HomeMy WebLinkAbout2002 Rainforest IrrigationCONSTRUCTION SERVICES AGREEMENT
THIS AGREEMENT made this f~ ~y of July, 2002, by and between the CITY
OF SEBASTIAN, a municipal corporation of the State of Florida, 1225 Main Street,
Sebastian, Florida, 32958, ("City") and Irrigation Consultants Unlimited, Inc., d/b/a
Rainforest Irrigation, a Florida corporation authorized to do business in the State of Florida,
125 43~a Avenue, Yero Beach, FL 32968 ("Contractor.")
WI-IEREAS, the City desires to engage a Florida ~icensed contractor who has special
and unique competence and experience in providing irrigation installation services necessary
to complete the Project hereunder; and
Wl~.~S, the Contractor represents that it has such competence and experience in
providing these services; and
WI-IEREAS, the City in reliance on such representation has selected the Contractor in
accordance with its procedure for selection of Contractor; and
WHEREAS, the City and the Contractor desire to reduce to writing their understanding
and agreements on such professional services.
IT IS, TI-IEREFORE, AGREED as follows:
ARTICLE I - The Contractual Relationship
1.0 EMPLOYMENT OF CONTRACTOR
The City hereby agrees that it may engage the Contractor and the Contractor hereby agrees to
perform professional services for the City in accordance with this Agreement. This
Agreement is not an exclusive agreement and the City may employ other contractors,
professional or technical personnel to furnish services for the City as the City in its sole
discretion finds is in the public interest.
The Agreemem shall not be construed to create a contractual relationship of any kind between
the City and the Subcontractor(s), or, between any person or firm other than the City and
Contractor.
The Contractor shall not sell, transfer, assign or otherwise dispose of the Contract or any
portion thereof, or of his right, title of interest therein or his obligations thereunder, or moneys
due or to become due under this Contract.
2.0 AGREEMENT DOCUMENTS
The Agreement Documems (also called CONTRACT DOCUMENTS) consist of this
Agreement, Supplemental Agreement(s), Request for Proposal Documents, Contract
Proposal, Bond Forms, Plans and Technical Specifications, Work Orders, Change Orders,
Addenda ff any, any other documems listed in the Agreement Documents, and written
modifications issued after execution of this Agreement, if any.
5
2.1 INTENT
The Specifications are an integrated part of the Contract Documents and as such will not stand
alone if used independently. The Specifications establish minimum standards of quality for
this Project. They do not purport to cover all details entering into the design and construction
of materials or equipment. The intent of the Agreement Documents is to set forth
requirements of performance, type of equipment and structures, and standards of materials
and construction. It is also intended to include all labor and materials, equipment, and
transportation necessary for the proper execution of the Work, to require new material and
equipment unless otherwise indicated, and to require complete performance of the Work in
spite of omission of specific reference to any minor component part and to include all items
necessary for the proper execution and completion of the Work by' the Contractor.
Performance by the Contractor shall be required only to the extent consistent with the
Agreement Documents and reasonably inferable from them as being necessary to produce the
intended results.
2.2 ENTIRE AND SOLE AGREEMENT
Except as specifically stated herein, the Agreement Documents constitute the entire
agreement between the parties and supersede all other agreements, representations,
warranties, statements, promises, and understandings not specifically set forth in the
Agreement Documents. Neither party has in any way relied, nor shall in any way rely, upon
any oral or written agreements, representations, warranties, statements, promises or
understandings not specifically set forth in the Agreement Documents.
2.3 AMENDMENTS
The parties may modify this Agreement at any time by written agreement. Neither the
Agreement Documents nor any term thereof may be changed, waived, discharged or
terminated orally, except by an instrument in writing signed by the party against which
enforcement of the change, waiver, discharge or termination is sought.
2.4 CONSTRUING TERMS
This Agreement shall not be construed against the party who drafted the same, as both parties
have obtained experts of their choosing to review the legal and business adequacy of the
sanle.
2.5 GOVERNING LAW AND WAIVER OF TRIAL BY JURY
This Agreement shall be governed by the laws of the State of Florida, and any venue for any
action pursuant to the Agreement Documents shall be in Indian River County, Florida. The
parties hereto expressly waive trial by jury in any action to enforce or otherwise resolve
any dispute arising hereunder.
This Agreement shall commence on the day it is executed by both parties and the term of the
Agreement shall extend until the Project is complete unless terminated in accordance with the
terms hereunder.
3.0 DEFINITION OF TERMS
3.1 GENERAL
Whenever the following terms appear in these Agreement Documents, their intent and
meaning shall, unless specifically stated otherwise, be interpreted as shown.
3.2 ACT OF GOD
The words "Act of God" mean an earthquake, flood, hurricane (or other named tropical
evem), tornado or other cataclysmic phenomenon of nature. Raith Wind or other natural
phenomenon (including tropical waves and depressions) of normal intensity for the locality
shall not be construed as an Act of God.
3.3 ADDENDUM (re: bid documents)
A modification of the plans or other contract documents issued by the Owner and distributed
to prospective bidders prior to the opening of bids. All Addenda shall be considered as part of
the Contract Documents.
3.4 AGREEMENT
A written agreement between the Contractor and Owner defining in detail the work to be
performed. The words Agreement and Contract, are one and the same.
3.5 A.S.T.M. DESIGNATION
Wherever the letters "A.S.T.M." are used in the Specifications, it shall be understood as
referring to the American Society for Testing Materials. When reference is made to a certain
Designated Number of a specification or test as set out or given by the American Society for
Testing Materials, it shall be understood to mean the current, up-to-date standard specification
or tentative specification for that particular process, material or test as currently published by
that group.
3.6 BID or PROPOSAL
The bid or proposal is the written offer of a Bidder to perform work descn'bed by the contract
documents when made out and submitted on the prescribed proposal form properly sealed and
guaranteed. The bid or proposal shall be considered as part of the Contract Documents.
7
3.7 BID BOND or PROPOSAL GUARANTEE:
Bid bond or Proposal Guarantee is not required under this Agreement.
3.8 BIDDER
An individual, partnership, or corporation submitting a proposal for the work comemplated;
acting directly or through a duly authorized representative.
3.9 CHANGE ORDER
A written order issued to the Contractor by the City and covering changes in the plana,
specifications, or scope of work when the mount of work changed is not deemed sufficient to
require a supplemental agreement, or adjustments in the Contract Price or Contract Time.
3.10 CONTRACT ADDENDUM
A special written provision modifying or clarifying the terms and conditions of the Contract.
The Contract Addendum sbMl be considered as part of the contract documents.
3.11 CONTRACTOR
The word "Contractor" shall mean an individual, partnership, or corporation, and his, their or
its heirs, executors, administrators, successors and assigns, or the lawful agent of any such
individual, firm, partnership, covenant or corporation, or his, their or its surety under any
contract bond, constituting one of the principals to the Contract and undertaking to perform
the work here~
3.12 DIRECTED, ORDERED, APPROVED & ETC.
Wherever in the Agreemem Documem the words "directed", "ordered", "approved",
"permitted", "acceptable", or words of similar import are used, it shall be understood that the
direction, order, approval or acceptance of the Owner is intended unless otherwise stated.
3.13 ENGINEER
A Professional Engineer duly licensed and registered in the State of Florida and designated by
the City as Engineer. The City may designate a staffmember as Engineer who is not licensed.
3.14 GENERAL CONDITIONS
The directions, provisions and requirements contained within the Agreement Documents, all
describing the general manner of performing the Work including detailed technical
requirements relative to hbor, material equipment, and methods by which the Work is to be
performed and prescribing the relationship between the City and the Contractor.
8
3.15 INSPECTOR
A duly authorized representative of the City assigned to make official inspections of the
materials famished and of the work performed by the Contractor.
3.16 LABORATORY
Any licensed and qualified laboratory designated by or acceptable to the Owner to perform
necessary testing of materials.
3.17 OWNER
City of Sebastian
3.18 PERFORMANCE AND PAYMENT BONDS
Performance and Payment Bonds are not required under this Agreement.
3.19 PLANS
The official, approved plans, including reproduction thereof, showing the location, character,
dimensions and details o£the work to be done. All shop drawings submit-ted by thc Contractor
shall be considered as patt of the eon~ract documents.
3.20 PROPOSAL
The proposal or bid is the written off`er o£ a Bidder to perform the work described by the
Contract Documents when made out and submitted on the preseribed proposal form, properly
signed and guaranteed. The proposal or bid shall be considered as part of the contract
documents.
3.21 SPECIAL CONDITIONS
Special clauses or provisions, supplemental to the Plans, Standard Specifications and other
contract documents, setting forth conditions varying from or additional to the Standard
Specifications for a specific project.
3.22 SPECIFICATIONS
The directions, provisions, and requirements together with all written agreements made or to
be made, setting forth or relating to the method and manner of performing the Work, or to the
quantities and qualities of materials, labor and equipment to be furnished under the
Agreement.
9
3.23 SUBCONTRACTOR
An individual, partnership or corporation supplying labor, equipment or materials under a
direct contract with the contractor for work on the project site. Included is the one who
supplies materials fabricated or formulated to a special design according to the plans and
specifications for the particular project.
3.24 SUPPLEMENTAL AGREEMENT
A written understanding, or proposal and acceptance, executed between the City and the
Contractor subsequent to execution of the Agreement herein with the written consent of the
Contractor's Surety, relating to the work covered by the Agreement and clarifying or
furthering the terms thereof. A modification to the Agreement shall be made by Contract
Addendum.
3.25 SURETY
Surety is a corporation qualified to act as surety under the laws of Florida, who executes the
Contractor's Performance and Payment Bonds and is bound with the Contractor for the
acceptable performance of the contracted work and for the payment of all debts pertaining
thereto.
3.26 WORK, (The) or PROJECT, (The)
The public improvement comemplated in the Plans and Specifications, and all actions
necessary to construct the same.
3.27 WORK ORDER
Work orders are work instructions including specification and plans that show the location,
character, dimensions and details to the work to be done. Work orders are specific
instructions, of l/m/ted scope, that will be a part of this contract. Work orders shall be
considered as part of the contract documents.
ARTICLE H - Performance
4.0 PLANS, SPECIFICATIONS AND RELATED DATA
4.1 INTENT OF PLANS AND SPECIFICATIONS
The intent of the Plans, Specifications, Work Orders and other Contract Documents is that the
Contractor furnishes all labor and materials, equipment, supervision and transportation
necessary for the proper execution of the Work unless specifically noted otherwise. The
Contractor shall do all the work shown on the Plans and described in the Specifications and
10
other Contract Documents and all incidental work considered necessary to substantially
complete the Work ready for use, occupancy, or operation in a manner acceptable to the City.
4.2 CONFLICT
In the event of any inconsistency, discrepancy or conflict between the Agreement, the Plans,
Specifications, and other Contract Documents, the Agreement shall prevail and govern over
all except a subsequently executed Contract Addendum; in the event of an inconsistency,
discrepancy or conflict between the Plans and Specifications, the Specifications shall prevail
and govern.
4.3 DISCREPANCIES IN PLANS
Any discrepancies found between the Plans and Specifications and site conditions, or any
errors or omissions in the Plans or Specifications, shall be immediately reported to the
Engineer and City. The Engineer shall promptly determine the validity and seriousness of the
claimed condition and correct any such error or omission in writing, or otherwise direct
Contractor. Any work done by the Contractor ag/er his discovery of such discrepancies, errors
or omissions shall be done at the Contractor's risk.
Any correction or errors or omissions in Plans and Specifications may be made by the
Engineer when such correction is necessary for the proper fi~lfillment of their intention as
construed by ~ Where said correction of errors or omissions, except as provided in the next
two (2) paragraphs below, adds to the mount of work to be done by the Contractor,
compensation for said additional work shall be made under the Paragraph 10.7 CHANGES IN
THE WORK below, except where the additional work may be classed under some item of
work for which a unit price is included in the proposal.
The fact that specific mention of any part of work is omitted in the Specifications, whether
intentionally or otherwise, when the same is clearly shown or indicated on the Plan~, or is
usually and customarily required to complete fully such work as is specified herein, will not
entitle the Contractor to consideration in the matter of any claim for extra compensation, but
the said work must be installed or done the same as if called for by both the Plans and
Specifications.
All work indicated on the Plans and not mentioned in the Specifications or vice versa, and all
work and material usual and necessary to make the Work complete in all its parts, whether or
not they are indicated on the Plans or mentioned in the Specifications, shall be furnished and
executed the same as if they were called for by both the Plans and Specifications.
The Contractor will not be allowed to take advantage of any errors or omissions in the Plan~
and Specifications. The Engineer will provide full information when errors or omissions are
discovered.
11
4.4 DRAWINGS AND SPECIFICATIONS AT JOB SITE
One (1) complete set of all Plans, Specifications, Work Orders, Addenda, Change Orders,
Shop Drawings and samples shall be maintained at the job site, in good order and annotated to
show all changes made during the construction process, and shall be available to the Engineer
and City at all times. A final copy thereof; along with "as-built" record drawings, operations
and maintenance manuals, and data sheets, shall be delivered to the Engineer upon the
completion of the Work.
4.5 DIMENSIONS
Dimensions shown on the Plans will be used. Where the work of the Contractor is affected by
finished dimensions, these shall be verified by the Contractor at site, and he shall assume the
responsibility for their use.
4.6 SAMPLING AND TESTING
Except as otherwise provided, sampling and testing of all materials, and the laboratory
methods and testing equipment, required under the Specifications shall be in accordance with
the latest standards or tenets of the American Society for Testing Materials.
The testing of samples and materials shall be made at the expense of the Contractor, except
where indicated otherwise. The Contractor shall furnish any required samples without charge.
The Contractor shall be given sn~cient notification of the placing of orders for materials to
permit testing.
As an exception to the above, when the Contractor represents a material or an item of work as
meeting Specifications and under recognized test procedures it fails, any re-testing shall be at
the Contractor's expense, billed at the Testing Laboratory's standard rate for individual tests.
It is expected that all inspections and testing of materials and equipment will be done locally.
If the Contractor desires that inspections for tests be made outside of the local area, all
expenses, including per diem for the Engineer or Inspectors, shall be borne by the Contractor.
4.7 SHOP DRAWINGS
The Contractor shall provide shop drawings, setting schedules and other drawings as may be
necessary for the prosecution of the Work in the shop and in the field as required by the Plans
and Specifications or Engineer's instructions. Deviations from the Plans and Specifications
shall be called to the attention of the City at the time of the first submission of shop drawings
and other drawings. The City's approval of any shop drawings shall not release the Contractor
from responsibility for errors, corrections of details, or conformance with the Contract. Shop
drawings shall be submitted according to the following schedule:
12
(a) Three (3) copies shall be submitted to the City at least thirty (30) days before
the materials indicated thereon are to be needed or earlier if required to prevent delay of work
or to comply with subparagraph (b).
(b) The City shall, within fourteen (14) days of the submittal of any shop
drawings, return two (2) copies to the Contractor marked with any corrections and changes
required and noting if the drawings are acceptable as noted, or ifresubmittal is required.
(c) The Contractor shall then correct the shop drawings to conform to the
corrections and changes requested by the City and resubmit three (3) copies to the City.
(d) Two (2) copies of Approved Shop Drawings shall be returned to the Contractor
by the City.
4.8 QUALITY OF EQUIPMENT AND MATERIALS
In order to establish standards of quality, the Specifications may refer to certain products by
name and catalog number. This procedure is not to be construed as eliminating from
competition other products of equal or better quality by other manufacturers where fully
suitable in design.
The Contractor shall furnish to the City a complete list of his proposed desired substitutions
prior to the signing of the Contract, together with such engineering and catalog data as the
City may require. Further substitutions may be submitted during the course of work in
accordance with Paragraph 4.10 SUBSTITUTION OF EQUIPMENT AND/OR MATERIAL
below.
The Contractor shall abide by the City's judgment when proposed substitution of materials or
items or equipment are judged to be unacceptable and shall furnish the specified material or
item of equipment in such case. All proposals for substitutions shall be submitted to the City
in writing by the Contractor and not by individual trades or material suppliers. The City will
advise of approval or disapproval of proposed substitutions in writing within a reasonable
time. No substitute materials shall be used unless approved by City in writing.
4.9 EQUIPMENT APPROVAL DATA
The Contractor shall furnish one (1) copy of corr~plete catalog data for every manufactured
item of equipment and all components to be used in the Work, including specific performance
data, material description, rating, capacity, material gauge or thickness, brand name, catalog
number and general type.
This submission shall be compiled by the Contractor and submitted to the City for review and
written approval before any of the equipment is ordered.
Each data sheet or catalog in the submission shall be indexed according to specification
section and paragraph for easy reference.
13
After written approval is received by the Contractor, submission shall become a part of the
Contract and may not be deviated from except upon written approval of the City.
Catalog data for equipment approved by the City does not in any case supersede the Contract
Documents. The acceptance by the City shall not relieve the Contractor from responsibility
for deviations from Plans or Specifications, unless he has called the City's attention, in
writing, to such deviations at the time of submission, nor shall it relieve him from
responsibility for errors of any sort in the items submitted. The Contractor shall check the
work described by the catalog data with the Contract Documents for deviations and errors.
It shall be the responsibility of the Contractor to insure that items to be furnished fit the space
available. He shall make necessary field measurements to ascertain space requirements,
including those for connections, and shall order such sizes and shapes of equipment that the
field installation shall suit the true intent and meaning of the Plans and Specifications.
Where eqm'pment requiring different arrangement of connections from those shown is
approved, it shall be the responsibility of the Contractor to install the equipment to operate
properly, and in harmony with the intent of the Plans and Specifications, and to make all
changes in the Work required by the different arrangement ofconneations at his own expense.
4.10 SUBSTITUTION OF EQUIPMENT AND/OR MATERIAL
After the execution of the Contract Agreement, the substitution of equipment and/or material
for that specified will be considered if:
(a) The equipment and/or materials proposed for substitution is determined by the
City to be equal or superior to that specified in the Contract;
(b) Unless determined to be of superior quality, the equipment and/or material
proposed for substitution is less expensive than that specified and that such savings to the
City, as proposed by the Contractor, are submitted with the request for substitution. If the
substitution is approved, the Contract price shall be reduced accordingly; and
(c) The equipment and/or material proposed for substitution is readily available
and its delivery and use, if approved as a substitution, will not delay the scheduled start and
completion of the specified work for which it is intended or the scheduled completion of the
entire work to be completed under the contract.
No request will be considered unless submitted in writing to the City and approval by the City
must also be in writing. To receive consideration, requests for substitutions must be
accompanied by documentary proof of the actual difference in cost to the Contractor in the
form of quotations to the contractor covering the original equipment and/or material, and also
equipment and/or material proposed for substitution or other proof satisfactory to the City. It
is the intention that the City shall receive the full benefit of the saving in cost involved in any
substitution unless the item is substituted for one designated in the Specifications by specific
14
manufacturer's name and type, in which case one-third of the savings shall accrue to the
benefit of the Contractor.
In all cases, the burden of proving adequate proof that the equipment and/or material offered
for substitution is equal or superior in construction and/or efficiency to that named in the
Contract shall rest on the Contractor and the proof will be submitted to the City. Request for
substitution of equipment and/or material which the Contractor cannot prove to the
satisfaction of the City, at its sole discretion and judgment, to be equal or superior in
construction and/or efficiency to that named in the Contract will not be approved.
5.0 MATERIALS AND WORKMANSHIP
5.1 MATERIALS FURNISHED BY THE CONTRACTOR
All materials and equipment used in the Work shall meet the requirements of the respective
Specifications, and shall not be used until it has been approved in writing by the City.
Wherever the specifications call for an item of material or equipment by a manufacturer's
name and type, and additional features of the item are specifically required by the
specifications, the additional features specified shall be provided whether or not they are
normally included in the standard manufacturer's item listed.
Wherever the specifications call for an item of material or equipment by a manufacturer's
name and type, and the specified item becomes obsolete and is no longer available, the
Contractor shall provide a substitute item of equal quality and performance which is
acceptable to the Engineer and City and is currently available, at no increase in Contract price.
5.2 STORAGE OF MATERIALS
Materials and equipment shall he stored so as to incur the preservation of their quality and
fitness for the Work. When considered necessary, they shall be placed on wooden platforms
or other hard clean surfaces, and not on the ground, and/or they shall he placed under cover.
Stored materials and equipment shall be located so as to facilitate prompt inspeetion~ Private
property zoned for, or adjacent to land zoned for, residential uses shall not he utilized for
storage purposes.
5.3 REJECTED WORK AND MATERIAL
Any materials, equipment or work which do not satisfactorily meet the Specifications may be
condemned by the Engineer or City by giving a written notice to the Contractor. All
condemned materials, equipment or work shall he promptly taken out and replaced.
All materials and equipment which do not conform to the requirements of the Contract
Documents, are not equal to samples approved by the Engineer and City, or are in any way
unsatisfactory or unsuited to the purpose for which they are intended, shall be rejected. Any
15
defective work whether the result of poor workmanship, use of defective materials, damaged
through carelessness or fi:om other cause shall be removed within ten (10) days after written
notice is given by the City, and the work shall be re-executed by the Contractor. The fact that
the Engineer or the City may have previously overlooked such defective work shall not
constitute an acceptance of any part of it. Should the Contractor fail to remove rejected work
or materials within ten (10) days after written notice to do so, the City may remove them and
may store the materials and equipment. Satisfaction of warranty work at,er final payment
shall be in accordance with Paragraph 10.15.
5.4 MANUFACTURER'S DIRECTION
Manufactured articles, materials and equipment shall be applied, installed, connected, erected,
used, cleaned, and conditioned as directed by the manufacturer unless herein specified to the
contrary.
5.5 SKILL AND CHARACTER OF WORKMEN
All workmen must have sufficient knowledge, skill and experience to perform properly the
work assigned to them. Any foreman or workman employed by the Contractor or
subcontractors who, in the opinion of the Engineer or the City does not perform his work in a
skillfi, tl manner, or appears to be incompetent or to act in a disorderly or intemperate manner
shall, at the written request of the City, be discharged immediately and shall not be employed
again in any portion of the Work without the approval ofthe City.
The Contractor shall at all times be respons~le for the conduct and discipline of his
employees and/or any subcontractor or persons employed by subcontractors.
5.6 CUTTING AND PATCHING
The Contractor shall do all necessary cutting and patching of the Work that may be required
to properly receive the work of the various trades or as required by the Plans and
Specifications to complete the Work. He shall restore all such cut or patched work as directed
by the Engineer or the City. Cutting of existing structures that could endanger the Work,
adjacent property, workmen or the public shall not be done unless approved by the Engineer
and under his surveillance.
5.7 CLEANING UP
The Contractor shall at all times keep the premises flee fi:om accumulation of waste materials
or rubbish caused by his employees or work. At the completion of the Work, he shall remove
all his rubbish, tools, scaffolding and surplus materials and shall leave his work "broom
clean" or its equivalent, unless more exactly specified, and shall insure that all debris and
other unsightly objects are removed and disposed of in a satisfactory manner. At no additional
expense to the City, the Contractor will restore to their original conditions or better, as nearly
as practicable, those portions of the site not designated for alteration and all such property,
structure, utilities, landscaping, etc., disturbed or damaged during the prosecution of the
Work. Final payment will be withheld until such clean up and repairs are completed
The Work will be considered complete only after all debris and unused material due to or
connected with the Work have been removed and the surrounding area left in a condition
satisfactory to the City. In the event the City finds that the Contractor has not complied in
keeping the job site clean, the City may, after twenty-four (24) hours written notice to the
Contractor to correct the situation, elect to have the job site cleaned by an independent labor
force. The cost of cleaning by said independent labor force shall be deducted from moneys
due the Contractor.
5.8 CITY'S OWNERSHIP OF MATERIALS
Any and all materials, whether structural or natural, found within the limits of the project
remain the property of the City unless City ownership is specifically conveyed to the
Contractor.
All material, equipment and work become the sole property of the City as installed. These
provisions shall not be comtmed as relieving the Contractor from the sole respons~ility for
all materials and work for which payments have been made, for the restoration of damaged
work, or as a waiver of fight of the City to require the fulfillment of all the terms of the
Contract.
5.9 GUARANTEE
The Contractor shall warrant all equipment furnished and work performed by him for a period
of one (1) year t~om the date of final written acceptance of the Work by City.
Satisfaction of warranty work after final payment shall be as per Paragraph 10.15.
All equipment and material warranties or guarantees shall be drawn in favor of the City and
the originals thereof furnished to the Engineer for review and acceptance prior to final
payment.
Such guarantee shall in no way limit or relieve the Contractor of liability fxom subsequent
claims of beach of contract due to substandard materials or workmanship, nor shall such
warranty period shorten the statute of limitations for bringing a breach of contract or other
action based upon any such deficiencies.
6.0 CONSTRUCTION STAKING TO BE PERFORMED BY CONTRACTOR
6.1 PERSONNEL, EQUIPMENT AND RECORD REQUIREMENTS
Adequate field notes and records shall be available for review by the City and Engineer as the
Work progresses and copies shall be available if necessary. Any inspection or checking of the
17
Contractor's field notes or layout work by the City and the acceptance of all or any part
thereof, shall not relieve the Contractor of his responsibility to achieve the lines, grades and
dimensions shown in the Plans and Specifications.
Prior to final acceptance of the project, the Contractor shall mark in a permanent manner on
the surface of the completed Work all control points shown on the Plans.
6.2 CONTROL POINTS FURNISHED BY THE CITY
The City will provide boundary or other control points and bench marks as shown on the
Plans as "Contractor's Survey Control Point", if any is provided. The Contractor shall be
responsible for all survey control of his work during construction. The Contractor shall
preserve all reference points and benchmarks furnished by the City.
6.3 FURNISHING OF STAKE MATERIALS
The Contractor shall furnish all stakes, templates and other materials necessary for
establishing and maintaining the lines and grades necessary for control and construction of the
Work.
6.4 LAYOUT OF WORK
Utilizing the control points furnished by the City in accordance with Paragraph 6.2, the
Contractor shall establish all horizontal and vertical controls necessary to construct the Work
in conformance with the Plans and Specifications. The Work shall include performing all
calculations required and setting all stakes needed such as grade stakes, offset stakes,
reference point stakes, slope stakes, and other reference marks or points necessaD' to provide
lines and grades for construction of all roadway, bridge and miscellaneous items.
Survey notes indicating the information and measurements used in establishing locations and
grades shall be kept in notebooks and furnished to the Engineer with the record drawings for
the Project.
6.5 SPECIFIC STAKING REQUIREMENTS
Stakes to establish lines and grades shall be set at appropriate intervals to assure that the
Project is constructed to meet the lines and grades shown on the Plans.
For bridge construction stakes and other control, references shall be set at sufficiently
fi, equent intervals to assure that all components of a structure are constructed in accordance
with the lines and grades shown in the Plans.
18
6.6 PAYMENT
The cost of performing layout work as described above shall be included in the contract
prices for the various items of work to which it is incidental.
6.7 COORDINATION WITH CITY
The City's recorded subdivision plats shall be considered correct. The distance, bearing and
curve information provided shall be used by the Contractor's surveyor to establish alignment
throughout construction. All surveying activities will be coordinated with the City's surveyor
as needed for proper completion of all work on the site.
Primary control monuments, originally set by the City, that are disturbed or destroyed during
construction shall be accurately replaced by the Contractor's surveyor to the satisfaction of the
City's surveyor.
6.8 LOCATION OF EXISTING UTILITIES AND PIPING
All existing underground utilities, such as telephone, cable television and electrical cables
must be located by the Contractor prior to starting work. The Contractor shall comact the
Utilities at least 48 hours prior to commencing any work within the project area. There may
be other utilities within the project area.
The cost of substantiating the location of utilities shall be Ix)me by the Contractor and
included in the bid price. The Contractor shall be responsible for the repair and/or
replacement of utilities which he damages during the course of construction.
Utilities deemed to require relocation shall be identified by the Contractor prior to
commencing work. The Contractor shall notice the City of the conflict and seek direction
from the City prior to proceeding with work. Directions from the City may be to proceed
despite conflict, place work order on hold and commence work at a different location, or
relocate utilities under separate contract with the utility or a change order to be directed by the
City.
7.0 PROGRESS AND COMPLETION OF WORK
7.1 CONTRACTOR'S OBLIGATION
Contractor shall supervise and direct the Work, using Contractor's best skill and attention.
Contractor shall be solely responsbte for and have control over construction means, methods,
techniques, sequences and procedures and for coordinating all portions of the Work under this
Contract, unless the Contract Documents give other specific instructions concerning these
matters.
19
Unless otherwise provided in the Contract Documents, Contractor shall provide and pay for
labor, materials, equipment, tools, construction equipment and machinery, water, heat,
utilities, transportation, and other facilities and services necessary for the proper execution
and completion of the Work, whether temporary or permanent and whether or not
incorporated or to be incorporated in the Work.
Unless otherwise provided in the Contract Documents, Contractor shall pay all sales, use and
other s'tmilar taxes.
Contractor shall enforce strict discipline and good order among Contractor's employees and
other persons carrying out the Work. Contractor shall not permit employment of unfit persons
or persons not skilled in tasks assigned to them
Contractor currently holds and shall maintain at all times during the term of this Contract all
required federal, state and local licenses necessary to perform the Work required under the
Contract Documents.
Contractor shall be responsible to the City for the acts and omissions of Contractor's
employees, Subcontractors and their agents and employees, and other persons performing
portions of the Work under a contract with Contractor.
Contractor shall indemnify, defend and hold City harmless tiom all claims arising out of or
related to its perfommnce of the Work except for acts arising solely from the active
negligence of the City.
7.2 START OF CONSTRUCTION
The Contractor shall commence work on the date specified in the Notice to Proceed
subsequently issued by the City, or as specifically noted in any Contract Addendum
However, in no ease shall the Contractor commence work until the City has been furnished
and acknowledges receipt of the Contractor's Certificates of Insurance and a properly
executed performance and payment bond as required.
7.3 CONTRACT TIME
The contractor shall complete, in an acceptable manner, all of the Work in the time stated in
the Contract Agreement and any Addenda or Change Orders thereto.
7.4 SCHEDULE OF COMPLETION
The Contractor's schedules are subject to the approval of the City, which shall not be
unreasonably withheld, and shall reflect a logical sequence of the various components of work
and the anticipated rates of production necessary to complete the Work on or before the
completion date. Said schedules shall be submitted within ten (10) days of the execution of
the agreement by the City except when requested otherwise and shall be updated and
20
resubmitted to the City on the twenty-fifth (25th) day of every month with the Contractor's
pay request.
7.5 COORDINATION OF CONSTRUCTION/PRECONSTRUCTION CONFERENCE
The Contractor shall coordinate his work with other contractors, the City and utilities to
assure orderly and expeditious progress of work.
The City shall hold a pre-constrnction conference at Sebast'mn City Hall at a time and date
mutually agreed upon with the Contractor after the Contract has been awarded and fully
executed.
7.6 PROPERTY OF OTHERS
A. Public Ownership
The Contractor shall be respons~le for the preservation of all public property, trees,
monuments, etc., along and adjacent to the street and/or right-of-way, and shall use every
precaution necessary to prevent damage or injury thereto. He shall use suitable precautions to
prevent damage to pipes, conduits and other underground structures, and shall protect
carefully from disturbance or damage all monuments and property marks until a land surveyor
has witnessed or otherwise referenced their location and shall not remove them until so
directed by the Engineer in writing. The City shall remove and relocate all traffic control
signs as required.
B. Private Ownership
Mail and newspaper boxes, sprinkler systems, ornamental shrubs, lawn ornaments, house
nmbers, fences, etc. may be removed and relocated by the property owners. The City will
not remove, relocate, or re-install mail boxes, sprinkler systems, ornamental shrubs, etc.
belonging to a private property owner. However, should such items not be removed or
relocated by the start of construction, the Contractor shall remove the objects, in a manner
which does not damage or injure the objects at no extra cost to the City, which interfere with
the construction of the Project and place them on the property owner's front lawn just outside
the project limits. Otherwise, the Contractor shall not enter upon private property for any
purpose without obtaining permission fi.om the property Owner thereof. Where extensive
intrusions upon private property are required for construction, the City and Contractor shall
cooperate to obtain Temporary Construction Easements fi.om the landowner.
7.7 PROTECTION OF EXISTING UTILITIES AND FACILITIES
All utilities and all structures of any nature, whether below or above ground, that may be
affected by the Work but are not required to be disturbed or relocated by the very nature of
the project, shall be protected and maintained by the Contractor and shall not be disturbed or
damaged by him during the progress of the Work; provided that, should the Contractor
21
disturb, disconnect or damage any utility or any structure, all expenses of whatever nature
arising fi.om such disturbance or the replacement or repair and testing thereof shall be borne
by the Contractor.
7.8 CROSSING PUBLIC FACILITIES
When new construction crosses highways, railroads, streets or similar public facilities under
the jurisdiction of state, county, city, or other public agency or private entity, the City through
the Engineer shall secure written permission prior to the commencement of construction of
such crossing. The Contractor will be required to furnish evidence of compliance with
conditions of the pexmit fi.om the proper authority before final acceptance of the Work by
City. Road closures are governed by Paragraph 8.3 below.
7.9 CHANGES IN THE WORK
The City may order changes in the Work through additions, deletions or modifications
without invalidating the Comract; however, any change in the scope of work or substitution of
materials shall require the written approval of the City. Compensation and time of completion
affected by the change shall be adjusted at the time of ordering such change. New and
unforeseen items of work found to be necessary and which cannot be covered by any item or
combination of items for which there is a contract price shall be classed as changes in the
Work. The Contractor shall do such changes in the Work and furnish such materials, labor
and equipment as may be required for the proper completion of construction of the work
contemplated. In the absence of such written order, no claim for changes in the Work shall be
considered. Changes in the Work shall be performed in accordance with the Specifications
where applicable and work not covered by the specifications or special provisions shall be
done in accordance with specifications issued for this purpose. Changes in the Work required
in an emergency to protect life and property shall be performed by the Contractor as required.
7.10 EXTENSION OF CONTRACT TIME
No extension of time shall be valid unless given in writing by the City. No monetary
compensation shall be given for such delay.
A delay beyond the Contractor's control occasioned by an "Act of God" may entitle the
Contractor to an extension of time in which to complete the Work as determined by the City
provided, however, the Contractor shall immediately give written notice to the City of the
cause of such delay.
"Rain day" extensions shall be granted upon written request of the Contractor to the City's
Project Manager when said Project Manager determines that weather conditions make it
counterproductive to work on said days. "Rain day" requests must be submitted at the end of
each work week or be waived, and the cumulative "rain day" extensions granted shall be
processed as a Change Order with each pay submittal.
In the event that the City suspends the Work as provided in Paragraph 9.3, the Contractor
shall be granted an extension of time to complete the Work for as many calendar days as the
22
Work was suspended; except, however, that the Contractor will not be granted an extension of
time to complete the Work if the suspension was caused by a fault of the Contractor.
7.11 CORRECTION OF WORK
Contractor shall, at no cost to the City, promptly correct Work f~iling to conform to
requirements of the Contract Documents, whether observed before or after completion of the
Work and whether or not fabricated, installed or completed, and shal/correct any Work found
to be not in accordance with the requirements of the Contract Documents within a period of
one (1) year bom the date of completion of the Work or by the terms of an applicable special
warranty required by the Contract Documents. The provisions of this Paragraph apply to the
Work done by Subcontractors as well as to the Work done by direct employees of Contractor.
Nothing contained in this Paragraph shall be construed to establish a period of limitation with
respect to other obligations which Contractor might have under the Contract Documents.
Establishment of the time period of one (1) year as described in Subparagraph 7.1 l(a) above
relates only to the specific obligation of Contractor to correct the Work, and has no effect on
the time within which the obligations of the Contract Documents may be enforced, nor to the
time within which proceedings may be commenced to establish Contractor's liability with
respect to Contractor's remaining contractual obligations.
7.12 LIQUIDATED DAMAGES
In the event Contractor violates or fails to perform any provision of the Contract Documents,
then the City may elect to receive, and Contractor agrees to pay, liquidated damages in the
amount of one hundred fifty dollars ($150) per day beyond the agreed completion date.
Inspection of the Work by the City and the subsequent issuance of a notice by the City
indicating substantial completion will be the date used to signify work completion. If
completion is beyond the schedule agreed upon, liquidated damages may be imposed by the
City on the Contractor and will be withheld fi:om payment.
It is expressly acknowledged by Contractor that said payment shall not be interpreted nor
construed as a penalty but is in fact a good faith attempt to fix damages which the City will
suffer in the event Contractor fails to perform as required hereunder or violates any provision
of the Contract Documents.
8.0 PUBLIC HEALTH AND SAFETY
8.1 PROTECTION OF PERSONS AND PROPERTY
The Contractor shall submit, for the City's approval, a projeet safety and security plan which
describes the Contractor's plans and procedures to protect the safety and property of property
owners, residents, and passers-by. The plan shall describe measures and precautions to be
taken during working hours and non-working hours.
23
A. Safety_ Precautions and Programq
The Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work in accordance with the U.S.
Department of Labor Occupational Safety and Health Act and the laws of the State of Florida.
This Contract requires that the Contractor and any and all subcontractors hired by the
Contractor comply with all relevant standards of the Occupational Safety and Health Act.
Failure to comply with the Act constitutes a failure to perform.
The Contractor agrees to reimburse the City for any fines and/or corn costs r sing from
penalties charged to the City for violations of OSHA committed by the Contractor or any and
all subcontractors.
B. Safetw of Persons and Property
The Contractor shall take all reasonable precautions for the safety of; and shall provide all
reasonable protection to prevent damage, injury or loss to, all employees on the Work and all
other persons who may be affected thereby; all the work materials and equipment to be
incorporated therein, whether in storage on or off the project site, under the care, custody or
control of the Contractor or any of his subcontractors; and other property on the project site or
adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and
utilities not designated for removal, relocation or replacement in the course of eonstructio~
The Contractor shall be held fully responsible for such safety and protection until final written
acceptance of the Work.
Fire hydrants on or adjacent to the Work shall be kept accessible to fire fighting equipment at
all times. Temporary provisions shall be made by the Contractor to insure the proper
functioning of all swales, gutters, sewer inlets, drainage ditches and irrigation ditches, which
shall not be obstructed except as approved by the City.
The Contractor acknowledges that, in executing the Project, it will operate machinery and
equipment that may be dangerous to the adjacent property owners and the general public. The
Contractor will be required to conduct excavations for the Project which may be bu?ardons to
person and property. The Contractor shall develop and implement a job safety and security
plan which will adequately protect all property and the general public.
8.2 TRAFFIC CONTROL
All safety precautions, traffic control, and warning devices necessary to protect the public and
workmen from hu?ards within the right-of-way shall be in strict accordance with SECTION
102, MAINTENANCE OF TRAFFIC, in the Florida Dept. of Transportation (FDOT) Std
The State of Florida Manual of Traffic Control and Safe Practices for Street and Highway
24
Construction, Maintenance and Utility Operations Specifications for Road and Bridge
Construction, latest edition, shall be used as minimum standards, as applicable.
Further, the Contractor shall carry on the Work in a manner that will cause the least possible
obstruction and interruption in traffic, and the least inconvenience to the general public and
the residents in the vicinity of the work.
8.3 ROAD CLOSURE AND DETOURS
Local traffic shall be maintained within the limits of the Project for the duration of the
construction period. Closing to through travel of more than two (2) consecutive blocks,
including the cross street intersected will not be permitted without specific author'tzation of
the City. No road or street shall be closed to the public except with the permission of the City
and proper governmental authority. When closing of roads are permitted, it shall require forty-
eight (48) hours notification to the City. Traffic detours shall be pre-approved prior to
clos'mg. "Street Closed to through Traffic" signs and "Detour" routes shall be indicated and
mainffmed by the Contractor when the job is located in a public or private street.
8.4 PROVISION OF ACCESS
Where traffic must cross open trenches, the comractor shall provide adequate ingress and
egress to dwellings, business facilities, utilities and service. Temporary provisions shall be
made by the Contractor to insure the use of sidewalks. The Contractor shall provide suitable
crossings at street intersections and driveways, and supply such aid as may be required for
pedestrians and motorists, including delivery vehicles, to safely negotiate the construction
areas.
On completion of Work within any area, the Contractor shall remove all debris, excess
materials, barricades and temporary Work leaving walkways and roads in said area clear of
obstructions.
8.5 WARNING SIGNS AND BARRICADES
The Contractor shall provide adequate signs, barricades, warning lights and flagmen, as
required, and all such other necessary precautions for the protection of the Work and the
safety of the public. All barricades and obstructions shall be protected at night by regulatory
signal lights which shall be kept in operation from sunset to sunrise. Barricades shall be of
substantial construction and shall be reflective to increase their visibifity at night. Suitable
warning signs shall be so placed and illuminated at night as to show in advance where
construction, barricades or detours exist. Unless so designated in the Bid Documents, no
d'n'ect payment for this work will be made, but the cost of providing, erecting and maimaining
such protection devices, including guards, watchmen and/or tlagmen as required shall be
considered as included and paid for in the various contract prices of the Work. Warning signs
and barricades shall be in conformance with the State of Florida, Manual of Traffic Control
and Safe Practices for Street and Highway Construction, Maintenance and Utility
Operations, latest edition.
25
The Contractor shall provide and maintain adequate barricades, construction signs, torches,
flashers, guards and flagrnen as required in pedestrian and vehicular traffic areas. Regulations
of local authorities shall be compiled with. Advance warning signs are required on all streets
where work is being conducted. Lane closures shall be signed and barricaded or coned as
indicated in aforementioned FDOT Index. Flagman may be required where traffic and length
of lane closure warrant them. Where such a plan is needed, Contractor shall submit and
obtain approval of their traffic control plan by the City.
8.6 OPEN TRENCHES
The Contractor shall fully comply with Florida Statutes and OSHA regulations with regard to
open trenebes during construction. The Contractor shall be place construction ha?ard fencing
along any open trenches during the construction work-day, and shall leave no open trenches
or excavations over-night unless properly fenced and with the specific approval of the
Engineer or the City.
8.7 PLACEMENT OF HEAVY EQUIPMENT
The Contractor shall not leave construction equipment parked in ~ont of or on a residential lot
overnight or on weekends. At the close of work each day, the equipment shall be driven to
and stored in a designated area so that the equipment will not become an "attractive nuisance"
to neighborhood children. All equipment left unattended during the course of working day,
such as during lunch hours or work breaks, shall not be left in a condition or location which
would create a safety hazard to the general public. All keys shall be removed fxom the
machines during those times.
8.8 TEMPORARY FACILITIES AND CONTROLS
The Contractor shall provide controls for sanitary facilities, environmental protection and
safety controls on site acceptable to the Florida Department of Health and Rehabilitative
Services, Department of Environmental Protection, and St. Johns River Water Management
District.
8.9 SANITARY PROVISION
The Contractor shall provide and maintain such sanitary accommodations adequate for the use
of his employees and those of his subcontractors, and as may be necessary to comply with the
requirements and regulations of the local and state departments of health.
Such facilities ~hall be made available when the first employees arrive on site of the Work,
shall be properly secluded t~om public observation, and shall be constructed and maintained
during the progress of the Work in suitable numbers and at such points and in such manner as
may he required or approved.
26
The Contractor shall maintain the sanitary facilities in a satisfactory and sanitary condition at
all times and shall enforce their use. Contractor shall rigorously prohibit the committing of
nuisances on the site of the Work, on the lands of the City or an adjacent property. The City
shall have the right to inspect such facilities at all times to deterraine whether or not they are
being properly and adequately maintained.
Following the period of necessity for such accommodations, they and all evidence affixed
thereto shall be removed.
8.10 WATER AND ELECTRIC SUPPLY
The Contractor shall make all necessary applications and arrangements, and pay all fees and
charges for water and electrical service necessary for the proper cempletion of the Project up
to the time of final acceptance. The Contractor shall provide and pay for any temporary
piping and connections.
8.11 NOISE CONTROL
The Contractor shall provide adequate protection againnt objectionable noise levels caused by
the operation of construction equipment, and shall submit a plan to the Engineer for his
review prior to initiation and implementation of the plan.
8.12 DUST CONTROL
The Contractor shall provide for adequate protection against raising objectionable dust clouds
caused by moving construction equipment, high winds or any other cause, and shall submit a
plan to the Engineer for his review prior to initiation and implementation of the plato
8.13 WATER CONTROL
The Contractor shall provide for satisfactory disposal of surplus water and shall submit a plan
to the Engineer for his review prior to initiation and implementation of the plan. Prior
approval shall be obtained from the proper authorities for the use of public or private lands or
facilities for such disposal.
8.14 POLLUTION, SILTATION AND EROSION CONTROL
The Contractor shall provide for and take sufficient precautions to prevem pollution of private
and public lands, reservoirs, ponds, rivers, streams, creeks, etc., by the disposal of surplus
materials in the forms of solids, liquids or gases including, but not limited to, fuels, oils
bitumen, calcium chloride or other harmful materials. Contractor shall conduct and schedule
Work operations so as to avoid or otherwise minimi?e pollution or siltation of streams, lakes
and reservoirs and to avoid interference with movement of migratory fish where there is a
high potential for erosion and subsequent water pollution.
27
Erosion control features shall be constructed concurrently with other work and at the earliest
practicable time.
The Contractor shall prepare a detailed description of Contractor's plan for Erosion and
Turbidity Control, including location of erosion control and turbidity control devices, marked
on a plan set as needed for clarity. The erosion and turbidity control shall meet the
requirements of the St. John's River Water Management District for control of discharge of
Total Suspended Matter, and shall prevent water and wind erosion of open excavations and
swales.
Article m - SUPERVISION AND ADMINISTRATION
9.0 ENGINEER, CITY, CONTRACTOR RELATIONS
9.1 ENGINEER'S RESPONSIBILITY AND AUTHORITY
All work done shall be subject to the construction review of the Engineer and City. Any and
all technical questions which may arise as to the quality and acceptab'dity of materials
furnished, work performed, or work to be performed, interpretation of Plans and
Specifications and alt technical questions as to the acceptable fulfillment of the Contract on
the part oftbe Contractor shall be referred to the Engineer who will resolve such questions.
9.2 ENGINEER'S DECISION
All claimq of a technical nature of the City or Contractor shall be presented to the Engineer
for resolution.
9.3 SUSPENSION OF WORK
The City shall have the authority to suspend the Work wholly or in part, for such periods as
may be deemed necessary and for whatever cause, to include but not be limited to, unsuitable
weather or such other conditions as are considered unfavorable for prosecution of the Work,
failure on the part of the Contractor to carry out the provisions of the Contract or to supply
materials meeting the requirements of the Specifications, or the action of a governmental
agency, by serving written notice of suspension to the Contractor. In the event that the
Engineer shall become aware of any condition which may be cause for suspension of the
Work, the Engineer shall mediately advise the City of such condition. The Contractor shall
not suspend operations under the provisions ofthi~ Paragraph without the City's permission.
9.4 CONSTRUCTION REVIEW OF WORK
All materials and each part or detail of the Work shall be subject at all times to construction
review by the Engineer and the City. The Engineer and the City may appoint inspectors. The
Contractor will be held strictly to the true intent of the Specifications in regard to quality of
mater'mls, workmanship, and the diligent execution of the Contract. Such construction review
28
may include mill, plant, or shop inspection, and any material ftmaished under the
Specifications is subject to such inspection. The Engineer and the City shall be allowed
access to all parts of the Work and shall be furnished with such information and assistance by
the Contractor as is required to make a complete and detailed review. The City shall not be
responsible for the acts or omissions of the Contractor.
9.5 FIELD TESTS AND PRELIMINARY OPERATION
The Contractor shall perform the work of placing in operation all equipment installed under
this Contract, except as specifically noted hereinafter.
The Contractor shall make adjustments necessary for proper operatiop~
The Contractor shall provide construction labor required for preliminary operation of the
equipment installed under this Contract.
The Contractor shall notify the City when work is considered to he complete, in operating
condition, and ready for inspection and tests. Further inspection requirements may he
designated in the Technical Specifications.
The City will conduct tests it deems necessary to determine if the Work functions properly.
Arrangements for testing laboratory services will be made by the City. Payment for testing to
show compliance with specified requirements will be paid for by the City. The cost of
retesting when materials and workmanship fail to meet specified requirements will be
deducted from moneys due the Contractor.
9.6 EXAMINATION OF COMPLETED WORK
The City may request an examination of completed work of the Contractor at any time before
acceptance by the City of the Work and shall remove or uncover such portions of the finished
work as may he directed. After examination, the Contractor shall restore said portions of the
Work to the standard required by the Specifications. Should the work thus exposed or
examined prove acceptable, the uncovering or removing and the replacing of the covering or
making good of the parts removed shall be paid for as extra work, but should the work so
exposed or examined prove unacceptable, the uncovering, removing and replacing shall be at
the Contractor's expense.
9.7 CONTRACTOR'S SUPERINTENDENT
A qualffied superintendent, who is acceptable to the City, shall be maintained on the project
and give sufficient supervision to the Work until its completion. The superintendent shall
have full authority to act on behalf of the Contractor, and all communications given to the
superintendent shall be considered given to the Contractor. In general, such communications
shall he confirmed in writing and always upon written request from the Contractor.
29
9.8 CITY'S RIGHT TO CORRECT DEFICIENCIES
Upon failure of the contractor to perform the work in accordance with the Contract
Documents, including any requirements with respect to the Schedule of Completion, and after
five (5) days written notice to the Contractor, the City may, without prejudice to any other
remedy he may have, correct such deficiencies. The Contractor shall be charged all costs
incun'ed to correct deficiencies.
9.9 CITY'S RIGHT TO TERMINATE CONTRACT AND COMPLETE WORK
In the event of any default by the Contractor, the City shall have the right to immediately
terminate the Contract upon issuance ofwrkten notice of termination to the Contractor stating
the cause for such action. This Agreement may be terminated by the City without cause
provided at least thirty (30) days written notice of such termination shall be given to the
Contractor. In the event of termination, the City may take possession of the Work and of an
materials, tools and equipment thereon and may finish the Work by whatever method and
means it may select.
It shall be considered a default by the Contractor whenever he shall:
(a) Declare bankruptcy, become insolvent or assign his assets for the benefit of his
creditors.
(b) Disregard or violate the provisions of the Contract Documents or City's written
instructions, or fail to prosecute the Work according to the agreed schedule of completion
including extensions thereof.
(c) Fail to provide a qualified superintendent, competent workmen or
subcontractors, or proper materials, or fail to make prompt payment therefore.
9.10 RIGHTS OF VARIOUS 1NTEREST
Wherever work being done by the City's forces or by other contractors is contiguous to work
covered by the Contract, the respective rig~tts of the various interests involved shall be
established by the City, to secure the completion of the various portions of the Work in
general harmony.
9.11 SEPARATE CONTRACTS
The City may let other contracts in connection with the Work of the Contractor. The
Contractor shall cooperate with other Contractors with regard to storage of materials and
execution of their work. It shall be the Contractor's responsibility to inspect all work by other
contractors affecting his work and to report to the City any irregularities which will not permit
him to complete his work in a satisfactory manner. His failure to notify the City of such
irregularities shall indicate the work of other contractors has been satisfactorily completed to
receive his work. It shall be the respons~llity oftbe Contractor to inspect the completed work
in place and report to the Engineer immediately any difference between completed work by
others and the Plans.
30
9.12 SUBCONTRACTS AND PURCHASE ORDERS
Prior to signing the Contract or at the time specified by the City, the Contractor shall submit
in writing to the City the names of the subcontractor proposed for the Work. Subcontractor
may not be changed except at the request or with the approval of the City. The Comractor is
responsible to the City for the acts and omissions of his subcontractors and their direct or
indirect employees, to the same extent as he is responsible for the acts and omissions of his
employees. The Contract Documents shall not be construed as creating a contractual relation
between any subcontractors and the City. The Contractor shall bind every subcontractor by
the terms of the Contract Documents.
For convenience of reference and facilitate the letting of contracts and subcontracts, the
Specifications are separated into title sections. Such separations shall not, however, operate to
make the Engineer or City an arbiter to establish limits to the contracts between the
Contractor and subcontractors.
9.13 WORK DURING AN EMERGENCY
The Comractor shall perform any work and shall furnish and install materials and equipment
necessary during an emergency endangering life or property. In all cases, he shall notify the
Engineer and City of the emergency as soon as practicable, but he shall not wait for
instructions before proceeding to properly protect both life and property.
9.14 ORAL AGREEMENTS
No oral order, objection, clakn or notice by any party to the others shall affect or modify any
of the terms or obligations contained in any of the Contract Documents, and none of the
provisions of the Contract Documents shall be held to be waived or modified by reason of any
act whatsoever, other than by a definitely agreed waiver or modification thereof in writing,
and no evidence shall be introduced in any proceeding of any other waiver or modification.
9.15 NIGHT, SATURDAY AND/OR SUNDAY WORK
No night or Saturday and Sunday work will be permitted, except in ease of emergency, or
with prior approval from City, and then only to such extent as is absolutely necessary to
protect life or property. This clause shall not pertain to crews organized to perform restoration
work which needs no verifying inspection, maintenance work on equipment, or to operate and
maintain special equipment such as dewatering pumps which may be required to work 24
hours per day. All such night, Saturday and/or Sunday work must be authorized by the City.
9.16 UNAUTHORIZED WORK
Work done without lines and grades having been established, work done without proper
inspection, or any changes made or extra work done without written authority will be done at
the Contractor's risk and will be considered unauthorized, and, at the option of the City, may
not be measured and paid for.
31
9.17 USE OF COMPLETED PORTIONS OF THE WORK
The City shall have the right to use, occupy, or place into operation any portion of the Work
that has been completed sufficiently to permit safe use, occupancy, or operation, as
determined by the Engineer. If such use, occupancy, or operation increases the cost of or
delays the Work, the Contractor shall be entitled to extra compensation, or an extension of
time, or both, as determined by the Engineer. However, if Contractor has failed to complete
the Work in accordance with the time requirements of the Agreement, no compensation
(including set-offs to liquidated damages) shall be allowed for such use or occupancy.
9.18 CONTRACTOR'S RESPONSIBILITY FOR WORK
Until acceptance of the Work by the City, it shall be under the charge and care of the
Contractor, and he shall take every necessary precaution against injury or damage to the Work
by the action of the elements or from any other cause whatsoever, whether arising fi.om the
execution or from the non-execution of the Work. The Contractor shall rebuild, repair, restore
and make good, without additional compensation, all injury or damage to any portion of the
Work occasioned by any cause, other than the sole and active negligence of the City, before
its completion and acceptance.
10.0 MEASUREMENT AND PAYMENT
10.1 COMPENSATION
The City will pay the Contractor the LUMP SUM amount of $ 48,468.52 for
performance of the Work hereunder.
10.2 DETAILED BREAKDOWN OF CONTRACT
Except in cases where unit prices form the basis for payment under the Contract, the
Contractor shall submit a complete breakdown of the contract amount showing the value
assigned to each part of the Work, including an allowance for profit and overhead within ten
(10) days of the execution of the Contract by the parties. Upon approval of the breakdown of
the contract amount by the Engineer and the City, it shall be used as the basis for all requests
for payment.
10.2 REQUEST FOR PAYMENT
The Contractor may submit to the City not more than once each month a request for payment
for work completed. Where applicable, the Contractor may choose to submit a request for
payment at the substantial completion of each work order. The City may elect to provide its
own form for the Contractor to submit progress payment requests. The standard form
provided by the City, or a form presented by the Contractor having received prior approval
from the City, can be used for the submittal of a progress payment.
32
The Contractor shall furnish the Engineer and the City all reasonable facilities required for
obtaining the necessary information relative to the progress and execution of the Work. In
addition to each month's invoice, an updated project schedule shall be submitted.
Each request for payment shall be computed from the work completed to date on all items
listed in the detailed breakdown of the contract amount less previous payments and hack
charges. Progress payments on account of Unit Price Work will be based on the number of
units completed at the time the payment request was dated by the Contractor. If payment is
requested on the basis of material~ and equipment not incorporated in the project but
delivered and suitably stored at the site or at another location agreed to in writing, the
payment request shall also be accompanied by a bill of sale, invoice or other documentation
warranty that the City has received the materials and equipment free and clear of all liens,
charges, security interests and encumbrances, all of which shall be satisfactory to the City. No
payments shall be made for materials stored on site without approval of the City.
An amount of 10% of each monthly pay request shall be retained until final completion and
written acceptance of the Work by the City. Payment of the retalnage shall be included in the
Contractor's final pay request in accordance with Paragraph 10.14. Any deviation in the
release or partial release of the 10% retalnage shall be at the sole discretion of the City, but in
no case earlier than completion of the Engineer's "punch list inspection".
Any request for payment shall be accompanied by claim releases for work done or materials
furnished in accordance with Paragraph 10.13.
Prior to submission of any request for payment by the Contractor, the Engineer shall review
the request for payment to determine the following:
(a) That the work covered by the request for payment has been completed in
accordance with the intent of the Plans and Specifications.
(b) That the quantities of work have been completed as stated in the request for
payment, whether for a unit price contract or for payment on a lump-sum contract.
10.3 CITY'S ACTION ON A REQUEST FOR PAYMENT
Within thirty (30) days from the date of receipt of a request for payment the City shall do one
of the following:
(a) Approve and pay the request for payment as submitted.
(b)
Approve and pay such other amount of the request for payment in accordance
with Paragraph 10.4 as the City shall decide is due the Contractor, informing
the Contractor in writing oftbe reasons for paying the amended amount.
(c)
Disapprove the request for payment in accordance with Paragraph 10.4
informing the Contractor in writing of the reasons for withholding payment.
33
10.4 CITY'S RIGHT TO WITHHOLD PAYMENT OF A REQUEST FOR PAYMENT
The City may withhold payment in whole or in part on a request for payment to the extent
necessary for any of the following reasons:
(a)
Work not performed but included in the request for payment, or the contract
Price has been reduced by written change order.
(b)
Work covered by the request for payment which is not in accordance with the
Plans, Specifications and generally accepted construction practices, including
if, in the opinion of the City, there is sufficient evidence that the Work has not
been satisfactorily completed, or based upon tests and/or inspections the work
is defective or has been damaged requiring correction or replacement.
(c)
In the event ora filing ora claim or lien, or information received by City ora
potential filing of a claim or lien against the Contractor or City.
(d)
Failure of the Contractor to make payments to subcontractors, material
suppliers or labor.
(e) Damage to another contractor.
(t)
The City has had to correct a defect in the Work, or there are other items
entitling the City to a set-off against the mount recommended.
(g) Default of any of the provisions of the Contract Documents.
10.5 PAYMENT FOR UNCORRECTED WORK
Should the City direct, in writing, the Contractor not to correct work that has been damaged or
that was not performed in accordance with the Contract Documents, an equitable deduction
bom the contract amount shall be made to compensate the City for the uncorrected work.
10.6 PAYMENT FOR REJECTED WORK AND MATERIALS
The removal of work and materials rejected under Paragraph 5.3 and the re-execution of work
by the Contractor shall be at the expense of the Contractor and the Contractor shall pay the
cost of replacing the destroyed or damaged work of other contractors by the removal of the
rejected work or materials and the subsequent re-execution of that work. In the event that City
incurs expenses related thereto, Contractor shall pay for the same within thirty (30) days after
written notice to pay is given by the City. If the Contractor does not pay the expenses of such
removal, after ten (10) days written notice being given by the City of its intent to sell the
materials, the City may sell the materials and shall pay to the Contractor the net proceeds
therefi:om after deducting all the costs and expenses that are incurred by the City. If the
proceeds do not cover the expenses incurred by the City, such additional amounts may he set-
off against any payments due Contractor.
34
10.7 CHANGES IN THE WORK
A. Change Orders
If conditions require a change in the scope of work or additional work varying from the
original Plans or Spec'rfications, such change shall be effected by the Contractor when the
City issues a written Change Order. The Change Order shall set forth in complete detail the
nature of the change, the change in the compensation to be paid the Contractor and whether it
is an addition or a reduction of the original total contract cost. Should additional or
supplemental drawings be required, they will be furnished by the Engineer.
Compensation to be paid to the Contractor for accomplishing the work of a Change Order
shall be established in one of the following ways:
(a) By lump sum proposed by the Contractor and accepted by the City.
Co) By unit prices established and agreed to.
(c) By unit prices established for additional ldnds of work.
(d) By other methods as may be mutually agreed upon.
(e)
By force account wherein the Contractor provides the labor and materials at
Contractor's direct cost plus 15% for overhead and profit. When the force
account method is used, the Contractor shall provide full and complete records
of all costs for review by the City.
Claims
Claims arising from changes or revisions made by the Contractor at the City's request shall be
presented to the City before work starts on the changes or revisions. If the Contractor deems
that extra compensation is due for work not covered herein, or in Supplememal Agreement,
the Contractor shall notif~ the City in writing of its intention to make claim for extra
compensation before work begins on wkich the claim is based. If such notification is not
given and the City is not afforded by the Contractor a method acceptable to the City for
keeping strict account of actual cost, then the Contractor hereby waives its request for such
extra compensation. The City is not obligated to pay the Contractor if the City is not notified
as described above. The Contractor may refuse to perform addilional work requested by the
City until an appropriate agreement is executed by the parties. Such notice by the Contractor
and the fact that the City has kept account of the costs as aforesaid shall not in any way be
construed as proving the validity of the clalr~
C. Differk~g Site Conditions
Contractor shall promptly, and before such conditions are disturbed, notify C'rty in writing of.'
1. Subsurface or latent physical conditions at the site differing materially from
those indicated in this Agreement and its subparts; or
35
2. Unknown physical conditions at the site, of an unusual nature, differing
materially from those ordinarily encountered and generally recognized as inhering in the work
of the character provided for in this Agreement.
If City finds that conditions materially differ and will cause an increase or decrease in the
Contractor's cost or the time required to perform any part of the work under this Agreement,
whether or not changed as a result of such conditions, the City shall approve an equitable
adjustment and will according modify the Agreement in writing. Any claim for an equitable
adjustment of the contract price based upon differing site conditions is specifically
conditioned upon prior written approval of the additional compensation by City.
No claim of the Contractor under this clause shall be allowed unless the Contractor has given
the notice required hereirL Further, no claim by the Contractor for an equitable adjustment
shall be allowed if asserted after final payment under this Agreement.
10.8 CANCELED ITEMS OF WORK
The City shall have the right to cancel those portions of the contract relating to the
construction of any item provided therein. Such cancellation, when ordered by the City in
writing, shall entitle the Contractor to the payment of a fair and equitable amount covering all
costs incurred by him pertaining to the canceled items before the date of cancellation or
suspension of the Work. The Contractor shall be allowed a profit percentage on the materials
used end on construction work actually done, at the same rates as provided for "Changes in
the Work", but no allowance will be made for anticipated profits. Acceptable materials
ordered by the Contractor or delivered on the site before the date of such cancellation or
suspension shall be purchased from the Contractor by the City at actual cost and shall
thereupon become the property of the City.
10.9 PAYMENT FOR WORK SUSPENDED BY THE CITY
If the Work or any part thereof shall be suspended by the City as provided in Paragraph 9.3,
the Contractor will then be entitled to payment for all work done except as provided in
Paragraph 10.4.
10.10 PAYMENT FOR WORK BY THE CITY
The cost of the work performed by the City removing construction materials, equipment, tools
and supplies in accordance with Paragraph 5.7 and in correcting deficiencies in accordance
with Paragraph 9.8 shall be paid by the Contractor.
10.11 PAYMENT FOR WORK BY CITY FOLLOWING TERMINATION OF
CONTRACT
A. Termination by City for Cause
Upon termination of the contract by the City for cause, including abandoment or termination
by Contractor, the City may enter imo an agreement with others for the completion of the
36
Work under this Agreement and the Contractor shall be held harmless for the work of others.
No further payments shall be due the Contractor until the Work is completed and accepted by
the City. If the unpaid balance of the contract amount shall exceed the cost of completing the
Work including all overhead costs, Contractor shall be paid up to the amount of the excess
balance on a quantum memit basis for the work done prior to termination. If the cost of
completing the Work shall exceed the unpaid balance, the Contractor or its Surety shall pay
the difference to the City. The cost incurred by the City as herein provided shall include the
cost of the replacement contractor and other expenses incurred by the City through the
Contractor's default. In either event, all work done, tracings, plang, spec'rfications, maps,
computer programs and data prepared by the Contractor under this Agreement shall be
considered property of the City.
B. Termination by City Without Cause
In the event the City without cause abandons, terminates or suspends this Agreement, the
Contractor shall be compensated for services rendered up to the time of such termination on a
quantum meruit basis and any work done or documents generated by the Contractor shall
remain the property of the City.
10.12 TERMINATION OF CONTRACTOR'S RESPONSIBILITY
The Contract will be considered complete when all work has been finished, the final
construction review is made by the Engineer, and the project accepted in writing by the City.
10.13 RELEASE OF CLAIMS (INTERIM/FINAL)
The Contractor shall deliver, with each request for payment, a completed Affidavit and
Release of Claim on a form supplied by the City. Also, t~om each supplier or subcontractor
who has notified the City of his right to file a Claim (Notice to City) or who is listed in the
Contractor's Affidavit and Release of Claim as an unpaid, potential Claimant, a Claimant's
Sworn Statement of Account, executed by the supplier or subcontractor, must be attached to
each request for payment.
If the completed forms are not supplied with the request for payment, the City will notify
Contractor of the outstanding claims of record and, if said completed form(s) are not supplied
within thirty (30) days, the City shall make joint payments to the Contractor and outstanding
claimants.
10.14 ACCEPTANCE AND FINAL PAYMENT
When it is detemained, as a result of a joint inspection of the Work by the Contractor, City,
and Engineer that the Work has been completed in accordance with the terms of the Contract
Documents, the Engineer shall certify completion of the Work to the City. At that tune, the
Contractor may submit the Contractor's final request for payment. The Contractor's final
request for payment shall be the contract amount plus all approved written additions less all
approved written deductions and less previous payrne~ts made. As a condition for Final
37
payment, a Contractor's Final Affidavit must be received by the City along with his Final
Payment Request and any as-built drawings which may be required. The Contractor shall
furnish full and final releases of Claim for labor, materials and equipment incurred in
connection with the Work, following which the City will release the Contractor except as to
the conditions of the performance bond, any legal rights of the City, required guarantees and
satisfaction of all warranty work, and shall authorize payment of the Contractor's final request
for payment.
10.15 SATISFACTION OF WARRANTY WORK AFTER FINAL PAYMENT
The making of the final payment by the City to the Contractor shall not relieve the Contractor
of responsibility for faulty materials or workmanship. The City shall promptly give notice of
faulty materials and workmanship and the Contractor shall promptly replace any such defects
discovered within one (1) year from the date of final written acceptance of the Work by the
City.
11.0 PIJBLIC CONTRACT REQIJIREMENTS
11.1 COVENANT AGAINST CONTINGENT FEES
The Contractor warrants that he has not employed or retained any company or person, other
than a bona fide employee working solely for the Contractor, to solicit or secure this
Agreement and that he has not paid or agreed to pay any person, company, corporation,
individual or firm, other than a bona fide employee working solely for the Contractor, any fee,
commission, percentage, girl or any other consideration contingent upon or resulting from the
award or making of this Agreement. For the breach or violation of th/s paragraph, the City
shall have the right to terminate the Agreement without liability and, at its discretion, deduct
from the Agreement price, or otherwise recover, the full mount of such fee, cmsmdssion,
percentage, gffi or consideration.
11.2 INTEREST OF MEMBERS OF CITY AND OTHERS
No officers, members or employees of the City and no member of its governing body, and no
other public official of the governing body of the locality or localities in which services for
the facilities are situated or carried out, who exercises any functions or responsibilities in the
review or approval of the undertaking or carrying out of this project, shall participate in any
decision relating to thi~ Agreement which affects his personal interest, or have any personal or
pecuniary interest, direct or indirect, in this Agreement or the proceeds thereof.
11.3 CERTIFICATION OF RESTRICTIONS ON LOBBYING
The Contractor agrees that no Federal appropriated funds have been paid or will be paid by or
on behalf of the Contractor to any person for influencing or attempting to influence any
officer or employee of any Federal agency, a member of Congress, an officer or employee of
Congress or an employee of a m~aber of Congress in connection with the awarding of any
Federal contract, the making of any Federal Grant, the making of any Federal loan, the
38
entering into of any cooperative agreement and the extension, continuation, renewal,
amendment or modification of any Federal contract, Grant, loan or cooperative agreement.
Further, Contractor shall fully comply with the Federal Lobbying Disclosure Act of 1995.
If any funds other than Federal appropriated funds have been paid by the Contractor to any
person for influencing or attempting to influence an officer or employee of any Federal
agency, a member of Congress, an officer or employee of Congress or an employee of a
member of Congress in connection with any Agreement, the undersigned shall complete and
submit the attached Standard Form-LLL "Disclosure Form to Report Lobbying" in
accordance with its instructions. Any and all subcontracts executed by Contractor for the
Work hereunder shall likewise certify and disclose accordingly
11.4 INTEREST OF CONTRACTOR
The Contractor covenants that he presently has no interest and shall not acquire any interest,
direct or indirect, which shall conflict in any manner or degree with the performance of
services required to be performed under this Agreement. The Contractor further covenants
that in the performance of this Agreement, no person having any such interest shall be
employed. The Contractor shall not undertake any professional work which conflicts with his
duties as the City's Contractor without the prior written consent of the City during the term of
this Agreement. Any work where the Contractor can reasonably anticipate that it may be
called to testify as a witness against the City in any litigation or administrative proceeding
will constitute a conflict of interest under this Agreement.
11.5 PUBLIC ENTITY CRIMES
The Contractor shall file the attached sworn statement which is entitled PUBLIC ENTITY
CRIMES, stating whether a person or affiliate as defined in Section 287.133 (1) Florida
Statutes, has been convicted of a public entity crime subsequent to July 1, 1989, in accordance
with the provisions of said statute.
11.6 DRUG-FREE WORKPLACE
The Agreement documents also consist of the "Drug-Free Workplace Form" which is in
accordance with Florida Statute 287.089 and must be signed and instituted.
11.7 COMPLIANCE WITH LAWS
Contractor shall comply with all applicable federal laws that in any way regulate or impact the
Work, including, but not limited to, The Clean Air Act (42 USC §7506(c)), The Endangered
Species Act (16 USC §1531, et seq.), Executive Order No. 11593, Executive Order No.
11988, Executive Order No. 11990, The Fish and Wildlife Coordination Act (PL 85-624), The
Safe Water Drinking Act Section 1424(e) (PL 93-523, as amended), The Wild and Scenic
Rivers Act (PL 90-542, as amended), The Demonstration Cities and Metropolitan
Development Act of 1966 (PL 89-754), Section 306 of The Clean Air Act, Section 508 of The
Clean Water Act, Executive Order No. 11738, The Civil Rights Act of 1964 (PL 88-352), The
39
Age Discrimination Act (PL 94-135), Section 13 of The Federal Water Pollution Control Act
(PL 92-500), Executive Order No. 11246, Executive Order No. 11625, Executive Order No.
12138, Executive Order No. 12549, The Davis Bacon Act (40 USC §276), the Occupational
Safety and Health Act and applicable regulations, and the Americans with Disabilkies Act
(PL 101-336).
11.8 INSLrRANCE
The Contractor agrees to carry insurance, of/he types and subject to the limits as set forth
below and maintain said insurance during the life of this agreement:
(a) Workers' Compensation - Contractor shall purchase workers' compensation
insurance as required by law.
(b) Commercial General Liab'fliw - Contractor shall purchase Commercial General
Liability insurance with a combined single limit of at least $1,000,000.
(c) Commercial Auto Liability - Contractor shall purchase Commercial Auto
Liab'flity insurance with a combined single limit of at least $1,000,000.
Further, Contractor shall maintain such insurance as is reasonably required to satisbj its
obligations under Paragraph 9.18 for the Work paid for by the City but not yet accepted.
The insurance company selected shall be A+ or better per the Best's Key Rating Guide. The
Contractor and the insurance company(s) shall agree to furnish the City thirty (30) days
written notice of their intent to cancel or terminate said insurance. It is the full responsibility
of the contractor to insure that all sub-contractors have full insurance coverage as stated
above.
The Contractor shall not commence the Work under this contract until he has obtained all the
insurance required under this paragraph and certificates of such insurance have been
submitted to the City, nor shall the Contractor allow any subcontractor to commence work on
his subcontract until all insurance required has been so obtained and approved by the City.
The Contractor shall carry and maintain until acceptance of the Work, insurance as specified
herein and in such form as shall protect him and any subcontractor performing work under
this Comract, or the City, from all claims and liability for damages for bodily injury,
including accidental death, under tlxis Contract, whether by himself or by any subcontractor or
by any one directly or indirectly employed by either ofther~
The Contractor shall furnish to the City certificates of insurance in duplicate showing proof of
insurance, naming the City as an additional insured party, prior to the start of construction as
provided in the Contract.
11.9 BOND
Bonds are not required under this Agreement.
11.10 PERMITS
All City and St. John's River Water Management District permits and other permits necessary
for the prosecution of the Work shall be secured by the City, except for Contractor's licenses
4O
and registrations. Contractor shall secure a building permit if required by the City's Building
Official.
11.11 LAWS TO BE OBSERVED
The Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, permit requirements and regulations in any manner affecting the conduct of the
Work, and all such orders and decrees as enacted by bodies or tribunals having any
jurisdiction or authority over the Work, and shall indemnify and save harmless the City and
Engineer against any expense, claim or liab'flity arising from, or based on, the violation of any
such law, ordinance, regulation, permit requirements, order or decree, whether by himself or
his employees. The failure of the Contractor to adhere to any known law or regulation
pertaining to furnishing services under this Agreement shall constitute a material breach of
this Agreement. The Contractor acknowledges that this requirement includes compliance with
all federal, state and local health and safety rules and regulations.
The Contractor shall keep himself fully informed of all existing and pending state and
national laws and municipal ordinances and regulations in any manner affecting those
engaged or employed in the Work, or in any way affecting the conduct of tribunals having any
jurisdiction or authority over the same. If any discrepancy or inconsistency is discovered in
the Plans, Specifications, or Contract for this work in relation to any such law, ordinance,
regulations, order or decree, he shall forthwith report the same to the Engineer and City in
writing. He shall at all times himself observe and comply with and cause all his agents,
subcontractors and employees to observe and comply with decrees; and shall protect and
indemnify the City and Engineer, their officers, employees and agents against any expense,
claim or liability arising from or based upon violation of any such law, ordinance, regulations,
orders or decree, whether by himself or his employees.
All building construction work alterations, repairs or mechanical installations and appliances
connected therewith shall comply with the applicable building rules and regulations,
restrictions and reservations of record, local ordinances and such other statutory provisions
pertaining to this class of work.
11.12 DEBARMENT AND SUSPENSION
In accordance with Executive Order 12549, Debarment and Suspension (40 CFR 32), the
Contractor shall agree and certify that neither it, nor its principals, is presently debarred,
suspended, proposed for debarment, declared ineligible, or voluntarily excluded from
participation in this transaction by any Federal department or agency; and that the Contractor
shall not knowingly enter into any lower tier contract, or other covered transaction, with a
person who is similarly debarred or suspended from participating in this covered transaction
without prior written approval of the City.
Upon execution of this Agreement by the Contractor, the Contractor shall complete sign and
return a copy of the form entitled "Certification Regardi~4g Debarments, Suspension,
Ineligibility and Voluntary Exclusion - Lower Tier Federally Funded Transactions" attached
41
hereto, and shall include the language of this Paragraph and the attached form in all
subcontracts executed to support the Contractor's work under this Agreemem.
12.0 MISCELLANEOUS
12.1 ADDRESSES FORNOTICES
All notices given under or in connection with any of the Contract Documents shall be
delivered in person or by telegraph or registered or certified mail to the parties at the address
as either party may by notice designate.
12.2 WRITTEN NOTICE
Written notice shall be considered as served when delivered to the designated representative
of the Contractor and receipt acknowledged or sent by registered mail to the individual, firm,
or corporation to the business address stated in Bid Proposal
Change of Address: It shall be the duty of each party to advise the other parties to the
Contract as to any changes in his business address until completion of the Contract.
12.3 TAXES
Contractor shall pay all sales or other taxes of any type which may be incurred in connection
with the Work hereunder, and shall reimburse the City for any such taxes paid by the City.
12.4 TIME IS OF VITAL IMPORTANCE
It is agreed and understood that time is of vital importance with respect to the completion date
for tbe Work and all other provisions of the Contract Documents.
12.5 NO WAIVER OF LEGAL RIGHTS
Neither the payment for, nor acceptance of the whole or any part of the Work by the City or
representatives of the City, nor any extension of time, nor the withholding of payments, nor
any possession taken by the City, nor the termination of employment of the Contractor shall
operate as a waiver of any portion of the Contract or any power therein reserved or any right
therein reserved or any right therein provided, nor shall the waiver by the City of any of the
Contractor's obligations or duties under this Agreement constitute a waiver of any other
obligation or duty of the Contractor under this Agreement.
12.6 RIGHT TO WORK PRODUCT
No reports, data, programs or other material produced in whole or in part under this
Agreement shall be subject to copyright by the Contractor, in the United States or in any other
42
country. The City or its assigns shall have the unrestricted authority to publish, disclose,
distribute and otherwise use, in whole or in part, any reports, data, programs or other material
prepared under this Agreement. All tracings, plans, specifications, maps, computer programs
and data prepared or obtained under this Agreement shall remain the property of the City.
Any use of any plans and specifications by the City except the use reasonably contemplated
by the City at the time the City entered this Agreemem will be at the City's risk and
Contractor, its officers, directors and employees, will be held harmless from such use.
IN WITNESS WlCtEREOF, the parties hereto have caused these presents to be
executed, the day and year first above written.
S~ A. U ' ,~CMC
City Cler~j~i6
(SE L)
Name: Terrence R. Moore
Title: City Manager
Approved as to Form and Content for:
e by the City of Sebastian Only
Ridh Stringer, City 4,~tomey
.................... CONTRACTOR
Signed, sealed and delivered
in the presence off conhn~cto
NAME: By:
Name:
NAME: Title:
43
Addendum to contract
1) The price noted in section 10.1 of con~act is based on the use of Nelson heads and
nozzles.
2) Price does not include a remote unit.
3) Price does not include union valves.
In wi_mess whereof, the patties hereto have cuased these presents to be executed, the
day and year first above written.
A'I TIsST:
~A. ~o/CMC
City Clerk
Name: Terrence 1L Moore
Title: City Managea
(SEAL)
Approved as to Form a~d Content for.
%City of
Rich Stringer, City A~mey
.CONTRACTOR
Signed,sealed, :md delivezed
in the presence of.'
Contractor
Name:
By:
Tide: