.., a` s � # f}i ^n t .. riff t # i'Z if �`P �{i .� r•� ir. ir� . F,,t y � �,�� { �}i+��°z FP i t'tf ° i# .�..,i , 1#. �:ys. . {zi l �'i'?la:; .h,Y r6Pi:i `�rJ�'� ., '_ a« Y f ! rY rl � •`���'�} $CsLt — ftbb OZ •mQo;*O bap5nodot\ubs*a -z\O m6uaH\uaEWoQoS\o;jAoo�l\t5.itlAdny.L\\ Sebastian Municipal Airport PRELIMINARY PROPOSED AIRCRAFT HANGAR "C" Sebastian, FL Opinion of Probable Construction Costs January 31, 2014 ITEM 02 - Site Subtotal 02- Site Work 03 - Concrete (Building) Slabs and footings Subtotal 03 - Concrete (Building) 04 - Masonry See "Specialties" Subtotal 04 - Masonry 05 - Metals See "Specialties" Subtotal 05 - Metals 06 - Wood and Plastics See "Specialties" Subtotal 06 - Wood and Plastics 07 - Thermal and Moisture Protection See "Specialties" Subtotal 07 - Thermal and Moisture Protection 08 - Doors and Windows Doors, Frames, Hardware Aluminum Storefront Subtotal 08 - Doors and Windows 09 - Finishes Epoxy Flooring Paint Subtotal 09 - Finishes 10 - Specialties NOT USED Subtotal 10 - Specialties 11 -Equipment Miscellaneous Subtotal 11 -Equipment QUANTITY UNIT COST EXTENDED LINE 1 LS $ 140,000.00 $ 140,000 20,889 SF $ 6.00 $ 125,334 $ 125,334 Preliminary Opinion of Probable Costs The Michael Baker Corporation Page 1 of 3 20,889 SF $ 0.50 $ 10,445 20,889 SF $ 0.50 $ 10,445 $ 20,889 20,889 SF $ 1.50 $ 31,334 20,889 SF $ 1.00 $ 20,889 $ 52,223 20,889 SF $ 1.00 $ 20,889 $ 20,889 Preliminary Opinion of Probable Costs The Michael Baker Corporation Page 1 of 3 Sebastian Municipal Airport PRELIMINARY PROPOSED AIRCRAFT HANGAR "C" Sebastian, FL Opinion of Probable Construction Costs January 31, 2014 ITEM 12 - Furnishings NOT USED Subtotal 12 - Furnishings 13 - Special Construction METAL BUILDING Building shell and components Masonry, Metals, Wds. & Plas, Therm. & Moisture Prot., Fire Protection, etc. Building erection Hangar Door Subtotal 13 - Special Construction 14 - Conveying Systems NOT USED Subtotal 14 - Conveying Systems 15 - Fire Protection See "Specialties" Subtotal 15 - Fire Protection 15 - Plumbing Plumbing Subtotal 15 - Plumbing 15 - Mechanical Mechanical Subtotal 15 - Mechanical 16 - Electrical Electrical Subtotal - Electrical QUANTITY UNIT COST EXTENDED LINE 20,889 SF $ 10.00 $ 208,890 20,889 SF $ 6.00 $ 125,334 LS $ 6.00 $ 30,000 $ 364,224 20,889 SF $ LS 2.00 $ 41,778 $ 41,778 $ 179,100 $ 179,100 20,889 SF $ 5.35 $ 111,756 $ 111,756 TOTAL CONSTRUCTION ELEMENTS $ 1,056,193 Preliminary Opinion of Probable Costs The Michael Baker Corporation Page 2 of 3 COMMUNITY DEVELOPMENT DEPARTMENT 1225 MAIN STREET -- SEBASTIAN, FL 32958 PHONE 772-388-8228 — FAX 772-388-8248 igriffinAcigyofsebastian.om — www.cityofsebastian.org MEMORANDUM TO: Rook Nelson; CEO, Eagle Air Transport RE: Memorandum of Understanding; Hangar "C" DATE: 10 February 2014 Referencing my transmittal of the lease draft to you regarding the relocation of Eagle Air Transport, to Sebastian Municipal Airport, I am compelled to memorialize the City's position regarding important issues: • Lease of city -owned hanger adjacent to Airport Administration Building with access to Apron F. • Non-exclusive access & use to the skydive "LZ" on North quadrant of airfield. • Hanger "TO -BE -BUILT" approximately 20,000 sqft or as large as FDOT project amount of $1.525M will allow. Eagle Air to lease approximately 15,000 sgft. • Fifteen year term at initial rate of $3.00 per sgft with annual CPI adjustments. Initial rate is contingent on FDOT approval of lease charge. • Eagle Air assumes all utility charges with separate metering. • Shared use of Airport Admin. Building `common areas.' • Use of Airport Admin. Building conference room for sales/safety/etc. seminars. • Modifications to Hangar "C" at Eagle Air's expense with airport approval. • Cost of fuel tank and/or fuel truck to service company aircraft assumed by Eagle Air. • Target move-in/C.O. issued: 1 December 2014. Terms of this understanding, and subsequent lease document, are subject to consent, and approval, of the Sebastian City Council, the Florida Department of Transportation, and the FAA. l � Joe Griffin Roo elson, CEO Interim City Manager Eagle Air Transport Sebastian Municipal Airport PRELIMINARY PROPOSED AIRCRAFT HANGAR "C" Sebastian, FL Opinion of Probable Construction Costs January 31, 2014 ITEM QUANTITY UNIT COST EXTENDED LINE General Conditions Contractor's General Conditions 1 LS 15.00% $ 158,429 TOTAL GENERAL CONDITIONS $ 158,429 TOTAL CONSTRUCTION ELEMENTS AND GEN. CONDITIONS $ 1,214,622 Contingency 1 LS 5.00% $ 60,731 TOTAL CONSTRUCTION OPINION OF COST 1,275,353 ENGINEERING/ ARCHITECTURE (A/E) DESIGN $ 157,848 A/E CONSTRUCTION ADMINISTRATION $ 74,084 A/E PERMITTING SERVICES $ 15,000 TOTAL ESTIMATED PROJECT COST 19522,285 Notes: FFE (Furniture, Equipment, etc.) - Not Included NOTE: This Opinion of Probable costs is based on 3,000 square feet of office shell space Preliminary Opinion of Probable Costs The Michael Baker Corporation Page 3 of 3